load testing machine application

Upload: jefry-n-s-butarbutar

Post on 03-Apr-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 Load Testing Machine Application

    1/12

  • 7/29/2019 Load Testing Machine Application

    2/12

    has several uses but this presentation will

    cable heads and single strands of wireline.

    .consist of a tool holder, a wireline clamp, a

    , ,section and the recording section.

  • 7/29/2019 Load Testing Machine Application

    3/12

  • 7/29/2019 Load Testing Machine Application

    4/12

    Reasons for Tensile Testing

    Training: Many times the newest members of thewre ne companes are respons e or u ng e ca ehead. Previously there has not been a way to test tomake sure technique has not been lost.

    nsurng e ua y o our ne: ow many mes avewe told our People to cut back to good Line? Good

    line is a relative term. Now we can give our people a ". .example.Safety: We have all heard or seen a string of tools fall to

    .Engineers check our crane blocks frequently but youdont see them checking cable heads. Now there is adevice to do just that.

  • 7/29/2019 Load Testing Machine Application

    5/12

    Cable Records: By keeping a record of the tensile strength of

    be replaced. Confidence in weak points given to our customer: How many times

    have we given a customer a point at which the head was supposedto part an t came out eary? By c ec ng t e ca e ea once aweek after a job, for several weeks, your young engineer will be able

    to tell a customer with confidence where the head will part. He willknow his fatigue factor He also did not have to lose any thing in thewe o ga n a nowe ge.

    Knowing when your line has been in corrosive fluids: By checkingyour tensile strength you will have a record of previous strengthsand can catch a dama ed line uicker. Also ou will have hard

    numbers to take back to the customer. No more twisting wire in frontof someone that only understands numbers.

  • 7/29/2019 Load Testing Machine Application

    6/12

    Placement of Cable head inac ne

    De endin on the

    style cablehead aperson needs only 5-

    wireline on the head.

    It is threaded throu ha typical wirelineclamp, the clamp is

    ,jack is pumped untilthe wire is parted.

  • 7/29/2019 Load Testing Machine Application

    7/12

    This devise is mounted in

    pace o e wre neclamp on the Load TestMachine and pulls a

    same radius as most

    cones have. Along withthe L.T. Machine it ivesan accurate test of asingle strands strengthand takes only

    approxma e yseconds to cut your wire,thread through the

    , .

  • 7/29/2019 Load Testing Machine Application

    8/12

    The L.T. Machine has

    a duel mechanicaland a duel electrical.

    consist of one 5000

    Lb/ si and a 600Lb/psi mechanicalgauge. Also a 5000

    Lb/psi electronicgauge.

  • 7/29/2019 Load Testing Machine Application

    9/12

  • 7/29/2019 Load Testing Machine Application

    10/12

    that have been pull tested. The data istransferred to M Docs/M Data and isretrained there so that it can be utilized.

    The next slide shows a Head that hasbeen pulled tested. As you can see notescan be recorded on the test and tension

    can e e ermne s mpy y po n ng ecurser at a point and right clicking.

  • 7/29/2019 Load Testing Machine Application

    11/12

  • 7/29/2019 Load Testing Machine Application

    12/12