Locally Administered Federal Aid Project

Owner: Broome County, NY

NYSDOT Region 9

Engineer: McFarland Johnson

Contractor: Economy Paving

Design 2013 – Construction 2014

Page 3: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

Hooper Road Bridge Town of Union, NY

Project Location

Page 4: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

Hooper Road Bridge Town of Union, NY

Project Location

Page 5: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

Hooper Road Bridge

NYS 17C

Project Location

Page 6: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

Existing Bridge 3-span Bridge 150’ (28’-83’-39’)

Constructed in 1964

Condition Rating 4.45, FSR 68.3

Page 7: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

Bridge Condition

Leaking Joints = Widespread Deterioration

Bearings Heavily Corroded

Pier Concrete Cracked & Delaminated

Deck Has Areas of Deterioration

Rehabilitation Required

Existing Bridge

Page 8: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

Problems:

• Deck Joint Failure

Page 9: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

Problems:

• Deteriorated Pedestals

Page 10: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

Problems:

• Deteriorating Piers

Page 11: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

Bridge Importance

Hooper Road – Urban Arterial

Large Traffic Volumes – ADT 10,000

Vital Link between Residential & Commercial Areas

Previous Construction Projects & Traffic Disruption

Page 12: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

Hooper Road Bridge

Detour West

3 miles – Route 17C North Street, Hayes Avenue

Watson Boulevard Detour East

6 miles – Rt 17C Rt 17, Rt 201, Harry L Drive

Watson Boulevard

Hooper Road Detour

Page 13: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

1. Conventional Construction

2. Accelerated Bridge Construction (ABC)

Options for Construction

• Bridge Constructed in Halves

• One Lane of Traffic on Hooper Road during Construction

• Hooper Road Southbound Maintained on Bridge

• Hooper Road Northbound – Off Site Detour

• Traffic Impact to Hooper Road = 4-5 Months

• Bridge Closed to Traffic During Construction

• Bridge Constructed with Prefabricated Elements to Accelerate Construction

• Hooper Road NB & SB – Off Site Detour

• Traffic Impact to Hooper Road = Approx. 2-4 Weeks

Page 14: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

What is “ABC”?

Components & Benefits of ABC

Prefabricated Bridge Elements & Systems (PBES) Reduces on site Construction Duration Improves Work Zone & Worker Safety

Minimized Traffic Impacts (Reduced Roadway User Costs)

Page 15: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

Primary Objectives

1) Restore the bridge condition using cost effective techniques

2) Minimize life cycle cost of maintenance and repair

Secondary Objectives

3) Utilize construction techniques to minimize traffic impacts to Hooper Road

4) Minimize impacts to NYS Route 17C during construction

Project Objectives

Page 16: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

Alternatives Considered

Bridge Improvement Alternatives Objectives Satisfied

1 2 3 4

Alternative 1 Deck Replacement

Alternative 2 Superstructure Replacement - Conventional

Alternative 3* Superstructure Replacement - ABC

Alternative 4 Bridge Replacement - ABC

Page 17: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC Superstructure Replacement • Full Depth Precast Deck Panels • New Steel Girders • Precast Pier Caps • Precast Approach Slabs

21 day Hooper Road Closure 2 Lanes on NYS Route 17C Liquidated Damages $5,000/day Reduced User Costs Public Strongly Favored Short Term Closure

Page 18: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC elements Pre-Closure

Remove / construct abutment pedestals Column repairs

Page 19: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC elements – Precast Pier Caps

Page 20: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC elements – Precast Pier Caps

Page 21: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC elements – Precast Pier Caps

Page 22: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC elements – Precast Pier Caps

Page 23: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC elements – Precast Pier Caps

Page 24: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC elements – Precast Pier Caps

Page 25: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC elements – Precast Pier Caps

Page 26: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC elements – Precast Pier Caps

Page 27: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC elements – Precast Deck Panels

Formwork critical UHPC Connections Watertight

Page 28: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC elements – Precast Deck Panels

Delivery

Page 29: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC elements – Precast Deck Panels

Setting Panels

Page 30: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC elements – Precast Deck Panels

Page 31: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC elements – Precast Deck Panels

Mix UHPC Batch on site Ductal Representative on site

Page 32: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC elements – Precast Deck Panels

Place UHPC Form high – grind later

Page 33: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC elements – Precast Deck Panels

Page 34: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC elements – Precast Deck Panels

Page 35: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC elements – Precast Deck Panels

Stud Pockets Fill from top

Page 36: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

ABC elements – Precast Approach Slabs

Page 37: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

Day 2 – Superstructure Demolition Underway

Page 38: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

Day 4 – Superstructure Demolition Complete

Page 39: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

Day 9 – Precast Pier Caps Installed

Page 40: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

Day 11 – New Structural Steel Installed

Page 41: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

Day 12 – Installation of Precast Deck Panels Begins

Page 42: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

Day 21 – Bridge Open to Traffic

Page 43: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge
Page 44: Locally Administered Federal Aid Project Owner: Broome ...€¦ · Design 2013 – Construction 2014 . Hooper Road Bridge Town of Union, NY Project Location . Hooper Road Bridge

Construction Cost = $1,600,000

EE = $1,900,000

Completed in 21 days without Liquidated Damages

Lesson Learned = Discuss Lead Time with Fabricators

Positive Feedback from Community