lmp base cases presented to: nepool markets committee november 19, 2001 robert b. burke
DESCRIPTION
Agenda Item #4 11/19&20/01 MC Mtg. LMP Base Cases Presented to: NEPOOL Markets Committee November 19, 2001 Robert B. Burke. Contents. LMP Publishing Process LMP Overview Static Base Case What was analyzed? How it was analyzed Summary of Results Next Steps. Static Cases. Purpose: - PowerPoint PPT PresentationTRANSCRIPT
LMP Base Cases
Presented to:
NEPOOL Markets Committee
November 19, 2001
Robert B. Burke
Agenda Item #411/19&20/01 MC Mtg.
Contents
• LMP Publishing Process
• LMP Overview
• Static Base Case– What was analyzed?
– How it was analyzed
– Summary of Results
• Next Steps
Static Cases
• Purpose:– Demonstrate software development progress
– Provide Participants with samples effects of possible
transmission line outage
– Test new unit dispatch software (EMP, UDS/SPD)
Future Releases
• Purpose:– Provide Participants with snapshot of actual system dispatch
with possible LMP values
– ISO will try to choose a dispatch cycle from the prior month with
congestion
– Test changes to new unit dispatch software (EMP, UDS/SPD)
Participant Input
• Technical session to review static cases– December 5 - Springfield Sheraton
– Register on-line at the ISO web site
• Are there additional “static” cases you would like
to see?– Email by December 14:
– ISO will review suggestions and release results of those cases
analyzed
What is LMP?
• Locational Marginal Price - cost of supplying the
next MW of load
• When congestion is present, locational marginal
prices may be different by zone
3 Bus Example - 1
Generator-1Capacity = 300 MW$10/MW
Generator-2Capacity = 200 MW$15/MW
Generator-3Capacity = 200 MW$20/MW
Load 2 = 499 MWMarket Clearing Price = $20
Load 1 = 100 MWMarket Clearing Price = $20
100 MW
200 MW
400 MW
99 MW
3 Bus Example - 2
Generator-1Capacity = 300 MW$10/MW
Generator-2Capacity = 200 MW$15/MW
Generator-3Capacity = 200 MW$20/MW
Load 2 = 499 MWLMP = $20
Load 1 = 100 MWLMP = $10
Thermal limit 150 MW
150 MW
100 MW350 MW
149 MW
What is Presented?
• Static base case
• Each Analysis Represents a Separate
Transmission Line Outage
• Resulting LMP values
Static Cases
• Started with secure network
• Actual system from September 4, 2001
• Hour Ending 15
• Load 18,375 MW
Data
• Load
• Generation
• Tie line flow
• Units on-line
• Unit bid data
• UDS/SPD agreed with Couger
How analysis was run
• Transmission Line removed from service
• Contingency analysis performed
• Contingencies identified
• Overload identified (binding constraint)
What’s in & What’s not
We included: • Power Flow Model
• Unit Bid Model
and enforced:
• Unit Capacity Limits
• Unit Ramp Rate Limits
• Generic Constraints
We didn’t include:• Transaction Model
• Inc/Dec Bid Model
• Reserve Model
• Market Power Mitigation
Cases Analyzed
Case Primary Transmission Line Removed1 Golden Hills-Mystic (349XY)2 Quaker Hill-Three Rivers 115 kV (197)3 Scobie-Sandy Pond (326)4 Card St.-Lake Road 345 kV (330)5 Norwalk-Northport 138 kV cable (1385)6 Grand Ave-Elm West (89003B)7 E. Springfld-E.Spring.Jct.-Piper 115 kV(1723)8 Canal-Carver St. 345 kV (322)9 Essex-Williston 115 kV (K23)10 Brayton-W. Farnum 345 kV (315)
PIPER
EASTSPRINGFIELD
FAIRMONTNORTH
BRECKWOODWEST
SPRINGFIELDAGAWAM
77
LINE 1723
SHAWINIGANCHICOPEE
LINE 1322
LINE 1254
LUDLOW
ORCHARD
ELM
POCHASSIC
SILVER
LINE 1433
Line 1723(E. Springfield - E. Springfield Junction - Piper)
PRECONTINGENCY STATELMP = $39.59
PIPER
EASTSPRINGFIELD
FAIRMONTNORTH
BRECKWOODWEST
SPRINGFIELDAGAWAM
LINE 1723
SHAWINIGANCHICOPEE
LINE 1322
LINE 1254
197 (193)
LUDLOW
ORCHARD
ELM
POCHASSIC
SILVER
LINE 1433
Line 1723(E. Springfield - E. Springfield Junction - Piper)
CONTINGENCY STATE
PIPER
EASTSPRINGFIELD
FAIRMONTNORTH
BRECKWOODWEST
SPRINGFIELDAGAWAM
LINE 1723
SHAWINIGANCHICOPEE
LINE 1322
LINE 1254
192 (193)
LUDLOW
ORCHARD
ELM
POCHASSIC
SILVER
LINE 1433
Line 1723(E. Springfield - E. Springfield Junction - Piper)
LMP WCMA Zone = $66.62LMP CT Zone = $39.20LMP other Zone = $38.25
SCOBIE
SEA BROOKSANDY POND
LINE 326
LINE 394
LOAD CENTER
GREGGSGREGGSMERRIMACK
LINE A253
LINE 363
LINE B202
LINE R187LINE C196LINE Q171
Line 326(Scobie - Sandy Pond)
PRECONTINGENCY STATELMP = $39.11
SCOBIE
SEA BROOKSANDY POND
LINE 326
LINE 394
LOAD CENTER
GREGGSGREGGSMERRIMACK
LINE A253 315(305)
LINE 363
LINE B202
LINE R187LINE C196LINE Q171
Line 326(Scobie - Sandy Pond)
CONTINGENCY STATE
SCOBIE
SEA BROOKSANDY POND
LINE 363LINE 326
LINE 394
LOAD CENTER
GREGGSGREGGSMERRIMACK
LINEA253
LINE B202
LINE R187LINE C196LINE Q171
302(305)
Line 326(Scobie - Sandy Pond)
LMP ME Zone = $15.50 LMP NH Zone = $31.28LMP WCMA Zone = $40.41 LMP NEMAB Zone = $41.78LMP other Zones = $40.11
Future Analyzes
• Possible additional studies from this static base
case
• Release LMP values for a dispatch cycle once a
month– Zonal LMP values
– Binding Constraints
Need more information?
• SMD Overview and Locational Marginal Pricing
training session– Sessions last week in November and first week in December
• Register on-line– Customer, Seminars and Training