Contract Information Title: Electrical Arc Flash Hazard Study
IFB/RFP Number: RFP #R14051
Supersedes:
n/a
Vendor Name: RMF Engineering
Debarment Form:
Required: No Form on File: Not Applicable
Contractor Certification: Virginia Code 22.1-296.1 …the school board shall require the contractor to provide certification that all persons who will provide such services have not been convicted of a felony or any offense involving the sexual molestation or physical or sexual abuse or rape of a child.
Required: Yes Form on File: Yes
Pricing:
See attached Pricing Sheet(s)
Contract Period:
July 1, 2017 – June 30, 2018
Contract Renewal Number:
4
Number of Renewals Remaining:
0
Procurement Contact: Sybil Snee
Procurement Director: Andrea Philyaw
Loudoun County Public Schools RFP #R14051Electrical Arc Flash Study
LOUDOUN COUNTY PUBLIC SCHOOLS ELECTRICAL ARC FLASH HAZARD STUDY COST PROPOSAL RFP #R14051 OFFEROR ____________________________________________
ITEM NO. ITEM DESCRIPTION UNIT UNIT PRICE
Under this section list all costs to perform electrical arc flash analysis for each size of school. The Offeror must provide a detailed itemized breakdown of the following for each size of school. Cost must include all deliverables listed in Paragraphs 2.1 – 2.5
1. Buildings with square footage between 200,000 grosssquare feet and 275,000 gross square feet
Each
2. Buildings with square footage between 150,000 grosssquare feet and 200,000 gross square feet
Each
3. Buildings with square footage between 75,000 grosssquare feet and 150,000 gross square feet
Each
4. Buildings with square footage less than 75,000 grosssquare feet
Each
Under this section list all costs to perform a school division-wide electrical safety program including all tasks listed in Paragraph 2.7
5. Prepare Electrical Safety Program LS
Under this section list rates to perform division-wide training of Qualified and Non-Qualified personnel as listed in Paragraph 2.7
6. One day training for 20 employees Each
7. One day training for 20 -30 employees Each
8. Two day training for 20 employees Each
9. Two day training for 20 – 30 employees Each
19 of 42
Renewal July 1, 2014 - June 30, 2015Renewal #2 July 1, 2015 - June 30, 2016Renewal #3 July 1, 2016 - June 30, 2017Renewal #4 July 1, 2017 - June 30, 2018
Loudoun County Public Schools RFP #R14051Electrical Arc Flash Study
Under this section provide pricing for arc flash professional staff services requested beyond requirements of Paragraph 2.
10. Project Manager Hour
11. Senior Professional Engineer Hour
12. Lead Engineer Hour
13. Jr. Designer/CAD Hour
14. Administrative Assistant Hour
20 of 42
Renewal July 1, 2014 - June 30, 2015Renewal #2 July 1, 2015 - June 30, 2016Renewal #3 July 1, 2016 - June 30, 2017
Renewal #4 July 1, 2017 - June 30, 2018
Buildings less than 75,000 sq.ft.
Hrs $ Hrs $ Hrs $ Hrs $ Hrs $ Hrs $ Hrs $ Hrs $ Hrs $
Survey 6 $218 12 $356 12 $356 30 $930Analysis & Report 2 $119 4 $190 8 $291 12 $356 8 $158 34 $1,113Electrical One Line Diagram 6 $218 8 $158 14 $376Electrical Floor Plans 1 $51 5 $237 10 $198 16 $486Oral Presentation 6 $218 6 $218Label Devices 6 $178 12 $237 18 $415
Subtotal 2 $119 1 $51 9 $427 26 $945 30 $889 12 $356 38 $751 118 $3,538
130% overhead $4,599
10% Profit $814
Total Direct Costs $8,951
Travel $500Reproducibles $200Labels /CD/Packaging $100
Total Indirect Costs $800
TOTAL $9,751
FEE BREAKDOWN - ELECTRICAL ARC FLASH HAZARD STUDY
July 16, 2013Loudoun County Schools EstimatorProject Title Client Name Date Prepared
SLD
ELECTRICAL
36.36 /HR$ Design Engineer Electrician
ITEMS 29.64 /HR$ 29.64 /HR$ Lead Engineer
51.38 /HR$ 47.43 /HR$ Director Project Manager Sr. Engineer
59.29 /HR$ Cad Tech
TotalTechnical Support
19.76 /HR$ 19.76 /HR$
RMF Engineering, Inc. 7/23/2013Page 1 of 4
Renewal July 1, 2014 - June 30, 2015Renewal #2 July 1, 2015 - June 30, 2016Renewal #3 July 1, 2016 - June 30, 2017Renewal #4 July 1, 2017 - June 30, 2018
Buildings over 75K sq.ft.under 150K sq.ft.
Hrs $ Hrs $ Hrs $ Hrs $ Hrs $ Hrs $ Hrs $ Hrs $ Hrs $
Survey 8 $291 24 $711 24 $711 56 $1,714Analysis & Report 2 $119 1 $51 8 $379 20 $727 36 $1,067 12 $237 79 $2,581Electrical One Line Diagram 9 $327 20 $395 29 $722Electrical Floor Plans 1 $51 5 $237 24 $474 30 $763Oral Presentation 6 $218 6 $218Label Devices 12 $356 24 $474 36 $830
Subtotal 2 $119 2 $103 13 $617 43 $1,563 72 $2,134 24 $711 80 $1,581 236 $6,828
130% overhead $8,876
10% Profit $1,570
Total Direct Costs $17,274
Travel $500Reproducibles $200Labels /CD/Packaging $100
Total Indirect Costs $800
TOTAL $18,074
Cad TechTotal
Technical Support19.76 /HR$ 19.76 /HR$
ELECTRICAL
36.36 /HR$ Design Engineer Electrician
ITEMS 29.64 /HR$ 29.64 /HR$ Lead Engineer
51.38 /HR$ 47.43 /HR$ Director Project Manager Sr. Engineer
59.29 /HR$
FEE BREAKDOWN - ELECTRICAL ARC FLASH HAZARD STUDY
July 16, 2013Loudoun County Schools EstimatorProject Title Client Name Date Prepared
SLD
RMF Engineering, Inc. 7/23/2013Page 2 of 4
Renewal July 1, 2014 - June 30, 2015Renewal #2 July 1, 2015 - June 30, 2016Renewal #3 July 1, 2016 - June 30, 2017Renewal #4 July 1, 2017 - June 30, 2018
Buildings over 150K sq.ft.under 200K sq.ft.
Hrs $ Hrs $ Hrs $ Hrs $ Hrs $ Hrs $ Hrs $ Hrs $ Hrs $
Survey 16 $582 20 $593 22 $652 58 $1,827Analysis & Report 2 $119 1 $51 8 $379 24 $873 32 $948 12 $237 79 $2,608Electrical One Line Diagram 9 $327 24 $474 33 $801Electrical Floor Plans 1 $51 7 $332 30 $593 38 $976Oral Presentation 6 $218 6 $218Label Devices 16 $474 30 $593 46 $1,067
Subtotal 2 $119 2 $103 15 $711 55 $2,000 68 $2,016 22 $652 96 $1,897 260 $7,497
130% overhead $9,746
10% Profit $1,724
Total Direct Costs $18,968
Travel $500Reproducibles $200Labels /CD/Packaging $100
Total Indirect Costs $800
TOTAL $19,768
TotalTechnical Support
19.76 /HR$ 19.76 /HR$ Cad Tech
FEE BREAKDOWN - ELECTRICAL ARC FLASH HAZARD STUDY
July 16, 2013Loudoun County Schools EstimatorProject Title Client Name Date Prepared
SLD
ELECTRICAL
36.36 /HR$ Design Engineer Electrician
ITEMSDirector Project Manager Sr. Engineer
59.29 /HR$ 29.64 /HR$ 29.64 /HR$ Lead Engineer
51.38 /HR$ 47.43 /HR$
RMF Engineering, Inc. 7/23/2013Page 3 of 4
Renewal July 1, 2014 - June 30, 2015
Renewal #2 July 1, 2015 - June 30, 2016Renewal #3 July 1, 2016 - June 30, 2017
Renewal #4 July 1, 2017 - June 30, 2018
Buildings over 200K sq.ft.under 275K sq.ft.
Hrs $ Hrs $ Hrs $ Hrs $ Hrs $ Hrs $ Hrs $ Hrs $ Hrs $
Survey 22 $800 20 $593 24 $711 66 $2,104Analysis & Report 2 $119 1 $51 8 $379 30 $1,091 32 $948 20 $395 93 $2,984Electrical One Line Diagram 9 $327 28 $553 37 $881Electrical Floor Plans 1 $51 7 $332 30 $593 38 $976Oral Presentation 6 $218 6 $218Label Devices 18 $534 40 $790 58 $1,324
Subtotal 2 $119 2 $103 15 $711 67 $2,436 70 $2,075 24 $711 118 $2,332 298 $8,487
130% overhead $11,033
10% Profit $1,952
Total Direct Costs $21,471
Travel $500Reproducibles $200Labels /CD/Packaging $100
Total Indirect Costs $800
TOTAL $22,271
Cad TechTotal
Technical Support19.76 /HR$ 19.76 /HR$
ELECTRICAL
36.36 /HR$ Design Engineer Electrician
ITEMS 29.64 /HR$ 29.64 /HR$ Lead Engineer
51.38 /HR$ 47.43 /HR$ Director Project Manager Sr. Engineer
59.29 /HR$
FEE BREAKDOWN - ELECTRICAL ARC FLASH HAZARD STUDY
July 16, 2013Loudoun County Schools EstimatorProject Title Client Name Date Prepared
SLD
RMF Engineering, Inc. 7/23/2013Page 4 of 4
Renewal July 1, 2014 - June 30, 2015Renewal #2 July 1, 2015 - June 30, 2016Renewal #3 July 1, 2016 - June 30, 2017Renewal #4 July 1, 2017 - June 30, 2018