location plan 1 floor plan - ground

7
UP UP 1 05_0201 2 04_0201 MEETING ROOM BG13 WAITING/ RECEPTION BG12 FEMALE BG19 CONGREGATION BG06 NARTHEX BG02 STORE 1 BG03 98.63 m² EXTERNAL VESTIBULE MALE BG18 CONFESSIONAL BG08 TRU2 TRU2 KITCHENETTE BG05 2 05_0201 SANCTUARY RAMP 1:10 RAMP 1:10 RAMP 1:10 WC BG17 DB BG14 STEP S T E P SERVICES BG15 WA03g WA02d WA02d WA02d WA02d WA02d WA03h WA04i WA03h BG09 WA02e WA02f WA02e WA04k WA04k 1 04_0204 1 0 4_0206 2 04_0205 1 04_0205 2 04_0204 BULKHEAD ABOVE WA02d CONFESSIONAL BG07 ACC WC BG20 INSLAB HEATING IN SLAB HEATING UNDER CARPET IN SLAB HEATING UNDER CARPET IN SLAB HEATING UNDER CARPET IN SLAB HEATING UNDER CARPET TRU2 TRU2 TRU2 TRU2 TRU2 TRU2 TRUSS OVER CPT1 CPT1 CPT1 FT1 CPT1 F F:08 F F:07 F F:05 F F:06 FF:09 F F:04 F F:03 F F:01 F F:02 CON1 CPT1 CPT1 CON1 FT1 CPT1 CON1 ALTAR SERVERS BG10 SACRISTY BG11 STORE 8.25 m² BG16 WA03h WA03g BULKHEAD ABOVE WA03h WA03h WA04k WA04n WA02e WA02d WA04q WA02e WA04j WA04i WA04p WA04p WA04p WA04p WA04r WA04r WA04r WA04p WA04p WA04p WA02e WA02e COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL DP1 DP1 DP1 DP1 DP1 DP1 DP1 DP1 CPT2 FT2 FT2 FT2 FT2 FT3 VYN CPT2 COL COL COL COL TR2 FW FW FW FW FW COL CPT1 FT1 FFL 11.340 FFL 11.165 FFL 11.165 COL SLAB EDGE BELOW LINE OF ROOF OVER SHOWN DASHED LINE OF TRUSS OVER CON1 LINE OF ROOF OVER SHOWN DASHED 1 05_0202 FFL 11.150 FFL 11.080 CPT1 CPT1 COL COL F HR TRU2 OVER FFL 11.150 FFL 11.150 PRELIMINARY ONLY 0 SCALE 1: T R U E NO R T H This drawing and the design expressed are copyright and remain the property of Webber Architects. In accordance with the commonwealth copyright act 1968 this drawing and design in whole or part may not be used unless licenced by Webber Architects. Verify all dimensions and falls on site before construction and do not scale from drawing. PRINT DATE: FILE PATH: BUILDER TO CONFIRM ALL DETAILS, SETOUTS (TILE, ETC.), FALLS & CONNECTIONS ON SITE BEFORE CONSTRUCTION 1000 2000 3000 4000 5000 mm 100 @ A1 SCALE : ISSUED : NORTH : PROJECT COMMENCEMENT DATE : SHEET NUMBER : 24/09/2018 5:00:09 PM T:\Revit Locals\2544 Medowie_High School Block B_candiceNT4ZE.rvt FLOOR PLAN - BLOCK B - GROUND 2544_03_0201_T CHAPEL CATHERINE McAULEY CATHOLIC COLLEGE 507 MEDOWIE ROAD, MEDOWIE, NSW 01.05.2017 NOT FOR CONSTRUCTION SCALE 1 : 100 FLOOR PLAN - GROUND 1 LOCATION PLAN ABBREVIATIONS 6.01 BAR FRIDGE 6.02 REFRIGERATOR 7.01 FEATURE LIGHT 1 7.02 FEATURE LIGHT 2 7.04 PROJECTOR SCREEN 7.05 FIRE EXTINGUISHER 8.01 TOILET 8.03 BASIN 8.05 SOAP DISPENCER 8.06 HAND DRYER 8.07 GRAB RAIL TYPE 1 8.08 GRAB RAIL TYPE 2 8.09 MIRROR 8.13 TOILET ROLL HOLDER TYPE 2 8.21 SINK MIXER 8.23 TAP ALL IN ONE 12.01 CHAIR TYPE 1 12.02 MEETING TABLE 1 12.03 MEETING TABLE 2 12.04 LOUNGE 12.06 MEETING TABLE ROUND 12.07 TABERNACLE APP1 ACOUSTIC PLASTERBOARD PANEL - TYPE 1 B1 BALUSTRADE - TYPE 1 BG BOX GUTTER BT1 BENCHTOP - TYPE 1 BT2 BENCHTOP - TYPE 2 BT3 BENCHTOP - TYPE 3 COL COLUMN CON1 CONCRETE - TYPE 1 CPP1 CONCRETE PRECAST PANEL - TYPE 1 CPT1 CARPET - TYPE 1 CPT2 CARPET - TYPE 2 CT3 CEILING TILES - TYPE 3 CUR1 CURTAIN CV1 CONCRETE VESSEL 1 DP DOWNPIPE DP1 DOWNPIPE - TYPE 1 EG EAVES GUTTER EG1 EAVES GUTTER - TYPE 1 FF:01 FIXED FURNITURE - TYPE 1 FF:05 FIXED FURNITURE - TYPE 5 FF:06 FIXED FURNITURE - TYPE 6 FHR FIRE HOSE REEL FLAS FLASHING FT1 FLOOR TILES - TYPE 1 FT2 FLOOR TILES - TYPE 2 FT3 FLOOR TILES - TYPE 3 FW FLOOR WASTE J01 PEW J02 BAPTISMAL FONT J03 ALTAR J04 AMBO J05 HOLY WATER FONT LWC1 LIGHT WEIGHT CLADDING - TYPE 1 LX1 LAMINATE - TYPE 1 LX2 LAMINATE - TYPE 2 MAT1 ENTRY MAT MRC METAL ROOF CAPPING MRS1 METAL ROOF SHEETING - TYPE 1 MRS3 METAL ROOF SHEETING - TYPE 3 MSR2 METAL SHEET ROOF PB1 PLASTERBOARD - TYPE 1 PF1 PAINT FINISH - TYPE 1 PPB PAINTED PLASTERBOARD PPB1 PAINTED PLASTERBOARD - TYPE 1 PPB2 PAINTED PLASTERBOARD - TYPE 2 S1 SCREEN - TYPE 1 SB SPLASHBACK SK1 SKIRTING - TYPE 1 SOC STATIONS OF THE CROSS SOF SOFFIT SVL SOLID VENEER LUMBER SVL1 SOLID VENEER LUMBER - TYPE 1 TL TIMBER LINING TRU1 TRUSS 1 TRU2 TRUSS 2 VYN VINYL REV DATE DESCRIPTION BY CHK L 25.05.2018 ROOM DATA SHEET REVIEW CA TH M 31.05.2018 FOR TENDER - 50% CA N 22.06.2018 FOR CLIENT APPROVAL CA JW O 28.06.2018 FOR STAGE 1 RFP CA P 12.07.2018 FOR CONSULTANT COORDINATION TR Q 31.07.2018 WINDOW AND DOOR RFI CA R 17.08.2018 FOR QA CA S 31.08.2018 FOR ECI CA T 24.09.2018 RESPONSE TO SUBMISSIONS CA NOTE: REFER TO LANDSCAPE PACKAGE FOR EXTERNAL PAVEMENT FINISHES

Upload: others

Post on 24-Feb-2022

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LOCATION PLAN 1 FLOOR PLAN - GROUND

UP

UP

1

05_0201

2

04_

020

1

MEETING ROOM

BG13

WAITING/ RECEPTION

BG12

FEMALE

BG19

CONGREGATION

BG06

NARTHEX

BG02

STORE 1

BG03

98.63 m²EXTERNAL VESTIBULE

MALE

BG18

CONFESSIONAL

BG08

TRU2

TRU2

KITCHENETTE

BG05

2

05_0201

SANCTUARYR

AM

P 1

:10

RAMP 1:10

RA

MP

1:1

0

WC

BG17

DB

BG14

STEP

STEP

SERVICES

BG15

WA03g

WA02d

WA02d

WA02d

WA02d

WA02d

WA03h

WA04i

WA03h

BG09

WA02e

WA02f

WA02e

WA04k WA04k

1

04_0204

104

_020

6

2

04_

020

5

1

04_0205

2

04_

020

4

BULKHEAD ABOVE

WA02d

CONFESSIONAL

BG07

ACC WC

BG20

INSLABHEATING

IN SLAB HEATINGUNDER CARPET

IN SLAB HEATING UNDER CARPET

IN SLAB HEATING UNDER CARPET

IN SLAB HEATINGUNDER CARPET

TRU2

TRU2

TRU2

TRU2

TRU2

TRU2

TRUSS OVER

CPT1

CPT1

CPT1

FT1

CPT1

FF:08

FF:07

FF:05

FF:06

FF

:09

FF:04

FF:03 FF:01

FF:02

CON1

CPT1

CPT1

CON1

FT1

CPT1

CON1

ALTAR SERVERS

BG10

SACRISTY

BG11

STORE8.25 m²BG16

WA03h

WA03g

BULKHEAD ABOVE

WA03h

WA03h

WA04k

WA04n

WA02e

WA02d

WA04q

WA02e

WA04j

WA04i

WA04p WA04p WA04p

WA04p

WA04r

WA04r

WA04r

WA04p

WA04p

WA04p

WA02e

WA02e

COL COLCOL COL

COLCOL

COL

COL

COL

COL

COL

COL

COL

COL

COL

COL COL COL COL

COL

COL

COL

COL

COL

COL

COL

COL

COL

DP1

DP1 DP1

DP1

DP1

DP1

DP1

DP1

CPT2

FT2FT2FT2

FT2

FT3

VYN

CPT2

COLCOL

COL

COL

TR2

FWFW

FW

FWFW

COL

CPT1

FT1

FFL 11.340

FFL 11.165

FFL 11.165

COL

SLAB EDGE BELOW

LINE OF ROOF OVER SHOWN DASHED

LINE OF TRUSS OVER

CON1

LINE OF ROOF OVER SHOWN DASHED

1

05_0202

FFL 11.150

FFL 11.080

CPT1

CPT1

COL

COL

FHR

TRU2 OVER

FFL 11.150

FFL 11.150

PRELIMINARY ONLY 0

SCALE 1:

TRU

EN

OR

TH

This drawing and the design expressed are copyright and remain the property of Webber Architects. In accordance with the commonwealth copyright act 1968 this drawing and design in whole or part may not be used unless licenced by Webber Architects. Verify all dimensions and falls on site before construction and do not scale from drawing.PRINT DATE: FILE PATH:BUILDER TO CONFIRM ALL DETAILS, SETOUTS (TILE, ETC.), FALLS & CONNECTIONS ON SITE BEFORE CONSTRUCTION

1000 2000 3000 4000 5000 mm

100 @ A1

SCALE :ISSUED : NORTH :

PROJECT COMMENCEMENT DATE : SHEET NUMBER :

24/09/2018 5:00:09 PM T:\Revit Locals\2544 Medowie_High School Block B_candiceNT4ZE.rvt

FLOOR PLAN - BLOCK B - GROUND

2544_03_0201_T

CHAPEL

CATHERINE McAULEY CATHOLIC COLLEGE

507 MEDOWIE ROAD, MEDOWIE, NSW

01.05.2017

NOT FOR CONSTRUCTION

SCALE 1 : 100

FLOOR PLAN - GROUND1

LOCATION PLAN

ABBREVIATIONS

6.01 BAR FRIDGE

6.02 REFRIGERATOR

7.01 FEATURE LIGHT 1

7.02 FEATURE LIGHT 2

7.04 PROJECTOR SCREEN

7.05 FIRE EXTINGUISHER

8.01 TOILET

8.03 BASIN

8.05 SOAP DISPENCER

8.06 HAND DRYER

8.07 GRAB RAIL TYPE 1

8.08 GRAB RAIL TYPE 2

8.09 MIRROR

8.13 TOILET ROLL HOLDER TYPE 2

8.21 SINK MIXER

8.23 TAP ALL IN ONE

12.01 CHAIR TYPE 1

12.02 MEETING TABLE 1

12.03 MEETING TABLE 2

12.04 LOUNGE

12.06 MEETING TABLE ROUND

12.07 TABERNACLE

APP1 ACOUSTIC PLASTERBOARD PANEL - TYPE 1

B1 BALUSTRADE - TYPE 1

BG BOX GUTTER

BT1 BENCHTOP - TYPE 1

BT2 BENCHTOP - TYPE 2

BT3 BENCHTOP - TYPE 3

COL COLUMN

CON1 CONCRETE - TYPE 1

CPP1 CONCRETE PRECAST PANEL - TYPE 1

CPT1 CARPET - TYPE 1

CPT2 CARPET - TYPE 2

CT3 CEILING TILES - TYPE 3

CUR1 CURTAIN

CV1 CONCRETE VESSEL 1

DP DOWNPIPE

DP1 DOWNPIPE - TYPE 1

EG EAVES GUTTER

EG1 EAVES GUTTER - TYPE 1

FF:01 FIXED FURNITURE - TYPE 1

FF:05 FIXED FURNITURE - TYPE 5

FF:06 FIXED FURNITURE - TYPE 6

FHR FIRE HOSE REEL

FLAS FLASHING

FT1 FLOOR TILES - TYPE 1

FT2 FLOOR TILES - TYPE 2

FT3 FLOOR TILES - TYPE 3

FW FLOOR WASTE

J01 PEW

J02 BAPTISMAL FONT

J03 ALTAR

J04 AMBO

J05 HOLY WATER FONT

LWC1 LIGHT WEIGHT CLADDING - TYPE 1

LX1 LAMINATE - TYPE 1

LX2 LAMINATE - TYPE 2

MAT1 ENTRY MAT

MRC METAL ROOF CAPPING

MRS1 METAL ROOF SHEETING - TYPE 1

MRS3 METAL ROOF SHEETING - TYPE 3

MSR2 METAL SHEET ROOF

PB1 PLASTERBOARD - TYPE 1

PF1 PAINT FINISH - TYPE 1

PPB PAINTED PLASTERBOARD

PPB1 PAINTED PLASTERBOARD - TYPE 1

PPB2 PAINTED PLASTERBOARD - TYPE 2

S1 SCREEN - TYPE 1

SB SPLASHBACK

SK1 SKIRTING - TYPE 1

SOC STATIONS OF THE CROSS

SOF SOFFIT

SVL SOLID VENEER LUMBER

SVL1 SOLID VENEER LUMBER - TYPE 1

TL TIMBER LINING

TRU1 TRUSS 1

TRU2 TRUSS 2

VYN VINYL

REV DATE DESCRIPTION BY CHK

L 25.05.2018 ROOM DATA SHEET REVIEW CA TH

M 31.05.2018 FOR TENDER - 50% CA

N 22.06.2018 FOR CLIENT APPROVAL CA JW

O 28.06.2018 FOR STAGE 1 RFP CA

P 12.07.2018 FOR CONSULTANT COORDINATION TR

Q 31.07.2018 WINDOW AND DOOR RFI CA

R 17.08.2018 FOR QA CA

S 31.08.2018 FOR ECI CA

T 24.09.2018 RESPONSE TO SUBMISSIONS CA

NOTE: REFER TO LANDSCAPE PACKAGE FOR EXTERNAL PAVEMENT FINISHES

Page 2: LOCATION PLAN 1 FLOOR PLAN - GROUND

UP

UP

UP

UP

FLSLFLS

L

2.0

2.00°

2.0

2.00°MRS1

MRS1

MRS1

MRS1

BG

MRS3

MRC

BG

BG

MRS3

SOF

MRS3

SOFBGMRC

SUMP AND DOWN PIPE

SUMP AND DOWN PIPE

SUMP AND DOWN PIPE

SUMP AND DOWN PIPE

SUMP AND DOWN PIPE

SUMP AND DOWN PIPE

SUMP AND DOWN PIPE

SUMP AND DOWN PIPE

LINE OF BUILDING BELOW

EG

DP

DP

VP UNDER

DP1

PRELIMINARY ONLY 0

SCALE 1:

TRU

EN

OR

TH

This drawing and the design expressed are copyright and remain the property of Webber Architects. In accordance with the commonwealth copyright act 1968 this drawing and design in whole or part may not be used unless licenced by Webber Architects. Verify all dimensions and falls on site before construction and do not scale from drawing.PRINT DATE: FILE PATH:BUILDER TO CONFIRM ALL DETAILS, SETOUTS (TILE, ETC.), FALLS & CONNECTIONS ON SITE BEFORE CONSTRUCTION

1000 2000 3000 4000 5000 mm

100 @ A1

SCALE :ISSUED : NORTH :

PROJECT COMMENCEMENT DATE : SHEET NUMBER :

24/09/2018 5:00:13 PM T:\Revit Locals\2544 Medowie_High School Block B_candiceNT4ZE.rvt

ROOF PLAN - BLOCK B

2544_03_0205_H

CHAPEL

CATHERINE McAULEY CATHOLIC COLLEGE

507 MEDOWIE ROAD, MEDOWIE, NSW

01.05.2017

NOT FOR CONSTRUCTION

SCALE 1 : 100

ROOF PLAN - BLOCK B1

LOCATION PLAN

ABBREVIATIONS

6.01 BAR FRIDGE

6.02 REFRIGERATOR

7.01 FEATURE LIGHT 1

7.02 FEATURE LIGHT 2

7.04 PROJECTOR SCREEN

7.05 FIRE EXTINGUISHER

8.01 TOILET

8.03 BASIN

8.05 SOAP DISPENCER

8.06 HAND DRYER

8.07 GRAB RAIL TYPE 1

8.08 GRAB RAIL TYPE 2

8.09 MIRROR

8.13 TOILET ROLL HOLDER TYPE 2

8.21 SINK MIXER

8.23 TAP ALL IN ONE

12.01 CHAIR TYPE 1

12.02 MEETING TABLE 1

12.03 MEETING TABLE 2

12.04 LOUNGE

12.06 MEETING TABLE ROUND

12.07 TABERNACLE

APP1 ACOUSTIC PLASTERBOARD PANEL - TYPE 1

B1 BALUSTRADE - TYPE 1

BG BOX GUTTER

BT1 BENCHTOP - TYPE 1

BT2 BENCHTOP - TYPE 2

BT3 BENCHTOP - TYPE 3

COL COLUMN

CON1 CONCRETE - TYPE 1

CPP1 CONCRETE PRECAST PANEL - TYPE 1

CPT1 CARPET - TYPE 1

CPT2 CARPET - TYPE 2

CT3 CEILING TILES - TYPE 3

CUR1 CURTAIN

CV1 CONCRETE VESSEL 1

DP DOWNPIPE

DP1 DOWNPIPE - TYPE 1

EG EAVES GUTTER

EG1 EAVES GUTTER - TYPE 1

FF:01 FIXED FURNITURE - TYPE 1

FF:05 FIXED FURNITURE - TYPE 5

FF:06 FIXED FURNITURE - TYPE 6

FHR FIRE HOSE REEL

FLAS FLASHING

FT1 FLOOR TILES - TYPE 1

FT2 FLOOR TILES - TYPE 2

FT3 FLOOR TILES - TYPE 3

FW FLOOR WASTE

J01 PEW

J02 BAPTISMAL FONT

J03 ALTAR

J04 AMBO

J05 HOLY WATER FONT

LWC1 LIGHT WEIGHT CLADDING - TYPE 1

LX1 LAMINATE - TYPE 1

LX2 LAMINATE - TYPE 2

MAT1 ENTRY MAT

MRC METAL ROOF CAPPING

MRS1 METAL ROOF SHEETING - TYPE 1

MRS3 METAL ROOF SHEETING - TYPE 3

MSR2 METAL SHEET ROOF

PB1 PLASTERBOARD - TYPE 1

PF1 PAINT FINISH - TYPE 1

PPB PAINTED PLASTERBOARD

PPB1 PAINTED PLASTERBOARD - TYPE 1

PPB2 PAINTED PLASTERBOARD - TYPE 2

S1 SCREEN - TYPE 1

SB SPLASHBACK

SK1 SKIRTING - TYPE 1

SOC STATIONS OF THE CROSS

SOF SOFFIT

SVL SOLID VENEER LUMBER

SVL1 SOLID VENEER LUMBER - TYPE 1

TL TIMBER LINING

TRU1 TRUSS 1

TRU2 TRUSS 2

VYN VINYL

REV DATE DESCRIPTION BY CHK

A 16.02.2018 DEVELOPED DESIGN - 90% CA

B 29.03.2018 FOR CLIENT APPROVAL CA TH

C 15.05.2018 FOR DEVELOPMENT APPROVAL CA

D 28.06.2018 FOR STAGE 1 RFP CA

E 12.07.2018 FOR CONSULTANT COORDINATION TR

F 17.08.2018 FOR QA CA

G 31.08.2018 FOR ECI CA

H 24.09.2018 RESPONSE TO SUBMISSIONS CA

NOTE:- CONTRACTOR TO PROVIDE A COMPLETE ROOF ACCESS AND FALL PROTECTION SYSTEM TO THE CHAPEL ROOF TO COMPLY WITH WORK COVER REQUIREMENTS AND RELEVANT STANDARDS.

- CONTRACTOR TO PROVIDE DEKTITE PR SIMILAR SUITABLE ROOF PENETRATIONS. COORDINATE WITH BUILDING SERVICES DOCUMENTATION.

Page 3: LOCATION PLAN 1 FLOOR PLAN - GROUND

BLOCK A

MRS1

S1

CPP1TRU2

LINE OF EXISTING GROUND LEVEL

HIGHLIGHTWINDOWSBEYOND

FEATURE STRUCTURALSTEEL TRUSS

RL

ROOF RIDGE

18.650 m

RL

UPPER FCL

17.380 m

RL

FFL

11.150 m

MRC

EG1BEYOND

LWC1

SOF

LINE OF ROOF BEYOND

S1

SOF

TRU2

2.00°

RL

LOWER GROUND FCL

13.850 m

RL

LEVEL 1 FFL

14.270 m

RL

LOWER ROOF RL

14.500 m

RL 11.150

MRS1

S1

CPP1

TRU2

RL

ROOF RIDGE

18.650 m

RL

UPPER FCL

17.380 m

RL

FFL

11.150 m

MRC

S1

TRU2

MRS3BGMECHANICAL EXHUAST AT HIGH LEVEL

2.00°2.01°

SOF

2.00°

LWC1

SOF

S1

TRU2EG1BEYOND

LINE OF ROOF BEYOND SHOWN DASHED

MRC

LINE OF EXISTING GROUND LEVEL

RL

LOWER GROUND FCL

13.850 m

RL

LEVEL 1 FFL

14.270 m

RL

LOWER ROOF RL

14.500 m

RL 11.500

RL 11.050

SCALE 1 : 100

ELEVATION 11

SCALE 1 : 10003_0201

ELEVATION 22

PRELIMINARY ONLY 0

SCALE 1:

This drawing and the design expressed are copyright and remain the property of Webber Architects. In accordance with the commonwealth copyright act 1968 this drawing and design in whole or part may not be used unless licenced by Webber Architects. Verify all dimensions and falls on site before construction and do not scale from drawing.PRINT DATE: FILE PATH:BUILDER TO CONFIRM ALL DETAILS, SETOUTS (TILE, ETC.), FALLS & CONNECTIONS ON SITE BEFORE CONSTRUCTION

1000 2000 3000 4000 5000 mm

100 @ A1

SCALE :ISSUED : NORTH :

PROJECT COMMENCEMENT DATE : SHEET NUMBER :

24/09/2018 5:00:26 PM T:\Revit Locals\2544 Medowie_High School Block B_candiceNT4ZE.rvt

ELEVATION - BLOCK B - 01

2544_04_0201_N

CHAPEL

CATHERINE McAULEY CATHOLIC COLLEGE

507 MEDOWIE ROAD, MEDOWIE, NSW

01.05.2017

NOT FOR CONSTRUCTION

ABBREVIATIONS

6.01 BAR FRIDGE

6.02 REFRIGERATOR

7.01 FEATURE LIGHT 1

7.02 FEATURE LIGHT 2

7.04 PROJECTOR SCREEN

7.05 FIRE EXTINGUISHER

8.01 TOILET

8.03 BASIN

8.05 SOAP DISPENCER

8.06 HAND DRYER

8.07 GRAB RAIL TYPE 1

8.08 GRAB RAIL TYPE 2

8.09 MIRROR

8.13 TOILET ROLL HOLDER TYPE 2

8.21 SINK MIXER

8.23 TAP ALL IN ONE

12.01 CHAIR TYPE 1

12.02 MEETING TABLE 1

12.03 MEETING TABLE 2

12.04 LOUNGE

12.06 MEETING TABLE ROUND

12.07 TABERNACLE

APP1 ACOUSTIC PLASTERBOARD PANEL - TYPE 1

B1 BALUSTRADE - TYPE 1

BG BOX GUTTER

BT1 BENCHTOP - TYPE 1

BT2 BENCHTOP - TYPE 2

BT3 BENCHTOP - TYPE 3

COL COLUMN

CON1 CONCRETE - TYPE 1

CPP1 CONCRETE PRECAST PANEL - TYPE 1

CPT1 CARPET - TYPE 1

CPT2 CARPET - TYPE 2

CT3 CEILING TILES - TYPE 3

CUR1 CURTAIN

CV1 CONCRETE VESSEL 1

DP DOWNPIPE

DP1 DOWNPIPE - TYPE 1

EG EAVES GUTTER

EG1 EAVES GUTTER - TYPE 1

FF:01 FIXED FURNITURE - TYPE 1

FF:05 FIXED FURNITURE - TYPE 5

FF:06 FIXED FURNITURE - TYPE 6

FHR FIRE HOSE REEL

FLAS FLASHING

FT1 FLOOR TILES - TYPE 1

FT2 FLOOR TILES - TYPE 2

FT3 FLOOR TILES - TYPE 3

FW FLOOR WASTE

J01 PEW

J02 BAPTISMAL FONT

J03 ALTAR

J04 AMBO

J05 HOLY WATER FONT

LWC1 LIGHT WEIGHT CLADDING - TYPE 1

LX1 LAMINATE - TYPE 1

LX2 LAMINATE - TYPE 2

MAT1 ENTRY MAT

MRC METAL ROOF CAPPING

MRS1 METAL ROOF SHEETING - TYPE 1

MRS3 METAL ROOF SHEETING - TYPE 3

MSR2 METAL SHEET ROOF

PB1 PLASTERBOARD - TYPE 1

PF1 PAINT FINISH - TYPE 1

PPB PAINTED PLASTERBOARD

PPB1 PAINTED PLASTERBOARD - TYPE 1

PPB2 PAINTED PLASTERBOARD - TYPE 2

S1 SCREEN - TYPE 1

SB SPLASHBACK

SK1 SKIRTING - TYPE 1

SOC STATIONS OF THE CROSS

SOF SOFFIT

SVL SOLID VENEER LUMBER

SVL1 SOLID VENEER LUMBER - TYPE 1

TL TIMBER LINING

TRU1 TRUSS 1

TRU2 TRUSS 2

VYN VINYL

REV DATE DESCRIPTION BY CHK

F 09.03.2018 FOR QA CA

G 29.03.2018 FOR CLIENT APPROVAL CA TH

H 15.05.2018 FOR DEVELOPMENT APPROVAL CA

I 22.06.2018 FOR CLIENT APPROVAL CA JW

J 28.06.2018 FOR STAGE 1 RFP CA

K 12.07.2018 FOR CONSULTANT COORDINATION TR

L 17.08.2018 FOR QA CA

M 31.08.2018 FOR ECI CA

N 24.09.2018 RESPONSE TO SUBMISSIONS CA

Page 4: LOCATION PLAN 1 FLOOR PLAN - GROUND

LINE OF EXISTING GROUND LEVEL

MRS1

TRU2

CPP1

S1

TRU2 TRU2 TRU2

RL

ROOF RIDGE

18.650 m

RL

UPPER FCL

17.380 m

RL

FFL

11.150 m

MRS3BG

EG1

FLAS

MSR2TRU2

S1MRC

LWC1

SOF

MRC

2.00° 2.00°

FULL HEIGHT LOUVRE DOORSAS PER MECHANICAL

EG1

BEYOND

LINE OF ROOF BEYOND

2.00°

RL

LOWER GROUND FCL

13.850 m

RL

LEVEL 1 FFL

14.270 m

RL

LOWER ROOF RL

14.500 m

CPP1

S1

MRS1

TRU2TRU2

RL

ROOF RIDGE

18.650 m

RL

UPPER FCL

17.380 m

RL

FFL

11.150 m

CPP1

TRU2

TRU2EG1MSR2

MRCMRC

LWC1

MRC

LWC1

S1

MRC

2.00°2.00°

SOF

B1

EG1BEYOND

LINE OF ROOF BEYOND

AMENITIES EXHAUST LOUVREREFER TO MECHANICAL DRAWINGS

2.00°

RL

LOWER GROUND FCL

13.850 m

RL

LEVEL 1 FFL

14.270 m

RL

LOWER ROOF RL

14.500 m

SCALE 1 : 10003_0202

ELEVATION 31

SCALE 1 : 100

ELEVATION 42

PRELIMINARY ONLY 0

SCALE 1:

This drawing and the design expressed are copyright and remain the property of Webber Architects. In accordance with the commonwealth copyright act 1968 this drawing and design in whole or part may not be used unless licenced by Webber Architects. Verify all dimensions and falls on site before construction and do not scale from drawing.PRINT DATE: FILE PATH:BUILDER TO CONFIRM ALL DETAILS, SETOUTS (TILE, ETC.), FALLS & CONNECTIONS ON SITE BEFORE CONSTRUCTION

1000 2000 3000 4000 5000 mm

100 @ A1

SCALE :ISSUED : NORTH :

PROJECT COMMENCEMENT DATE : SHEET NUMBER :

24/09/2018 5:00:37 PM T:\Revit Locals\2544 Medowie_High School Block B_candiceNT4ZE.rvt

ELEVATION - BLOCK B - 02

2544_04_0202_N

CHAPEL

CATHERINE McAULEY CATHOLIC COLLEGE

507 MEDOWIE ROAD, MEDOWIE, NSW

01.05.2017

NOT FOR CONSTRUCTION

ABBREVIATIONS

6.01 BAR FRIDGE

6.02 REFRIGERATOR

7.01 FEATURE LIGHT 1

7.02 FEATURE LIGHT 2

7.04 PROJECTOR SCREEN

7.05 FIRE EXTINGUISHER

8.01 TOILET

8.03 BASIN

8.05 SOAP DISPENCER

8.06 HAND DRYER

8.07 GRAB RAIL TYPE 1

8.08 GRAB RAIL TYPE 2

8.09 MIRROR

8.13 TOILET ROLL HOLDER TYPE 2

8.21 SINK MIXER

8.23 TAP ALL IN ONE

12.01 CHAIR TYPE 1

12.02 MEETING TABLE 1

12.03 MEETING TABLE 2

12.04 LOUNGE

12.06 MEETING TABLE ROUND

12.07 TABERNACLE

APP1 ACOUSTIC PLASTERBOARD PANEL - TYPE 1

B1 BALUSTRADE - TYPE 1

BG BOX GUTTER

BT1 BENCHTOP - TYPE 1

BT2 BENCHTOP - TYPE 2

BT3 BENCHTOP - TYPE 3

COL COLUMN

CON1 CONCRETE - TYPE 1

CPP1 CONCRETE PRECAST PANEL - TYPE 1

CPT1 CARPET - TYPE 1

CPT2 CARPET - TYPE 2

CT3 CEILING TILES - TYPE 3

CUR1 CURTAIN

CV1 CONCRETE VESSEL 1

DP DOWNPIPE

DP1 DOWNPIPE - TYPE 1

EG EAVES GUTTER

EG1 EAVES GUTTER - TYPE 1

FF:01 FIXED FURNITURE - TYPE 1

FF:05 FIXED FURNITURE - TYPE 5

FF:06 FIXED FURNITURE - TYPE 6

FHR FIRE HOSE REEL

FLAS FLASHING

FT1 FLOOR TILES - TYPE 1

FT2 FLOOR TILES - TYPE 2

FT3 FLOOR TILES - TYPE 3

FW FLOOR WASTE

J01 PEW

J02 BAPTISMAL FONT

J03 ALTAR

J04 AMBO

J05 HOLY WATER FONT

LWC1 LIGHT WEIGHT CLADDING - TYPE 1

LX1 LAMINATE - TYPE 1

LX2 LAMINATE - TYPE 2

MAT1 ENTRY MAT

MRC METAL ROOF CAPPING

MRS1 METAL ROOF SHEETING - TYPE 1

MRS3 METAL ROOF SHEETING - TYPE 3

MSR2 METAL SHEET ROOF

PB1 PLASTERBOARD - TYPE 1

PF1 PAINT FINISH - TYPE 1

PPB PAINTED PLASTERBOARD

PPB1 PAINTED PLASTERBOARD - TYPE 1

PPB2 PAINTED PLASTERBOARD - TYPE 2

S1 SCREEN - TYPE 1

SB SPLASHBACK

SK1 SKIRTING - TYPE 1

SOC STATIONS OF THE CROSS

SOF SOFFIT

SVL SOLID VENEER LUMBER

SVL1 SOLID VENEER LUMBER - TYPE 1

TL TIMBER LINING

TRU1 TRUSS 1

TRU2 TRUSS 2

VYN VINYL

REV DATE DESCRIPTION BY CHK

F 09.03.2018 FOR QA CA

G 29.03.2018 FOR CLIENT APPROVAL CA TH

H 15.05.2018 FOR DEVELOPMENT APPROVAL CA

I 22.06.2018 FOR CLIENT APPROVAL CA JW

J 28.06.2018 FOR STAGE 1 RFP CA

K 12.07.2018 FOR CONSULTANT COORDINATION TR

L 17.08.2018 FOR QA CA

M 31.08.2018 FOR ECI CA

N 24.09.2018 RESPONSE TO SUBMISSIONS CA

Page 5: LOCATION PLAN 1 FLOOR PLAN - GROUND

2

05_0201

UNDERCROFT

CONGREGATION

MRS1

UNDERCROFT

FEATURE STRUCTURE STEEL TRUSS

LINE OF EXISTING GROUND LEVELLINE OF PROPOSED GROUND LEVEL

CC

SOF

RL

ROOF RIDGE

18.650 m

RL

UPPER FCL

17.380 m

RL

FFL

11.150 m

MRS3 BG

TRU1 7.02

J03

J04

SOC DG02

04

WG12

17WG12

16

DG02

19

WG03

15

WG04

14

WT12

42

WT11

41

WT11

40

WT11

39

WT12

26

WT11

28

WT11

29

WT11

30

J02

CV1FT3

PF1PF1

CPP1

CPP1CPP1 CPP1 CPP1

CPP1

MRCMRS1

S1

TRU2

S1PPB1 TLAPP1PPB1

CPT1CPT1

SOCSOC SOCSOC SOC

SOF

TRU2

2.00°2.00°

CPP1

WATERPROOF MEMBRANE

WAFFLE POD SLAB TO ENGINEERS DETAILS

WG03

03

WG04

04

RAISED FLOOR BEYOND

SCREW PILES TO ENGINEERS DETAILS

RL

LOWER GROUND FCL

13.850 mRL

LEVEL 1 FFL

14.270 mRL

LOWER ROOF RL

14.500 m

1

05_0201 AABB

UNDERCROFTCONGREGATION

NARTHEX

LINE OF EXISTING GROUND LEVEL

LINE OF PROPOSED GROUND LEVEL

HIGHLIGHT GLAZING

MRS1

B1

CONCRETE RETAINING WALL TO ENGINEERS DETAILS

CONCRETE SLAB TO ENGINEERS DETAILS

7.027.01

J03 J04

S1 S1

BG

SOF

EXTERNAL VESTIBULE

RL

ROOF RIDGE

18.650 m

RL

UPPER FCL

17.380 m

RL

FFL

11.150 m

MRS3

SOF

MRC

LWC1

CPP1

CPP1CPP1

CPP1

2.00°

WT11

37WT11

40

WT11

41

WT11

44

WT12

43

WT12

42

WT11

45

WT11

47

WT10

48

WG04

14

WG03

15

MRC

TLAPP1 TL

SOF

SOF

MRS3

BG

2700

PF1

PF1

SCREW PILES TO ENGINEERS DETAILS

SOCSOC

SOCSOC

SOCSOC SOC

MRS1

1:40.5

RL

LOWER GROUND FCL

13.850 m

RL

LEVEL 1 FFL

14.270 m

RL

LOWER ROOF RL

14.500 m

3350

PRELIMINARY ONLY 0

SCALE 1:

This drawing and the design expressed are copyright and remain the property of Webber Architects. In accordance with the commonwealth copyright act 1968 this drawing and design in whole or part may not be used unless licenced by Webber Architects. Verify all dimensions and falls on site before construction and do not scale from drawing.PRINT DATE: FILE PATH:BUILDER TO CONFIRM ALL DETAILS, SETOUTS (TILE, ETC.), FALLS & CONNECTIONS ON SITE BEFORE CONSTRUCTION

1000 2000 3000 4000 5000 mm

100 @ A1

SCALE :ISSUED : NORTH :

PROJECT COMMENCEMENT DATE : SHEET NUMBER :

24/09/2018 5:00:41 PM T:\Revit Locals\2544 Medowie_High School Block B_candiceNT4ZE.rvt

SECTION - BLOCK B - 01

2544_05_0201_L

CHAPEL

CATHERINE McAULEY CATHOLIC COLLEGE

507 MEDOWIE ROAD, MEDOWIE, NSW

01.05.2017

NOT FOR CONSTRUCTION

SCALE 1 : 10003_0201

SECTION 11

SCALE 1 : 10003_0201

SECTION 22

ABBREVIATIONS

6.01 BAR FRIDGE

6.02 REFRIGERATOR

7.01 FEATURE LIGHT 1

7.02 FEATURE LIGHT 2

7.04 PROJECTOR SCREEN

7.05 FIRE EXTINGUISHER

8.01 TOILET

8.03 BASIN

8.05 SOAP DISPENCER

8.06 HAND DRYER

8.07 GRAB RAIL TYPE 1

8.08 GRAB RAIL TYPE 2

8.09 MIRROR

8.13 TOILET ROLL HOLDER TYPE 2

8.21 SINK MIXER

8.23 TAP ALL IN ONE

12.01 CHAIR TYPE 1

12.02 MEETING TABLE 1

12.03 MEETING TABLE 2

12.04 LOUNGE

12.06 MEETING TABLE ROUND

12.07 TABERNACLE

APP1 ACOUSTIC PLASTERBOARD PANEL - TYPE 1

B1 BALUSTRADE - TYPE 1

BG BOX GUTTER

BT1 BENCHTOP - TYPE 1

BT2 BENCHTOP - TYPE 2

BT3 BENCHTOP - TYPE 3

COL COLUMN

CON1 CONCRETE - TYPE 1

CPP1 CONCRETE PRECAST PANEL - TYPE 1

CPT1 CARPET - TYPE 1

CPT2 CARPET - TYPE 2

CT3 CEILING TILES - TYPE 3

CUR1 CURTAIN

CV1 CONCRETE VESSEL 1

DP DOWNPIPE

DP1 DOWNPIPE - TYPE 1

EG EAVES GUTTER

EG1 EAVES GUTTER - TYPE 1

FF:01 FIXED FURNITURE - TYPE 1

FF:05 FIXED FURNITURE - TYPE 5

FF:06 FIXED FURNITURE - TYPE 6

FHR FIRE HOSE REEL

FLAS FLASHING

FT1 FLOOR TILES - TYPE 1

FT2 FLOOR TILES - TYPE 2

FT3 FLOOR TILES - TYPE 3

FW FLOOR WASTE

J01 PEW

J02 BAPTISMAL FONT

J03 ALTAR

J04 AMBO

J05 HOLY WATER FONT

LWC1 LIGHT WEIGHT CLADDING - TYPE 1

LX1 LAMINATE - TYPE 1

LX2 LAMINATE - TYPE 2

MAT1 ENTRY MAT

MRC METAL ROOF CAPPING

MRS1 METAL ROOF SHEETING - TYPE 1

MRS3 METAL ROOF SHEETING - TYPE 3

MSR2 METAL SHEET ROOF

PB1 PLASTERBOARD - TYPE 1

PF1 PAINT FINISH - TYPE 1

PPB PAINTED PLASTERBOARD

PPB1 PAINTED PLASTERBOARD - TYPE 1

PPB2 PAINTED PLASTERBOARD - TYPE 2

S1 SCREEN - TYPE 1

SB SPLASHBACK

SK1 SKIRTING - TYPE 1

SOC STATIONS OF THE CROSS

SOF SOFFIT

SVL SOLID VENEER LUMBER

SVL1 SOLID VENEER LUMBER - TYPE 1

TL TIMBER LINING

TRU1 TRUSS 1

TRU2 TRUSS 2

VYN VINYL

REV DATE DESCRIPTION BY CHK

D 09.03.2018 FOR QA CA

E 29.03.2018 FOR CLIENT APPROVAL CA TH

F 15.05.2018 FOR DEVELOPMENT APPROVAL CA

G 22.06.2018 FOR CLIENT APPROVAL CA JW

H 28.06.2018 FOR STAGE 1 RFP CA

I 12.07.2018 FOR CONSULTANT COORDINATION TR

J 17.08.2018 FOR QA CA

K 31.08.2018 FOR ECI CA

L 24.09.2018 RESPONSE TO SUBMISSIONS CA

Page 6: LOCATION PLAN 1 FLOOR PLAN - GROUND

PRELIMINARY ONLY

This drawing and the design expressed are copyright and remain the property of Webber Architects. In accordance with the commonwealth copyright act 1968 this drawing and design in whole or part may not be used unless licenced by Webber Architects. Verify all dimensions and falls on site before construction and do not scale from drawing.PRINT DATE: FILE PATH:BUILDER TO CONFIRM ALL DETAILS, SETOUTS (TILE, ETC.), FALLS & CONNECTIONS ON SITE BEFORE CONSTRUCTION

SCALE :ISSUED : NORTH :

PROJECT COMMENCEMENT DATE : SHEET NUMBER :

24/09/2018 5:00:42 PM T:\Revit Locals\2544 Medowie_High School Block B_candiceNT4ZE.rvt

3D IMAGES - BLOCK B - 01

2544_10_0201_H

CHAPEL

CATHERINE McAULEY CATHOLIC COLLEGE

507 MEDOWIE ROAD, MEDOWIE, NSW

01.05.2017

NOT FOR CONSTRUCTION

REV DATE DESCRIPTION BY CHK

A 09.11.2017 FOR CLIENT COMMENT CA

B 05.12.2017 FOR PIC MEETING FS

C 22.12.2017 FOR CLIENT REVIEW CA

D 15.05.2018 FOR DEVELOPMENT APPROVAL CA

E 22.06.2018 FOR CLIENT APPROVAL CA JW

F 28.06.2018 FOR STAGE 1 RFP CA

G 17.08.2018 FOR QA CA

H 24.09.2018 RESPONSE TO SUBMISSIONS CA

Page 7: LOCATION PLAN 1 FLOOR PLAN - GROUND

PRELIMINARY ONLY

This drawing and the design expressed are copyright and remain the property of Webber Architects. In accordance with the commonwealth copyright act 1968 this drawing and design in whole or part may not be used unless licenced by Webber Architects. Verify all dimensions and falls on site before construction and do not scale from drawing.PRINT DATE: FILE PATH:BUILDER TO CONFIRM ALL DETAILS, SETOUTS (TILE, ETC.), FALLS & CONNECTIONS ON SITE BEFORE CONSTRUCTION

SCALE :ISSUED : NORTH :

PROJECT COMMENCEMENT DATE : SHEET NUMBER :

24/09/2018 5:00:42 PM T:\Revit Locals\2544 Medowie_High School Block B_candiceNT4ZE.rvt

3D IMAGES - BLOCK B - 02

2544_10_0202_G

CHAPEL

CATHERINE McAULEY CATHOLIC COLLEGE

507 MEDOWIE ROAD, MEDOWIE, NSW

01.05.2017

NOT FOR CONSTRUCTION

REV DATE DESCRIPTION BY CHK

A 05.12.2017 FOR PIC MEETING FS

B 22.12.2017 FOR CLIENT REVIEW CA

C 15.05.2018 FOR DEVELOPMENT APPROVAL CA

D 22.06.2018 FOR CLIENT APPROVAL CA JW

E 28.06.2018 FOR STAGE 1 RFP CA

F 17.08.2018 FOR QA CA

G 24.09.2018 RESPONSE TO SUBMISSIONS CA