loop 375 trans mountain west osab

16
Loop 375  Transmountain West  Texas Department of Transportation

Upload: jimhtolbert434

Post on 29-May-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

8/9/2019 Loop 375 Trans Mountain West OSAB

http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 1/16

Loop 375

 Transmountain West

 Texas Department of Transportation

8/9/2019 Loop 375 Trans Mountain West OSAB

http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 2/16

Project LayoutProject Let: December, 2010

Estimate: $79.8 million

Beg. Construction: Spring 2010

Construction Time: 24 Months

People of The State of Texas

City of El Paso

City of El Paso

People of The State of Texas

8/9/2019 Loop 375 Trans Mountain West OSAB

http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 3/16

8/9/2019 Loop 375 Trans Mountain West OSAB

http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 4/16

 Texas Department of Transportation

8/9/2019 Loop 375 Trans Mountain West OSAB

http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 5/16

 Texas Department of 

8/9/2019 Loop 375 Trans Mountain West OSAB

http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 6/16

 Texas Department of Transportation

Begin Roadway Construction

I10

Eastbound

 Westbound

8/9/2019 Loop 375 Trans Mountain West OSAB

http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 7/16

Northwestern DriveI10

Loop 375

 Texas Department of Transportation

Northwestern

8/9/2019 Loop 375 Trans Mountain West OSAB

http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 8/16

Resler Drive

RESLER Dr.

 Texas Department of Transportation

8/9/2019 Loop 375 Trans Mountain West OSAB

http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 9/16

Plexxar Drive

PLEXAR Dr.

 Texas Department of Transportation

EPNG

City of El Paso

8/9/2019 Loop 375 Trans Mountain West OSAB

http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 10/16

Paseo Del Norte Drive

Paseo del Norte Dr.

 Texas Department of Transportation

8/9/2019 Loop 375 Trans Mountain West OSAB

http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 11/16

 Texas Department of Transportation

City of El PasoState Park

8/9/2019 Loop 375 Trans Mountain West OSAB

http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 12/16

Franklin Mountain State Park 

Entrance

End Roadway 

Construction

 Texas Department of Transportation

8/9/2019 Loop 375 Trans Mountain West OSAB

http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 13/16

Resler Dr and Transmountain Intersection

Existing Median Bullnose to beaffected

Loose Aggregate: Franklin Red and Grey

Stamped Colored Concrete: Ashlar SlatePattern

Vegetation: Oleander, Golden Euonymous,Rosemary and Lantana

Tress: NoneMonument Plaques: To be relocated

8/9/2019 Loop 375 Trans Mountain West OSAB

http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 14/16

Existing Area Vegetation

Tress: Texas Honey Mesquite, Chitalpa,Bradford Pear, Palo Verde, Afghan Pine,Chinese Pistachio, Texas Red Oak andLive Oak

Vegetation:

Oleander, Golden Euonymous, Dalea,Bird of Paradise, Yucca, Rosemary, TamJuniper, Turpentine Bush, Texas Sage,Fountain Grass, Ocotillo, Sotol, Cactus,

Coyote Bush and Lantana

8/9/2019 Loop 375 Trans Mountain West OSAB

http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 15/16

Proposed Landscape at Hike and Bike Trail

Planting schemes at parkwayareas

Loose Aggregate: Franklin Red and Grey

Boulders: Franklin Red color

Vegetation: Rosemary, Texas Sage, Yuccas,Sotol, Ocotillo, Tam Juniper, Cassia

Tress: Texas Honey Mesquite, Chitalpa, Palo

Verde

* Future vegetation and driveways bydevelopers

P d S P k E Si

8/9/2019 Loop 375 Trans Mountain West OSAB

http://slidepdf.com/reader/full/loop-375-trans-mountain-west-osab 16/16

CONCRETE

FOOTINGS

FINISHED GRADE

4” DIA TUBE

TUBE CAP

STAINLESS STEEL

LETTERS

U CHANNEL

FRAME

MULTIPLE CORTEN STEEL

PANELS MOUNTAIN SHAPES

WELDED TO U CHANNEL

Proposed State Park Entry Sign(Optional)

 Approx Dimensions 4’ x 8’

Existing Metal Structures

 Throughout El Paso