london 2062_ph
DESCRIPTION
LONDON 2062 Professor Sir Peter Hall London 2062 - UCL 23 April 2012 London Plan: Population Rising (especially in East) - but Ageing Employment: Growing too – especially in Centre and East Deprivation: Continuing W-E Divide London Plan 2011: Key Diagram Major Transport Schemes Thameslink Crossrail Heathrow: Missing Connection Orbirail: Good News, Bad News Missing Interchange: Bermondsey Missing Interchange: Loughborough Jct Missing Interchange: Brixton The West London Line ModelTRANSCRIPT
LONDON 2062
Professor Sir Peter HallLondon 2062 - UCL23 April 2012
London Plan: Population Rising (especially in East) - but Ageing
Employment: Growing too – especially in Centre and East
Deprivation: Continuing W-E Divide
London Plan 2011: Key Diagram
Major Transport Schemes
Thameslink
Crossrail
Heathrow: Missing Connection
Orbirail: Good News, Bad News
Missing Interchange: Bermondsey
Missing Interchange: Loughborough Jct
Missing Interchange: Brixton
The West London Line Model
How Berlin Does It! (Why not here?)
Orbirail 2?
HS2: Key Features• Very high speed: up to
400k/hr• No stops, except• “Edge city” locations:
airports, secondary centres
• 2 phases: (1) Birmingham (2) Leeds, Manchester
• Links on to HS1…• …and “classic” network
London
• Euston: enlarged:Problem!
• (Maybe not?: divert LM slow trains to Crossrail?
• King’s Cross:
• HS1 link
Capital Superhub: London International
• European Model: Berlin Hauptbahnhof
• UK Example: Proposed London International:
• Euston +KX/SP
Old Oak: A West London Stratford?
Thames Gateway Targets: 2003
Thames Gateway Bridge: An Answer?
Thames Gateway: Stratford 1999, 2012
Kent Thamesside:Ebbsfleet Valley, Fastrack
Thames Gateway:Eastern Quarry 1997, 2006, 2015
South East Mega-City Region
Sustainable Communities Corridors:Growing the SE into the Midlands…
Outer Orbirail
London Plan:Airports
Thames Hub Airport