http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 2/16
Project LayoutProject Let: December, 2010
Estimate: $79.8 million
Beg. Construction: Spring 2010
Construction Time: 24 Months
People of The State of Texas
City of El Paso
City of El Paso
People of The State of Texas
8/9/2019 Loop 375 Trans Mountain West OSAB
http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 3/16
8/9/2019 Loop 375 Trans Mountain West OSAB
http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 4/16
Texas Department of Transportation
8/9/2019 Loop 375 Trans Mountain West OSAB
http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 5/16
Texas Department of
8/9/2019 Loop 375 Trans Mountain West OSAB
http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 6/16
Texas Department of Transportation
Begin Roadway Construction
I10
Eastbound
Westbound
8/9/2019 Loop 375 Trans Mountain West OSAB
http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 7/16
Northwestern DriveI10
Loop 375
Texas Department of Transportation
Northwestern
8/9/2019 Loop 375 Trans Mountain West OSAB
http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 8/16
Resler Drive
RESLER Dr.
Texas Department of Transportation
8/9/2019 Loop 375 Trans Mountain West OSAB
http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 9/16
Plexxar Drive
PLEXAR Dr.
Texas Department of Transportation
EPNG
City of El Paso
8/9/2019 Loop 375 Trans Mountain West OSAB
http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 10/16
Paseo Del Norte Drive
Paseo del Norte Dr.
Texas Department of Transportation
8/9/2019 Loop 375 Trans Mountain West OSAB
http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 11/16
Texas Department of Transportation
City of El PasoState Park
8/9/2019 Loop 375 Trans Mountain West OSAB
http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 12/16
Franklin Mountain State Park
Entrance
End Roadway
Construction
Texas Department of Transportation
8/9/2019 Loop 375 Trans Mountain West OSAB
http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 13/16
Resler Dr and Transmountain Intersection
Existing Median Bullnose to beaffected
Loose Aggregate: Franklin Red and Grey
Stamped Colored Concrete: Ashlar SlatePattern
Vegetation: Oleander, Golden Euonymous,Rosemary and Lantana
Tress: NoneMonument Plaques: To be relocated
8/9/2019 Loop 375 Trans Mountain West OSAB
http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 14/16
Existing Area Vegetation
Tress: Texas Honey Mesquite, Chitalpa,Bradford Pear, Palo Verde, Afghan Pine,Chinese Pistachio, Texas Red Oak andLive Oak
Vegetation:
Oleander, Golden Euonymous, Dalea,Bird of Paradise, Yucca, Rosemary, TamJuniper, Turpentine Bush, Texas Sage,Fountain Grass, Ocotillo, Sotol, Cactus,
Coyote Bush and Lantana
8/9/2019 Loop 375 Trans Mountain West OSAB
http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 15/16
Proposed Landscape at Hike and Bike Trail
Planting schemes at parkwayareas
Loose Aggregate: Franklin Red and Grey
Boulders: Franklin Red color
Vegetation: Rosemary, Texas Sage, Yuccas,Sotol, Ocotillo, Tam Juniper, Cassia
Tress: Texas Honey Mesquite, Chitalpa, Palo
Verde
* Future vegetation and driveways bydevelopers
P d S P k E Si
8/9/2019 Loop 375 Trans Mountain West OSAB
http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 16/16
CONCRETE
FOOTINGS
FINISHED GRADE
4” DIA TUBE
TUBE CAP
STAINLESS STEEL
LETTERS
U CHANNEL
FRAME
MULTIPLE CORTEN STEEL
PANELS MOUNTAIN SHAPES
WELDED TO U CHANNEL
Proposed State Park Entry Sign(Optional)
Approx Dimensions 4’ x 8’
Existing Metal Structures