lok adalath ppt 1 to 20

20
Presented By: Mr. Ponnuraj, IAS, Deputy Commissioner, Shimoga Dist. District Administration, Shimoga Presentation Before The Hon. Lok Adalath

Upload: prakashdcpa

Post on 31-Oct-2014

917 views

Category:

Business


1 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Lok adalath ppt   1 to 20

Presented By:Mr. Ponnuraj, IAS,

Deputy Commissioner,Shimoga Dist.

District Administration, Shimoga

Presentation Before The Hon. Lok Adalath

Page 2: Lok adalath ppt   1 to 20

STRUCTURE OF PRESENTATION

Municipal Solid Waste Management

Bio Medical Waste Management

Tank & Water Table – Management & Restoration

Watershed Management

Industrial Pollution

Forest – Plantation

Eviction Clearance

Village Forest Committee

Page 3: Lok adalath ppt   1 to 20

INF0RMATION ABOUT DISTRICT

Page 4: Lok adalath ppt   1 to 20

INF0RMATION ABOUT DISTRICT

1. Population: 16.42 Lakhs

2. Area: 8,477 Sq. Km

3. Taluks: 07

4. ULB’s: 09

5. GP’s: 260

6. Urban Population: 10.71 Lakhs

7. Rural Population: 5.71 Lakhs

8. Annual Rain Fall: 1800 to 2000 mm

9. No. of Rainy Days: 87

Page 5: Lok adalath ppt   1 to 20

1. MUNICIPAL SOILD WASTE MANAGEMENT1. MUNICIPAL SOILD WASTE MANAGEMENT

Page 6: Lok adalath ppt   1 to 20

MSW - AT A GLANCEMSW - AT A GLANCE

Name of ULB No. of Wards

Population(2011)

Solid Waste Gen. (TPD)

Primary Collection

Segregation Sec. Collection & Transportation

MSW Treatment

Disposal Facility

CMC - Shimoga 35 3,22,505 166.06 28 Wards 1 Ward Yes Yes IMSWTLFF

CMC - Bhadravathi 35 150540 51.68 6 Wards - Yes - ELFF

CMC - Sagara 31 53,660 22.00 26 Wards 3 Ward Yes Yes ELFF

TMC - Shikaripura 23 36,024 16.50 6 Wards - Yes - ELFF

TP – Thirthahalli 15 14,537 5.00 15 Wards - Yes Yes IMSWTLFF

TP - Soraba, 11 11,027 5.00 8 Wards - Yes - ELFF

TP – Shiralkoppa 15 16,872 5.00 3 Wards - Yes - ELFF

TP – Hosanagara 11 5,533 1.80 2 Wards - Yes - LF

TP - Jog-Kargal 13 10,840 3.65 3 Wards - Yes - LF

189 6,21,538 276.69 97 4 9 ULBs 3 ULB 9 ULB

NOTE:IMSWTLFF : Integrated MSW Treatment & Sanitary Landfill Facility - 2 ULBELFF: Engineering Land Fill Facility- 5 ULBLF: Land Filling - 2 ULB

Page 7: Lok adalath ppt   1 to 20

SWM ACHIVEMENTS - SHIMOGASWM ACHIVEMENTS - SHIMOGA

Page 8: Lok adalath ppt   1 to 20

SWM ACHIVEMENTS - SAGARASWM ACHIVEMENTS - SAGARA

Page 9: Lok adalath ppt   1 to 20

SEWERAGE SYSTEMSEWERAGE SYSTEM

Name of ULB Population(2011)

UGD Network Facility STP Facility Remarks

CMC - Shimoga 3,22,505 Old network revamping and additional coverage being tackled

Renovation and fresh STP being constructed

Slow progress, contract terminated, matter before HC

CMC - Bhadravathi 150540 UGD Network Work being established

Renovation being done and additional coverage

Slow progress, Fresh tender called

CMC - Sagara 53,660 Tender Called Tender Called work will begin in 2- 3 months

TMC - Shikaripura 36,024 UGD Network Work is Completed STP Work is Under Progress

Site dispute resolved, work under progress

TP – Thirthahalli 14,537 No UGD SystemNo STP System -

TP - Soraba, 11,027 No UGD SystemNo STP System -

TP – Shiralkoppa 16,872 No UGD SystemNo STP System -

TP – Hosanagara 5,533 No UGD SystemNo STP System -

TP - Jog-Kargal 10,840 No UGD SystemNo STP System -

Page 10: Lok adalath ppt   1 to 20

SLAUGHTER HOUSESLAUGHTER HOUSE

Slaughter House

Exists

Thirthahalli

DPR Preparation

Shimoga,

Bhadravathi,

Shikaripura

Land Identification

Shimoga, Sagara

In all other ULBs DPR & Land Identification to be

done

Page 11: Lok adalath ppt   1 to 20

2. BIO MEDICAL WASTE MANAGEMENT2. BIO MEDICAL WASTE MANAGEMENT

Page 12: Lok adalath ppt   1 to 20

MEDICAL INSTITUTIONS (MI) - SHIMOGA DIST.MEDICAL INSTITUTIONS (MI) - SHIMOGA DIST.

Particulars of HCF’s No. of HCFs

Health and Family Welfare 112

Medical Education 01

Govt. AYUSH 35

Veterinary and Animal Husbandry 162

Private 669

Total 979

Page 13: Lok adalath ppt   1 to 20

BIO MEDICAL WASTE MANAGEMENT – Govt. MIBIO MEDICAL WASTE MANAGEMENT – Govt. MISl.

No.Levels of Hospitals No. of

Health Care Facilities

Progress on Bio Medical Waste Handling Rules

No. of HCF Tied up with

CTF

Deep Burial & Sharp Pit Completed

Liquid Waste Disinfection

Unit Completed

1 District Level Hospital (Shikaripura)

1 1 - 1

Medical Education (SIMS) 1 1 - 1

Taluk Level Hospital 5 5 - 5

Community Health Center 7 5 2 7

Primary Health Center & Urban Health Centre

99 7 72 78

2 District Level Ayush Hospital

01 01 Tied up with MeG..H. 01

Taluk Level Hospital 34 34 All Ayush dispensaries are tied up with near

by PHCS

34

Time required for implementation: Remaining 20 Deep burial, Sharp Pits & 21 Liquid Waste

Disinfection Units will be completed by 31-12-2011

Page 14: Lok adalath ppt   1 to 20

BIO MEDICAL WASTE MANAGEMENT – Animal Hus. & Pvt. Inst.BIO MEDICAL WASTE MANAGEMENT – Animal Hus. & Pvt. Inst.

Type of HCE No. of HCE’s

Solid BMW

Handing over to CBMWTF

Installed Captive facility

Captive facility under Construction

Veterinary Hospital 17 - 13 -

Veterinary dispensary 72 - 17 -

Primary veterinary centre and Artificial Insemination Centre

73 - 14 -

Total 162 44

Time required for implementation: Remaining units will be completed by 31-03-2012

No.s of HCE Solid BMW

Tie up with CBMWTF Installed Captive facility

Yet to Comply

669 444 06 219

Animal Husbandry:

Private HCE’s:

Page 15: Lok adalath ppt   1 to 20

ACTION TAKENACTION TAKEN

Description No.s

Closed Establishments 28

Closer Order Issued 49

Notice Issued for Non-Compliance 301

Soraba & Hosanagara Taluk HCE’s are covered under Common Bio Medical Waste

Treatment Facility

Page 16: Lok adalath ppt   1 to 20

BIO MEDICAL WASTE – COLLECTION & SEGREGATION SYSTEMBIO MEDICAL WASTE – COLLECTION & SEGREGATION SYSTEM

Human anatomical waste into yellow Bins

Infected waste into Red Bins

Sharps into White Bins

Page 17: Lok adalath ppt   1 to 20

BIO MEDICAL WASTE – TRANSPORTATIONBIO MEDICAL WASTE – TRANSPORTATION

Door step Collection

Transportation by BMW Authorized

Vehicle

Page 18: Lok adalath ppt   1 to 20

COMMON BMW TREATEMNT FACILITY - SHIMOGACOMMON BMW TREATEMNT FACILITY - SHIMOGA

Plant Capacity: 1000 Kg/ Day

Effluents Handling Capacity: 3000 Lt/d

Plant Area: 1 Acr.

Established: 2004

Shushurutha Bio Medical Waste Treatment Facility, Machenahalli

Page 19: Lok adalath ppt   1 to 20

COMMON BMW TREATEMNT FACILITY - SHIMOGACOMMON BMW TREATEMNT FACILITY - SHIMOGA

Facilities Available at CBWTF

Incinerator Scrubber

Autoclave

Sharp & Ash Pit

ETP

Page 20: Lok adalath ppt   1 to 20

IN-SITU BIO MEDICAL WASTE TREATMENT UNITSIN-SITU BIO MEDICAL WASTE TREATMENT UNITS

ETP LWTP

LWTP

LWTP

Sharp Pit