Page 1: Load List for B-12-1

FOR B12-1 WELL PLATFORM.

Page 1 of 5

PC80

1230

1-00

PROJECT: C SERIES PROJECT 4 WELL HEAD PLATFORM PROJECT

ELECTRICAL LOAD LIST FOR B12-1 WELL PLATFORM

Notes: 1. Load list is based on preliminary instrumentation loads.

OIL AND NATURAL GAS CORPORATION LTD. INDIA

TECHNIP KT INDIA PVT LTD.

CLIENT: ONGC TITLE : ELECTRICAL LOAD LIST

A 30.05.2012 SGBM

30.05.2012 SKVS

30.05.2012 SIS

ISSUED FOR ENQUIRY A

PEM STATUS

MADE BY & DATE

BY & DATE

APP BY & DATE

STATUS

REV

DOCUMENT NO. : P4901-LS-EL-003

Page 2: Load List for B-12-1

(Amp.)

P: PRELIMINARY D: DESIGN APPROVED C: CERTIFIED F : Final

Page 2 of 5

TECHNIP KT INDIA LIMITED.

ELECTRICAL LOAD LIST (B12-1 - System I : 24V DC ) RTU

SYSTEM Client: ONGC

Sr. No.

Load Description

Qty.

Rated

Voltage

Unit Load (Watt)

Total Load (Watt)

Run Up Time In Hrs./Day

Energy Consumed in

Ah/Day

Energy Consumed in WH/Day

Unit Load @ 24V DC

(Amp.)

Total Load 24V

DC (Amp.)

Duty Cycle/ Load

Factor

Average Current

Drawn @ 24VStatus

Remarks

1 TIC PLC

1.1 Multivariable Transmitter 1 24 35 35 24 35 840 1.458 1.458 P

1.2 Electronic Transmitter (TT, PT) 32 24 0.5 16 24 16 384 0.0208 0.667 P

1.3 Pig Detectors 1 24 1.2 1.2 0.01 0.0005 0.012 0.050 0.050 P

1.4 Isolating Barriers 32 24 1.6 51.2 24 51.2 1228.8 0.067 2.133 P

1.5 RTU PLC System 1 24 300 300 24 300 7200 12 12 P

1.6

Microwave Radio during Transmit Micro Radio during Receive Microwave Radio during Sleep Mode

1

24 272 272 24 272 6528 11.333

11.333 P

Limit Switches 24 1.2 9.6 9.6 230.4 0.4 P

1.8 Level Switch / Pressure Switch 5 24 1.2 24 6 144 0.050 0.25 P

TOTAL 691 690 16555

10% MARGIN 69 69 1655

TOTAL (WITH 10% MARGIN )

760

759

18,210

32

TOTAL AVERAGE DEMAND: Amps

TOTAL PEAK DEMAND: 33 Amps

1.7

8 24 0.050

6.0

29

3

Project No. : P4901 Date: 30/05/2012 Rev: A

Page 3: Load List for B-12-1

24V (Amp.)

assumed.

P: PRELIMINARY D: DESIGN APPROVED F: FINAL

SH. 3 OF 5

ELECTRICAL LOAD LIST (B12-1- System II: 24V DC) LIGHTING, INST.

GAS FILTER SEPARATOR Client: ONGC

Sr. No.

Load Description

Qty.

Rated

Voltage Unit Load

(Watt) Total Load

(Watt)

Run Up Time In

Hrs./Day

Energy Consumed in Ah/Day

Energy Consumed in WH/Day

Unit Load @ 24V

DC (Amp.)

Total Load 24V

DC (Amp.)

Duty Cycle/ Load

Factor

Average Current

Drawn @ Status

Remarks

1

Illumination for Level Gauge

3

24 50 150 0.25 1.56 37.5 2.083

6.25 P

Run-Up time of 0.25hr/day is

2 INST. GAS FILTER SEPARATOR

2.1 Illumination for Level Gauge 2 24 50 100 0.25 1.042 25 2.083 4.167 P

2.2 Level Switch 1 24 1.2 1.2 0.01 0.0005 0.012 0.05 0.05 P

3 Lighting System

3.1 Electrical/Telemetry Room Lighting 2 24 60 120 3 15 360 2.5 5 P

3.2 Battery Room Lighting 2 24 60 120 3 15 360 2.5 5 P

3.3 Shelter House Lighting 2 24 60 120 3 15 360 2.5 5 P

TOTAL 611 48 1142.5 25.5

10% MARGIN 61 5 114.25 2.5

TOTAL (WITH 10% MARGIN ) 672 53 1257 28

TOTAL AVERAGE DEMAND: Amps

TOTAL PEAK DEMAND: 28 Amps

TECHNIP KT INDIA LIMITED.

Project No. : P4901 Date: 30/05/2012 Rev: A

Page 4: Load List for B-12-1

Current

24V

P: PRELIMINARY D: DESIGN APPROVED C: CERTIFIED F : Final

SH. 4 OF 5

ELECTRICAL LOAD LIST (B12-1 - System III : 24V DC ) FIRE &

GAS, HIPPS SYSTEM Client: ONGC

Sr. No.

Load Description

Qty.

Rated

Voltage

Unit Load

(Watt)

Total Load (Watt)

Run Up Time In

Hrs./Day

Energy Consume

d in Ah/Day

Energy Consumed in WH/Day

Unit Load @ 24V

DC (Amp.)

Total Load

24V DC (Amp.)

Duty Cycle/ Load

Factor

Average

Drawn @

(Amp.)

Status

Remarks

1 FIRE AND GAS PLC

1.1 Hydrogen Detectors 3 24 4.6 13.8 24 13.8 331.2 0.192 0.575 P

1.2 HC Gas Detectors 32 24 7.5 240 24 240 5760 0.313 10 P

1.3 Heat Detectors 10 24 0.25 2.5 24 2.5 60 0.010 0.104 P

1.4 Smoke Detectors 43 24 0.25 10.75 24 10.75 258 0.010 0.43 P

1.5 Flashing beacons 4 24 33.6 134.4 0.25 1.4 33.6 1.400 5.6 P Run-Up time of 0.25hr/day is assumed.

1.6 Electronic hooter 2 24 6 12 0.25 0.25 3 0.250 0.5000 P Run-Up time of 0.25hr/day is assumed.

1.7 Relays & Timers 0 24 6 0 0.25 0.000 0 0.250 0.000 P Run-Up time of 0.25hr/day is assumed.

1.8 F&G PLC 1 24 300 300 24 300 7200 12.5 12.5 P

2 HIPPS

2.1 Pressure Switch 3 24 1.2 3.6 0.01 0.015 0.036 0.050 0.15 P

2.2 Solenoid Valve 4 24 24 96 0.01 0.04 0.96 1.000 4 P

2.3 PLC System 1 24 300 300 24 300 7200 12.5 12.5 1.0000 12.5000 P

TOTAL 1113 968 20,847 46 10% MARGIN 119 94 2265 5

TOTAL (WITH 10% MARGIN ) 1307 1038 24192 54.5

TOTAL AVERAGE DEMAND: Amps TOTAL PEAK DEMAND: 54.5 Amps

TECHNIP KT INDIA LIMITED.

Shutdown Panel 3 1 24 75 75 24 75 1800 3.12 3.12 P

Project No. : P4901 Date: 30/05/2012 Rev: A

SBMahadik
1188
SBMahadik
49.5
SBMahadik
944
SBMahadik
22647
Page 5: Load List for B-12-1

P: PRELIMINARY D: DESIGN APPROVED C: CERTIFIED F: Final

SH. 5 OF 5

ELECTRICAL LOAD LIST (B157 - System IV : 24V DC )

NAV-AID SYSTEM

PROJECT NO.: P4901 DATE: 30/05/2012 REV: A

TECHNIP KT INDIA LIMITED.

Client ONGC Morse code “U” Nav-Aids Lanterns 15 Sec.

Sr. no. Load description Qty. Rated

voltage ON OFF ON OFF ON OFF Duty cycle

Av Lamp

current incl

Surge

Flasher Quiesce

nt current

(A)

AVDaily power drain @24V

AV Daily power drain including battery charger/

discharger, efficiency

AV Daily power

drain @ worse case

(Ah/Day)

Status Remarks

1 Nav Aid Lanterns 4 24 0.4 0.5 0.4 0.50 1.2 12.00 0.13 3.33 0.005 7.22 7.6 30.42 P

Total 1.2 0.13 0.005 7.60 30.42

Total Daily load = 30.42 AH/DAY