list of figures

4
vii LIST OF FIGURES Page Figure 1-1: Plunger lift Figure 1-2: Rod pump Figure 1-3 API rod Pump designation Figure 1-4: PCP Figure 1-5 Hydraulic Lift Figure 1-6: ESP Figure 1-7 Gas lift Figure 3-1 shows the packing type of Compression packing Figure 3-2 Show a position of Piper valve and Ball Valve (Suction sys.) Figure 3-3 Show a position of ball valve (injection sys.) and Choke adjustable (injection sys.) Figure 3-4 Show a position of the Swab valve at the wellhead Christmas tree Figure 3-5 Show a position of Ball valve 1, 2 (Production sys.) Figure 3-6 Show a position of the ball valve (inlet accumulation, Outlet Production and Outlet suction). Figure 3-7 Show a position of Gate valve (Production sys.) Figure 3-8 Show a position of the dual basket strainer 300 lb. Figure 3-9 Show a position of Start Switch and Power Switch Figure 3-10 Show a position of Plunger candle cover and Crosshead cover Figure 3-11 Show a position of Crankshaft. Figure 3-12 Show a position extension rod stand before loosen Figure 3-13 Show the extension rod and plunger Figure 3-14 Show the plunger slide into the stuffing box Figure 3-15 Show after remove the extension and Wiper box Figure 3-16 Show the plunger that removed from the pump Figure 3-17 Show stuffing box, gland nut and Stuffing gland box bushing Figure 3-18 show the bushing Figure 3-19 Show the packing rings and the follower of bushing Figure 3-20 Show the stuffing Box Figure 3-21 Show the Stuffing box retainer nut and Stuffing box retainer Figure 3-22 Show the stuffing box Figure 3-23 Show the stuffing box Appendix A Fig 1-1 Show the component of the beam pumping. 3 4 5 5 7 8 9 24 27 28 28 29 30 30 31 31 32 33 33 34 34 35 35 36 36 37 38 38 39 39 71

Upload: kanoksakomkaew

Post on 15-Nov-2015

215 views

Category:

Documents


1 download

TRANSCRIPT

  • vii

    LIST OF FIGURES

    Page Figure 1-1: Plunger lift Figure 1-2: Rod pump Figure 1-3 API rod Pump designation Figure 1-4: PCP Figure 1-5 Hydraulic Lift Figure 1-6: ESP Figure 1-7 Gas lift Figure 3-1 shows the packing type of Compression packing Figure 3-2 Show a position of Piper valve and Ball Valve (Suction sys.) Figure 3-3 Show a position of ball valve (injection sys.) and Choke adjustable (injection sys.) Figure 3-4 Show a position of the Swab valve at the wellhead Christmas tree Figure 3-5 Show a position of Ball valve 1, 2 (Production sys.) Figure 3-6 Show a position of the ball valve (inlet accumulation, Outlet Production and Outlet suction). Figure 3-7 Show a position of Gate valve (Production sys.) Figure 3-8 Show a position of the dual basket strainer 300 lb. Figure 3-9 Show a position of Start Switch and Power Switch Figure 3-10 Show a position of Plunger candle cover and Crosshead cover Figure 3-11 Show a position of Crankshaft. Figure 3-12 Show a position extension rod stand before loosen Figure 3-13 Show the extension rod and plunger Figure 3-14 Show the plunger slide into the stuffing box Figure 3-15 Show after remove the extension and Wiper box Figure 3-16 Show the plunger that removed from the pump Figure 3-17 Show stuffing box, gland nut and Stuffing gland box bushing Figure 3-18 show the bushing Figure 3-19 Show the packing rings and the follower of bushing Figure 3-20 Show the stuffing Box Figure 3-21 Show the Stuffing box retainer nut and Stuffing box retainer Figure 3-22 Show the stuffing box Figure 3-23 Show the stuffing box Appendix A Fig 1-1 Show the component of the beam pumping.

    3 4 5 5 7 8 9

    24 27

    28 28 29 30

    30 31 31 32 33 33 34 34 35 35 36 36 37 38 38 39 39 71

  • viii

    LIST OF FIGURES (Continued)

    Page Appendix A Fig 1-2 Mark the center line. Appendix A Fig 1-3 Mark the center line. Appendix A Fig 1-4 Set the base. Appendix A Fig 1-5 Set the base. Appendix A Fig 1-6 Mark the position of the main frame centers. Appendix A Fig 1-7 Mark the position of the main frame centers. Appendix A Fig 1-8 Mark the center lines of the front of the unit frame. Appendix A Fig 1-9 Mark the center lines of the front of the unit frame. Appendix A Fig 1-10 Lift the structure on concrete. Appendix A Fig 1-11 Align the center lines of the T-head and concrete base. Appendix A Fig 1-12 fill the gear reducer to the appropriate level. Appendix A Fig 1-13 Install the saddle bearing adapters to the Samson post. Appendix A Fig 1-14 Attach the saddle bearing to the saddle bearing adapters. Appendix A Fig 1-15 Attach the Samson post third leg to the Samson post. Appendix A Fig 1-16 Position the hoisting sling between the legs at the Samson post top. Appendix A Fig 1-17 Attach the Pitman arms to the equalizer beam. Appendix A Fig 1-18 Install the saddle bearing set screw bolts into the walking beam. Appendix A Fig 1-19 Install the guide lock. Appendix A Fig 1-20 Install all bolts finger tight. Appendix A Fig 1-21 Install the three banjo bolts. Appendix A Fig 1-22 Install the three banjo bolts into the tapped housing. Appendix A Fig 1-23 Check the clearance dimension. Appendix A Fig 1-24 Check the clearance dimension . Appendix A Fig 1-25 Adjust the saddle bearing. Appendix A Fig 1-26 Install the Vbelts. Appendix A Fig 1-27 Install the belt guard assembly. Appendix A Fig 1-28 Install the wireline and reinstall the wireline retaining plate. Appendix A Fig 1-29 Slide the wireline ferrule buttons. Appendix A Fig 1-30 Install the horsehead. Appendix A Fig 1-31 Install the horsehead adjusting.

    72 72 72 72 72 72 73 73 73 73 73 73 74 74

    74 74

    74 75 75 75 75 75 75 76 76 76

    76 77 77

    77

  • ix

    LIST OF FIGURES (Continued) Page Appendix A Fig 1-32 Place the horsehead mounting pin on the horsehead mount. Appendix A Fig 1-33 Place the horsehead mounting pin on the weldment. Appendix A Fig 1-34 Install the bolt into the horsehead mount. Appendix A Fig 1-35 Install the pawl safety bolt. Appendix A Fig 1-36 Check the center of the horsehead runners. Appendix A Fig 2-1 Clean up motors. Appendix A Fig 2-2 Check motor's connecting terminals check. Appendix A Fig 2-3 Connection electric line into the motor. Appendix A Fig 2-5 Connection electric line into the maincontrol. Appendix A Fig 2-6 Test on. Appendix A Fig 3-1 Annulus pressure grade. Appendix A Fig 3-2 Production pressure grade. Appendix A Fig 3-3 Injection pressure grade. Appendix A Fig 3-4 Accumulative pressure grade. Appendix A Fig 3-5 Resurevoir oil and water level. Appendix A Fig 3-6 Reservoir temperature grade. Appendix A Fig 3-7 Suction presure grade. Appendix A Fig 3-8 Injection rate grade. Appendix A Fig 3-9 Main control. Appendix B Figure 1-1 Nuclear Applications. Appendix B Figure 1-2 Carbon packing. Appendix B Figure 1-3 General Device packing. Appendix B Figure 1-4 PEFE packing. Appendix B Figure 1-5 Abrasion Resistant Aramid Fiber Packing. Appendix C Figure 1-1 Show the Rod Lift system. Appendix C Figure 1-2 Show beam pumping system. Appendix C Figure 1-3 Show Beam Pumping Unit Designations. Appendix C Figure 1-4 Bottom hold-down insert pump. Appendix C Figure 1-5 the plungers of pump. Appendix C Figure 1-6 Ball and Seats. Appendix C Figure 1-7 the API Pump Designation. Appendix C Figure 1-8 the Rod string. Appendix C Figure 1-9 the API T Couplings.

    77 77 77 77 78 79 79 80 80 81 81 81 81 81 82 82 82 82 83 85 86 87 88 89 90 92 94 96

    103 107 108 109 111

  • x

    LIST OF FIGURES (Continued) Page Appendix C Figure 1-10 the API Spray Metal Couplings Appendix C Figure 1-11 the Sinker Bars

    111 112