Super-Kamiokande Gadolinium R&D Project: Status and Outlook 68 th JPS annual meeting. Kyoto. September 11 th , 2012. Lluís Martí Magro (Univ. Tokyo, ICRR) for the Super-Kamiokande collaboration.

Upload: hera

Post on 07-Feb-2016

35 views

Category:

Documents


0 download

DESCRIPTION

Super-Kamiokande Gadolinium R&D Project: Status and Outlook 68 th JPS annual meeting. Kyoto. September 11 th , 2012. Llu í s Mart í Magro (Univ. Tokyo, ICRR) for the S uper- K amiokande collaboration. Supernova Relic Neutrino. Flux limit at Super-K. Phys. Rev. D 85, 052007 (2012). - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

Super-Kamiokande Gadolinium R&D Project:

Status and Outlook

68th JPS annual meeting. Kyoto. September 11th, 2012.

Lluís Martí Magro (Univ. Tokyo, ICRR) for the Super-Kamiokande collaboration.

Page 2: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

Flux limit at Super-K

Phys. Rev. D 85, 052007 (2012)

Supernova Relic Neutrino

Lluís Martí Magro 68th JPS annual meeting 11th September, 2012

2

The goal is the discovery of SRN !

→ Measurement limits getting closer to predictions→ Large backgrounds dominate this analysis→ Expand the energy range starting from 10 MeV

Page 3: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

Gadolinium Antineutrino Detector Zealously Outperforming Old Kamiokande Super!

Inverse beta decay(2.2MeV)

~8 MeV

•ΔT~30μsec•Vertices within ~50cm

GADZOOKS!

Lluís Martí Magro 68th JPS annual meeting 11th September, 2012

3

→Dissolve Gd in SK pure water (0.2%)→Neutrons captured on Gd produce a cascade of photons of ~8 MeV→The coincidence detection of e+ and those photons we can single out inverse beta decays and greatly reduce backgrounds!!

J.Beacom and M.Vagins, Phys.Rev.Lett.93 (2004) 17110

Page 4: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

Evaluating Gadolinium’s Action on Detector Systems

Kamioka mine

200 ton tank

EGADS

Lluís Martí Magro 68th JPS annual meeting 11th September, 2012

4

Our Goals: Water purification system Monitor the water transparency Effects on detector components Adding/removing Gd Neutron background

New hall

240 20' PMT

200 ton tank (d=6.5 m, h=6.5 m)

15 ton tankWater system

Water transparency

measurem

ent

Achieve and maintain a high water quality while keeping Gd

Page 5: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

Lluís Martí Magro 68th JPS annual meeting 11th September, 2012

5

EGADS plan schedule

- Step 1: Circulation through the 200 ton tank with pure water (no PMTs mounted) Done!- Step 2: Circulation through the 15 ton tank with Gd2(SO4)3 Done!- Step 3: Circulation though the 200 ton tank with Gd2(SO4)3 loaded water- Step 4: PMT mounting (240 in total)- Step 5: Full realization of the EGADS project

Page 6: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

Lluís Martí Magro 68th JPS annual meeting 11th September, 2012

6

EGADS plan schedule

- Step 1: Circulation through the 200 ton tank with pure water (no PMTs mounted) Done!- Step 2: Circulation through the 15 ton tank with Gd2(SO4)3 Done!- Step 3: Circulation though the 200 ton tank with Gd2(SO4)3 loaded water- Step 4: PMT mounting (240 in total)- Step 5: Full realization of the EGADS project

Page 7: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

Lluís Martí Magro 68th JPS annual meeting 11th September, 2012

7

EGADS plan schedule

- Step 1: Circulation through the 200 ton tank with pure water (no PMTs mounted) Done!- Step 2: Circulation through the 15 ton tank with Gd2(SO4)3 Done!- Step 3: Circulation though the 200 ton tank with Gd2(SO4)3 loaded water- Step 4: PMT mounting (240 in total)- Step 5: Full realization of the EGADS project

Page 8: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

Lluís Martí Magro 68th JPS annual meeting 11th September, 2012

8

EGADS plan schedule

- Step 1: Circulation through the 200 ton tank with pure water (no PMTs mounted) Done!- Step 2: Circulation through the 15 ton tank with Gd2(SO4)3 Done!- Step 3: Circulation though the 200 ton tank with Gd2(SO4)3 loaded water- Step 4: PMT mounting (240 in total)- Step 5: Full realization of the EGADS project

Page 9: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

Lluís Martí Magro 68th JPS annual meeting 11th September, 2012

9

EGADS plan schedule

- Step 1: Circulation through the 200 ton tank with pure water (no PMTs mounted) Done!- Step 2: Circulation through the 15 ton tank with Gd2(SO4)3 Done!- Step 3: Circulation though the 200 ton tank with Gd2(SO4)3 loaded water- Step 4: PMT mounting (240 in total)- Step 5: Full realization of the EGADS project

Page 10: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

- Step 1: Circulation through the 200 ton tank with pure water (no PMTs mounted) Done!- Step 2: Circulation through the 15 ton tank with Gd2(SO4)3 Done!- Step 3: Circulation though the 200 ton tank with Gd2(SO4)3 loaded water- Step 4: PMT mounting (240 in total)- Step 5: Full realization of the EGADS project

Lluís Martí Magro 68th JPS annual meeting 11th September, 2012

10

EGADS plan schedule

Page 11: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

Lluís Martí Magro 68th JPS annual meeting 11th September, 2012

11

EGADS plan schedule

- Step 1: Circulation through the 200 ton tank with pure water (no PMTs mounted) Done!- Step 2: Circulation through the 15 ton tank with Gd2(SO4)3 Done!- Step 3: Circulation though the 200 ton tank with Gd2(SO4)3 loaded water- Step 4: PMT mounting (240 in total)- Step 5: Full realization of the EGADS project

Page 12: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

Filtration of Gd loaded water

Impurities size ++ ―>

Porous size ++ ―>

(NF)

(UF)

(RO)

12 11th September, 2012

68th JPS annual meetingLluís Martí Magro

Page 13: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

Water system

M.Vagins

15 ton EGADS

Test Tank

Intake Pump

(>4 ton/hr)

5 m 1st Stage

Filter

Concentrated Gd NF Reject Lines

UV#1

Mem

braneD

egas

0.2 m 2nd Stage Filter

0.5 ton Collection

Buffer Tank

RepressurizationPump

(>0.6 MPa, >4 ton/hr)

RepressurizationPump

(>0.6 MPa, >3 ton/hr)

NF #2

NF #1

Ultrafilter #1

Repressur-izationPump

(>0.9 MPa, >2 ton/hr)

TOC

5 m Filter

0.5 ton Buffer Tank

RO #1

UF #1

UF #2

Repressurization Pump

(>0.9 MPa, >1.5 ton/hr)

DI#2

5 m Filter

RO #2

RO Permeate Lines

Conveying Pump

(~0.35 MPa, >4 ton/hr)

Recycles RO Reject Lines

ChillerUF#1 Reject Line

UF#2 Reject

UV#2

DI#1

To Drain

Lluís Martí Magro 68th JPS annual meeting 11th September, 2012

13

Anion-rem

oval resin

5 m

Anion-rem

oval resin

Page 14: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

The EGADS Hall

Pre-treatment system

15m3 tank for pre-treatment

200 ton tank UDEAL

Water system

14

Anion-removal resin

(AJ4400)

Lluís Martí Magro 68th JPS annual meeting 11th September, 2012

Page 15: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

The EGADS Hall

15 Lluís Martí Magro 68th JPS annual meeting 11th September, 2012

15 m3 tank and pre-treatment

Gadolinium removal systemWater system

New New AJ4400July 11th

Flushing system13th August

Page 16: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

16 Lluís Martí Magro 68th JPS annual meeting 11th September, 2012

New run (20th July)

Gadolinium sulfate concentrationCo

ncen

tratio

n [p

pm]

NF1-R reduced from 12L → 9L (19th April)

Pump 4 off (2nd May)

01/01/2012 31/01/2012 01/03/2012 31/03/2012 30/04/2012 30/05/2012 29/06/2012 29/07/2012 28/08/20120

500

1000

1500

2000

2500Gadolinium Sulfate Concentration in 15 ton tank Run 2 Run 3

NF1-R reduced from 12L → 9L (19th April)

Pump 4 off (2nd May)

Sampling date

We can keep the Gd concentration constant !

Page 17: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

Summary

Hollow cathode lamp

Step 1: the EGADS main water system is able to reach and maintain SK pure water quality level Step 2: after adding Gd, the water system can obtain and maintain a high pure water quality level (see Yano-san's talk) while keeping Gd → New AJ4400 resin installed in the main water system → Membrane flushing system upgraded Step 3: soon we will start the circulation of Gd loaded water though the 200 ton tank Preparations for the next steps are well advanced: PMT pre-calibration and installation, DAQ system, etc (see Mori-san and Yamaguchi-san's talks!)

Lluís Martí Magro 68th JPS annual meeting 11th September, 2012

17

Done!

Done!

Page 18: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

Hollow cathode lamp

BACKUP

Page 19: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

The EGADS main water system reached SK level pure water

Transparency (pure water, step1)

Lluís Martí Magro 68th JPS annual meeting 11th September, 2012

19

Page 20: Llu í s Mart í  Magro (Univ. Tokyo, ICRR)  for the  S uper- K amiokande collaboration

Hollow cathode lamp

BACKUP