8/17/2019 Logbook Toby http://slidepdf.com/reader/full/logbook-toby 1/12 DAY MO. YR. DAY MO. YR. 14 TO PROPOSED TWO-STOREY RESIDENCE GRIBALDO ST., GRACEPARK, CALOOCAN CITY DT FORM 002 "ANNEX A" LOG SHEETO CANDIDATE PROJECT TITLE/DESCRIPTION & LOCATION PERIOD COVERED 1 FROM 1 14 31 2 14 2 B. PLANNING AND DESIGN CONCEPTUALIZATION 15 1 14 21 A. SITE VISIT (INVETORY & CONDITION) 13 1 14 14 1 14 C. CONCEPTUAL INTERIOR LAYOUT 22 1 14 25 1 14 14 18 2 14 22 2 14 F. DRAFTED FINAL STRUCTURAL AND ARCHITECTURAL PLAN 6 2 14 17 E. CONCEPTUALIZATION OF STRUCTURAL AND UTILITIES 1 2 14 5 2 14 D. PREPARATION OF PRELIMINARY ARCHITECTURAL DRAWINGS 27 I. PREPARE PROJECT COST ESTIMATE & BILL OF MATERIALS 26 2 14 11 H. PREPARATION OF PERSPECTIVE & INTERIORS 24 2 14 25 2 14 G. DRAFTED PLUMBING AND ELECTRICAL PLANS AND DETAILS L. PREPARE FORMS AND DOCUMENTS FOR BUILDING PERMIT 18 3 14 25 3 14 6 14 3 14 M. CONSTRUCTION PROGRAMMING K. PREPARE PROJECT SPECIFICATIONS 12 3 14 17 3 14 10 7 14 14 M. CONSTRUCTION SUPERVISION 22 5 14 25 26 3 14 2 4 14 7 7 14 9 7 4 7 14 5 7 14 N. PREPARE CONSTRUCTION PROGRESS REPORT 26 6 14 3 7 14 P. DRAFTED AS BUILT PLAN 14 7 14 Q. PREPARED INTEIOR DETAILS AND SPECIFICATION O. CONDUCTED BUILDING INSPECTION AND ASBUILT

Upload: aoi-light

Post on 06-Jul-2018

228 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Logbook Toby

8/17/2019 Logbook Toby

http://slidepdf.com/reader/full/logbook-toby 1/12

DAY MO. YR. DAY MO. YR.

14

TO

PROPOSED TWO-STOREY RESIDENCE

GRIBALDO ST., GRACEPARK, CALOOCAN CITY

DT FORM 002 "ANNEX A"LOG SHEETO

CANDIDATE

PROJECT TITLE/DESCRIPTION &

LOCATION

PERIOD COVERED

1

FROM

1 14 31 2 14

2

B. PLANNING AND DESIGN

CONCEPTUALIZATION15 1 14 21

A. SITE VISIT (INVETORY & CONDITION) 13 1 14 14 1 14

C. CONCEPTUAL INTERIOR LAYOUT 22 1 14 25 1 14

14

18 2 14 22 2 14

F. DRAFTED FINAL STRUCTURAL AND

ARCHITECTURAL PLAN6 2 14 17

E. CONCEPTUALIZATION OF STRUCTURAL AND

UTILITIES1 2 14 5 2 14

D. PREPARATION OF PRELIMINARYARCHITECTURAL DRAWINGS

27

I. PREPARE PROJECT COST ESTIMATE & BILL

OF MATERIALS 26 2 14 11

H. PREPARATION OF PERSPECTIVE &

INTERIORS24 2 14 25 2 14

G. DRAFTED PLUMBING AND ELECTRICAL

PLANS AND DETAILS

L. PREPARE FORMS AND DOCUMENTS FOR

BUILDING PERMIT18 3 14 25 3 14

6 14

3 14

M. CONSTRUCTION PROGRAMMING

K. PREPARE PROJECT SPECIFICATIONS 12 3 14 17 3 14

10 7 14 14

M. CONSTRUCTION SUPERVISION 22 5 14 25

26 3 14 2 4 14

7 7 14 9 7

4 7 14 5 7 14

N. PREPARE CONSTRUCTION PROGRESS

REPORT26 6 14 3 7 14

P. DRAFTED AS BUILT PLAN 14

7 14Q. PREPARED INTEIOR DETAILS AND

SPECIFICATION

O. CONDUCTED BUILDING INSPECTION AND

ASBUILT

Page 2: Logbook Toby

8/17/2019 Logbook Toby

http://slidepdf.com/reader/full/logbook-toby 2/12

DAY MO. YR. DAY MO. YR.

PROJECT TITLE/DESCRIPTION &

LOCATION

PERIOD COVERED

FROM TO

A. PREPARATION OF PRELIMINARY

ARCHITECTURAL DRAWINGS

TOTAL NO. OF HOURS

3 4 14 5 4 14

PROPOSED ONE-STOREY RESIDENCE WITH ROOF

DECK PATEROS ST.,

MAYPAJO, CALOOCAN CITY

C. DRAFTED FINAL STRUCTURAL AND

ARCHITECTURAL PLAN10 4 14 16 4 14

14B. CONCEPTUALIZATION OF STRUCTURAL AND

UTILITIES7 4 14 9 4

4 14 23 4

E. PREPARATION OF PERSPECTIVE &

INTERIORS24 4 14 25 4 14

14D. DRAFTED PLUMBING AND ELECTRICAL

PLANS AND DETAILS21

G. PREPARE BILL OF MATERIALS 30 4 14 5 5 14

14F PREPARE PROJECT COST ESTIMATE 26 4 14 29 4

14 21 5

I. PREPARE FORMS AND DOCUMENTS FOR

BUILDING PERMIT10 5 14 14 5 14

14H. PREPARE PROJECT SPECIFICATIONS 6 5 14 9 5

14J. CONSTRUCTION PROGRAMMING 15 5

14P. INTIRIOR DESIGN SUPERVISION 18

M. REVISION PLAN FOR TOILET 6 8 14 8 8

7 14 29 7

14

Q. SPACE MANAGEMENT STUDY 30 7 14 5 8 14

N. PREPARATION OFLANDSCAPE PLAN 9 8 14 12 8 14

O. PREPARED INTEIOR DETAILS AND

SPECIFICATION14 7 14 17 7 14

Page 3: Logbook Toby

8/17/2019 Logbook Toby

http://slidepdf.com/reader/full/logbook-toby 3/12

DAY MO. YR. DAY MO. YR.

O. LANDSCAPE SUPERVISION 14 3 15 16 3 15

N. PREPARATION OFLANDSCAPE PLAN 11 3 15 13 3 15

26 9 14 2 10 14

PROJECT TITLE/DESCRIPTION &

LOCATION

PERIOD COVEREDFROM TO

TOTAL NO. OF HOURS

A. PREPARATION OF PRELIMINARY

ARCHITECTURAL DRAWINGS13 8 14 26 8 14

PROPOSED TWO-STOREY RESIDENCE WITH ROOF

DECK BINANGONAN ST.,

MAYPAJO, CALOOCAN CITY

9 14

14B. CONCEPTUALIZATION OF STRUCTURAL AND

UTILITIES27 8 14 5 9

14D. DRAFTED PLUMBING AND ELECTRICAL

PLANS AND DETAILS16 9 14 22 9

C. DRAFTED FINAL STRUCTURAL AND

ARCHITECTURAL PLAN 6 9 14 15

G. PREPARE BILL OF MATERIALS 3 1O 14 8 10

F PREPARE PROJECT COST ESTIMATE

E. PREPARATION OF PERSPECTIVE &

INTERIORS23 9 14 25 9 14

M. REVISION PLAN FOR TOILET 7

14I. PREPARE FORMS AND DOCUMENTS FOR

BUILDING PERMIT16 10 14 21 10

H. PREPARE PROJECT SPECIFICATIONS 9 10 14 15 10 14

14

14J. PREPARED INTEIOR DETAILS AND

SPECIFICATION22 10 14 25 10

K. INTIRIOR DESIGN SUPERVISION 26 2 15 2 3 15

L. SPACE MANAGEMENT STUDY 3 3 15 6 3

3 15 10 3 15

15

Page 4: Logbook Toby

8/17/2019 Logbook Toby

http://slidepdf.com/reader/full/logbook-toby 4/12

DAY MO. YR. DAY MO. YR.

O. DRAFTED AS BUILT PLAN 13 2 15 18 2 15

M. CONSTRUCTION PROGRAMMING 2 2 15 10 2 15

L. PREPARE FORMS AND DOCUMENTS FOR

BUILDING PERMIT24 1 15

K. PREPARE PROJECT SPECIFICATIONS 17 1 15 23 1 15

31 1 15

5 1 15

I. PREPARE PROJECT COST ESTIMATE & BILL

OF MATERIALS6 1 15 16 1 15

H. PREPARATION OF PERSPECTIVE &

INTERIORS2 1 15

13 12 14

G. DRAFTED PLUMBING AND ELECTRICAL

PLANS AND DETAILS 15 12 14 22 12 14

F. DRAFTED FINAL STRUCTURAL AND

ARCHITECTURAL PLAN27 11 14

20 11 14

E. CONCEPTUALIZATION OF STRUCTURAL AND

UTILITIES21 11 14 26 11 14

D. PREPARATION OF PRELIMINARY

ARCHITECTURAL DRAWINGS14 11 14

B. PLANNING AND DESIGNCONCEPTUALIZATION

3 11 14 11 11 14

C. CONCEPTUAL INTERIOR LAYOUT 12 11 14 13 11 14

A. SITE VISIT (INVETORY & CONDITION) 28 10 14 31 10 14

P. PREPARED INTEIOR DETAILS AND

SPECIFICATION20 2 15

N. CONDUCTED BUILDING INSPECTION AND

ASBUILT11 2 15 12 2 15

24 2 15

PROJECT TITLE/DESCRIPTION &

LOCATION

PERIOD COVERED

FROM TO

PROPOSED THREE-STOREY RESIDENCE WITH

ROOF DECK PATEROS ST., MAYPAJO, CALOOCAN

CITY

Q. CONSTRUCTION SUPERVISION 17 3 15 16 4 15

TOTAL NO. OF HOURS

Page 5: Logbook Toby

8/17/2019 Logbook Toby

http://slidepdf.com/reader/full/logbook-toby 5/12

DAY MO. YR. DAY MO. YR.

5 15 16 5 15

Q. SPACE MANAGEMENT STUDY 18 5 15 23 5 15

P. INTIRIOR DESIGN SUPERVISION 5

15 29 4 15

O. PREPARED INTEIOR DETAILS ANDSPECIFICATION

30 4 15 4 5 15

N. DRAFTED AS BUILT PLAN 27 4

PROJECT TITLE/DESCRIPTION &

LOCATION

PERIOD COVERED

FROM TO

PROPOSED THREE-STOREY RESIDENCE WITH

ROOF DECK PATEROS ST., MAYPAJO, CALOOCAN

CITY

TOTAL NO. OF HOURS

M. CONDUCTED BUILDING INSPECTION AND

ASBUILT24 4 15 25 4 15

L. PREPARE CONSTRUCTION PROGRESS

REPORT17 4 15 23 4 15

Page 6: Logbook Toby

8/17/2019 Logbook Toby

http://slidepdf.com/reader/full/logbook-toby 6/12

TOTAL NO. OF HOURS

Page 7: Logbook Toby

8/17/2019 Logbook Toby

http://slidepdf.com/reader/full/logbook-toby 7/12

A B C D E F

240

75

32 32

16

27

16

40

48

DIVERSIFIED TRAINING FOR ARCHITECTS LICENSURE EXAMINATION

SHEET NO.

1 OF 4

CORRESPONDING NUMBER OF HOURS OF DESCRIBED TRAINING (FOP)TOTAL

NO.HOURS

48

16

3216

40

70

40

16

16

88

70

60

88

32 32

240

40

6363

27

60

75

40

40

16 16

Page 8: Logbook Toby

8/17/2019 Logbook Toby

http://slidepdf.com/reader/full/logbook-toby 8/12

A B C D E F

54

CORRESPONDING NUMBER OF HOURS OF DESCRIBED TRAINING (FOP)TOTAL

NO.

HOURS

30

211 281 256 48 91 48 935

30

54

2424

16 16

4848

36

40

48 48

32

40

36

32

54

80

6060

30

24 24

30

32 32

Page 9: Logbook Toby

8/17/2019 Logbook Toby

http://slidepdf.com/reader/full/logbook-toby 9/12

A B C D E F

20 20

24 24

48

32

36

48

32

120 608

CORRESPONDING NUMBER OF HOURS OF DESCRIBED TRAINING (FOP) TOTALNO.

HOURS

170 156 0 114 48

120

72

45 45

96

60

24 24

96

72

60

72

40

45

36

40

45

72

90

120

3030

Page 10: Logbook Toby

8/17/2019 Logbook Toby

http://slidepdf.com/reader/full/logbook-toby 10/12

A B C D E F

32 32

16

60 60

96 96

54 54

84 84

24 24

120 120

180

84 84

180

66 66

25 25 50

80 80

16 16

32 32

16

CORRESPONDING NUMBER OF HOURS OF DESCRIBED TRAINING (FOP)TOTAL

NO.

HOURS

288 288

80 809303 217 20 48 141

Page 11: Logbook Toby

8/17/2019 Logbook Toby

http://slidepdf.com/reader/full/logbook-toby 11/12

A B C D E F

80 80

72 72

36 36

36 36

16

CORRESPONDING NUMBER OF HOURS OF DESCRIBED TRAINING (FOP)TOTAL

NO.

HOURS

411 318 320 128 109 72 1358

60

16

60

Page 12: Logbook Toby

8/17/2019 Logbook Toby

http://slidepdf.com/reader/full/logbook-toby 12/12

72 0 0 72 0 80 224