Thunderstorm activity and lightning guard problem of the overhead transmission lines
3 Copyright © 2010 Streamer Inc. All rights reserved.
LIGHTNING PROTECTION SOLUTIONS
Only in Russia because of dangerous weather environment economic waste figures up annually around 60 billions of rubles, as well as electricity supply network complex damage – nearly 5 billions of rubles.
William M. Daley, US Secretary of Commerce:«Weather is a big business. It’s not only the environment – it’s an integer economical indicator. Weather influences upon a seventh part of the economy, $ 1 trillion per year.»
Quantity of dangerous weather conditions in Russia
Lightning guard problem of the overhead transmission lines
4 Copyright © 2010 Streamer Inc. All rights reserved.
LIGHTNING PROTECTION SOLUTIONS
Lightning overvoltage
Safe lightning protection
Smoothly
Bad lightning protection or its deficiency
Power setback
Electricity supply system breakdown
Necessity of the remedial work
Production downtime or
customer curtailment
Material losses
Bodily injury
Possible harm to nature
According to the LLC “Lukoil-West Siberia” data the enterprise received less than one is due more than
350.000 tonnes of oil for 5 years because of lightning outages
History of the company
5 Copyright © 2010 Streamer Inc. All rights reserved.
LIGHTNING PROTECTION SOLUTIONS
1995 – foundation of the research center on lightning protection of transmission lines under the auspices of Saint-Petersburg State Polytechnic University; developing of the new technology concerning lightning overvoltage protection; receiving the first patent for an invention
1996 – flotation of company; first supplies of the product for OAO “Lenenergo”
1999 – industrial production was set up; first sales
2000 – the product was recommended by Technical Committee of RAO “UES of Russia “ for serial production and implementation
2002 – first GOST Russia Certificate of Conformity was gained
2003 – distributor footprint development
2004 – the product was recommended for installation by LTD “Rosep” (“Methodological instructive regulations for lightning protection”); beginning of the dynamic sales
2005 – the product was considered as top-priority for installation on the transmission lines of the OAO “Russian Railways”
2006 – start of the collaboration with oil and gas complex companies
2008 – new revolutionary system was developed, combined with both insulator and arrester properties
2009 – access to cross-border market; opening the branch in Moscow; winning the competition, guided by the Fund for the Promotion of the Development of Small Businesses in the Sphere of Science and Technology; investiture of the best innovative enterprise of St. Petersburg in the domain of energy saving; signing a contract on strategic partnership with OAO “FGC UES”
Structure of the company
6 Copyright © 2010 Streamer Inc. All rights reserved.
LIGHTNING PROTECTION SOLUTIONS
We pay great attention to the quality of the product: departments that control manufacturing process - research, technical, quality and production
Managers of commerce department have distinct specialization and need-satisfaction approach
It was formed Board of management, consisted of leading researches (the best teaching staff of the leading high schools of Russian Federation as well as members of international electro-technical organizations) and prosperous businessmen
Partners of the company
7 Copyright © 2010 Streamer Inc. All rights reserved.
LIGHTNING GUARD OF POWER GRIDS
Electric grid companiesFGS UES (Federal Grid Company of Unified Energy System);IDGC Holding (Interregional Distribution Grid Companies Holding)
Industrial sector
Gazprom
Lukoil
ТNК-ВР
Russian Railways
International partners
ENSTO
Sicam
Niled
High educational institutions, engineering offices
Up to date there are more than 250 000 units of the product installed in the electric power systems
8 Copyright © 2010 Streamer Inc. All rights reserved.
LIGHTNING GUARD OF POWER GRIDS
International fame and patents
9 Copyright © 2010 Streamer Inc. All rights reserved.
LIGHTNING GUARD OF POWER GRIDS
Research advisor of the company – Georgy V. Podporkin, D.Sc. in engineering, professor of St. Petersburg Polytechnic University, Senior Member IEEEThe company has 16 patents. First generation technology (Long-Flashover Arresters LFA) was patented in Russia and abroad: Germany, Finland, France, Great Britain, Italy, USA.Moreover, at present moment are lodged application for patenting Second generation technology (Multi-Chamber System) in the following countries: USA, Mexico, India, China, Indonesia, Japan, Vietnam, Thailand, Korea, France, Italy, Germany, Spain, Finland, Sweden, Norway, Estonia, Latvia, Lithuania, Poland, Czech Republic, Hungary, Rumania, Bulgaria, Great Britain, Turkey, Brazil, Argentina, Australia, Republic of South Africa, Azerbaijan, Kazakhstan, Ukraine, Belorussia.Informative articles about company are publishing in the leading technical mass media both in Russia and overseas: (Energetik, Energetika, Etektrichestvo, Elektrotehnika, IEEE Transactions on Power Delivery, Proceedings International Conference on Lightning Protection (ICLP), Proceedings of Electricity Distribution International Conference (CIRED), International Symposium on Lightning Protection (SIPDA))
First generation solution: Long-Flashover Arresters
10 Copyright © 2010 Streamer Inc. All rights reserved.
LIGHTNING GUARD OF POWER GRIDS
According to the Statute Concerning engineering policy in distributing electricity supply network complexIt is necessary to install LFA on the transmission lines: - for overvoltage protection and against the cable burning on the lines with insulated conductors;- on the approach to electricity distribution plant of the substations;- for weak parts of the transmission line defending ; - in the regions with extremely high percentage of lightning outages.
Operational principle of LFA:Protection of insulators against the lightning flashoversForming of the long discharge channelDischarge channel segmentationArcing fault prevention
Key qualities of LFA:Defense against lightning overvoltagesDefense the conductors from burnouts Prevention the lines from dumpingHigh reliability: current flows OFF the device Loop-Type Long-Flashover arrester for power lines 10kV,
the most popular in Russia
11 Copyright © 2010 Streamer Inc. All rights reserved.
LIGHTNING GUARD OF POWER GRIDS
First generation solution: Long-Flashover Arresters
Comparison of different measures of reducing the quantity of insulated conductors damage
12 Copyright © 2010 Streamer Inc. All rights reserved.
LIGHTNING GUARD OF POWER GRIDS
Measure Function Cost Old line New line
Effect Maintenance
Adding shield wire Intercepting direct lightning, and reducing induced voltage
High Difficult Easy Middle No
Adding arresters To absorb the energy of lightning and limit lightning overvoltage
High Difficult Easy High Very high
Adding arresters with shield wire
To absorb the energy of lightning and limit lightning overvoltage, and reduce the fault rate of arresters
Very high Difficult Easy Very high High
Adding LFA To increase flashover path and eliminate the power frequency arcs
Low Easy Easy High Almost no
Partially strengthening insulation thickness
To increase flashover path and eliminate the power frequency arcs
High Very difficult Difficult Middle No
Adopting insulator with high CFO
To increase the impulse withstand level and reduce the lightning flashover rate
Low Невозможно
Easy Middle No
Adopting Cascaded insulation system
To decrease faults in main line by setting insulation weak location
Middle Impossible Middle High Middle
Adopting insulators with charging gaps
To make the arc burning on the electrodes and not to break down the conductor
High Difficult Easy High No
Applying new insulation conductor
To increase the arc withstand capability of covered conductor
High Impossible Easy Middle Low
Partially stripping covered line and installing cable cleat
To make the arc burning the electrodes and protecting the conductor
Low Difficult Difficult High Almost no
Second generation solution: Multi-chamber system (MCS)
13 Copyright © 2010 Streamer Inc. All rights reserved.
LIGHTNING GUARD OF POWER GRIDS
Structurally common and effective Multi-chamber arresters (MCA)Multi-chamber Insulators-arresters (MCIA) for 10-35 kV and higher.
Advantages of usage MCS instead of suspension strand:- no lightning outages;- unbending of power line exploitation;- refusal of using towers ground wire;- reducing of weight and price of towers or reducing its quantity
Advantages of Multi-chamber system have already been accepted by distribution companies, oil and gas complex companies, our foreign partners and by Russian Railway. Now these devices are installed in pilot production on the problem transmission lines: Volgogradenergo, Lukoil, TNK-BP
Second generation solution: multi-chamber system
14 Copyright © 2010 Streamer Inc. All rights reserved.
LIGHTNING GUARD OF POWER GRIDS
а) initial phase of discharge
б) final phase of discharge
1 – silicone side-face2 – electrodes3 – cameras4 – discharge channels
Second generation solution: multi-chamber system
15 Copyright © 2010 Streamer Inc. All rights reserved.
LIGHTNING GUARD OF POWER GRIDS
16 Copyright © 2010 Streamer Inc. All rights reserved.
LIGHTNING GUARD OF POWER GRIDS
Correlation of Power lines of 500 kV with surge arrester and with MCIA
Second generation solution: arresters
SA Lines with SA Lines with MCIA
Quotations of some large testimonials
17 Copyright © 2010 Streamer Inc. All rights reserved.
LIGHTNING GUARD OF POWER GRIDS
• IDGC Holding, assistant general manager – production manager P.I. Okley:«…Owing to relative simplicity and originality … proposed technology deserves support,
development and wide application.»
• Gazprom, deputy chairman of the board А.G. Ananenkov:«… Yours LFA are in operation on some energy facilities of OAO “Gazprom”, there are
some positive results of their usage.»
• Russian Railways, Electrification and electric supply department, chief engineer of the department V.V. Hananov:
«… ОАО “Russian Railways” is interested in these devices, that protect overhead line from overvoltage. Expectable buying quantity in 2009 will comprise about 100 millions of rubles.»