Page 1: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK

Lilburn, GA

July | 2013

Jill Stachura

Page 2: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

Project Location

Brown and Caldwell 2

Gwinnett County, GA:

• Population: 825,000

• Area: 437 sq. miles

• 1,300 miles storm drainage system

• 80,000 structures maintained

• Stormwater Utility income $32M/yr

Page 3: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

Watershed Improvement Program

Brown and Caldwell 3

Watershed Assessment - 1999

Watershed Protection Plan - 2000

Watershed Improvement Plans (WIPs) 2001- present

Project Implementation 2005 - present

Page 4: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

• Meet Permit Requirements (NPDES, MS4, MNGWPD, TMDLs)

• Improve and Protect Water Quality

• Improve Aquatic Habitat

• Meet Water Quality Standards/ Designated Use [303(d) listed]

• Improve Natural and Urban Environment for the public’s use

Gwinnett County Watershed Improvement Program Goals

4

Brown and Caldwell

Page 5: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

• Stream Walks

• BMP Inventory

• GIS WQ Modeling

• CIP Development

BC completed WIPs

for 60% of County

~ 300 sq. miles.

Gwinnett County: Watershed Improvement Plans 2001–2010

Brown and Caldwell 5

Page 6: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

• Camp Creek

• 7 sq. mile drainage area at project site

• Within 100 yr FEMA floodplain (Zone AE)

• City owned property

• Greenway

• 303(d) listed for fecal coliform bacteria (urban runoff)

Project Location

Brown and Caldwell 6

Page 7: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

• 900 linear feet

• 30 foot wide channel with 8 to 12 foot vertical banks

• Railroad overpass just upstream

Site Information – Pre-Restoration

Brown and Caldwell 7

Page 8: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

• Incised channel, no connection to floodplain (Rosgen F-5)

• Poor habitat

• Stream eroding into left bank and encroaching historic inert waste landfill and park facilities

• Steep, vertical banks - safety hazard to park patrons

• Debris jams throughout

Lilburn City Park Camp Creek Restoration

Brown and Caldwell 8

Page 9: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

• Municipal complex (courts, police, etc.)

• On downtown square, high visibility

• Park has large greenspace, amphitheater, walking trails, playground, etc.

• Camp Creek flows along eastern border of parcel

• Camp Creek fenced off from park

• Five pipe outfalls; direct stormwater discharges to creek from 30 developed acres, no treatment

• Flooding problems in park

Pre-Construction Conditions

Brown and Caldwell 9

Page 10: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

• Water Quality Sampling • High bacteria, high TSS during

storms, high nitrogen, high organic content

• Habitat Assessment • Suboptimal

• Benthic macro-invertebrate assessment • Poor

• Geomorphic measurements • F-5, Incised, aggraded in places

• Debris jams

Pre-Construction Monitoring

Brown and Caldwell 10

Page 11: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

• Priority 3 Stream Restoration

• Stabilize banks in place

• Create floodplain benches and reconnect to floodplain where feasible

• Remove concrete debris

• Revegetate

Alternative 1

Brown and Caldwell 11

Page 12: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

• Priority 1 Stream Restoration

• Relocate stream into right floodplain

• Utilize old channel for bioretention treatment of 30 acres

• Remove invasives and revegetate

Alternative 2

Brown and Caldwell 12

Page 13: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

• Improved stream access to floodplain for water quality benefit

• Moved stream away from park facilities and landfill

• Enlarged park area and provides new amenity for patrons

• Combined several storm sewer outfalls

• Bioretention stormwater treatment (3 cascading cells, fieldstone outfall) for 30 acres

Project Benefits

Brown and Caldwell 13

Page 14: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

• 150 days – Substantial Completion (March – July 2012)

• First built new channel, Camp Creek isolated from construction

• Removed plug and activated new channel

• Combined outfalls and built 3 cascading bioretention cells

• Plantings – three phases

Construction

Brown and Caldwell 14

Page 15: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

• C-5 Type Channel

• 975 linear feet

• 0.2% slope

• 2 stone cross vanes

• 5 stone J-hooks

• 2 log J- hooks

• 3 double stone J-hooks

• Toe wood/brush mattresses

Design & Construction - Stream

Brown and Caldwell 15

Page 16: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

Stream Construction

Brown and Caldwell 16

Cleared and flagged for new channel Roughed in new channel

Page 17: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

Stream Construction

Brown and Caldwell 17

New

Channel

Existing

Channel

Page 18: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

Stream Construction

Brown and Caldwell 18

Log vane Scour log and toe wood/brush mattress

Page 19: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

Stream Construction

Brown and Caldwell 19

Completed Stone J-hook Stone J-hook

Page 20: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

Completed Project

Brown and Caldwell 20

New

Channel

Old Channel, Now Bio-

Retention

Page 21: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

Completed Project

Brown and Caldwell 21

Page 22: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

Completed Project

Brown and Caldwell 22

Page 23: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

Completed Project

Brown and Caldwell 23

Page 24: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

• 5 outfalls – total drainage area – 30 acres

• Designed system of 3 cascading bioretention cells in old channel

• Underdrain system with valve (only to be used if needed)

• Engineered soil

• Outfall connection to stream

• Plantings

Design & Construction – Bioretention BMP

Brown and Caldwell 24

Page 25: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

Bioretention BMP

Brown and Caldwell 25

Underdrain Installation Installing Engineered Soil

Page 26: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

Bioretention BMP

Brown and Caldwell 26

Engineered soil Installed in 1-ft lifts, water in, no compaction

Type 3 Rip-rap at outfalls

Page 27: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

Bioretention BMP

Brown and Caldwell 27

Cobble and mulch installed Sod and Irrigation System

Page 28: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

Bioretention BMP

Brown and Caldwell 28

Page 29: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

Bioretention BMP

Brown and Caldwell 29

Complete, planted BMP Fieldstone Outfall Structure Connection to creek

Page 30: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

• Plantings

• Maintenance

• LOMR

• Water Quality and Geomorphic Monitoring

• Construction Cost - $772k

Post-Construction

Brown and Caldwell 30

Page 31: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

Flood of September 2009

Brown and Caldwell 31

Railroad

Crossing

Page 32: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

Post Flood Repairs by City

Brown and Caldwell 32

Railroad

Crossing

Page 33: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

February 2011 - Preconstruction

Brown and Caldwell 33

Railroad

Crossing

Page 34: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

During Construction – Installing Fieldstone Cross Vanes, Structures 1 and 2

Brown and Caldwell 34

Railroad

Crossing

Railroad

Crossing

Page 35: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

April 2012 – Construction

Brown and Caldwell 35

Railroad

Crossing

Page 36: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

June 2012 – End of Construction

Brown and Caldwell 36

Railroad

Crossing

Page 37: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

January 2013 – Near Bankfull Event

Brown and Caldwell 37

Railroad

Crossing

Page 38: Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN … · 2013. 8. 9. · •Incised channel, no connection to floodplain (Rosgen F-5) •Poor habitat •Stream eroding into left

• Gwinnett County Department of Water Resources

• City of Lilburn

• Georgia Development Partners

• Meanders River Restoration, Inc.

Acknowledgements

Brown and Caldwell 38