© Douglas OHI [email protected] www.douglasohi.com LIWA PLASTICS EPC 1 BUILDING WORKS Key Facts Client: CCJV Period: 33 Months Location: Sohar, Sultanate of Oman Completion Date: July 2019 Engineering, procurement and construction of various buildings such as substations, main receiving substations, main control buildings, deluge houses, operator shelters, workshop building, maintenance building and ground houses (total 63 nos).

Upload: lynhan

Post on 02-Mar-2019

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LIWA PLASTICS EPC 1 BUILDING WORKS - douglasohi.com · © Douglas OHI info@douglasohi.com  LIWA PLASTICS EPC 1 BUILDING WORKS Key Facts Client:

© Douglas OHI [email protected] www.douglasohi.com

LIWA PLASTICS EPC 1BUILDING WORKS

Key Facts

Client:CCJV

Period:33 Months

Location:Sohar, Sultanate of Oman

Completion Date:July 2019

Engineering, procurement and construction of various buildings such as substations, main receiving substations, main control buildings, deluge houses, operator shelters, workshop building, maintenance building and ground houses (total 63 nos).