lhcb and its upgrade - reducing further the ux85/1 beam pipe diameter?
DESCRIPTION
LHCb and its upgrade - Reducing further the UX85/1 beam pipe diameter?. A major upgrade of LHCb is scheduled for 2018 (LS2) to run at up to 2*10 33 cm -2 s -1 with a data taking at 40MHz. On the detector side, mainly the tracking devices will be replaced. - PowerPoint PPT PresentationTRANSCRIPT
LHCb and its upgrade - Reducing further the UX85/1 beam pipe diameter?
A major upgrade of LHCb is scheduled for 2018 (LS2) to run at up to 2*1033 cm-2s-1 with a data taking at 40MHz. On the detector side, mainly the tracking devices will be replaced.
This gives the possibility to think about increasing the acceptance region for the tracking station in front of the magnet - closer to the beam line.
-> will improve considerably the tracking between the VeLo and the Tracking Station after the magnet, having another tracking segment between both!
1 2 3 4
54 mm Ø50 mm Ø
60 mm Ø
381 mm Ø262 mm Ø
25 mrad10 mrad
142 mm Ø
1940 mm 3648 mm
420 mm 145 mm
6050 mm
1290 mm
5330 mm
Trigger Turicensis (TT)
Two track segment in the tracking after the magnetNo track element in the TT -> not possible to link the segment with the one in the VELO!
UX85/1 before welding to the VELO exit window.
TT
UX85/1
RICH 1Magnet
Is there any possibility reducing the beam pipe diameter close to the TT station?
Although …• already down at 50mm in diameter• close to on of the LHC injection• HL-LHC• …• Aperture for LHCb were presented 3/2/2009 (M.
Giovannozzi: “These values might be too pessimistic!”)