lite deck tile, xbeam & stair tread maintenance, repair ... · you’re ready to begin...

9
Installation Instructions & Demos Available at www.zometek.com / ZomeTek video series on Youtube.com Find us on ZomeTek Channel WWW. ZOMETEK .COM / 888 505-7953 -Lite Deck Tile, xBEAM & Stair Tread -Maintenance, Repair & Warranty Installation Guide STRONG, DURABLE & MOISTURE-RESISTANT PERFORMS IN RAIN, WIND, SNOW, SAND AND HEAVY TRAFFIC

Upload: others

Post on 30-May-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Lite Deck Tile, xBEAM & Stair Tread Maintenance, Repair ... · you’re ready to begin installing your deck tiles. ZomeTek pro-tip: Lay out and open your deck tiles first. Place the

Installation Instructions & Demos Available at www.zometek.com / ZomeTek video series on Youtube.com

Find us on ZomeTek Channel

W W W . Z O M E T E K . C O M / 8 8 8 5 0 5 - 7 9 5 3

-Lite Deck Tile, xBEAM & Stair Tread

-Maintenance, Repair & Warranty

Installation GuideC O M P O S I T E D E C K I N G

STRONG, DURABLE & MOISTURE-RESISTANT PERFORMS IN RAIN, WIND, SNOW, SAND AND HEAVY TRAFFIC

Page 2: Lite Deck Tile, xBEAM & Stair Tread Maintenance, Repair ... · you’re ready to begin installing your deck tiles. ZomeTek pro-tip: Lay out and open your deck tiles first. Place the

2C O M P O S I T E D E C K I N G

ABOUT ZOMETEK® COMPOSITE DECKING . . . . . . . . . . . . . . . . . . . . . . . . 2• PRE-INSTALLATION INSPECTION

PLANK & END GAPPING / INSTALLATION TOOLS . . . . . . . . . . . . . . . . . . . . 3

ZOMETEK® DECK TILE INSTALLATION PROCEDURE . . . . . . . . . . . . . . . . . 4-5

ZOMETEK® XBEAM & STAIR TREAD INSTALLATION . . . . . . . . . . . . . . . . 6-7

MAINTENANCE & REPAIR GUIDELINES . . . . . . . . . . . . . . . . . . . . . . . . . . 8

WARRANTY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

C O M P O S I T E D E C K I N G

ABOUT ZOMETEK® COMPOSITE DECKINGZomeTek®’s bamboo composite decking is manufactured using a type of composite material made by mixing natural bamboo fiber with 100% recycled plastics (48% bamboo composite; 4% additives; 48% high-density polyethylene [HDPE]). This construction-grade material is a strong, moisture- and mildew-resistant composite, engineered to endure all types of abuse, including rain, snow, ice, sand, and heavy foot traffic. The surface looks great with its natural wood appearance and requires minimal maintenance.

Like most composites, ZomeTek®’s Deck Tiles & xBEAM Deck Planks may have slight color variations from piece to piece. This is due to naturally-occurring variations in bamboo fibers and HDPE. Purchasing all required decking material at one time is recommended as manufacturing runs can produce slightly different colors.Do not install if color variation is not acceptable. Installation denotes acceptance of warranty.

PRE-INSTALLATION INSPECTIONBefore installing any ZomeTek® Deck Tiles or xBEAM Deck Planks, make sure that the new or existing deck and framework or patio is structurally sound and meets local building codes. For Deck Tiles, proper slope is required to allow for drainage.

When installing xBEAM Deck Planks, the joists must be a maximum of 16” on-center. xBEAM Deck Planks can be installed by either face-screwing or blind screwed/clip installation. CAMO® is an approved installation method. Follow the manufacturer’s instructions.

Page 3: Lite Deck Tile, xBEAM & Stair Tread Maintenance, Repair ... · you’re ready to begin installing your deck tiles. ZomeTek pro-tip: Lay out and open your deck tiles first. Place the

3C O M P O S I T E D E C K I N G

PLANK & END GAPPING / INSTALLATION TOOLS (Overview)MINIMUM END TO END GAPAll materials expand and contract as temperatures rise and fall. The following chart will help to insure that your ZomeTek® installation is a success. Leave the appropriate gap between planks, as indicated in the chart below, depending on the length of your planks and the temperature at time of installation.

C O M P O S I T E D E C K I N G

Plank Length Below 40°F 40°F to 70°F Above 70°F

End Butt Abutting End Butt Abutting End Butt Abutting

12’ 1/8” 1/4” 1/8” 3/16” 1/8” 1/8”

16’ 3/16” 3/8” 3/16” 1/4” 1/8” 1/8”

20’ 1/4” 1/2” 1/4” 3/16” 1/8” 1/8”

PLEASE NOTE: When installing in extreme situations, please consult technical department before installation. When installation area exceeds 20’, shorter planks will show less movement. We recommend that you do not install below 32ºF or above 100ºF.

GENERAL INSTALLATION TOOLS FOR ZOMETEK® DECK TILESCircular Saw or Miter Saw with 60-tooth carbide tipped blade Jig Saw or Band SawPencilRubber Mallet ScissorsKneepads Tape Measure#1 Phillips head screwdriver or bitWire Brush Pieces of Cardboard (12”x12”)Box Cutter

GENERAL INSTALLATION TOOLS FOR ZOMETEK® STAIR TREAD & XBEAM DECK PLANKS Circular Saw or Miter Saw with 60-tooth carbide tipped blade Table SawPower Drill or Impact Driver 1/8” Drill Bit2-3/4” Deck Screws and Screw Bit 2-3/4” Composite Deck Screws with Torx head* and Screw Bits 1/4” SpacerPencil Tape MeasureMultiple pieces of approx. 12” Long 2x4’s Rubber Mallet*color matched to decking material

GENERAL INSTALLATION TOOLS FOR HIDDEN FASTENERSCircular Saw or Miter Saw with 60-tooth carbide tipped blade Table SawPower Drill or Impact Driver 1/8” Drill Bit2-3/4” Deck Screws and Screw Bit 2-3/4” Composite Deck Screws with Torx head* and Screw Bits ZomeTek Installation Clips 1/4” Spacer Pencil Tape Measure Multiple pieces of approx. 12” Long 2x4’s Rubber Mallet*color matched to decking material

SAFETY FIRST! ALWAYS PROTECT YOURSELF WHEN USING POWER TOOLS. USE OF PROTECTIVE EYEWEAR IS STRONGLY RECOMMENDED.

Page 4: Lite Deck Tile, xBEAM & Stair Tread Maintenance, Repair ... · you’re ready to begin installing your deck tiles. ZomeTek pro-tip: Lay out and open your deck tiles first. Place the

4C O M P O S I T E D E C K I N G

Snap Fitting

ZOMETEK® DECK TILE INSTALLATION PROCEDUREZomeTek® Deck Tiles cut, mill and route just like solid wood. We recommend using a 60-tooth carbide tipped blade. Following these simple installation and maintenance guidelines will allow you to sit back and enjoy your new deck with confidence. Please read these instructions completely before installing your new deck.

Please refer to the Pre-Installation Inspection on page 2 and General Installation Tools list on page 3 before starting installation of ZomeTek® Deck Tiles.

You can also find a step-by-step video installation guide at ZomeTek.com.

INSTALLATION OVER HARD-SURFACE, CONCRETE OR EXISTING DECKSTEP 1: PREP YOUR SURFACEIf installing against an existing structure, start away from the structure. Before beginning installation, sweep the surface, then check structure grade to check for proper slope. Once major repairs on the surface are completed (if necessary), you’re ready to begin installing your deck tiles.

ZomeTek pro-tip: Lay out and open your deck tiles first.

Place the first tile directly on the existing surface with the female sides facing the outside of the installation area. If necessary, install deck tile trim along outside edge.

STEP 2: LAYING THE TILESPlace the first tiles away from building or residence. Install the next tile by placing the female side of the tile onto the male side of the existing tile and press down firmly to engage the snap fitting. Each peg should seat into each corresponding hole. Lightly tap the pegs into final position and rough out the edges to fit square. (NOTE: the tiles will square themselves over time.) Place the tiles so both sides fit and tap into place.

Work in a diagonal pattern and continue to install additional tiles as steps 1 & 2 dictate.

C O M P O S I T E D E C K I N G

SAFETY FIRST! ALWAYS PROTECT YOURSELF WHEN USING POWER TOOLS. USE OF PROTECTIVE EYEWEAR IS STRONGLY RECOMMENDED.

Prep Your Surface

Laying First Tiles

Page 5: Lite Deck Tile, xBEAM & Stair Tread Maintenance, Repair ... · you’re ready to begin installing your deck tiles. ZomeTek pro-tip: Lay out and open your deck tiles first. Place the

5C O M P O S I T E D E C K I N G

STEP 3: TRIMMING TO FITIt may be necessary to cut the end tile(s) of a row to fit the layout. Rest a tile in place and mark the cut point. When making a cut, make sure to remove any screws that may be in the path of the blade using a #1 Phillips head screwdriver or bit. If the layout allows for a complete tile at the end of the row, simply cut off the male snap fittings using a power or hand saw if not using trim. STEP 4: WORKING AROUND OBSTRUCTIONSTo cut out around a pole, pipe or other obstruction, it is best to first make a template of the cut using a piece of cardboard. Once your template fits nicely onto the deck tile, use the template to mark where you’ll make your cuts on the deck tile. Important: Before you perform any cuts on a deck tile, make sure to remove all screws in the cut-path! Once you have cut the deck tile with a jigsaw or bandsaw, install your tile in place around the obstruction.

STEP 5: CLEANING & MAINTENANCEAfter your deck tiles have been completely installed, we strongly encourage you to follow our Decking Maintenance & Repair Guideline (page 8) before enjoying your new ZomeTek® decking experience.First, completely spray down the entire deck with ZomeTek® Intensive Deck and Patio Cleaner and then proceed to use a brush to thoroughly scrub the entire deck. Once you have finished scrubbing, thoroughly rinse down the deck with a hose and your new deck is complete!

See our website for a detailed, step-by-step installation video.

INSTALLATION OVER ROOF MEMBRANEIn the case of installation over a torched-down or PVC membrane roof, the roof membrane must always be installed and used in accordance with manufacturer’s specifications. Most membrane manufacturers require a sacrificial layer between their membrane and anything on top of it. Proper slope for drainage is required. Consult with membrane manufacturer for compatibility. ZomeTek® does not warranty any leaks or issues associated with the roofing membrane system (for more on this, please refer to ZomeTek®’s Warranty Guidelines on page 9).

During the first 90 days after installation, some water marks may be left on the surface. This is a normal occurrence and will disappear after a normal weathering period.

Cleaning & Maintenance

Trimming to Fit

Working Around Obstructions

C O M P O S I T E D E C K I N G

Page 6: Lite Deck Tile, xBEAM & Stair Tread Maintenance, Repair ... · you’re ready to begin installing your deck tiles. ZomeTek pro-tip: Lay out and open your deck tiles first. Place the

6C O M P O S I T E D E C K I N G

INSTALLATION OF FIRST PLANKIf starting install against an existing structure, place 1⁄4” spacers along the back edge and end of the plank. Butt plank snug to the spacers. Place installation clip into the groove of the first plank and attach the clip to the joist. Pre-drill 1” in from the back of the plank and end of the plank at each joist using a 1/8” drill bit. Using composite deck screws, attach the plank to the joists through the top of the plank, making sure that the screws sit flush or slightly below the plank’s surface. Continue installing clips to each joist along the plank.

INSTALLATION OF ADDITIONAL BOARDSPlace additional rows of planks into the clips from the previous rows. If the fit is tight, lightly tap the plank into place using a lightweight rubber mallet to maintain equal spacing. Install clip no closer than 1” from end of plank and no more than 1-1/2” from end of plank. Continue installing clips to each joist along the plank.

To install xBEAM Deck Planks unsing the face screwing method, attach planks using two [2] composite deck screws to each joist. Space each row of xBEAM Deck Planks using 1/4” spacers. Do not screw ends of planks closer than 1” to ends of planks. Maximum overhang should be no more than 1”.

C O M P O S I T E D E C K I N G

Installation of additional boards

SAFETY FIRST! ALWAYS PROTECT YOURSELF WHEN USING POWER TOOLS. USE OF PROTECTIVE EYEWEAR IS STRONGLY RECOMMENDED.

ZOMETEK® XBEAM DECK PLANK INSTALLATION PROCEDUREZomeTek® Composite Deck Planks cut, mill and route just like solid wood. We recommend using a 60-tooth carbide tipped blade. Following these simple installation and maintenance guidelines will allow you to sit back and enjoy your new deck with confidence. Please read these instructions completely before installing your new deck.

Before starting installation of ZomeTek® xBEAM Deck Planks, please refer to the Pre-Installation Inspection on page 2, End to End Gapping chart on page 3, and General Installation Tools list, as well as the General Tools for Hidden Fasteners on page 3.

You can also find a step-by-step video installation guide at ZomeTek.com/videos.html

CAMO® is an approved installation method. Follow the manufacturer’s instructions, making sure you attach Camo screws no closer than 1” from end of plank and no more than 1-1/2” from end of plank.

CuttingMeasuring

Face screw

Page 7: Lite Deck Tile, xBEAM & Stair Tread Maintenance, Repair ... · you’re ready to begin installing your deck tiles. ZomeTek pro-tip: Lay out and open your deck tiles first. Place the

7C O M P O S I T E D E C K I N G

C O M P O S I T E D E C K I N G

BUTTING A SEAMAttach a 12” 2x4 to the side of the existing joist using (4) 2-3/4” deck screws, making sure that the top of the 2x4 is flush to the joist. The seam of the planks should lie between the joist and 2x4, with the appropriate expansion gap*. Install two clips into previous row where the end butts of the seam will be. After seamed planks are installed, be sure to install two more clips at the end of each plank at the seam. Please note that failure to double joist end-butts voids the ZomeTek warranty.

INSTALLATION OF LAST PLANKIt may be necessary to trim the last plank lengthwise (rip) to allow for a expansion gap*. Place last plank into the clips from the previous row. With a 1/8” expansion gap*, pre-drill 1” in from the back of the plank and end of the plank at each joist using a 1/8” drill bit. Using composite deck screws, attach the plank to the joists through the top of the plank, making sure that the screws sit flush or slightly below the plank’s surface.

INSTALLATION OF SLEEPERSBefore installing “sleepers,” ensure adequate drainage is in place. It is recommended that “sleepers” are 2x4 and aligned perpendicular to your deck. The outside “sleepers” must be attached. Middle “sleeper” should be attached 16” on-center. It is also recommended that hidden fasteners are installed to present the most flush look for your deck. A minimum of 1-1/2” air space is required.

INSTALLATION OF FASCIAAttach fascia to the rim joist using three [3] screws spaced no further apart than 16” on-center. Both the top and bottom screw should be as close to top/bottom as possible but no closer than 1”. Fasten the fascia from one end to the other or from the center out to each end. Never fasten the fascia from both ends to the center. Leave a 1/8” space between the fascia ends where two pieces meet or wherever a piece meets a solid surface (i.e., a corner or a building wall) to allow for expansion of the material.

INSTALLATION OF STAIR TREADSA minimum of three [3] 2-3/4 composite deck screws is required for every stair “stringer” (jacks). “Stringers” need to be placed no greater than 16-inches on-center. The first screw must be placed as close as possible to the front, no closer than 1”; the second screw must be placed as close as possible to the back, but no closer than 1”; the third & final screw must be placed in the middle of the “stringer.”While pre-drilling is recommended, it is not required.

CLEANINGA thorough cleaning of the decking after installation is necessary. During the first 90 days after installation, some water marks may be left on the surface. This is a normal occurrence and will go away after a normal weathering period. Please refer to our ZomeTek® Maintenance & Repair Guide on page 8 for recommended cleaners.*Note on Expansion Gaps: For appropriate expansion gaps to use in your installation, please refer to the Resources link at ZomeTek.com

Fascia Installation

Butting a Seam

Blind Screw Installation

Page 8: Lite Deck Tile, xBEAM & Stair Tread Maintenance, Repair ... · you’re ready to begin installing your deck tiles. ZomeTek pro-tip: Lay out and open your deck tiles first. Place the

8C O M P O S I T E D E C K I N G

ZOMETEK DECKING MAINTENANCE & REPAIR GUIDELINESAs with all exterior building products, ZomeTek® will require periodic cleaning to ensure lasting beauty. Follow these simple guidelines to keep your decking looking beautiful for years to come.

GENERAL CLEANINGGeneral dirt and debris should be sprayed off with a hose to remove surface debris. Use ZomeTek® Intensive Deck and Patio Cleaner and a soft bristle brush to remove dirt and debris from the grooves or texture. Thoroughly rinse all soapy water from deck surface with water. For best results, wash ZomeTek® in the morning or evening hours when the surface of the deck is cool to minimize drying of cleaners on the deck surface. A thorough cleaning is recommended twice per year using ZomeTek® Intensive Deck and Patio Cleaner. Please refer to ZomeTek.com to find a video tutorial on how to properly maintain your composite deck.

GREASE/OIL/FOOD SPILLSAll food spills should be removed as soon as possible. To remove light stains, use a mild dish soap with warm water and a soft bristle brush to remove dirt and debris from the grooves or texture. Thoroughly rinse all soapy water from deck surface with water. When using ZomeTek® Intensive Deck and Patio Cleaner, stubborn stains can be removed at full strength.

RUST STAINS/GROUND-IN DIRT & GRIME/PIGMENT STAINSFor more stubborn stains and debris, use ZomeTek® Intensive Deck and Patio Cleaner.

ICE/SNOWA plastic shovel may be used to remove snow. Do not use excessive force. Never use a metal shovel to remove snow. Calcium chloride or rock salt may be used to melt snow or ice from the surface of the deck.

C O M P O S I T E D E C K I N G

MILDEW AND POLLENIt is important to prevent build-up of pollen/debris. Mildew stains may occur where moisture, pollens, and/or dirt are present. Mildew needs a food source to grow, which can be grass, pollens, dirt, debris, wood and wood resins. To clean mildew and pollen stains from your composite deck, use ZomeTek® Intensive Deck and Patio Cleaner.

SCUFFS & ABRASIONSLike other weathering processes, scuffs and abrasions generally disappear after a normal 8-10 week period.

PRESSURE WASHINGPressure washers may be used with a maximum of 1500 PSI. Use a fan tip and keep a distance of at least 8-10” from the surface.

SCRATCHESScratches, nicks, cuts and grooves can be eliminated by using a scratch repair pad or a wire brush. Lightly brush in the direction of the grain of the decking. The brushed area will weather back in approximately 8-10 weeks. For best results, use of a scratch repair pad is highly recommended. Please refer to the Resources tab on ZomeTek.com for a scratch repair video tutorial.

SANDINGSanding composite decking is not recommended, as sanding will alter the appearance and color of your deck and void the warranty (please see page 9 for a complete list of what is and is not covered under ZomeTek® Warranty Guidelines).

DISPOSALZomeTek® Composite Decking products should be disposed of like other construction scraps & debris or other residential waste. It is not recommended to burn any remaining ZomeTek® Composite Decking product due to the composition of the materials.

Page 9: Lite Deck Tile, xBEAM & Stair Tread Maintenance, Repair ... · you’re ready to begin installing your deck tiles. ZomeTek pro-tip: Lay out and open your deck tiles first. Place the

9C O M P O S I T E D E C K I N G

WARRANTY Please note that installation of ZomeTek® Composite Deck products denotes acceptance and agreement of ZomeTek® warranty terms & conditions.1. Any claims must be made in writing within 30 days of detection.2. ZomeTek® warrants to the original purchaser that ZomeTek® Composite Decking conforms to ZomeTek® standards and specifications and is free from defects in materials and workmanship, and will remain free from such defects for a period of twenty-five [25] years residential use from date of purchase and ten [10] years commercial use.3. ZomeTek® warrants to original purchaser of any & all ZomeTek® Composite Decking products that structural damage caused by rot, splitting, termites, and fungal decay will not occur for a period of twenty-five [25] years, beginning on the date that the product was purchased and continuing until this period of time has elapsed, or until the property on which ZomeTek® Composite Decking product was originally installed has transferred ownership.4. Warranty only applies when material is used under normal residential/light commercial foot traffic conditions.5. Decking must be installed in accordance with ZomeTek® written installation instructions or ZomeTek® video installation instructions, both of which are available under the Resources tab on ZomeTek.com.6. Regular maintenance, as described in ZomeTek® Decking Maintenance & Repair Guidelines (page 7) must be followed. Damage caused by unapproved cleaners or chemicals is not covered under this warranty. The only approved cleaner covered under warranty is ZomeTek® Intensive Deck and Patio Cleaner.7. ZomeTek®, as with other composite decks, is subject to seasonal expansion and contraction. This is a normal occurrence and not considered a defect.8. Damage caused by furniture, appliances, wheeled items, or items drug across the face of the material are not covered under this warranty.9. Damage caused by fire, flooding, other natural disasters, acts of God, shipping, construction or installation-related damage are not covered under this warranty.10. Negligence, erosion, improper drainage, settlement or movement to the structure to which decking is installed, voids this warranty.11. Product quality, defects in material, or error that doesn’t not exceed 5% of material is not covered under this warranty.12. ZomeTek® will, at its discretion, repair, replace, or credit the full purchase price of the defective material. Labor is not included or covered under this warranty.13. In no event will ZomeTek®’s liability exceed the cost of replacement of the defective product or the refund of the original purchase price.14. This warranty is transferable once, within five [5] years of original purchase date. Warranty registration is required within thirty [30] days upon purchase of material. Failure to register in this timeframe will void this warranty.15. Installation Over Roof Membrane: In the case of installation over a torched-down or PVC membrane roof. • Roof membrane must always be installed and used in accordance with manufacturer’s specifications (please refer to Roof Membrane guidelines on page 4). Most membrane manufacturers require a sacrificial layer between their membrane and anything on top of it. For example, IB Roofing and Durolast recommend a 40mil HDPE Abrasion Sheet between their membrane and our deck tiles. It is strongly recommended that whichever membrane system is used, consumers and contractors choose a more durable 80mil version rather than a standard 50mil product. ZomeTek® does not warranty any leaks or issues associated with the roofing membrane system.

Fill out this registration form and attach proof of purchase, then scan & email to [email protected], or mail to:ZomeTek®

909 Industry DriveTukwila, WA 98188

ATTN: Warranty Department

C O M P O S I T E D E C K I N G

PRO RATED WARRANTY SCHEDULE

YEARS SINCE PURCHASE PERCENT OF PURCHASE COVERED BY WARRANTY

Years 1 to 6 100%

Years 7 to 10 80%

Years 11 to 14 60%

YEARS SINCE PURCHASE PERCENT OF PURCHASE COVERED BY WARRANTY

Years 15 to 18 40%

Years 19 to 21 20%

Years 22 to 25 10%

Name:

Address:

City:

State:

Zip:

Purchase Date:

Installation Date:

Number of Planks Purchased:

Residential Install? Yes No

Type of Install: New Construction Renovation