lockheed martin’s lunar demonstration projects

6
Lockheed Martin’s Lunar Demonstration Projects Dr. Christine Edwards Lockheed Martin Space Deputy Exploration Architect LSIC Spring Meeting May 11-12, 2021 © 2021 Lockheed Martin Corporation. All Rights Reserved.

Upload: others

Post on 25-Mar-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Lockheed Martin’s Lunar Demonstration Projects

Lockheed Martin’sLunar Demonstration Projects

Dr. Christine EdwardsLockheed Martin Space Deputy Exploration Architect

LSIC Spring MeetingMay 11-12, 2021

© 2021 Lockheed Martin Corporation. All Rights Reserved.

Page 2: Lockheed Martin’s Lunar Demonstration Projects

MISSION 1

6.5 Days

South Pole Site

Initial Mission Sequence for South Pole RegionMISSION 2

14-30 Days

(Lunar Day Only)

New S. Pole Site

MISSION 3

14-30 Days

(Lunar Day Only)

New South Pole Site

Lander Lander

HMP

Lander

MICRO-PSR WATER ISRU DEMO

HMP

REGOLITH O2 ISRU DEMO

LTV

FSP

MISSION 4

14-30 Days

(Lunar Night Survivability)

Permanent South Pole Site

Lander Landing Pad Grooming

HMP

LTV

ISRU Pilot Plant

Comm Comm Comm Comm

LTV LTV

VIPER Investigations

VSAT VSAT VSAT

Page 3: Lockheed Martin’s Lunar Demonstration Projects

VSAT

ISRU Plant

MOBILE ARCHITECTURE BEGINNINGS OF A MICROGRID ARCHITECTURE

Transition from Mobile to Microgrid to Future Architectures

Travel to ChargingPower Line

Cables

FSP

VSAT

Power Beaming

ADAPTABILITY

VSAT

Microgrid Hub

PSR Excavator

Page 4: Lockheed Martin’s Lunar Demonstration Projects

Lockheed Martin’s Vertical Solar Array Technology (VSAT)

The VSAT operational system concept combines innovative modifications to existing solar array technology, deployment andretraction mechanisms, and a composite mast design with leveling legs, gimbal, sun sensors, avionics, power and thermal systemswhile accommodating for the challenging lunar environment.

Commercial Impact:• Reduce barrier of entry for lunar surface assets by providing mobile power station

• Reducing functionality required of surface assets• Catalyzing a commercial services by reducing environment risk for long-term lunar surface assets

• i.e. dust mitigation, surviving lunar night• Offering new, affordable capabilities for lunar surface applications

Technology Image

Deployed Stowed

Deployer Assembly

Blanket Container Assembly•Contains solar array blanket (shown in stowed position)

Ball Bearing RingEnclosure

Leveling Legs

Solar Array Blanket

Page 5: Lockheed Martin’s Lunar Demonstration Projects

Cryogenic Demonstration Mission (CDM)

• NASA Space Technology Mission Directorate (STMD) Tipping Point project• In-space demonstration mission using liquid hydrogen• Testing more than a dozen cryogenic fluid management technologies