load calculations buildings
TRANSCRIPT
-
7/29/2019 Load calculations buildings
1/31
ARYA JAGAT
DEAD LOADS:
BRICK WORKS - FLOOR HT. = 3.30M
230 THK. WALL - BEAM DEPTH = 0.60 M 0.23 x 2.70 x
0.45 M 0.23 x 2.85 x
CONCRETE - FLOOR SLABS - THICKNESS = 0.150 M 0.15 x 1.00 x
PLASTERS: 0.01 M 0.01 x 1.00 x
FLOOR FINISHES: 0.10 M 0.10 x 1.00 x
FLOOR FINISHES (ROOF):
LIVE LOADS:
STILT LEVEL:
FLOORS:
ROOF (ACCESSIBLE):
ROOF (INACCESSIBLE):
LOAD ON BEAMS FROM SLAB
= w*lx/6*(3-(lx/ly)^2) where lx
-
7/29/2019 Load calculations buildings
2/31
LIVE (STILT LVL) = 8.08kN/m
(FLOORS) = 3.23 kN/m
ROOF (ACCESSIBLE): 2.42kN/m
ROOF (INACCESSIBLE): 1.21kN/m
PANEL 4:
lx = 4.10 m
ly = 5.04 m
LOADS ON BEAM
DEAD (FLOORS) = 9.87kN/m
(ROOF) = 14.66 kN/m
LIVE (STILT LVL) = 7.99kN/m
(FLOORS) = 3.20 kN/m
ROOF (ACCESSIBLE): 2.40kN/m
ROOF (INACCESSIBLE): 1.18kN/m
PANEL 5:
lx = 3.20 m
ly = 5.04 m
LOADS ON BEAM
DEAD (FLOORS) = 8.55kN/m
(ROOF) = 12.71 kN/m
LIVE (STILT LVL) = 6.93kN/m
(FLOORS) = 2.77 kN/m
ROOF (ACCESSIBLE): 2.08kN/m
ROOF (INACCESSIBLE): 0.92kN/m
SELF WEIGHT OF DEEP BEAM PER FLOOR: 3.30 M 0.20 x 3.30 x
DEAD LOAD ON BEAMS 1 TO 5:
LOAD ON BEAM 1 FROM 1 FLOOR: 30.53 kN/m
LOAD ON BEAM 1 FROM 5 FLOORS: 152.67kN/m
LOAD ON BEAM 2 FROM 1 FLOOR: 25.09 kN/m
LOAD ON BEAM 2 FROM 5 FLOORS: 125.44kN/m
LOAD ON BEAM 3 FROM 1 FLOOR: 26.47 kN/m
LOAD ON BEAM 3 FROM 5 FLOORS: 132.37kN/m
LOAD ON BEAM 4 FROM 1 FLOOR: 26.37 kN/m
LOAD ON BEAM 4 FROM 5 FLOORS: 131.83kN/m
LOAD ON BEAM 5 FROM 1 FLOOR: 25.05 kN/m
LOAD ON BEAM 5 FROM 5 FLOORS: 125.26kN/m
LIVE LOAD ON BEAMS 1 TO 5:
LOAD ON BEAM 1 FROM 1 FLOOR: 4.55 kN/m
LOAD ON BEAM 1 FROM 5 FLOORS: 22.73 kN/m
LOAD ON BEAM 2 FROM 1 FLOOR: 2.78 kN/m
-
7/29/2019 Load calculations buildings
3/31
LOAD ON BEAM 2 FROM 5 FLOORS: 13.91 kN/m
LOAD ON BEAM 3 FROM 1 FLOOR: 3.23 kN/m
LOAD ON BEAM 3 FROM 5 FLOORS: 16.15 kN/m
LOAD ON BEAM 4 FROM 1 FLOOR: 3.20 kN/m
LOAD ON BEAM 4 FROM 5 FLOORS: 15.98 kN/m
LOAD ON BEAM 5 FROM 1 FLOOR: 2.77 kN/m
LOAD ON BEAM 5 FROM 5 FLOORS: 13.85 kN/m
-
7/29/2019 Load calculations buildings
4/31
20 = 12.42 kN/m
20 = 13.11 kN/m
25 = 3.750 kN/sqm
2.2 = 0.024 kN/sqm
24 = 2.400 kN/sqm
6.174 kN/sqm
5.400
9.174 kN/sqm
= 5.00 kN/sqm
= 2.00 kN/sqm
= 1.50 kN/sqm
= 0.75 kN/sqm
-
7/29/2019 Load calculations buildings
5/31
25 = 16.50 kN/m
-
7/29/2019 Load calculations buildings
6/31
-
7/29/2019 Load calculations buildings
7/31
ARYA JAGAT
DEAD LOADS:
BRICK WORKS - FLOOR HT. = 3.30M
230 THK. WALL - BEAM DEPTH = 0.60 M 0.23 x 2.70 x
0.45 M 0.23 x 2.85 x
CONCRETE - FLOOR SLABS - THICKNESS = 0.150 M 0.15 x 1.00 x
PLASTERS: 0.01 M 0.01 x 1.00 x
FLOOR FINISHES: 0.10 M 0.10 x 1.00 x
FLOOR FINISHES (ROOF):
LIVE LOADS:
STILT LEVEL:
FLOORS:
ROOF (ACCESSIBLE):
ROOF (INACCESSIBLE):
LOAD ON BEAMS FROM SLAB
= w*lx/6*(3-(lx/ly)^2) where lx
-
7/29/2019 Load calculations buildings
8/31
LIVE (STILT LVL) = 8.08kN/m
(FLOORS) = 3.23 kN/m
ROOF (ACCESSIBLE): 2.42kN/m
ROOF (INACCESSIBLE): 1.21kN/m
PANEL 4:
lx = 4.10 m
ly = 5.04 m
LOADS ON BEAM
DEAD (FLOORS) = 9.87kN/m
(ROOF) = 14.66 kN/m
LIVE (STILT LVL) = 7.99kN/m
(FLOORS) = 3.20 kN/m
ROOF (ACCESSIBLE): 2.40kN/m
ROOF (INACCESSIBLE): 1.18kN/m
PANEL 5:
lx = 3.20 m
ly = 5.04 m
LOADS ON BEAM
DEAD (FLOORS) = 8.55kN/m
(ROOF) = 12.71 kN/m
LIVE (STILT LVL) = 6.93kN/m
(FLOORS) = 2.77 kN/m
ROOF (ACCESSIBLE): 2.08kN/m
ROOF (INACCESSIBLE): 0.92kN/m
SELF WEIGHT OF DEEP BEAM PER FLOOR: 3.30 M 0.20 x 3.30 x
DEAD LOAD ON BEAMS 1 TO 5:
LOAD ON BEAM 1 FROM 1 FLOOR: 30.53 kN/m
LOAD ON BEAM 1 FROM 5 FLOORS: 152.67kN/m
LOAD ON BEAM 2 FROM 1 FLOOR: 25.09 kN/m
LOAD ON BEAM 2 FROM 5 FLOORS: 125.44kN/m
LOAD ON BEAM 3 FROM 1 FLOOR: 26.47 kN/m
LOAD ON BEAM 3 FROM 5 FLOORS: 132.37kN/m
LOAD ON BEAM 4 FROM 1 FLOOR: 26.37 kN/m
LOAD ON BEAM 4 FROM 5 FLOORS: 131.83kN/m
LOAD ON BEAM 5 FROM 1 FLOOR: 25.05 kN/m
LOAD ON BEAM 5 FROM 5 FLOORS: 125.26kN/m
LIVE LOAD ON BEAMS 1 TO 5:
LOAD ON BEAM 1 FROM 1 FLOOR: 4.55 kN/m
LOAD ON BEAM 1 FROM 5 FLOORS: 22.73 kN/m
LOAD ON BEAM 2 FROM 1 FLOOR: 2.78 kN/m
-
7/29/2019 Load calculations buildings
9/31
LOAD ON BEAM 2 FROM 5 FLOORS: 13.91 kN/m
LOAD ON BEAM 3 FROM 1 FLOOR: 3.23 kN/m
LOAD ON BEAM 3 FROM 5 FLOORS: 16.15 kN/m
LOAD ON BEAM 4 FROM 1 FLOOR: 3.20 kN/m
LOAD ON BEAM 4 FROM 5 FLOORS: 15.98 kN/m
LOAD ON BEAM 5 FROM 1 FLOOR: 2.77 kN/m
LOAD ON BEAM 5 FROM 5 FLOORS: 13.85 kN/m
-
7/29/2019 Load calculations buildings
10/31
20 = 12.42 kN/m
20 = 13.11 kN/m
25 = 3.750 kN/sqm
2.2 = 0.024 kN/sqm
24 = 2.400 kN/sqm
6.174 kN/sqm
5.400
9.174 kN/sqm
= 5.00 kN/sqm
= 2.00 kN/sqm
= 1.50 kN/sqm
= 0.75 kN/sqm
-
7/29/2019 Load calculations buildings
11/31
25 = 16.50 kN/m
-
7/29/2019 Load calculations buildings
12/31
-
7/29/2019 Load calculations buildings
13/31
TYPE-3 QTR, ANDRO
REACTIONS AT COLUMN SUPPORTS FOR DEAD + LIVE LOAD COMBINATION
L/CForces (kN) Moments (kNm)
Fx Fy Fz Mx My Mz
78 LOAD + LIV 12.32 686.08 35.51 39.07 0.76 -1.47
79 LOAD + LIV 0.80 1851.89 27.59 29.98 -1.65 12.05
80 LOAD + LIV -16.56 1402.48 8.04 9.92 -0.11 24.72
81 LOAD + LIV -15.73 782.11 1.57 1.60 0.05 24.18
82 LOAD + LIV -55.64 2861.21 2.01 2.73 -0.05 69.58
83 LOAD + LIV -15.31 1058.78 -0.55 -0.94 0.33 23.29
84 LOAD + LIV 26.39 1271.61 25.38 26.48 1.71 -32.00
85 LOAD + LIV 90.31 3800.51 72.32 80.94 4.22 -106.76
86 LOAD + LIV -61.11 3669.23 104.89 123.74 9.07 69.47
87 LOAD + LIV -20.56 1679.39 -10.06 -16.82 10.92 21.51
88 LOAD + LIV -116.87 444.35 14.57 12.13 10.69 52.93
89 LOAD + LIV 52.03 1196.35 -36.22 -46.90 1.63 -105.53
90 LOAD + LIV 151.97 4469.62 -50.39 -64.53 1.47 -222.42
91 LOAD + LIV -11.07 5095.96 -52.37 -61.59 -3.24 -33.96
92 LOAD + LIV -138.69 559.84 -6.59 -9.21 -0.85 107.44
93 LOAD + LIV 48.71 940.62 -2.70 -8.64 0.47 -101.38
94 LOAD + LIV 120.79 3471.87 -3.85 -11.61 1.12 -185.56
95 LOAD + LIV 7.42 4166.22 -0.86 -3.31 -1.03 -54.40
96 LOAD + LIV -123.95 516.74 0.11 0.61 0.29 92.16
97 LOAD + LIV 55.48 1210.33 31.66 30.59 -0.24 -116.05
98 LOAD + LIV 148.70 4370.98 39.41 37.56 0.78 -225.23
99 LOAD + LIV 2.63 5104.21 51.76 56.33 1.82 -56.87
100 LOAD + LIV -136.11 558.34 9.72 13.80 2.59 97.34
101 LOAD + LIV 45.71 1114.61 -50.60 -66.67 -2.51 -78.86
102 LOAD + LIV 69.23 3546.02 -64.76 -86.17 -0.84 -107.64
103 LOAD + LIV 68.26 3906.87 -58.75 -74.46 -6.64 -113.20
104 LOAD + LIV -59.15 214.08 5.20 12.67 -8.98 28.01
105 LOAD + LIV -133.35 527.59 -21.25 -18.43 -10.02 31.70
106 LOAD + LIV -29.79 2229.12 -8.36 -10.78 -0.60 22.60
107 LOAD + LIV 5.39 1242.43 -10.67 -13.95 -0.48 -11.99
108 LOAD + LIV 2.57 1051.03 -3.69 -5.20 -0.49 -8.72
109 LOAD + LIV 5.90 683.83 -1.29 -2.76 -0.23 -10.24
110 LOAD + LIV 5.29 820.64 -1.14 -2.17 -0.19 -9.52
111 LOAD + LIV 30.97 525.39 -16.14 -27.05 -2.06 -44.09
112 LOAD + LIV -0.31 1143.56 -16.84 -24.03 0.21 -0.11
113 LOAD + LIV 6.65 607.06 -2.85 -4.61 -0.16 -11.36
114 LOAD + LIV 9.22 713.09 -3.03 -4.44 -0.10 -14.58
115 LOAD + LIV 16.38 1139.35 -12.45 -15.26 -0.80 -23.42
116 LOAD + LIV -31.89 114.56 -14.21 -8.79 -8.62 22.83
122 LOAD + LIV -3.45 2441.41 29.61 35.97 0.00 9.25
168 LOAD + LIV -99.75 394.99 10.08 18.54 -3.67 63.28
210 LOAD + LIV 1.12 623.02 -17.23 -29.54 -0.09 -1.88
537 LOAD + LIV 85.05 2700.49 -2.58 -5.22 0.30 -87.62
538 LOAD + LIV 0.00 175.21 0.00 0.00 0.00 0.00
Node
No.
-
7/29/2019 Load calculations buildings
14/31
CALCULATION OF STATIC BASE SHEAR:
Total wt. of structure, W = 77083 kN T at X-Direction = 0.09h
Zone Factor, Z = 0.16 d at X-Direction =
Z/2 = 0.08 T =
Importance Factor, I = 1 For me
Response Reduction Factor, R = 5 0.10 =< T =
-
7/29/2019 Load calculations buildings
15/31
-
7/29/2019 Load calculations buildings
16/31
sqrt(d)
25.40m
0.136 sec 0.02
ium soil site &
sqrt(d)
16.10m
0.170 sec
ium soil site &
ctor of 1
-
7/29/2019 Load calculations buildings
17/31
OVERHEAD SERVICE RESERVOIR AT SAWAI MADHOPUR, RAJASTHAN - 500KL CAPACITY .
REACTIONS AT COLUMN SUPPORTS FOR DEAD + LIVE LOAD COMBINATION
L/CForces (kN) Moments (kNm)
Fx Fy Fz Mx My Mz
32 LOAD + LI 9.08 284.83 18.03 12.33 -0.26 -10.82
33 LOAD + LI 4.37 403.85 -14.09 -5.82 0.15 -5.74
34 LOAD + LI 1.20 380.27 18.23 11.36 0.09 -2.41
35 LOAD + LI 4.21 331.87 6.12 4.00 0.00 -3.65
36 LOAD + LI 3.28 367.61 0.42 -0.34 -0.05 -3.07
37 LOAD + LI -11.48 263.64 1.92 1.37 -0.16 6.22
38 LOAD + LI -6.35 649.92 6.54 1.83 0.04 4.44
39 LOAD + LI 1.37 663.96 8.00 0.72 -0.01 -0.88
40 LOAD + LI -1.51 422.23 5.49 3.75 -0.09 1.16
41 LOAD + LI -0.58 620.96 -1.61 -2.02 -0.02 -0.66
42 LOAD + LI 8.33 1136.75 -30.28 -22.35 -0.10 -6.08
43 LOAD + LI -1.55 1213.34 -5.66 -5.84 0.14 0.84
44 LOAD + LI -0.27 609.56 -4.75 -2.60 -0.31 0.29
45 LOAD + LI -5.85 140.10 8.03 9.05 -0.36 5.1746 LOAD + LI -6.15 241.56 -0.14 -0.05 -0.07 5.73
47 LOAD + LI 10.22 273.86 -18.03 -13.22 0.27 -10.68
48 LOAD + LI 6.23 389.58 14.98 5.29 0.29 -6.41
49 LOAD + LI 8.16 621.15 8.76 1.45 -0.01 -7.07
50 LOAD + LI -1.15 523.99 -1.56 -1.56 0.01 -0.74
51 LOAD + LI -2.75 691.96 -2.71 -2.75 0.27 0.00
52 LOAD + LI -2.93 201.56 -5.12 -5.04 0.15 -0.14
53 LOAD + LI 2.05 253.81 -0.73 -0.47 -0.41 -2.79
54 LOAD + LI 0.06 215.73 -10.89 -2.58 -0.38 -0.26
55 LOAD + LI -17.99 470.73 -0.95 -0.61 -0.38 19.07
CALCULATION OF STATIC BASE SHEAR:
Total wt. of structure, W = 11373 kN
Zone Factor, Z = 0.16 Ht. of structure, h =
Z/2 = 0.08 T =
Importance Factor, I = 1 For mediu
Response Reduction Factor, R = 5 0.55 =