    Sr. no. ACTIVITIES AREA WISE

    A CRITICAL POINTS

    1 Air balancing

    2 AHU all openings to be closed

    3 Fire damper pending -1nos. At AHU

    4 Cable taging

    5 D.B. Marking

    6 E.L. Marking

    7 Railing in server room8 Italian marble polishing.

    9 All DB louvers

    10Core cut in slab for connectivity of 4th floor &

    5th floor hub room

    B CORNER MEETING ROOM

    1 Table alignment

    2 Paint

    3 Door closer speed

    4 Skirting cleaning

    5 Laminnate cleaning

    C LEFT HAND SIDE PRODUCTION AREA

    1Grid tiles change near meeting room/

    Alignment

    2 Final paint coat on wall and ceiling

    3 Exit sinage to be removed.4 S.S. Railing buffing

    5 Junction box plates

    6 Testing of all switchs and sockets.

    7 Fire sinages

    8 Carpet to be placed where reqired

    D RIGHT HAND SIDE PRODUCTION AREA

    1 Paint finishing on ceiling and walls

    2 Ceiling alignment

    3 All electrical panel flash test

    4 Fire door cleaning

    5 Paint in D.B. panel boxes

    6 Cable dressing in electrica DB boxes7 Earthing connections in DB

    8Screws in hinges in DB box doors and

    magnetic catchers

    9Production area EXIT sinages to be fixed

    properly

    10Cable dressing in electrica DB boxes and

    cleaning of doors

    e COMMUNICATION ROOM - 2

    1 Cleaning and painting

    f LOCKER ROOM

    1 Exit sinage to be placed near locker room

    2 Brick work near fire damper in locker rooom

    G REPRO ROOM

    1 Ceiling tile change

    H SMALL MEETING ROOM

    1 Paint

    I I.T. ROOM

    1 Painting ang cleaning

    2 Screws in Hinges

    J SERVER ROOM

    1 S.S. Railing

    2 Tile cutting

    3 Opening to be closed near door4 Paint

    5Trap doors in floors with board and laminate

    finish

  • 8/3/2019 List of Pending Activities on 4th Floor

    2/2

    L TRAINING ROOM

    1 S.S. Strip in grooves

    2 Glass panel to be fixed with beeding.

    3 Paint

    4 Palmet finishing

    M BATTRY ROOM

    1 Cleaning room2 Aluminum skirting

    3 Lighting fixture to be changed

    N UPS ROOM

    1Invertar battary to be shifted to battary

    rooom

    2 Cable dressing

    3 Painting

    4 Cleaning

    5 Grid tile to be changed and grid alignment

    6 Door Frame finishing

    O HUB ROOM

    1 Cable dressing

    2 Painting

    3 Cleaning

    4 Grid tile to be changed and grid alignment

    5 Door Frame finishing

    P HR / ADMIN ROOM

    1 Final paint

    2 Lackerd glass finish

    3 Polish of beeding above the skirting

    Q BOARD ROOM

    1 Finishses of grooves neear door

    2 Wire manager to be cut in front tables

    3 Front tables to be fixed properly

    R MAIL ROOM

    1 Switch plate to be fited properly

    2 Paint

    S RECEPTION

    1 Paint

    2 Final duco paint on tables

    3 Final polish of marble

    4 Door frame cleaning

    5 Vertical cove finish in paint

    6 Cable taging behind the cove

    7 Reception/Security table drawer handles

    U SSC ROOMS

    1 Window glass2 CCTV carpentered structure

    V GENTS AND LADIES REST ROOMS

    1 Beds & mattress

    2 Door closer speed

    3 Paint

    W GENTS TOILET

    1 Paint2 ceiling alignment

    X LADIES TOILET

    1 Wall tile to be changed2 Basin counter

    Y PANTRY COUNTER

    1 Counter