Page 1: LOS ANGELES STREET CIVIC BUILDING · OUR FUTURE WORKPLACE CIVIC CENTER MASTER PLAN Vision District Design Guidelines Los Angeles Street Civic Building PROCESS AND NEXT STEPS P3-DBFOM

MMAYOR’S CABINET PRESENTATIONJJuly 9, 2018

LOS ANGELES STREET CIVIC BUILDING

p3 CONSORTIUM PRESENTATIONOCTOBER 03, 2018

01

https://civiccenterprojects.lacity.org

180928_v2.1

Page 2: LOS ANGELES STREET CIVIC BUILDING · OUR FUTURE WORKPLACE CIVIC CENTER MASTER PLAN Vision District Design Guidelines Los Angeles Street Civic Building PROCESS AND NEXT STEPS P3-DBFOM

OOUR FUTURE WORKPLACE

CIVIC CENTER MASTER PLAN VisionDistrict Design GuidelinesLos Angeles Street Civic Building

PROCESS AND NEXT STEPSP3 - DBFOM Delivery MethodLASCB Space Programming Questionnaire

1. INTRODUCTIONS

2. CIVIC CENTER MASTER PLAN

3. PARKER CENTER DEMOLITION

4. REVIEW OF THE LOS ANGELESSTREET CIVIC CENTER PROJECT

5. QUESTIONS

02

https://civiccenterprojects.lacity.org

Page 3: LOS ANGELES STREET CIVIC BUILDING · OUR FUTURE WORKPLACE CIVIC CENTER MASTER PLAN Vision District Design Guidelines Los Angeles Street Civic Building PROCESS AND NEXT STEPS P3-DBFOM

Demolition Design

Informa tion T echnology Deca bling

H a za rdous W a ste R emova l

B uilding Deconstruction

S ite Gra ding 19’ B elow S treet Level

PPARKER CENTER DEMOLITION

03

PROJECT SITECIVIC CENTER

VICINITY MAP

Page 4: LOS ANGELES STREET CIVIC BUILDING · OUR FUTURE WORKPLACE CIVIC CENTER MASTER PLAN Vision District Design Guidelines Los Angeles Street Civic Building PROCESS AND NEXT STEPS P3-DBFOM

CCIVIC CENTER MMASTER PLAN

04

CIVIC CENTER DISTRICT BOUNDARIESCIVIC CENTER DISTRICT DESIGN GUIDELINES

UnionStation

Temple St.

2nd St.

Spring St.

Main St.

Los

Ange

les

St.

Judg

e Jo

hn A

iso

St.

Grande A

ve.

Ala

med

a St

.

1st St.

180927_v2.0

LAPD

CalTrans

CITY HALL

Page 5: LOS ANGELES STREET CIVIC BUILDING · OUR FUTURE WORKPLACE CIVIC CENTER MASTER PLAN Vision District Design Guidelines Los Angeles Street Civic Building PROCESS AND NEXT STEPS P3-DBFOM

Demolition Design

Informa tion T echnology Deca bling

H a za rdous W a ste R emova l

B uilding Deconstruction

S ite Gra ding 19’ B elow S treet Level

PPARKER CENTER DEMOLITION

CIVIC CENTER MASTER PLANDRAFT CONCEPTUAL DESIGN

PH.APH.D PH.B

PH.FPH.E

PH.C

LOS ANGELES STREET CIVIC BUILDING

05

180927_v2.0

https://civiccenterprojects.lacity.org/projects/civic-center-master-plan-environmental-impact-report-eir

Page 6: LOS ANGELES STREET CIVIC BUILDING · OUR FUTURE WORKPLACE CIVIC CENTER MASTER PLAN Vision District Design Guidelines Los Angeles Street Civic Building PROCESS AND NEXT STEPS P3-DBFOM

Demolition Design

Informa tion T echnology Deca bling

H a za rdous W a ste R emova l

B uilding Deconstruction

S ite Gra ding 19’ B elow S treet Level

PPARKER CENTER DEMOLITION

PARKER CENTER DEMOLITION

DEMOLITION DESIGN

RELOCATION OFINFORMATION TECHNOLOGYCABLING INCOLLABORATION WITH ITA

ARTWORK PRESERVATIONAND RELOCATION INCOLLABORATION WITH DCA

REMOVAL OF HAZARDOUSMATERIALS

BUILDINGDECONSTRUCTION

SITE GRADING TO 19 FT.BELOW STREET LEVEL

DEMOLITION COMPLETIONDECEMBER 2019

06

Page 7: LOS ANGELES STREET CIVIC BUILDING · OUR FUTURE WORKPLACE CIVIC CENTER MASTER PLAN Vision District Design Guidelines Los Angeles Street Civic Building PROCESS AND NEXT STEPS P3-DBFOM

Demolition Design

Informa tion T echnology Deca bling

H a za rdous W a ste R emova l

B uilding Deconstruction

S ite Gra ding 19’ B elow S treet Level

PPARKER CENTER DEMOLITION

BUREAU OFENGINEERING

BOARD OFPUBLIC WORKS MUNICIPAL FACILITIES

COMMITTEE

COUNCIL

PERKINS + WILLPREPARE PRE-DESIGN

DOCUMENTS

P3 DEVELOPERTEAM

MAYOR

P3 COUNSEL

CITYATTORNEY

RFQ/ RFPCITY P3 ADVISOR

07

PROJECT ORGANIZATIONAL STRUCTURE

CITY ADMINISTRATIVE OFFICEMAYOR'S OFFICE

CITY LEGISLATIVE ANALYST

Page 8: LOS ANGELES STREET CIVIC BUILDING · OUR FUTURE WORKPLACE CIVIC CENTER MASTER PLAN Vision District Design Guidelines Los Angeles Street Civic Building PROCESS AND NEXT STEPS P3-DBFOM

Demolition Design

Informa tion T echnology Deca bling

H a za rdous W a ste R emova l

B uilding Deconstruction

S ite Gra ding 19’ B elow S treet Level

PPARKER CENTER DEMOLITION

ogy

emova l

tion

ow

NTER N

LOS ANGELES STREET CIVIC BUILDINGDRAFT CONCEPTUAL DESIGN

08

Page 9: LOS ANGELES STREET CIVIC BUILDING · OUR FUTURE WORKPLACE CIVIC CENTER MASTER PLAN Vision District Design Guidelines Los Angeles Street Civic Building PROCESS AND NEXT STEPS P3-DBFOM

Demolition Design

Informa tion T echnology Deca bling

H a za rdous W a ste R emova l

B uilding Deconstruction

S ite Gra ding 19’ B elow S treet Level

PARKER CENTER DEMOLITION

27 - 29 STORY, 753,740 S.F., APPROX.

1,173 SUBTERRANEAN PARKING

COMMERCIAL SPACE AREA 65,000 S.F.

RANGE OF OCCUPANTS 2,600 -3,200

INNOVATIVE CONSIDERATIONS:

CONFERENCE CENTER

COLLABORATIVE WORK SPACES

WITH STAFF HOTELING

LEED PLATINUM

SECURITY MEASURES

AUTOMATED PARKING

NEW CIVIC BUILDING

09

27 - 29 STORY (753,740 SF., APPROX.)1,173 SUBTERRANEAN PARKING SPACES65,000 SF. OF COMMERCIAL SPACE2,600 - 3,200 RANGE OF OCCUPANTS

INNOVATIVE CONSIDERATIONSCONFERENCE CENTERCOLLABORATIVE WORK SPACESLEED PLATINUM / NET-ZEROSOPHISTICATED SECURITYAUTOMATED PARKING

Page 10: LOS ANGELES STREET CIVIC BUILDING · OUR FUTURE WORKPLACE CIVIC CENTER MASTER PLAN Vision District Design Guidelines Los Angeles Street Civic Building PROCESS AND NEXT STEPS P3-DBFOM

Demolition Design

Informa tion T echnology Deca bling

H a za rdous W a ste R emova l

B uilding Deconstruction

S ite Gra ding 19’ B elow S treet Level

PARKER CENTER DEMOLITION

CIVIC CENTER MASTER PLANDISTRICT DESIGN GUIDELINESIN COLLABORATION WITH THE CHIEF DESIGNOFFICER, THE PLANNING DEPARTMENT AND THEDEPARTMENT OF TRANSPORTATION

1. DEVELOP PEDESTRIAN REALM DESIGN STANDARDS2. PUBLIC RIGHT-OF-WAY STANDARDS (i.e. SIDEWALKS)3. MOBILITY CIRCULATION PLAN4. PUBLIC OPEN SPACE5. BUILDING FRONTAGE STREET LEVEL DESIGN6. PARKING ANALYSIS7. BUILDING MATERIALS AND COLOR

10http://clkrep.lacity.org/onlinedocs/2015/15-0554_rpt_CAO_01-09-2017.pdf

Page 11: LOS ANGELES STREET CIVIC BUILDING · OUR FUTURE WORKPLACE CIVIC CENTER MASTER PLAN Vision District Design Guidelines Los Angeles Street Civic Building PROCESS AND NEXT STEPS P3-DBFOM

AAND NEXT STEPS

11

Page 12: LOS ANGELES STREET CIVIC BUILDING · OUR FUTURE WORKPLACE CIVIC CENTER MASTER PLAN Vision District Design Guidelines Los Angeles Street Civic Building PROCESS AND NEXT STEPS P3-DBFOM

PP3PROJECT DELIVERY

METHOD

DESIGN - BUILD - FINANCE - OPERATE - MAINTAIN

Design Competition - RFP Process

Construction Completed by 2023

Estimated Capital Costs approximately $700M+

12

http://clkrep.lacity.org/onlinedocs/2014/14-1604_rpt_CAO_05-25-2018.pdf

Page 13: LOS ANGELES STREET CIVIC BUILDING · OUR FUTURE WORKPLACE CIVIC CENTER MASTER PLAN Vision District Design Guidelines Los Angeles Street Civic Building PROCESS AND NEXT STEPS P3-DBFOM

PPerformance Specifications (Present - December 2018)

Space Planning(Present - December 2018)

Parker Center Demolition(Scheduled completion December 2019)

ProcurementJuly 2018 - April 2019

Construction(Target August 2023)

PROJECTMILESTONES

1. PRE-DESIGN TASK A: PROGRAMMING

TASK B: PERFORMANCE SPECIFICATION TASK C: DESIGN GUIDELINES FOR CIVIC CENTER TASK D: OPERATIONS & MAINTENANCE

2. PROCUREMENT CONSULTANT TO WRITE RFQ/RFP AND PROVIDE ADVICE ON FINANCIAL & ASSET DISPOSITION.

3. P3 LEGAL COUNSEL TO ASSIST AS NECESSARY DURING RFQ/RFP & IN WRITING PROJECT AGREEMENT

13

Page 14: LOS ANGELES STREET CIVIC BUILDING · OUR FUTURE WORKPLACE CIVIC CENTER MASTER PLAN Vision District Design Guidelines Los Angeles Street Civic Building PROCESS AND NEXT STEPS P3-DBFOM

Demolition Design

Informa tion T echnology Deca bling

H a za rdous W a ste R emova l

B uilding Deconstruction

S ite Gra ding 19’ B elow S treet Level

PPARKER CENTER DEMOLITION

14

TASK A: FACILITYPROGRAMMING

· STREETS AND OPEN SPACES· BUILDINGS AND ARCHITECTURE· IDENTITY AND WAYFINDING· MOBILITY AND TECHNOLOGY· ETC...

· FACILITY MANAGEMENT· UTILITY MANAGEMENT· HELPDESK· HOUSEKEEPING· LANDSCAPE· SECURITY· PARKING· REPAIRS· LIFE CYCLE MAINTENANCE· ETC...

· SPACE PROGRAMMING· SPACE DATA· BLOCKING/STACKING DIAGRAMS· PARKING STRATEGIES· ETC...

TASK B: ARCHITECTURAL ANDENGINEERING PERFORMANCE

SPECIFICATIONSUNIFORMAT II SPECIFICATIONS (TO LEVEL 4)FOR:· A - SUBSTRUCTURE· B - SHELL· C - INTERIORS· D - SERVICES· E - EQUIPMENT & FURNISHINGS· F - SPECIAL CONSTRUCTION & DEMOLITION· G - BUILDING SITEWORK· ETC...

TASK C: CIVIC CENTER MASTERPLAN DISTRICT DESIGN GUIDELINES

TASK D: OPERATING ANDMAINTENANCE SPECIFICATIONS

Page 15: LOS ANGELES STREET CIVIC BUILDING · OUR FUTURE WORKPLACE CIVIC CENTER MASTER PLAN Vision District Design Guidelines Los Angeles Street Civic Building PROCESS AND NEXT STEPS P3-DBFOM

Demolition Design

Informa tion T echnology Deca bling

H a za rdous W a ste R emova l

B uilding Deconstruction

S ite Gra ding 19’ B elow S treet Level

PPARKER CENTER DEMOLITION

1. RFQ TO BE ISSUED DECEMBER 2018(45 DAYS)

2. RFQ SUBMITTAL DUE DATE JANUARY 2019

3. RFP TO SHORT LISTED TEAMS MAY 2019

4. RFP SUBMITTAL DUE DATE SEPTEMBER 2019

5. SELECTION OF DBFOM TEAM NOVEMBER 2019

6. COUNCIL APPROVAL OF PROJECT AGREEMENT JANUARY 2020

7. START OF DESIGN & CONSTRUCTION FEBRUARY 2020

8. FACILITY GRAND OPENING APRIL 2023

SCHEDULE

15

Page 16: LOS ANGELES STREET CIVIC BUILDING · OUR FUTURE WORKPLACE CIVIC CENTER MASTER PLAN Vision District Design Guidelines Los Angeles Street Civic Building PROCESS AND NEXT STEPS P3-DBFOM

QUESTIONS?

16

FEEDBACK

• NEXT OUTREACH MEETING

• STIPEND FOR DESIGN COMPETITION

• SCORING CRITERIA FOR SELECTION OF P3 DEVELOPER

• OTHER...

https://civiccenterprojects.lacity.org

Page 17: LOS ANGELES STREET CIVIC BUILDING · OUR FUTURE WORKPLACE CIVIC CENTER MASTER PLAN Vision District Design Guidelines Los Angeles Street Civic Building PROCESS AND NEXT STEPS P3-DBFOM

Demolition Design

Informa tion T echnology Deca bling

H a za rdous W a ste R emova l

B uilding Deconstruction

S ite Gra ding 19’ B elow S treet Level

PPARKER CENTER DEMOLITION

LONG BEACH - SELECTION CRITERIA

17

ADMINISTRATIVE PASS - FAIL • CITY'S REQUIRED DOCUMENTS TO BE SUBMITTED (SUBMITTAL PACKAGE)TECHNICAL SCORING CIVIC CENTER 141 (57%) • CITY AMENITY (SIMILAR TO LOS ANGELES CITY'S BIP PROGRAM REQUIREMENTS) 32 (13%) • PROGRAM (DIVIDED FOR MAJOR COMPONENTS, SUCH AS: NUMBER OF STAFF, PARKING, LEED, SECURITY, ETC.) 26 (11%) • QUALITY (MATERIAL & SYSTEMS) 23 (9%) • ACCESS (PROXIMITY TO TRANSPORTATION, ETC.) 5 (2%) • URBAN FORM (URBAN PLANNING, INCLUDING: BUILDING MASSING, STREET SCAPE, ETC.) 55 (22%)TECHNICAL SCORING CIVIC CENTER FACILITY MANAGEMENT 18 (7%) • APPROACH TO OPERATION & MAINTENANCE, ETC.FINANCIAL SCORING CIVIC CENTER 88 (36%) • FINIANCIAL PLAN, MODEL, FLOW OF FUNDS, DOCUMENTS, TIMING AND PHASING, ETC.

TOTAL POINTS 247

Page 18: LOS ANGELES STREET CIVIC BUILDING · OUR FUTURE WORKPLACE CIVIC CENTER MASTER PLAN Vision District Design Guidelines Los Angeles Street Civic Building PROCESS AND NEXT STEPS P3-DBFOM

Demolition Design

Informa tion T echnology Deca bling

H a za rdous W a ste R emova l

B uilding Deconstruction

S ite Gra ding 19’ B elow S treet Level

PPARKER CENTER DEMOLITION

LAWA - APM SCORING & EVALUATION CRITERIA

18

TECHNICAL MERIT 4,000APM SYSTEM 700APPROACH TO OPERATIONS AND MAINTENANCE 700INCLUSIVE - SIMILAR TO LOS ANGELES CITY'S BIP PROGRAM 600APPROACH TO EXECUTION OF PROJECT CONSTRUCTION 500APPROACH TO MAINTENANCE OF TRAFFIC/ MITIGATION OFCONSTRUCTION IMPACTS 500PROJECT SAFETY & SECURITY 500SUSTAINABILITY 300PUBLIC OUTREACH/ STAKEHOLDER COMMUNICATION 200

ARCHITECTURAL APPEAL 1,000ARCHITECTURAL APPEAL OF THE APM FIXED FACILITIES 750VEHICLE AESTHETICS 250

USER EXPERIENCE 1,000TECHNICAL POINTS 6,000

PRICE POINTS (100% TO TEAM WITH LOWEST PRICE) 4,000TOTAL AVAILABLE POINTS 10,000