    FIXTURE

    CONSUMABLE

    TOOL

    PROCESS PARAMETERS

    INPUT QUALITY

    INPROCESS QUALITY

    OUTPUT QUALITY

    CHECK POINT BEFORE START OF M/C

    GAUGES

    LOADING PATTERN

    1) VERTICAL COMPONENT ONFIXTURE WITH CLAMPING.

    1) QUENCHING OIL2) LPG GAS (PROPANE GAS)

    1) FREE FROM DENTS & DAMAGES.

    1) CASE DEPTH - 0.4 TO 0.7 mm2) HARDNESS - 81 TO 83 HRA3) CORE HARDNESS - >= 1000

    1) CARBURISING GAS TEMPERATURE900~940C & REDn 840~870C

    2) QUENCHING TEMP. 50~150C

    1) HARDNESS TESTER

    1) HOLDING FIXTURE WITH CLAMPS

    2) CHARGE QTY-130 NOS

    76.0(O )

    94.

    0

    42.0(O )

  • 7/27/2019 Locking Slide Part2

    2/12

    FIXTURE

    TOOL

    PROCESS PARAMETERS

    INPUT QUALITY

    INPROCESS QUALITY

    OUTPUT QUALITY

    CHECK POINT BEFORE START OF M/C

    GAUGES

    LOADING PATTERN

    FIXTURE

    CONSUMABLE

    TOOL

    PROCESS PARAMETERS

    INPUT QUALITY

    OUTPUT QUALITY

    CHECK POINT BEFORE START OF M/C

    GAUGES

    LOADING PATTERN

    NO OF COMPONENT: 1 COMPONENT

    SOLUABLE OIL- 1:20 CONCENTRATION

    OIL TANK CLEAN FREQUENCY - 6MONTHS

    1. AIR RING GAUGE 50h8

    1. OD SIZE - 49.98 0.005

    1. CHECK COOLANT LEVEL IN TANK.

    1. FEED: 0.2 TO 1.6 MM/ MIN

    2. SPEED : 1500-1800RPM

    3. CLAMPING PRESSURE : 3-5 BAR

    4. FINE FEED : 1 MM/MIN

    2. RUNOUT : 0.03 WRT A

    8. VISUAL : NO PATCH MARK,CHATTERMARK.

    2. CHECK WHEEL RPM.

    1. ENSURE NO DENTS ON RESTING FACE.

    2. CHECK BURR ON OD.

    3. CHECK ID SIZE OF COMPONENT.

    1. COMPONENT SHOULD BE LOBBINGFREE.

    2. CIRCULARITY SHOULD BE 0.002 MAX.

    1.GRINDING WHEEL 400 X 50 X 127TYPE -463-K5(TH01021001)

    1.GRINDING MANDRILL

    3. ROUGHNESS Rz 2

    (GA14006042)

    I = IMPORTANT DIMENSIONS

    I

    I

    I = IMPORTANT DIMENSIONS

    4. RUNOUT : 0.03 WRT A

    5. PERPENDICULARITY : 0.03 WRT A6. SURFACE FINISH : Rz2.5

    7. DIMN.10.2 +0.1

    I

    I

    2. EXPANDING MANDREL NO.(GA14010046)

    3. D.H.G.

    ^ 0.03 A

    Rz2

    II

    II

    49.9

    80.0

    05

    42

    O

    10.2+0.1

    94.0

    A

    ^ 0.03 A

    n 0.03 ARz2.5

    NOTE : DATUM A IS PCD

  • 7/27/2019 Locking Slide Part2

    3/12

    CONTROL PLAN 32

    PD/F09/R2

    Machine,

    Device, forMfg.

    CharacteristicsSpecial

    Char.Class

    Methods

    Responsibility

    Reaction

    Plan/Corrective actionNo. Product Process

    Product/ ProcessSpecification/

    Tolerance

    Evaluation/ Measurement

    Technique

    SampleControl Method

    Size Freq.

    Grinding

    M/C.

    1. - Settingapproval

    - As per control plan ARG & Micrometer Continuous5 OK jobs

    Every

    Setting

    Setting Approval

    Report

    Prod. Supervisor

    If not ok 1.

    Stop theproduction

    2. Confirm

    last hour

    production

    3.Do resetting &

    inspect 5

    comp.

    2. Out Side Diameter. - I 49.98 0.005 ARG & Micrometer 1 Per hour HIPR OperatorARG (GA14006042) 100% Continues - Operator

    3. Roughness - - 0.4Ra Roughness tester 5 Per hour HIPR Operator4. Run out

    - I ^ 0.03 ADial &Between Center. 5 Per hour HIPR Operator

    5. Run out- I ^ 0.03 A

    Dial &Between Center. 5 Per hour HIPR Operator

    6. Perpendicularity - I { 0.03 A Dial & height gauge 5 Per hour HIPR Operator7. Dimn. - - 10.2 +0.1 Digital height gauge 5 Per hour HIPR Operator

    HIPR: - Hourly Inspection & Production Report : Important dimension ARG: - Air Ring Gauge

    X Prototype X Pre-launch Production

    Control Plan Number : CP/ FG14000032

    Key Contact/Phone : 1) Mr.R.V.Vaidya

    +0240-2244001+0240-2244002

    Date (Org) 25.11.2012 Date (Rev.) 20.11.2012

    Part Number/Latest Change Level : SF14053032 (4475_319_054) Core Team : 1) Mr. S.G.Waghmare

    2) Mr. D.T.Kawle

    3) Mr. J.S.Isargunde

    Customer Engineering Approval/Date (If Reqd)

    Part Name/Description : LOCKING SLIDE

    Part Process Number : 120 Supplier / Plant Approved / date Customer Quality Approval/Date (If Reqd)

    Process Name/ Operation Description: OD Grinding

    Supplier/Plant :- Sanjeev Auto Parts , K96, Waluj,Aurangabad

    Supplier Code:38709

    Other Approval/Date (If Reqd) Other Approval / Date (If Reqd)

  • 7/27/2019 Locking Slide Part2

    4/12

    76.0(O )

    94.0

    42.0(O )

    FIXTURE

    CONSUMABLE

    TOOL

    PROCESS PARAMETERS

    INPUT QUALITY

    INPROCESS QUALITY

    OUTPUT QUALITY

    CHECK POINT BEFORE START OF M/C

    WORK INSTRUCTION

    GAUGES

    LOADING PATTERN

    NO. OF COMPONENTS : 1 NOS

    ANTI RUST OIL

    1) NO EXCESS OIL REMAINS ONCOPMPONENT

    1) COMPONENT FREE FROM DUST,CHIPS & RUST.

    1) TAKE COMPONENT FROM SINGLE

    1) ENSURE CLEANED COMPONANTFREE FROM RUST & DUST

  • 7/27/2019 Locking Slide Part2

    5/12

    CONTROL PLAN 32

    PD/F09/R2

    X Prototype X Pre-launch Production

    Control Plan Number : CP/ FG14000032

    Key Contact/Phone : 1) Mr.R.V.Vaidya

    +0240-2244001+0240-2244002

    Date (Org) 20.11.2012 Date (Rev.) 20.11.2012

    Part Number/Latest Change Level : SF14007032 (4475_319_054) Core Team : 1) Mr. S.G.Waghmare

    2) Mr. D.T.Kawle

    3) Mr. J.S.Isargunde

    Customer Engineering Approval/Date (If Reqd)

    Part Name/Description : LOCKING SLIDE

    Part Process Number : 130 Supplier/ Plant Approval/Date Customer Quality Approval/Date (If Reqd)

    Process Name/ Operation Description :-WASHING

    Supplier/Plant

    Sanjeev Auto Parts Mfgrs Pvt Ltd.,

    K-96, MIDC, Waluj, Aurangabad.

    Supplier Code:

    38709

    Other Approval/Date (If Reqd)

    Machine,

    Device, MgBooks for

    Mfg.

    CharacteristicsSpecial

    Char.

    Class

    Methods

    Responsibility

    Reaction

    Plan &corrective

    actionNo. Product ProcessProduct/ Process

    Specification/ Tolerance

    Evaluation/

    Measurement

    Technique

    Sample

    Control MethodSize Freq.

    Washing

    m/c

    1 Visual dimension - - No Rust, no scale of HT Visual

    100% Continuous

    -

    OperatorIf

    component

    is not okthen rewash

    it

    5 Per hourProd.

    Supervisor

    2 Cleanliness - -Max Allowable

    contaminant=25.948mg Millipore 1 Per lot Millipore Report QA Inspector

  • 7/27/2019 Locking Slide Part2

    6/12

    SANJEEV AUTO PARTS MFRS. PVT. LTD.

    MATERIAL & HEAT TREATMENT :-

    PART NAME :- PRPD BY

    CHKD BY

    APPD BY

    MOD NO. DATEMOD. CHANGES

    BRAKE ALL SHARP EDGES ASK IF IN DOUBT

    PART. NO. :-

    CUST. REF. NO./MOD. NO.:-

    PD/F15/R2

    DATE

    38.

    5

    +0.4

    OO

    76.

    00

    -0.

    5

    2.0+1

    10.50-0.5

    70.

    00

    -0.

    5

    O

    63.

    00

    -0.

    5

    O

    59.0

    -0.

    2

    O

    50.0

    0

    O

    h8

    42.

    0

    +0.4

    O

    61.

    75

    da=

    h11

    94.0

    83.50-0.3

    55.0-1

    9.00+0.5

    80.00+0.5

    8.00-0.572.5+1

    6.5+0.2

    87

    19'

    020'

    R2.5

    -1

    R2.5

    -1

    ^ 0.05 P1

    n 0.05 P1

    14.80

    -0.25

    Ch.0.6 x 45

    SEE DETAIL 'X'

    P1

    ^ 0.05 P1

    R1.6 -0.2

    Rz63

    DOG.

    16

    60.0

    d

    =59.

    25

    -0.

    68

    df=

    MARKING LOCATION OPTIONAL

    CONTACT PATTERN WITHSAMPLE MATING GEAR

    MARKED ACC.TO ZFN 2011 X

    ALTERNATIVERz5C

    Rz2.5CH.1.7 +0.3 X 45

    0.

    35

    0.

    2

    30

    5

    0.

    8

    0.4

    0.350.2

    0.80.4

    30

    5

    R0.4 0.2

    DETAIL 'X'

    RELIEF GROOVE

    S.P.A.J.S.I.

    R.V.V.

    F

    LOCKING SLIDE

    FG14000032

    4475_319_054_DES001

    20/11/12

    20/11/12

    20/11/12

    ZFN417-A

    NEW DRAWING RELEASED.20/11/12F

    FORGING TOLERANCE ACC. TO EN 10243

    DRAFT ANGLE = 6

    ( ) SUPPLEMENTRY DIMENSION

    SPLINE GEAR TEETH

    TEST DIMENSION OVER ROLLERS ACC.

    TO DIMENSION INSPECTION REPORT

    100% TESTING WITH PROFILE GAUGE

    ## DEVIATION TO 4475_319_043 VER "a"

    SEE DRAW. MODIFICATION

    # ALTERNATIVE MATERIAL ACC. TO TABLE 4475_700_072

    Rz20

    DIN 5480-W62X1.25X30X48X9h

    y

    HEAT TREATMENT

    CASE HAEDENED ACC TO ZFN 417

    SURFACE HARDNESS : 81 TO 85 HRA.

    CASE DEPTH : 0.4 TO 0.7

    CORE STRENGHT : 1000 N/mm2

    SR.NO. SPUR GEAR, BEVEL GEAR TOOTH DATA CURVIC COUPLING

    1 NO. OF TEETH/ NORMAL MODULE Z = 48 / Mn = 1.25 Z = 6 / Mn = 9.833

    2 PRESSURE ANGLE = 30 = 03 HELIX ANGLE = =

    4 HAND OF HELIX ---- ----

    5 CENTER DISTANCE IN HOUSING a = a =

    6 MATING GEAR No/NO. TEETH 4461_353_056 / Z = 48 4461_351_061/ Z = 6

    7 SETTING DATA ACC TO M NO. 0041 072 569 0042 710 009

    8 OPD DIMENSION(Over Pin2.5) 64.578/64.507

    9 ROOT DIAMETER 59.250

    I

    I

    I

    I

    I

    I

    I

    I

    I

    0.000 50.000

    -0.039 49.961

    0.000 61.750

    -0.190 61.560

    MAXIMUM LIMITS

    50.000 h8

    61.750 h11

    FIT SIZE ALLOWNCE

  • 7/27/2019 Locking Slide Part2

    7/12

  • 7/27/2019 Locking Slide Part2

    8/12

  • 7/27/2019 Locking Slide Part2

    9/12

  • 7/27/2019 Locking Slide Part2

    10/12

    CONTROL PLAN 32

    PD/F09/R2

    X Prototype X Pre-launch Production

    Control Plan Number : CP/ FG14000032

    Key Contact/Phone : 1) Mr.R.V.Vaidya+0240-2244001

    +0240-2244002

    Date (Org) 25.11.2012 Date (Rev.) 20.11.2012

    Part Number/Latest Change Level : SF14007032 (4475_319_054) Core Team : 1) Mr. S.G.Waghmare

    2) Mr. D.T.Kawle

    3) Mr. J.S.Isargunde

    Customer Engineering Approval/Date (If Reqd)

    Part Name/Description : LOCKING SLIDE

    Part Process Number : 140 page : 4/4 Supplier / Plant Approved / date Customer Quality Approval/Date (If Reqd)

    Process Name/ Operation Description : VISUAL DIMENSION INSPACTION

    Supplier/PlantSanjeev Auto Mfrs Pvt.Ltd.

    K-96 ,MIDC,Waluj,Aurangabad

    Supplier Code:38709

    Other Approval/Date (If Reqd) Other Approval / Date (If Reqd)

    Machine,

    Device, forMfg.

    CharacteristicsSpecial

    Char.Class

    Methods

    Responsibility

    Reaction Plan

    & correctiveactionNo. Product Process

    Product/ ProcessSpecification/ Tolerance

    Evaluation/ MeasurementTechnique

    SampleControl Method

    Size Freq.

    Manually

    48. Core strength - - 1000 N/mm Sampling plan SSP (N) H.T. Report QA Inspector

    If not OK rejectthe lot.& put in

    red bin informto supervisor

    49. Root diameter - - 59.250 Vernier caliper Sampling plan SSP (N) PDI Report QA Inspector

    50. DOP. - - 64.578/64.507 Spline ring gauge GO /NOGO Sampling plan SSP (N) PDI Report QA Inspector

    51. Material - - ZFN417-A Chemical analysis Sampling plan SSP (N) PDI Report QA Inspector

    52. Visual - - No. teeth dent & damage Visually Sampling plan SSP (N) PDI Report QA Inspector

  • 7/27/2019 Locking Slide Part2

    11/12

    CONTROL PLAN 32

    PD/F09/R2

    X Prototype X Pre-launch Production

    Control Plan Number : CP/ FG14000032

    Key Contact/Phone : 1) Mr.R.V.Vaidya+0240-2244001

    +0240-2244002

    Date (Org) 25.11.2012 Date (Rev.)

    Part Number/Latest Change Level : SF14007032 (4475_319_054)

    Part Name/Description : LOCKING SLIDE

    Core Team : 1) Mr. S.G.Waghmare

    2) Mr. D.T.Kawle3) Mr. J.S.Isargunde

    Customer Engineering Approval/Date (If Reqd)

    Part Process Number : 150

    Process Name/ Operation Description : Packing & Forwarding

    Supplier/ Plant Approval/Date: Customer Quality Approval/Date (If Reqd):

    Supplier/Plant

    Sanjeev Auto Parts Mfrs Pvt. Ltd.,

    K-96, MIDC, Waluj, Aurangabad

    Supplier Code:

    360450

    Other Approval/Date (If Reqd):

    Characteristics Methods

    SampleMachine,

    Device, forMfg. No. Product Process

    SpecialChar.Class

    Product/ ProcessSpecification/ Tolerance

    Evaluation/

    MeasurementTechnique Size Freq.

    Control MethodResponsibility

    Reaction Plan &

    Corrective action

    Manual 1 Packing & forwarding - - Packing in Bin Visual counting 100% Continues Physical Verification Dispatch officerIf not OK, put in

    red bin.

  • 7/27/2019 Locking Slide Part2

    12/12