IntroductionoThe Lucknow Metro is a Mass Rapid Transit System (MRTS) .

oAfter completion it will be the fastest and most economical project in India.

oThe metro project will be the most expensive public transport system in the state of  Uttar Pradesh.

oLucknow Metro will be having two routes, from North to South and East to West.

Page 3: Lmrc - Lucknow Metro Rail Co-orporation

HistoryoThe Lucknow Metro Rail Project was planned to include two corridors:

• North-South and East-West.• The Gomti Nagar Link.

oThe North-South corridor was to  cover a distance of 23 kilometres.

o The East-West corridor was planned to have a total length of 11 km.

o The designed speed of metro would be 90 km/h while the scheduled speed would be 34 km/h (21 mph) for North-South corridor and 32 km/h for East-West corridor.

Page 4: Lmrc - Lucknow Metro Rail Co-orporation

One of the most important projects –why?

oLucknow Metro Rail project is the fastest and most economical such project in India.

oLucknow, the capital of most populous state of India.

oLucknow is an important service and trading centre.

oRapidly growing city.o  So government of U.P. decided to implement LMRC to meet the mobility and

accessibility needs of people of Lucknow.

Page 5: Lmrc - Lucknow Metro Rail Co-orporation

Timeline• 2008 September: Papers for Lucknow metro rail project was submitted to

Uttar Pradesh Government by DMRC• 2008 October: The LDA (Lucknow Development Authority) cleared the

project

Page 6: Lmrc - Lucknow Metro Rail Co-orporation

• 2009 February: LDA and DMRC entered into an agreement• 2009 June: Lucknow traffic pattern was analyzed by a Bangalore company

as per the requirement of DMRC• 2009 July: DMRC initiated a Geo-technical survey

Page 7: Lmrc - Lucknow Metro Rail Co-orporation

• 2010 April: DMRC submitted the transportation and traffic report• 2010 May: The traffic issues were consulted between the committee

formed by Chief Secretary of UP Government and DMRC• 2010 June: The plan of route alignment was submitted by DMRC. The

related departments were coordinated by Lucknow Divisional commissioner • 2010 August: Detailed plan of the route was presented by DMRC• 2010 September: The route was once again consulted between the DMRC

and committee of Divisional Commissioner

Page 8: Lmrc - Lucknow Metro Rail Co-orporation

• 2011 July: The DPR (detailed project report) was submitted

Page 9: Lmrc - Lucknow Metro Rail Co-orporation

• 2013 June: Chief Minister Akhilesh Yadav cleared the metro rail network • 2013 August: The revised DPR prepared by DMRC was approved by UP

government• 2013 October: The Lucknow Metro Rail Corporation came into existence.

The construction was planned to start during December• 2013 November: DMRC initiated to work on Lucknow Metro and assure

to complete the first phase before February 2017• 2013 December: The project was approved by Indian Government

Page 10: Lmrc - Lucknow Metro Rail Co-orporation

• 2014 February:  E. Sreedharan, the Metro man took the charge as Chief adviser for Lucknow metro• 2014 March: Lucknow Metro project was initiated with foundation stone• 2014 July 10: Union Budget allocate 100 crore rupee towards Lucknow

Metro by Arun Jaitley, Indian Finance Minister• 2014 September 27: Lucknow Metro construction was initiated

Page 11: Lmrc - Lucknow Metro Rail Co-orporation

•Delay in PIB nod left LMRC cash-strappedThe delay in Public Investment Board's (PIB) clearance

to the city's Metro project had left Lucknow Metro Rail Corporation (LMRC) struggling to arrange funds to buy the train coaches in time.

Page 12: Lmrc - Lucknow Metro Rail Co-orporation

• 2015 August 6: PIB cleared the Lucknow Metro

Page 13: Lmrc - Lucknow Metro Rail Co-orporation

InitialisationOBJECTIVE

oAnalyse the strength and weakness of lucknow metro from socio-economic perspective.

oModel demand supply curve and various revenue functions.

oEstimate the breakeven for lucknow metro.

Page 14: Lmrc - Lucknow Metro Rail Co-orporation

InitialisationREQUIREMENTS

oExtensive data.

oDetailed surveys.

oProfile of settlement topography.

Page 15: Lmrc - Lucknow Metro Rail Co-orporation

InitialisationFUNDING

oTo be built at an estimated cost of Rs 6,928 crore.

oOut of this, the Centre will fund Rs 1,300 crore in the form of equity and subordinate debt and rest by state government.

Page 16: Lmrc - Lucknow Metro Rail Co-orporation

Designing

oThe project was started in 27th Sept 2014 and first phase will finish by 2017.

oNumber of lines will be two- BLUE and BROWN, divided in phase 1 and 2.

oTotal of 33 stations with 11 underground and 22 will be elevated. oBoth blue and brown line starting from Munshipulia(BLUE) and Vasant Kunj

(BROWN) will intersect at Charbagh.

oLMRC is jointly owned by companies GoI and GoUP.

Page 17: Lmrc - Lucknow Metro Rail Co-orporation

Route

Page 18: Lmrc - Lucknow Metro Rail Co-orporation

Phase 1 & 2oTotal nearly 34 kilometers, will be laid across the city at an estimated cost of

Rs 6,928 crores.

oThe East-West corridor will be from Amausi to Indiranagar

oA 3.4-km elevated track connecting Inter college(GomtiNagar) to Patrakarpuram be the first to be completed.

oThe North-South corridor will connect Gautam Buddha Marg to Vasant Kunj.

Page 19: Lmrc - Lucknow Metro Rail Co-orporation

ImplementationCOST ESTIMATES

oNorth-South Corridor• Works out to Rs. 4992Crores excluding taxes and duties. • Estimated total taxes & duties are Rs. 729 Crore.

oCharbagh Railway Station – Vasantkunj• Works out to Rs. 3723Crores excluding taxes and duties.• Estimated total taxes & duties are Rs. 572Crore.

Page 20: Lmrc - Lucknow Metro Rail Co-orporation

Cost EstimatesoEstimated cost of Rs 9786.00 Crore with central taxes and land cost.

Sr. No. Name of Corridor Distance (KMs)

Estimated cost without taxes

(Rs/Crore)

Estimated cost with Central taxes & land

cost (Rs/Crore) 1. N-S Corridor

(CCS Airport-Munshipulia)

22.878 4,992.00 5,590.00

2. E-W Corridor (Charbagh-Vasant Kunj)

11.098 3,723.00 4,196.00

Page 21: Lmrc - Lucknow Metro Rail Co-orporation

StatusoApril 2015 : Work of placing of caps on pillars started.oMay 2015 : Placing of U-Girders began.oDecember 2015 : Approximately 56% of the civil work had been completed.oApril 2016 : 80% of construction work completed.oDecember 2016 : The first line of Lucknow Metro (Transport Nagar to Charbagh)

is expected to get operational.

oThe trial of metro train at priority section is scheduled to be started in August 2016 and final operation will be started in December 2016.

Page 22: Lmrc - Lucknow Metro Rail Co-orporation

Effects on Environment

oEIA- to predict and qualify the magnitude of impacts, evaluate and asses the importance of identified changes.

oMain Aim- to decongest the road traffic.

oReduce vehicles on roads and vehicular pollution.

Page 23: Lmrc - Lucknow Metro Rail Co-orporation

Positive ImpactsoEmployment Opportunities.

oEnhancement of economy.

oReduced traffic.

oReduced Pollution.

o It is actually a Mass Rapid Transit.

Page 24: Lmrc - Lucknow Metro Rail Co-orporation

ConclusionoLucknow Metro was awarded the “Best Metro for Excellence in Innovative

Designs”.oLucknow Metro project competes with the upcoming Kochi Metro Rail

project to be the fastest completing project.oMetro systems are more reliable,comfortable and safer than roads based

systems.oMethodology and arguments used to satisfy these systems needs careful

analysis.

Page 25: Lmrc - Lucknow Metro Rail Co-orporation

Bibliography

owww.digialm.com/lmrc

owww.lmrcl.com

owww.sarkariresult.com/page/lmrc2016