DESCRIPTION OF ITEM NO 1: Loading or unloading into or from Railway Wagons lead within one chain Shingle, sand, ballast, surkhi ashes, kankar, brick bats, coal. Lime or 1000 Nos. tiles size 12"x6"x2" or 9"x4½"x1½" properly laid and stacked. Detail Qty Rate Per Unit (Rs.) Amount (Rs.) Rate Analysis for 1250 Bricks Labour Unskilled Cooly 1.00 No 140.00 P. Day 140.00 Total 140.00 Sundries 10.00 Percent 14.00 Total 154.00 Contractor's Profit & Overheads 20.00 Percent 30.80 Total 184.80 Item Rates Labour Rate Per 100 Cft Rs. 147.84 Say 147.85 Labour Rate Per Cum Rs. 52.22 Say 52.20 CHAPTER NO. 2 LOADING UNLOADING AND STACKING Unit Rate (British System) per 100 Cft Page 1

Upload: romdhan88

Post on 21-Jul-2016

58 views

Category:

Documents


1 download

DESCRIPTION

Loading, Unloading, Stacking Calculation

TRANSCRIPT

Page 1: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 1: Loading or unloading into or from Railway

Wagons lead within one chain Shingle, sand,

ballast, surkhi ashes, kankar, brick bats, coal.

Lime or 1000 Nos. tiles size 12"x6"x2" or

9"x4½"x1½" properly laid and stacked.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 1250 Bricks

Labour

Unskilled Cooly 1.00 No 140.00 P. Day 140.00

Total 140.00

Sundries 10.00 Percent 14.00

Total 154.00

Contractor's Profit & Overheads 20.00 Percent 30.80

Total 184.80

Item Rates

Labour Rate Per 100 Cft Rs. 147.84 Say 147.85

Labour Rate Per Cum Rs. 52.22 Say 52.20

CHAPTER NO. 2

LOADING UNLOADING AND STACKING

Unit Rate (British System) per 100 Cft

Page 1

Page 2: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 2: Loading or unloading bricks into or from Railway

Wagons laid and stacked lead within one chain.

a) Bricks 10" size.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 1250 Bricks

Labour

Unskilled Cooly 1.25 No 140.00 P. Day 175.00

Total 175.00

Sundries 10.00 Percent 17.50

Total 192.50

Contractor's Profit & Overheads 20.00 Percent 38.50

Total 231.00

Item Rates

Labour Rate Per 1000 Nos Rs. 184.80 Say 184.80

Unit Rate (British System) per 1000 Nos

Page 2

Page 3: Loading, Unloading, Stacking

Item No. 2 Loading or unloading bricks into or from Railway

Wagons laid and stacked lead within one chain.

b) Bricks 9" or smaller size.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 1250 Bricks

Labour

Unskilled Cooly 1.00 No 140.00 P. Day 140.00

Total 140.00

Sundries 10.00 Percent 14.00

Total 154.00

Contractor's Profit & Overheads 20.00 Percent 30.80

Total 184.80

Item Rates

Labour Rate Per 1000 Nos Rs. 147.84 Say 147.85

Unit Rate (British System) per 1000 Nos

Page 3

Page 4: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 3: Loading or unloading into or from Railway

Wagons cement in bags (from inside or outside

the go-down) and stacking within one chain.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Bags

Labour

Unskilled Cooly 1.25 No 140.00 P. Day 175.00

Total 175.00

Sundries 10.00 Percent 17.50

Total 192.50

Contractor's Profit & Overheads 20.00 Percent 38.50

Total 231.00

Item Rates

Labour Rate Per 100 Bags Rs. 184.80 Say 184.80

Unit Rate (British System) per 100 Bags

Page 4

Page 5: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 4: Loading or unloading into of from Railway

Wagons empty cement bags (from inside or

outside the go-down) and stacking.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Nos.

Labour

Unskilled Cooly 0.12 No 140.00 P. Day 16.80

Total 16.80

Sundries 10.00 Percent 1.68

Total 18.48

Contractor's Profit & Overheads 20.00 Percent 3.70

Total 22.18

Item Rates

Labour Rate Per 100 Nos Rs. 22.18 17.74 Say 17.75

125

Unit Rate (British System) per 100 Nos

Page 5

Page 6: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 5: Loading or unloading into or from Railway

Wagons (from inside or outside the go-down) and

stacking white lime in bags.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Mds

Labour

Unskilled Cooly 0.75 No 140.00 P. Day 105.00

Total 105.00

Sundries 10.00 Percent 10.50

Total 115.50

Contractor's Profit & Overheads 20.00 Percent 23.10

Total 138.60

Item Rates

Labour Rate Per 100 Mds Rs. 110.88 Say 110.90

Labour Rate Per 100 Kg Rs. 2.97 Say 2.95

Unit Rate (British System) per 100 Mds

Page 6

Page 7: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 6: Loading or unloading into or from Railway

Wagons structural steel, joists, broad, narrow or

meter gauge rail and rail fastening etc.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Ton

Labour

Unskilled Cooly 0.60 No 140.00 P. Day 84.00

Total 84.00

Sundries 10.00 Percent 8.40

Total 92.40

Contractor's Profit & Overheads 20.00 Percent 18.48

Total 110.88

Item Rates

Labour Rate Per Ton Rs. 88.70 Say 88.70

Labour Rate per Tonne Rs. 87.30 Say 87.30

Unit Rate (British System) per Ton

Page 7

Page 8: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 7: Loading or unloading 45 gallons drum full into

or from Railway Wagons lead upto one chain.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Labour

Unskilled Cooly 0.06 No 140.00 P. Day 8.40

Total 8.40

Sundries 10.00 Percent 0.84

Total 9.24

Contractor's Profit & Overheads 20.00 Percent 1.85

Total 11.09

Item Rates

Labour Rate Per Each Rs. 11.09 Say 11.10

Unit Rate (British System) per Each

Page 8

Page 9: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 8: Loading or unloading packages or stock of all

sorts upto I cwt. except cement in jute or paper

bags.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Labour

Unskilled Cooly 0.03 No 140.00 P. Day 4.20

Total 4.20

Sundries 10.00 Percent 0.42

Total 4.62

Contractor's Profit & Overheads 20.00 Percent 0.92

Total 5.54

Item Rates

Labour Rate Per Each No. Rs. 5.54 Say 5.55

Unit Rate (British System) per Each

Page 9

Page 10: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 9: Loading or unloading sleepers other than wooden

including stacking lead within one chan in.

a) Broad gauge sleepers.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Nos.

Labour

Unskilled Cooly 2.50 Nos 140.00 P. Day 350.00

Total 350.00

Sundries 10.00 Percent 35.00

Total 385.00

Contractor's Profit & Overheads 20.00 Percent 77.00

Total 462.00

Item Rates

Labour Rate Per 100 Nos Rs. 369.60 Say 369.60

Unit Rate (British System) per 100 Nos

Page 10

Page 11: Loading, Unloading, Stacking

Item No. 9 Loading or unloading sleepers other than wooden

including stacking load within one chan in.

b) Metre guage and narrow guage sleepers.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Nos

Labour

Unskilled Cooly 1.25 No 140.00 P. Day 175.00

Total 175.00

Sundries 10.00 Percent 17.50

Total 192.50

Contractor's Profit & Overheads 20.00 Percent 38.50

Total 231.00

Item Rates

Labour Rate Per 100 Nos Rs. 184.80 Say 184.80

Unit Rate (British System) per 100 Nos

Page 11

Page 12: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 10: Loading or unloading timber logs or timber for

shuttering into or from Railway Wagons of any

gauge including stacking, lead within one chain.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 20 Ton

Labour

Unskilled Cooly 5.00 Nos 140.00 P. Day 700.00

Total 700.00

Sundries 10.00 Percent 70.00

Total 770.00

Contractor's Profit & Overheads 20.00 Percent 154.00

Total 924.00

Item Rates

Labour Rate Per Ton Rs. 46.20 Say 46.20

Per Tonne Rs. 45.47 Say 45.45

Unit Rate (British System) per Ton

Page 12

Page 13: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 11: Loading or unloading bhoosa in Railway Wagons

lead upto 150 feet.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Mds

Labour

Unskilled Cooly 3.00 Nos 140.00 P. Day 420.00

Total 420.00

Sundries 10.00 Percent 42.00

Total 462.00

Contractor's Profit & Overheads 20.00 Percent 92.40

Total 554.40

Item Rates

Labour Rate Per 100 Mds. Rs. 443.52 Say 443.50

Labour Rate Per 100 Kg Rs. 11.88 Say 11.90

Unit Rate (British System) per 100 Mds

Page 13

Page 14: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 12: Loading or unloading timber scrap or wooden

plugs into or from Railway Wagons and stacking

within one chain lead.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 1.25 Ton

Labour

Unskilled Cooly 0.50 No 140.00 P. Day 70.00

Total 70.00

Sundries 10.00 Percent 7.00

Total 77.00

Contractor's Profit & Overheads 20.00 Percent 15.40

Total 92.40

Item Rates

Labour Rate Per Ton Rs. 73.92 Say 73.90

Labour Rate Per Tonne Rs. 72.75 Say 72.75

Unit Rate (British System) per Ton

Page 14

Page 15: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 13: Loading or unloading pitching stone or spawl

from Railway Wagons of any gauge (including

clearing 5 feet away from the rail)

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Cft.

Labour

Unskilled Cooly 0.37 No 140.00 P. Day 51.80

Total 51.80

Sundries 10.00 Percent 5.18

Total 56.98

Contractor's Profit & Overheads 20.00 Percent 11.40

Total 68.38

Item Rates

Labour Rate Per 100 Cft Rs. 54.70 Say 54.70

Labour Rate Per Cum Rs. 19.32 Say 19.30

Unit Rate (British System) per 100 Cft

Page 15

Page 16: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 14: Loading or unloading building stone (including

clearing 5 feet away from rails)

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Cft.

Labour

Unskilled Cooly 0.48 No 140.00 P. Day 67.20

Total 67.20

Sundries 10.00 Percent 6.72

Total 73.92

Contractor's Profit & Overheads 20.00 Percent 14.78

Total 88.70

Item Rates

Labour Rate Per 100 Cft Rs. 70.96 Say 70.95

Labour Rate Per Cum Rs. 25.06 Say 25.05

Unit Rate (British System) per 100 Cft

Page 16

Page 17: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 15: Unloading oil, bitumen tar etc.

a) Crude oil (to be pumped from tank wagon, into

tank).

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 1250 Gallons

Labour

Unskilled Cooly 1.25 No 140.00 P. Day 175.00

Total 175.00

Sundries 10.00 Percent 17.50

Total 192.50

Contractor's Profit & Overheads 20.00 Percent 38.50

Total 231.00

Item Rates

Labour Rate Per 1000 Gln. Rs. 184.80 Say 184.80

Labour Rate Per 100 Liters Rs. 4.07 Say 4.05

Unit Rate (British System) per 1000 Gln

Page 17

Page 18: Loading, Unloading, Stacking

Item No. 15 Unloading oil, bitumen tar etc.

b) Crude oil (drained by gravity).

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 1250 Gallons

Labour

Unskilled Cooly 1.25 No 140.00 P. Day 175.00

Total 175.00

Sundries 10.00 Percent 17.50

Total 192.50

Contractor's Profit & Overheads 20.00 Percent 38.50

Total 231.00

Item Rates

Labour Rate Per 1000 Gln. Rs. 184.80 Say 184.80

Labour Rate Per 100 Liters Rs. 4.07 Say 4.05

Unit Rate (British System) per 1000 Gln

Page 18

Page 19: Loading, Unloading, Stacking

Item No. 15 Unloading oil, bitumen tar etc.

c) Crude oil materials from Railway Wagons.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Cft

Labour

Unskilled Cooly 0.16 No 140.00 P. Day 22.40

Total 22.40

Sundries 10.00 Percent 2.24

Total 24.64

Contractor's Profit & Overheads 20.00 Percent 4.93

Total 29.57

Item Rates

Labour Rate Per 100 Cft Rs. 23.65 Say 23.65

Labour Rate Per Cum Rs. 8.35 Say 8.35

Unit Rate (British System) per 100 Cft

Page 19

Page 20: Loading, Unloading, Stacking

Item No. 15 Unloading oil, bitumen tar etc.

d) Fuel oil from tank into empty drums and stacking

within one chain.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 45 Ton

Labour

Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00

Total 2,240.00

Sundries 10.00 Percent 224.00

Total 2,464.00

Contractor's Profit & Overheads 20.00 Percent 492.80

Total 2,956.80

Item Rates

Labour Rate Per Ton Rs. 65.71 Say 65.70

Labour Rate Per Tonne Rs. 64.67 Say 64.65

Unit Rate (British System) per Ton

Page 20

Page 21: Loading, Unloading, Stacking

Item No. 15 Unloading oil, bitumen tar etc.

e) Petrol (2 gallon tin)

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Nos

Labour

Unskilled Cooly 0.63 Nos 140.00 P. Day 88.20

Total 88.20

Sundries 10.00 Percent 8.82

Total 97.02

Contractor's Profit & Overheads 20.00 Percent 19.40

Total 116.42

Item Rates

Labour Rate Per 100 Nos Rs. 93.14 Say 93.15

Unit Rate (British System) per 100 Nos

Page 21

Page 22: Loading, Unloading, Stacking

Item No. 15 Unloading oil, bitumen tar etc.

f) Kerosine oil (4 gallons tin).

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Nos

Labour

Unskilled Cooly 1.25 Nos 140.00 P. Day 175.00

Total 175.00

Sundries 10.00 Percent 17.50

Total 192.50

Contractor's Profit & Overheads 20.00 Percent 38.50

Total 231.00

Item Rates

Labour Rate Per 100 Nos Rs. 184.80 Say 184.80

Unit Rate (British System) per 100 Nos

Page 22

Page 23: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 16: Removing and stacking within one chain lead.

a) Stones, Spawl, Brick Bats, shingle, sand, lime.

Surki, ashes, Kankar & Coal etc.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Cft

Labour

Unskilled Cooly 0.50 No 140.00 P. Day 70.00

Total 70.00

Sundries 10.00 Percent 7.00

Total 77.00

Contractor's Profit & Overheads 20.00 Percent 15.40

Total 92.40

Item Rates

Labour Rate Per 100 Cft Rs. 73.92 Say 73.90

Labour Rate Per Cum Rs. 26.11 Say 26.10

Unit Rate (British System) per 100 Cft

Page 23

Page 24: Loading, Unloading, Stacking

Item No. 16 Removing and stacking within one chain lead.

b) Bricks

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 15,000 Nos

Labour

Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00

Total 2,240.00

Sundries 10.00 Percent 224.00

Total 2,464.00

Contractor's Profit & Overheads 20.00 Percent 492.80

Total 2,956.80

Item Rates

Labour Rate Per 1000 Nos Rs. 197.12 Say 197.10

Unit Rate (British System) per 1000 Nos

Page 24

Page 25: Loading, Unloading, Stacking

Item No. 16 Removing and stacking within one chain lead.

c) Broad gauge wooden sleepers

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 2,500 Nos

Labour

Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00

Total 2,240.00

Sundries 10.00 Percent 224.00

Total 2,464.00

Contractor's Profit & Overheads 20.00 Percent 492.80

Total 2,956.80

Item Rates

Labour Rate Per 100 Nos Rs. 118.27 Say 118.25

Unit Rate (British System) per 100 Nos

Page 25

Page 26: Loading, Unloading, Stacking

Item No. 16 Removing and stacking within one chain lead.

d) Metre gauge or narrow gauge wooden sleepers.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 4,200 Nos

Labour

Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00

Total 2,240.00

Sundries 10.00 Percent 224.00

Total 2,464.00

Contractor's Profit & Overheads 20.00 Percent 492.80

Total 2,956.80

Item Rates

Labour Rate Per 100 Nos Rs. 70.40 Say 70.40

Unit Rate (British System) per 100 Nos

Page 26

Page 27: Loading, Unloading, Stacking

Item No. 16 Removing and stacking within one chain lead.

e) Rails, girders, pipes, cement etc.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 90 Ton

Labour

Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00

Total 2,240.00

Sundries 10.00 Percent 224.00

Total 2,464.00

Contractor's Profit & Overheads 20.00 Percent 492.80

Total 2,956.80

Item Rates

Labour Rate Per Ton Rs. 32.85 Say 32.85

Labour Rate Per Tonne Rs. 32.33 Say 32.35

Unit Rate (British System) per Ton

Page 27

Page 28: Loading, Unloading, Stacking

Item No. 16 Removing and stacking within one chain lead.

f) Bridge and crossing timber etc.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 750 Nos

Labour

Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00

Total 2,240.00

Sundries 10.00 Percent 224.00

Total 2,464.00

Contractor's Profit & Overheads 20.00 Percent 492.80

Total 2,956.80

Item Rates

Labour Rate Per 100 Nos Rs. 394.24 Say 394.25

Unit Rate (British System) per 100 Nos

Page 28

Page 29: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 17: Loading into Wagons Girders, Rails, permanent

way material (except wooden sleepers) iron work,

M.S. Bars, Pipes, etc. including lead one chain

and stacking inside Wagons.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 40 Ton

Labour

Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00

Total 2,240.00

Sundries 10.00 Percent 224.00

Total 2,464.00

Contractor's Profit & Overheads 20.00 Percent 492.80

Total 2,956.80

Item Rates

Labour Rate Per Ton Rs. 73.92 Say 73.90

Labour Rate Per Tonne Rs. 72.75 Say 72.75

Unit Rate (British System) per Ton

Page 29

Page 30: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 18: Unloading from Wagons Girders, Rails,

permanent way material (except wooden sleepers)

iron work, M.S. Bars, Pipes, etc. lead upto one

chain but excluding stacking.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 70 Ton

Labour

Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00

Total 2,240.00

Sundries 10.00 Percent 224.00

Total 2,464.00

Contractor's Profit & Overheads 20.00 Percent 492.80

Total 2,956.80

Item Rates

Labour Rate Per Ton Rs. 42.24 Say 42.25

Labour Rate Per Tonne Rs. 41.57 Say 41.55

Unit Rate (British System) per Ton

Page 30

Page 31: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 19: Loading into Wagons, wooden broad gauge

sleepers including one chain lead and stacking.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 1,000 Nos

Labour

Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00

Total 2,240.00

Sundries 10.00 Percent 224.00

Total 2,464.00

Contractor's Profit & Overheads 20.00 Percent 492.80

Total 2,956.80

Item Rates

Labour Rate Per 100 Nos Rs. 295.68 Say 295.70

Unit Rate (British System) per 100 Nos

Page 31

Page 32: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 20: Unloading wooden broad gauge sleepers from

Wagons including one chain lead and stacking.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 2,100 Nos

Labour

Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00

Total 2,240.00

Sundries 10.00 Percent 224.00

Total 2,464.00

Contractor's Profit & Overheads 20.00 Percent 492.80

Total 2,956.80

Item Rates

Labour Rate Per 100 Nos Rs. 140.80 Say 140.80

Unit Rate (British System) per 100 Nos

Page 32

Page 33: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 21: Loading metre gauge or narrow gauge wooden

sleepers including one chain lead and stacking

inside Wagons.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 2,000 Nos

Labour

Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00

Total 2,240.00

Sundries 10.00 Percent 224.00

Total 2,464.00

Contractor's Profit & Overheads 20.00 Percent 492.80

Total 2,956.80

Item Rates

Labour Rate Per 100 Nos Rs. 147.84 Say 147.85

Unit Rate (British System) per 100 Nos

Page 33

Page 34: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 22: Unloading metre gauge or narrow gauge wooden

sleepers including one chain lead but excluding

stacking

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 3,800 Nos

Labour

Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00

Total 2,240.00

Sundries 10.00 Percent 224.00

Total 2,464.00

Contractor's Profit & Overheads 20.00 Percent 492.80

Total 2,956.80

Item Rates

Labour Rate Per 100 Nos Rs. 77.81 Say 77.80

Unit Rate (British System) per 100 Nos

Page 34

Page 35: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 23: Loading Bridge and grossing timber including

one chain lead and stacking.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Nos

Labour

Unskilled Cooly 4.00 Nos 140.00 P. Day 560.00

Total 560.00

Sundries 10.00 Percent 56.00

Total 616.00

Contractor's Profit & Overheads 20.00 Percent 123.20

Total 739.20

Item Rates

Labour Rate Per 100 Nos Rs. 591.36 Say 591.35

Unit Rate (British System) per 100 Nos

Page 35

Page 36: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 24: Unloading Bridge and crossing timber including

one chain lead but excluding stacking.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Nos

Labour

Unskilled Cooly 2.00 Nos 140.00 P. Day 280.00

Total 280.00

Sundries 10.00 Percent 28.00

Total 308.00

Contractor's Profit & Overheads 20.00 Percent 61.60

Total 369.60

Item Rates

Labour Rate Per 100 Nos Rs. 295.68 Say 295.70

NOTE :

Rate for loading and unloading for Mobile trucks/ boats, item 1-15 will be 80%

of the rate of Railway Wagons.

Unit Rate (British System) per 100 Nos

Page 36

Page 37: Loading, Unloading, Stacking

DESCRIPTION OF ITEM NO 25: Loading or unloading bitumen, asphalt or tar in

drums, into or from Railway Wagons lead upto

one chain.

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 25 Ton

Labour

Unskilled Cooly 6.00 Nos 140.00 P. Day 840.00

Total 840.00

Sundries 10.00 Percent 84.00

Total 924.00

Contractor's Profit & Overheads 20.00 Percent 184.80

Total 1,108.80

Item Rates

Labour Rate Per Ton Rs. 44.35 Say 44.35

Labour Rate Per Tonne Rs. 43.65 Say 43.65

Unit Rate (British System) per Ton

Page 37