Liquid-hydrogen absorber:

Shigeru Ishimoto KEK

Contents

(1) Introduction

(2) MICE absorber design

(3) Prototype absorber test at KEK

(4) MICE absorber instrumentation

(5) Schedule

(6) Summary

status report

hydrangea

UKNF/MICE Oversight Committee meeting, RAL, Jul-21, 22, 2008

MICE cooling channel

Drawing by S. Q. Yang

Tracker Module 1

Tracker Module 2

AFC Module 1 AFC Module 3

AFC Module 2

RFCC Module 1

RFCC Module 1

BEAM

AFC (Absorber & Focus Coil) moduleCryomech PT415 cooler

([email protected])

LH2 condenser

Safety windows

absorberwindows

G-10 SupportAbsorber & Pipes

Mini In-Flange (Al-SS)

30 PinFeedthrough

Tee

L-H2 IN

G-H2 OUT

G-He/N2 OUT

L-He/N2 IN

A-A’(22.5 deg.)

G-H2 OUT

L-H2 IN

G-He/N2 OUT

LHe/LN2 IN

Tee

30 PinFeedthrough

Heat- exchanger

LH2 LH2

MIRAPRO Co.

Liquid-hydrogen absorber

Flange of MICE absorber

Design window; Oxford Design flange; KEK Machining ; Mississippi

Tolerance between flange and body: 0.1-0.3 mm

G-10 (x8)

t=1, W=25, L=90 mm

Total ~ 0.2 W

SS, t=1Screws on

AFC Magnet

76.5

34

SS 15.7

AL 14.8

34

From Absorber

Small flange and G-10 support

Tee and 30 pin feedthrough

In seal

Kyocera 30 pin feedthrogh

Support for pipe

welding

pipe welding

L < 0.5mm

Prototype absorber

MICE absorber test at KEK

1,959T.M.P.

G-M [email protected]

LH2 condenser

Dummy bore(room temperature)

Prototype absorber

Prototype absorber test at KEK

0.30 l / h , 2.6 W 1.33 l / h , 11.7 W

2000 l tank

Cooling stopLH2 1.43 l

68 hrs to fill 20 l

Liquefaction and vaporization of LH2 in 20 l

Absorber

MICE absorber test at KEK

H2 vapor

Cernox calibration curve

H2 Press  (Torr)

n-H2 Temp.(K)

e-H2 Temp.(K)

Absorber Temp.(K)

T (K)

DAY

MICE absorber test at KEK

10 Cernox 1050SD

4 wires; AB101, 102, 105, 109,110

2 wires; AB103,104,106,107,108

(Total 5*4 + 5*2 = 30 wires)

   Im=0.1 mA; 101,103,105,107,109

Im=1 mA; 102,104,106,108,110

Temperature & level sensors in the absorber

In LH2

over heating mode in gas

Sensor and heater (overall)

HTR-25-100W

25.4

CX-1050-SD

Sensor blocks

2 cernox inside absorber

cernox for L-H2 pipes

cernox for L-N2 pipes

19

16

20

5

20

2 or 4 x 0.14 mm2 ETFE cable

Delivery of 1st FC Oct 2009

Spring 2010

Q4 2010-- 2011

STEP VISTEP V

STEP IV

MICE absorber schedule

KEKto RAL

Arrive 2 absorber flanges from US

KEK RAL

Summary

(1) Absorber R&D at KEK was successfully finished and MICE absorbers were designed based on this experience.

(2) We are ordering the first MICE absorber body to Japanese company. It will be delivered by the end of Oct-2008 after the cooling test at KEK. The Second absorber will be ordered in Nov-2008, and delivered by Feb-2009.

(3) Thermometer/level sensors inside and outside absorber body will be wired in Japan.

(4) Thin absorber flanges will be set at RAL. First flanges will be delivered by May-2009 from Univ. of Mississippi.

(5) The overall assemble in the AFC module will start from Jul-2009 at RAL.

Thank you