lng reference projects - glava.no reference projects february 2013-2-lng reference projects existing...

62
LNG Reference Projects February 2013

Upload: vunga

Post on 20-Jun-2018

237 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

LNG Reference Projects

February 2013

Page 2: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-2-

LNG Reference Projects

Existing Installations

• Everett LNG (USA)

• Freeport LNG (USA)

• Bay State Gas (USA)

• Sabine Pass LNG (USA)

• National Grid / Haverhill (USA)

• Golden Pass LNG (USA)

• Canaport LNG (Canada)

• Manzanillo LNG (Mexico)

• Altamira LNG (Mexico)

• Mejillones LNG (Chile)

• Peru LNG

• Gate LNG (The Netherlands)

• Adriatic LNG (Italy)

• Egyptian LNG

• Qatar LNG

• RasGas (Qatar)

• Yemen LNG

• Hazira LNG (India)

Specified But Not Yet Installed

• Kittimat LNG (Canada)

• Dunquerke LNG (France)

• Yamal LNG (Russia)

• Zeebrugge LNG (Belgium)

• Bahia Blanca LNG (Argentina)

• Gorgon LNG (Australia)

• Pluto LNG (Australia)

• Gladstone LNG (Australia)

• Dighi LNG (India)

• Petronet LNG (India)

• Skikda LNG (Algeria)

Page 3: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-3-

LNG Import Terminal In St. John, New Brunswick

• Scope: >5000 m of

cryogenic and utility piping

• Date: August 2008

• Process Temps.: -260°F (-162°C)

to ambient

• Design Goal: Condensation

control; flash-freeze protection of

fire-water lines in LNG spills

• Insulation: 2 layers (20 mm)

Cryogel-Z over PIR

• Results:

– Material was specified because of the reduced labor force, faster installation

schedule, and fire protection

– Contractor stated that wished he could have done 100% Cryogel, as it “would

have gone on five times faster”

Page 4: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-4-

Cryogel-Over-PIR Improved Spacing, Schedule & Fire Resistance

Page 5: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-5-

Elbow Design

Page 6: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-6-

Installation in St. John, NB

Page 7: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-7-

Cutting Area Within the Unit

Page 8: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-8-

This Is What 200 Cryogel Z Elbows Looks Like In Storage

Page 9: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-9-

Valves and Flanges on Offshore LNG Import Terminal

• Scope:

– 1500+ valves & flanges >2”

• Location:

– Southeast of Venice, Italy

• Process Temp.:

– -260°F (-162°C)

• Other Factors:

– Clashes and supply / logistical issues

with baseline material

• Insulation:

– 7-11 layers Cryogel Z

• Results:

– All material air-freighted to job site

within 4-weeks ARO

– 700 insulators trained on Cryogel

– All clashes resolved ahead of schedule

Page 10: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-10-

Shrink an LNG Import Terminal to 300’ x 600’…

Page 11: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-11-

…and Mechanical Clashes Spring Up…

Page 12: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-12-

…Everywhere

Page 13: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-13-

A Spec Was Created For Tying Cryogel Into Adjacent Insulation

Cellular glass

Void fill

Cryogel

Page 14: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-14-

Particular Attention Was Paid to the Tie-Ins

Page 15: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-15-

Void Spaces Were Stuffed With Fiber

Page 16: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-16-

Cryogel Layers Were Then Applied And Held With Tape

Cryogel Z

Void Fill

Page 17: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-17-

Each Layer Was Marked for Inspection

Page 18: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-18-

SS Bands Used to Secure the Cryogel Over the Foamglas

Page 19: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-19-

Cryogel Joints Were Sealed with Foil-Faced Butyl Tape

Page 20: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-20-

Valves Were Finished With a Butyl Membrane & UV-Cure GRP

Page 21: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

Insulating Double-Gimbaled

Cryogenic Flex Joints

Page 22: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-22-

Insulating Cryogenic Flex Joints

• Scope:

– 36” LNG flex joints

• Location:

– Mexico

• Temperature:

– -260°F (-162°C)

• Design Goals:

– Condensation control on a

doubly-gimbaled flex joint

for large bore pipe

• Insulation:

– 4-5” (11-13 layers) Cryogel Z

to match 8-9” of PIR

• Results:

– Insulated in Houston and trucked to Mexico

– Worked with EPC, joint manufacturer and contractor on the overall design

Page 23: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-23-

As-Delivered Flex Joints Prior to Insulation

Page 24: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-24-

Void-Filling with Fibrous Blanket Material

Page 25: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-25-

Installing Cryogel Layers

Page 26: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-26-

Insulation Complete w/ External Expansion-Contraction Joint

Page 27: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-27-

Finished Article Ready for Transport

Page 28: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-28-

Lifting Gimbal Joint

Page 29: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-29-

Positioning Beneath Riser Pipe

Page 30: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-30-

Both Gimbal Joints Installed on Liquid and Vapor Return Lines

Page 31: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

LNG Tank Risers

Page 32: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-32-

Insulating LNG Tank Risers

• Scope: 150’ of 24” and 12” pipe

• Process Temp.: -260°F (-162°C)

• Insulation:

– 2.8” (70 mm) Cryogel Z

• Other Factors:

– Frequent thermal cycling

– Only 3” of clearance between pipe

surface and tank stiffening rings

– All work done between LNG deliveries

– Insulated pipes pass through hoop

guides designed to limit sideways

deflection due to wind loads. Insulation

had to withstand compressive-, shear-,

and impact-loading

• Results:

– Lines are in-service; Tank 2 this year

Page 33: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-33-

Steel Clamp Rings Used to Protect Insulation & Support Jacket

Anchor

Ring 1

Ring 3

Ring 4

Ring 5

Ring 2

LNG

Pipe wall

Pipe guide

1¼” SS bands

Fabricated

SS clamp ring

1” insulation

support ring

Heavy-gage stainless

steel clamp rings at

each tank ring pulled

double duty:

1.They acted as a

bumper between the

insulation and the

pipe guide, and

2.Periodically

supporting the 150’

of SS jacket

Page 34: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-34-

Material Was Pre-Cut on the Ground to the Right Circumference

Page 35: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-35-

During Installation, Cryogel Was Held In Place with Tape

Page 36: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-36-

Foster 90-66 Vapor Stops Being Painted

Page 37: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-37-

Minimal Clearance Between Insulation, Tank Stiffener Rings

Page 38: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-38-

Stainless Steel Clamp Ring Held on with Bands

Page 39: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-39-

Pipe Guides Constructed to Allow Minimal Rattle Space

Page 40: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-40-

Liquid Ethylene Sphere in Brazil

• Scope:

– 60’ ethylene sphere

• Location:

– Southern Brazil

• Temperature:

– -30°F (-34°C)

• Design Goals:

– Condensation control

– 90-min fire protection

• Insulation:

– 50 mm Cryogel Z + 10 mm Pyrogel XT + galvanized steel jacket

• Results:

– Reduced thickness by 67%

– 20% faster installation than with spray foam

– Sproule Mfg. designed cut patterns, resulting in a 98.5% material yield

Page 41: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-41-

All Joints Taped to Provide Continuous Vapor Barrier

Page 42: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-42-

Standoffs Support Jacket While Bands Harness Bottom Head

Page 43: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-43-

Jacketing Near the Sphere’s Apex, Before Painting

Page 44: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-44-

The Finished Article

Page 45: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-45-

Super-Insulated Liquid Ethylene Vessel

• Scope: 10’ x 60’ ethylene bullet

• Location: Southampton, UK

• Design Goals:

– Maintain liquid during 6-week T/A without refill or refrigeration (BOG <5 kg/day)

– Passive fire protection

• Insulation Design:

– 13.4” (340 mm) of Cryogel,

jacketed with SS

• Results:

– Vessel was pre-insulated in

Manchester, then trucked

250 miles to Southampton

– Unit successfully installed

and operated during T/A

– Now in-service as just a

very well-insulated

ethylene storage vessel

Page 46: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-46-

10’ x 60’ Vessel As-Delivered from Fabrication Yard

Page 47: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-47-

On a 34-Layer System, Keeping an Accurate Count is Important

Page 48: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-48-

Patterns Created In-Place By Simply Removing Excess Material

Page 49: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-49-

Bands and Bridles Installed Every Fourth Layer for Support

Page 50: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-50-

Final Layer Installed, Banded and Sealed with Tape

Page 51: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-51-

Fiber Blankets Protect the Vapor Barrier from Screw Punctures

Page 52: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-52-

Finished Article Awaiting 250-Mile Transport by Truck

Page 53: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-53-

Rigging and Installation On Site

Page 54: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-54-

Heat Exchanger Modules

• Location: Northern Alberta

• Scope: Three pre-insulated

heat exchanger modules

• Date: Mar, 2007

• Process Temp.: 250-400°F

• Design Goal: Heat conservation

• Insulation: 2” mineral wool �

¾” Pyrogel

• Other Factors: Modules insulated in Kansas City; transported to Alberta

• Results:

– Insulation survives the abuse of long-distance road transport

– Thinner profile reduced interference near inlets, outlets, and structural supports

Page 55: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-55-

Heat Exchanger Insulation Survives Transport and Handling

Page 56: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-56-

SAGD Operation, Ft. McMurray, AB

• Scope: 3 km of 24” pipe

• Date: Summer 2009

• Process Temp.: 300°C (570°F)

• Design Goal: Heat conservation

• Other Factors: All piping

was pre-insulated in Edmonton

and trucked 6 hours to remote

work site

• Results:

– Eliminated need for an on-site man camp

– Reduced effective labor rate from $200/hr to $45/hr

Page 57: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-57-

Pyrogel Enables Pre-Insulation, Transport of Pipe & Equipment

Page 58: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-58-

Pyrogel Enables Pre-Insulation, Transport of Pipe & Equipment

Page 59: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-59-

Pyrogel Enables Pre-Insulation, Transport of Pipe & Equipment

Page 60: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-60-

Pyrogel Enables Pre-Insulation, Transport of Pipe & Equipment

Page 61: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

-61-

Summary and Conclusions

• Efficiency

– Most efficient insulation materials in the world

– Saves energy

– Reduces touch temperatures

• Productivity

– Flexible blanket form for increased productivity

– Streamlined planning, supply chain, and logistics

– Better space efficiency

– Enables pre-insulation of piping and equipment

• Durability

– Resistance to damage by water, heat, and mechanical abuse

– Will not promote corrosion under insulation

– Exceptional fire protection

Page 62: LNG Reference Projects - glava.no Reference Projects February 2013-2-LNG Reference Projects Existing Installations ... Microsoft PowerPoint - LNG References (Feb 2013).ppt Author:

Thank

You