)low profile barriers - ~800 lftemporary construction...
Embed Size (px)
TRANSCRIPT
-
JMatthewsText BoxNEW TERMINAL C NORTHHAUL ROUTE PLAN
JMatthewsText BoxNEW TERMINAL C NORTHEARLY DEMOLITION SEQUENCE
JMatthewsPolygon
JMatthewsSnapshot
JMatthewsPolyLine
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
dspinksPolygon
dspinksPolyLine
dspinksPolyLine
dspinksPolyLine
dspinksCalloutExisting VSRs
dspinksArrow
dspinksArrow
dspinksCalloutExisting TC2 Entry and Exit Gates to remain active during Phase 1
dspinksCalloutDemolish Terminal B Walkways
dspinksPolyLine
dspinksCalloutConstruct Temp. VSR w/ barrier on construction side for bypass during construction activities
dspinksPolyLine
dspinksCalloutConstruct Temp. tug lane and tie back to existing VSR
dspinksPolyLine
dspinksPolyLine
dspinksCloud
dspinksCalloutClouded portion of VSR decommisioned after completion of temporary tug lane and SIDA fencing
dspinksCalloutGate, typ.
dspinksLine
dspinksArc
dspinksLine
dspinksLine
dspinksArc
dspinksLine
dspinksText BoxSEQUENCE 1
dspinksCalloutAdditional barriers, to be relocated to new location(TBD) within construction site during Sequence 2, to then be removed at either completion of Sequence 2 or Sequence 3
dspinksCalloutT-Point to remain active during Phase 1
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsPolyLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsPolygon
JMatthewsPolygon
JMatthewsPolygon
dspinksPolyLine
dspinksText Box6' Chain link construction fencing with wind screen - ~1,300 LF
dspinksLine
dspinksArc
dspinksLine
dspinksLine
dspinksArc
dspinksLine
dspinksText BoxLockable chain link gates large enough for vehicle traffic(gates in SIDA fencing to be procured in separate package)
dspinksPolyLine
dspinksText BoxSIDA fencing(to be procured in separate package)
dspinksPolyLine
dspinksText BoxExisting VSR
dspinksPolyLine
dspinksText BoxTemporary VSR(to be procured in separate package)
dspinksPolyLine
dspinksText BoxTemporary VSR(to be striped per HAS standards)
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksText BoxLow profile barriers - ~800 LF
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksText BoxFOD fencing to be installed prior to demolition of Terminal B Walkways and to be removed upon completion of SIDA fencing at overall site perimeter once it is procured and installed by others - ~1,750 LF
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsPolyLine
JMatthewsPolyLine
dspinksPolyLine
dspinksText BoxTemporary Construction Roads
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksLine
-
JMatthewsPolygon
JMatthewsSnapshot
JMatthewsPolyLine
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
dspinksPolygon
dspinksPolyLine
dspinksPolyLine
dspinksPolyLine
dspinksCalloutExisting TC2 Entry and Exit Gates to remain active during Phase 1
dspinksPolyLine
dspinksPolyLine
dspinksPolyLine
dspinksLine
dspinksLine
dspinksArc
dspinksLine
dspinksLine
dspinksArc
dspinksLine
dspinksSnapshot
dspinksSnapshot
dspinksSnapshot
dspinksSnapshot
dspinksSnapshot
dspinksSnapshot
dspinksPolygon
dspinksPolyLine
dspinksCalloutTemp. VSR w/ barrier on construction side for bypass during construction activities
dspinksRectangle
dspinksRectangle
dspinksRectangle
dspinksRectangle
dspinksText BoxPour 1
dspinksText BoxPour 2
dspinksText BoxPour 3
dspinksText BoxPour 4
dspinksCalloutT-point reconfiguration required from start of Phase 4 demo until T-point is relocated
dspinksCloud
dspinksCalloutPortion of existing VSR to be decommisioned at start of Phase 4 demo, TC2 still available, east bound traffic to utilized temp. tug lane at North end of site
dspinksRectangle
JMatthewsPolyLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsCalloutGate, typ.
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsText BoxSEQUENCE 2
JMatthewsText BoxNEW TERMINAL C NORTHEARLY DEMOLITION SEQUENCE
JMatthewsPolygon
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksLine
dspinksLine
JMatthewsPolyLine
JMatthewsPolyLine
-
dspinksSnapshot
JMatthewsPolygon
JMatthewsSnapshot
JMatthewsPolyLine
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
JMatthewsSnapshot
dspinksPolygon
dspinksPolyLine
dspinksCalloutExisting TC2 Entry and Exit Gates and VSR to be closed mid-July to accommodate demolition schedule of Terminal Project
dspinksPolyLine
dspinksPolyLine
dspinksPolyLine
dspinksLine
dspinksLine
dspinksArc
dspinksLine
dspinksLine
dspinksArc
dspinksLine
dspinksSnapshot
dspinksSnapshot
dspinksSnapshot
dspinksSnapshot
dspinksSnapshot
dspinksSnapshot
dspinksPolygon
dspinksRectangle
dspinksRectangle
dspinksRectangle
dspinksRectangle
dspinksText BoxPour 1
dspinksText BoxPour 2
dspinksText BoxPour 3
dspinksText BoxPour 4
dspinksLine
dspinksArc
dspinksLine
dspinksLine
dspinksArc
dspinksLine
dspinksPolyLine
dspinksPolyLine
dspinksCalloutPermanent relocated TC-2 and access road to be activated mid-August
dspinksArrow
dspinksPolygon
dspinksPolygon
dspinksRectangle
dspinksRectangle
dspinksRectangle
dspinksRectangle
dspinksText BoxPour 5
dspinksText BoxPour 6
dspinksText BoxPour 7
dspinksText BoxPour 8
dspinksText BoxPour 9
dspinksText BoxPour 10
dspinksCloud
JMatthewsPolyLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsCalloutGate, typ.
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsLine
JMatthewsArc
JMatthewsLine
JMatthewsText BoxSEQUENCE 3
JMatthewsText BoxNEW TERMINAL C NORTHEARLY DEMOLITION SEQUENCE
JMatthewsPolyLine
JMatthewsPolyLine
-
GARA
GE
HOTEL
MARR
IOTT
TERM
INAL C
GARA
GE
TERM
INAL C
TERM
INAL D
EAST
AIR TR
AFFIC
CONT
ROL T
OWER
TERM
INAL B
FIS BU
ILDING
TERM
INAL E
C
3
7
E5A
E
4
B
E6
E
7
A
E
1
8
B
E
1
7
E
19 E
2
0
A
C
3
6
C
4
0
C41
E
1
6
E
8
E
2
1
E
9
E
1
5
B
C
4
2
E
2
2
E
1
5
A
E23
E
1
C
3
0
C
3
1
E
1
0
B
C
3
3
E
1
4
E24
C43
C44
C
4
5
E
1
2
C
2
9
B76
B
8
3
A
B
8
8
A1
A2
C
2
7
A8 B
8
7
C
2
6
C
2
5
D
1
D
2
B
8
1
A
D3
B
7
7
A
B
8
0
D
4
B
7
9
A
A
9
A10
D
1
2
D
7
D
8
D
9
D
4
A
D11
D
1
0
D
6
A
C
1
4
A
1
1
A12
C
2
2
C
1
5
A14
A
1
5
C
2
1
C
1
6
C
2
0
C
17
C
1
9
C
1
8
A7
C
3
2
C34
C35
C24
C
2
3
C
3
9
D
5
E
2
A
E
2
B
E
3
E
1
1
E
2
0
B
B83
B
8
1
B
7
6
A
B
7
7
B
7
9
B
8
5
A
D
6
E
1
8
A
E
1
0
A
E
7
B
E
5
B
E
4
A
B85B
B
6
6
B
6
5
B
6
4
B63A
B
6
3
B
6
2
A
B
6
2
B61
B
6
0
B
7
5
B
7
4
B
7
3
B72
B
7
1
A
B
7
1
B
7
0
B69
B
6
8
A
1
9
A
1
8
A
1
7
A
2
4
A
2
5A
2
6
A
2
7
A
2
9
A30
B86
B
8
6
A
A3G
A3H
A3F
A3E
A3D
A3C
A3B A3A
TERM
INAL A
WS.I05.02
8
WS.I05.01
2
WS.I05.01
2
WS.I05.02
2
WS.I05.02
2
WS.I05.01
2
1" = 12000'-0"
WS.I1S.100
OVERALL SITE PLAN
1
SITE PLAN - OVERALL AREA
WV19
NEW
WEST
VAULT
ARFF
99
ARFF
54
NORTH
VAULT
ARFF 92
A0-4
APS501
EV2
A0-4
APS502
A0-4
APS503
A0-4
APS504
A0-4
APS505
A0-4
APS507
A0-4
APS506
REVISIONS
APPROVED BY:
DIRECTOR
HOUSTON AIRPORT SYSTEM
A.I.P. NO.
C.I.P. NO.
H.A.S. NO.
Approver
612 V
NO. DESCRIPTION DATE BY
REVISIONS
SCALE:
DATE:
APPROVED BY:
DIRECTOR
HOUSTON AIRPORT SYSTEM
ARCHITECT'S PROJECT NO.
A.I.P. NO.
C.I.P. NO.
H.A.S. NO.
SHEET NO.
SHEET TITLE:
2014.004
Approver
HAS 612 V
NO. DESCRIPTION DATE BY
03/25/2014
1.
13201 Northwest Freeway, Ste. 800
Houston, TX 77040
713.586.5544
TBPE FIRM #12493
E N G I N E E R S , I N C
PERMIT SET 03/25/2014
TOTAL ACCESS POINT :
(N) AO-1 = 0
(N) AO-2 = 0
(N) AO-3 = 0
(N) AO-4 = 7
(N) AD-1 = 0
(N) AD-2 = 0
RE:1/WS.I3S.04 FOR
ENLARGED PLAN
RE:1/WS.I3S.05 FOR
ENLARGED PLAN
RE:1/WS.I3S.06 FOR
ENLARGED PLAN
RE:1/WS.I3S.01 FOR
ENLARGED PLAN
RE:1/WS.I3S.02 FOR
ENLARGED PLAN
RE:1/WS.I3S.07 FOR
ENLARGED PLAN
RE:1/WS.I3S.03 FOR
ENLARGED PLAN
POLE MOUNT
JMatthewsPolyLine
JMatthewsPolyLine
JMatthewsPolyLine
JMatthewsCalloutConstruction Entrance to Jobsite - Existing Gate EV1
JMatthewsCalloutPotential Construction Parking Locations
JMatthewsPolyLine
dspinksRectangle
dspinksText BoxJob Site
dspinksCalloutRoute to Jobsite
dspinksCalloutAlternate Entrance to Jobsite (Off Peak Hours - Not Available at Start of Project)
dspinksCalloutAlternate Route to Jobsite (Off Peak Hours - Not Available at Start of Project)
-
# Activity ID Activity Orig
Dur
Rem
Dur
Start Finish
1 StructureStructureStructureStructureStructureStructure
2
3 Mobilization/GeneralMobilization/GeneralMobilization/GeneralMobilization/GeneralMobilization/GeneralMobilization/General
4
5
6 S0090 Demo Package Construction Fencing and Low Pro Barrier Placement 15 15 27-Apr-15 15-May-15
7 S0080 Decommssion, Winterize and Relocate for Storage Gates 26 and 27 Jet Bridges 15 15 01-May-15 22-May-15
8 S0060 New T-Point Striped and Temporary Offices in Place 10 10 04-May-15 15-May-15
9 S0010 Site Mobilization / BBus Buildout 20 20 07-May-15 04-Jun-15
10 S0020 Site Demolition of Existing Gate 84 Walkways 20 20 18-May-15 15-Jun-15
11 S0065 Existing T-Point Decommissioned, Carts and CTBs Relocated 10 10 18-May-15 01-Jun-15
12 S0040 Site Demo/Salvage of Existing Trash Compactor 15 15 16-Jun-15 07-Jul-15
13 S0030 Site Demolition of Bag Make-Up/Busing Building 10 10 08-Jul-15 21-Jul-15
14 S0070 Install T-Point Light Fixtures, Permanent Mobile Office and Renovate Spaces 20 20 29-Jul-15 25-Aug-15
15 S0050 AOA Apron/Ramp Repairs (CTB and Paving) 100 100 20-Aug-15 14-Jan-16
16 Pour 01 (Grid Z.5 - EE)Pour 01 (Grid Z.5 - EE)Pour 01 (Grid Z.5 - EE)Pour 01 (Grid Z.5 - EE)Pour 01 (Grid Z.5 - EE)Pour 01 (Grid Z.5 - EE)
17
18
19 S01000 Apron and CSB Removal at Building Footprint 10 10 05-Jun-15 18-Jun-15
20 S01010 Demo Existing Utilities and IT Duct Bank 15 15 06-Jul-15 24-Jul-15
21 S01020 Partial Subgrade Backfill and Prep (-1 Ft) 9 9 21-Jul-15 31-Jul-15
22 S01030 Drilled Piers 7 7 29-Jul-15 06-Aug-15
23 S01040 Building Underground Utilities and MEP 9 9 05-Aug-15 17-Aug-15
24 S01050 Excavate, Reinforce and Pour Grade Beams/Caps 7 7 12-Aug-15 20-Aug-15
25 S01060 Reinforce, Form and Pour Columns 4 4 19-Aug-15 24-Aug-15
26 S01070 Backfill and Prep Final Subgrade Lift 5 5 21-Aug-15 27-Aug-15
27 S01080 Form, Reinforce, and Pour Slab on Grade 5 5 11-Sep-15 17-Sep-15
28 S01090 Compacted Aggregate Base Fill at GSE Paving 5 5 15-Sep-15 21-Sep-15
29 S01100 Form, Reinforce and Pour GSE Paving 5 5 22-Sep-15 28-Sep-15
30 S01110 Form Level 2 Podium 7 7 13-Oct-15 21-Oct-15
31 S01120 Reinforce Level 2 Podium 4 4 20-Oct-15 23-Oct-15
32 S01130 Pour Level 2 Podium 1 1 26-Oct-15 26-Oct-15
33 S01140 Reinforce, Form and Pour Level 2 V Column Plinths 2 2 27-Oct-15 28-Oct-15
34 S01160 Strip Form Work Level 2 Podium 5 5 30-Oct-15 05-Nov-15
35 S01150 Erect and Detail Structural Steel 18 18 20-Nov-15 17-Dec-15
36 Pour 02 (Grid U.5 - Z.5)Pour 02 (Grid U.5 - Z.5)Pour 02 (Grid U.5 - Z.5)Pour 02 (Grid U.5 - Z.5)Pour 02 (Grid U.5 - Z.5)Pour 02 (Grid U.5 - Z.5)
37
38
39 S02000 Apron and CSB Removal at Building Footprint 7 7 19-Jun-15 29-Jun-15
40 S02010 Demo Existing Utilities and IT Duct Bank 15 15 26-Jun-15 17-Jul-15
41 S02020 Partial Subgrade Backfill and Prep (-1 Ft) 9 9 14-Jul-15 24-Jul-15
42 S02030 Drilled Piers 7 7 07-Aug-15 17-Aug-15
43 S02040 Building Underground Utilities and MEP 9 9 18-Aug-15 28-Aug-15
44 S02050 Excavate, Reinforce and Pour Grade Beams/Caps 5 5 26-Aug-15 01-Sep-15
45 S02060 Reinforce, Form and Pour Columns 4 4 31-Aug-15 03-Sep-15
46 S02070 Backfill and Prep Final Subgrade Lift 5 5 02-Sep-15 09-Sep-15
47 S02080 Form, Reinforce, and Pour Slab on Grade 5 5 18-Sep-15 24-Sep-15
48 S02090 Compacted Aggregate Base Fill at GSE Paving 5 5 22-Sep-15 28-Sep-15
49 S02100 Form, Reinforce and Pour GSE Paving 5 5 29-Sep-15 05-Oct-15
50 S02110 Form Level 2 Podium 7 7 22-Oct-15 30-Oct-15
51 S02120 Reinforce Level 2 Podium 4 4 29-Oct-15 03-Nov-15
52 S02130 Pour Level 2 Podium 1 1 04-Nov-15 04-Nov-15
53 S02150 Strip Form Work Level 2 Podium 5 5 10-Nov-15 16-Nov-15
54 S02140 Erect and Detail Structural Steel 18 18 23-Nov-15 18-Dec-15
55 Pour 03 (Grid P.5 - U.5)Pour 03 (Grid P.5 - U.5)Pour 03 (Grid P.5 - U.5)Pour 03 (Grid P.5 - U.5)Pour 03 (Grid P.5 - U.5)Pour 03 (Grid P.5 - U.5)
56
57
58 S03000 Apron and CSB Removal at Building Footprint 7 7 30-Jun-15 09-Jul-15
59 S03010 Demo Existing Utilities and IT Duct Bank 15 15 27-Jul-15 14-Aug-15
60 S03020 Partial Subgrade Backfill and Prep (-1 Ft) 9 9 11-Aug-15 21-Aug-15
61 S03030 Drilled Piers 8 8 18-Aug-15 27-Aug-15
62 S03040 Building Underground Utilities and MEP 9 9 31-Aug-15 11-Sep-15
63 S03050 Excavate, Reinforce and Pour Grade Beams/Caps 7 7 08-Sep-15 16-Sep-15
64 S03060 Reinforce, Form and Pour Columns 4 4 15-Sep-15 18-Sep-15
65 S03070 Backfill and Prep Final Subgrade Lift 5 5 17-Sep-15 23-Sep-15
66 S03080 Form, Reinforce, and Pour Slab on Grade 5 5 25-Sep-15 01-Oct-15
67 S03090 Compacted Aggregate Base Fill at GSE Paving 5 5 29-Sep-15 05-Oct-15
68 S03100 Form, Reinforce and Pour GSE Paving 5 5 06-Oct-15 12-Oct-15
69 S03110 Form Level 2 Podium 7 7 02-Nov-15 10-Nov-15
70 S03120 Reinforce Level 2 Podium 4 4 09-Nov-15 12-Nov-15
71 S03130 Pour Level 2 Podium 1 1 13-Nov-15 13-Nov-15
72 S03150 Strip Form Work Level 2 Podium 5 5 19-Nov-15 25-Nov-15
73 S03140 Erect and Detail Structural Steel 15 15 18-Dec-15 12-Jan-16
74 Pour 04 (Grid L.5 - P.5)Pour 04 (Grid L.5 - P.5)Pour 04 (Grid L.5 - P.5)Pour 04 (Grid L.5 - P.5)Pour 04 (Grid L.5 - P.5)Pour 04 (Grid L.5 - P.5)
75
76
77 S04000 Apron and CSB Removal at Building Footprint 7 7 10-Jul-15 20-Jul-15
78 S04010 Demo Existing Utilities and IT Duct Bank 15 15 20-Jul-15 07-Aug-15
79 S04020 Partial Subgrade Backfill and Prep (-1 Ft) 9 9 24-Aug-15 03-Sep-15
80 S04030 Drilled Piers 7 7 01-Sep-15 10-Sep-15
81 S04040 Building Underground Utilities and MEP 9 9 14-Sep-15 24-Sep-15
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
Qtr 4, 2014 Qtr 1, 2015 Qtr 2, 2015 Qtr 3, 2015 Qtr 4, 2015 Qtr 1, 2016 Qtr 2, 2016 Qtr 3, 2016 Qtr 4, 2016 Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018
Demo Package Construction Fencing and Low Pro Barrier Placement
Decommssion, Winterize and Relocate for Storage Gates 26 and 27 Jet Bridges
New T-Point Striped and Temporary Offices in Place
Site Mobilization / BBus Buildout
Site Demolition of Existing Gate 84 Walkways
Existing T-Point Decommissioned, Carts and CTBs Relocated
Site Demo/Salvage of Existing Trash Compactor
Site Demolition of Bag Make-Up/Busing Building
Install T-Point Light Fixtures, Permanent Mobile Office and Renovate Spaces
AOA Apron/Ramp Repairs (CTB and Paving)
Apron and CSB Removal at Building Footprint
Demo Existing Utilities and IT Duct Bank
Partial Subgrade Backfill and Prep (-1 Ft)
Drilled Piers
Building Underground Utilities and MEP
Excavate, Reinforce and Pour Grade Beams/Caps
Reinforce, Form and Pour Columns
Backfill and Prep Final Subgrade Lift
Form, Reinforce, and Pour Slab on Grade
Compacted Aggregate Base Fill at GSE Paving
Form, Reinforce and Pour GSE Paving
Form Level 2 Podium
Reinforce Level 2 Podium
Pour Level 2 Podium
Reinforce, Form and Pour Level 2 V Column Plinths
Strip Form Work Level 2 Podium
Erect and Detail Structural Steel
Apron and CSB Removal at Building Footprint
Demo Existing Utilities and IT Duct Bank
Partial Subgrade Backfill and Prep (-1 Ft)
Drilled Piers
Building Underground Utilities and MEP
Excavate, Reinforce and Pour Grade Beams/Caps
Reinforce, Form and Pour Columns
Backfill and Prep Final Subgrade Lift
Form, Reinforce, and Pour Slab on Grade
Compacted Aggregate Base Fill at GSE Paving
Form, Reinforce and Pour GSE Paving
Form Level 2 Podium
Reinforce Level 2 Podium
Pour Level 2 Podium
Strip Form Work Level 2 Podium
Erect and Detail Structural Steel
Apron and CSB Removal at Building Footprint
Demo Existing Utilities and IT Duct Bank
Partial Subgrade Backfill and Prep (-1 Ft)
Drilled Piers
Building Underground Utilities and MEP
Excavate, Reinforce and Pour Grade Beams/Caps
Reinforce, Form and Pour Columns
Backfill and Prep Final Subgrade Lift
Form, Reinforce, and Pour Slab on Grade
Compacted Aggregate Base Fill at GSE Paving
Form, Reinforce and Pour GSE Paving
Form Level 2 Podium
Reinforce Level 2 Podium
Pour Level 2 Podium
Strip Form Work Level 2 Podium
Erect and Detail Structural Steel
Apron and CSB Removal at Building Footprint
Demo Existing Utilities and IT Duct Bank
Partial Subgrade Backfill and Prep (-1 Ft)
Drilled Piers
Building Underground Utilities and MEP
Start Date 19-Aug-14
Finish Date 27-Feb-17
Data Date 21-Jan-15
Run Date 09-Feb-15
Page 1 OF 3
File CN05
Remaining Level of ...
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining ...
New Terminal C North
Houston, Texas
MCC Project #3665.10
-
# Activity ID Activity Orig
Dur
Rem
Dur
Start Finish
82 S04050 Excavate, Reinforce and Pour Grade Beams/Caps 8 8 21-Sep-15 30-Sep-15
83 S04005 Demo/Abate Fuel Lines and Backfill (unknown depth) 8 8 22-Sep-15 01-Oct-15
84 S04060 Reinforce, Form and Pour Columns 4 4 29-Sep-15 02-Oct-15
85 S04150 Drilled Piers, Grade Beams and Columns at Conflicts with Hydrant Fuel Lines 4 4 19-Oct-15 22-Oct-15
86 S04070 Backfill and Prep Final Subgrade Lift 5 5 20-Oct-15 26-Oct-15
87 S04080 Form, Reinforce, and Pour Slab on Grade 5 5 22-Oct-15 28-Oct-15
88 S04090 Compacted Aggregate Base Fill at GSE Paving 5 5 23-Oct-15 29-Oct-15
89 S04100 Form, Reinforce and Pour GSE Paving 5 5 27-Oct-15 02-Nov-15
90 S04110 Form Level 2 Podium 7 7 11-Nov-15 19-Nov-15
91 S04120 Reinforce Level 2 Podium 4 4 18-Nov-15 23-Nov-15
92 S04130 Pour Level 2 Podium 1 1 24-Nov-15 24-Nov-15
93 S04160 Strip Form Work Level 2 Podium 5 5 02-Dec-15 08-Dec-15
94 S04140 Erect and Detail Structural Steel 15 15 21-Dec-15 13-Jan-16
95 Pour 05 (Grid 24.33 - 30.5)Pour 05 (Grid 24.33 - 30.5)Pour 05 (Grid 24.33 - 30.5)Pour 05 (Grid 24.33 - 30.5)Pour 05 (Grid 24.33 - 30.5)Pour 05 (Grid 24.33 - 30.5)
96
97
98 S05000 Apron and CSB Removal at Building Footprint 5 5 21-Aug-15 27-Aug-15
99 S05010 Demo Existing Utilities 15 15 28-Aug-15 18-Sep-15
100 S05020 Partial Subgrade Backfill and Prep (-1 Ft) 9 9 15-Sep-15 25-Sep-15
101 S05030 Drilled Piers 10 10 21-Sep-15 02-Oct-15
102 S05005 Demo/Abate Fuel Lines and Backfill (unknown depth) 12 12 22-Sep-15 07-Oct-15
103 S05040 Building Underground Utilities and MEP 9 9 29-Sep-15 09-Oct-15
104 S05050 Excavate, Reinforce and Pour Grade Beams/Caps 4 4 13-Oct-15 16-Oct-15
105 S05180 Drill Piers (Grid A) 2 2 15-Oct-15 16-Oct-15
106 S05150 FRP Wall Footing and Retaining Walls 6 6 16-Oct-15 23-Oct-15
107 S05170 Piers, Grade Beams and Columns at Conflicts with Hydrant Fuel Lines 3 3 23-Oct-15 27-Oct-15
108 S05060 Reinforce, Form and Pour Columns 7 7 26-Oct-15 03-Nov-15
109 S05070 Backfill and Prep Final Subgrade Lift 8 8 28-Oct-15 06-Nov-15
110 S05080 Form, Reinforce, and Pour Slab on Grade 5 5 04-Nov-15 10-Nov-15
111 S05090 Compacted Aggregate Base Fill at GSE Paving 5 5 06-Nov-15 12-Nov-15
112 S05100 Form, Reinforce and Pour GSE Paving 5 5 10-Nov-15 16-Nov-15
113 S05110 Form Level 2 Podium 7 7 20-Nov-15 02-Dec-15
114 S05120 Reinforce Level 2 Podium 5 5 03-Dec-15 09-Dec-15
115 S05130 Pour Level 2 Podium 5 5 10-Dec-15 16-Dec-15
116 S05190 Strip Form Work Level 2 Podium 5 5 22-Dec-15 30-Dec-15
117 S05140 Erect and Detail Structural Steel Mezzanine Floor 10 10 25-Jan-16 05-Feb-16
118 S05160 Erect and Detail Strucutral Steel High Roof 25 25 08-Feb-16 11-Mar-16
119 S05200 RFP Mezzanine Slab on Metal Deck 5 5 24-Mar-16 31-Mar-16
120 Pour 06 (Grid 20.33 - 24.33)Pour 06 (Grid 20.33 - 24.33)Pour 06 (Grid 20.33 - 24.33)Pour 06 (Grid 20.33 - 24.33)Pour 06 (Grid 20.33 - 24.33)Pour 06 (Grid 20.33 - 24.33)
121
122
123 S06000 Apron and CSB Removal at Building Footprint (Includes Cut at LD) 6 6 28-Aug-15 04-Sep-15
124 S06010 Demo Existing Utilities and IT Duct Bank 15 15 21-Sep-15 09-Oct-15
125 S06005 Demo/Abate Fuel Lines and Backfill (unknown depth) 15 15 02-Oct-15 22-Oct-15
126 S06020 Partial Subgrade Backfill and Prep (-1 Ft) 9 9 06-Oct-15 16-Oct-15
127 S06030 Drilled Piers (Includes JF Conflicted Piers in Area 4) 10 10 09-Oct-15 22-Oct-15
128 S06180 Drill Piers (Grids A, B, C) 3 3 12-Oct-15 14-Oct-15
129 S06015 FRP Wall Footing and Retaining Walls 8 8 13-Oct-15 22-Oct-15
130 S06040 Building Underground Utilities and MEP 9 9 19-Oct-15 29-Oct-15
131 S06050 Excavate, Reinforce and Pour Grade Beams/Caps 7 7 28-Oct-15 05-Nov-15
132 S06060 Reinforce, Form and Pour Columns 5 5 04-Nov-15 10-Nov-15
133 S06170 Drilled Piers, Grade Beams and Columns at Conflicts with Hydrant Fuel Lines 5 5 05-Nov-15 11-Nov-15
134 S06070 Backfill and Prep Final Subgrade Lift 5 5 09-Nov-15 13-Nov-15
135 S06080 Form, Reinforce, and Pour Slab on Grade 5 5 12-Nov-15 18-Nov-15
136 S06090 Compacted Aggregate Base Fill at GSE Paving 5 5 16-Nov-15 20-Nov-15
137 S06100 Form, Reinforce and Pour GSE Paving 5 5 23-Nov-15 01-Dec-15
138 S06110 Form Level 2 Podium 8 8 03-Dec-15 14-Dec-15
139 S06120 Reinforce Level 2 Podium 4 4 11-Dec-15 16-Dec-15
140 S06130 Pour Level 2 Podium 1 1 17-Dec-15 17-Dec-15
141 S06150 Reinforce, Form and Pour Level 2 V Column Plinths 2 2 18-Dec-15 21-Dec-15
142 S06160 Strip Form Work Level 2 Podium 5 5 23-Dec-15 31-Dec-15
143 S06140 Erect and Detail Structural Steel Mezzanine Floor 2 2 25-Jan-16 26-Jan-16
144 Pour 07 (Grid 13.5 - 20.33)Pour 07 (Grid 13.5 - 20.33)Pour 07 (Grid 13.5 - 20.33)Pour 07 (Grid 13.5 - 20.33)Pour 07 (Grid 13.5 - 20.33)Pour 07 (Grid 13.5 - 20.33)
145
146
147 S07000 Apron and CSB Removal at Building Footprint 7 7 12-Aug-15 20-Aug-15
148 S07010 Demo Existing Utilities 15 15 19-Aug-15 09-Sep-15
149 S07180 Drill Piers (Grid A, A.4, A.8, B, C) 8 8 10-Sep-15 21-Sep-15
150 S07160 Mass Excavation at Utilador Tie-in and Basement 5 5 22-Sep-15 28-Sep-15
151 S07020 Partial Subgrade Backfill and Prep (-1 Ft) 9 9 28-Sep-15 08-Oct-15
152 S07015 FRP Wall Footing and Retaining Walls 15 15 29-Sep-15 19-Oct-15
153 S07005 Demo/Abate Fuel Lines and Backfill (unknown depth) 15 15 08-Oct-15 28-Oct-15
154 S07030 Drilled Piers 8 8 26-Oct-15 04-Nov-15
155 S07025 Drilled Piers, Grade Beams and Columns at Conflicts with Hydrant Fuel Lines 6 6 29-Oct-15 05-Nov-15
156 S07040 Building Underground Utilities and MEP 12 12 02-Nov-15 17-Nov-15
157 S07060 Reinforce, Form and Pour Columns 10 10 12-Nov-15 25-Nov-15
158 S07070 Backfill and Prep Final Subgrade Lift 10 10 16-Nov-15 01-Dec-15
159 S07050 Excavate, Reinforce and Pour Grade Beams/Caps 4 4 19-Nov-15 24-Nov-15
160 S07080 Form, Reinforce, and Pour Slab on Grade 15 15 02-Dec-15 22-Dec-15
161 S07090 Compacted Aggregate Base Fill at GSE Paving 5 5 18-Dec-15 28-Dec-15
162 S07100 Form, Reinforce and Pour GSE Paving 5 5 29-Dec-15 05-Jan-16
163 S07110 Form Level 2 Podium 10 10 06-Jan-16 19-Jan-16
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
Qtr 4, 2014 Qtr 1, 2015 Qtr 2, 2015 Qtr 3, 2015 Qtr 4, 2015 Qtr 1, 2016 Qtr 2, 2016 Qtr 3, 2016 Qtr 4, 2016 Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018
Excavate, Reinforce and Pour Grade Beams/Caps
Demo/Abate Fuel Lines and Backfill (unknown depth)
Reinforce, Form and Pour Columns
Drilled Piers, Grade Beams and Columns at Conflicts with Hydrant Fuel Lines
Backfill and Prep Final Subgrade Lift
Form, Reinforce, and Pour Slab on Grade
Compacted Aggregate Base Fill at GSE Paving
Form, Reinforce and Pour GSE Paving
Form Level 2 Podium
Reinforce Level 2 Podium
Pour Level 2 Podium
Strip Form Work Level 2 Podium
Erect and Detail Structural Steel
Apron and CSB Removal at Building Footprint
Demo Existing Utilities
Partial Subgrade Backfill and Prep (-1 Ft)
Drilled Piers
Demo/Abate Fuel Lines and Backfill (unknown depth)
Building Underground Utilities and MEP
Excavate, Reinforce and Pour Grade Beams/Caps
Drill Piers (Grid A)
FRP Wall Footing and Retaining Walls
Piers, Grade Beams and Columns at Conflicts with Hydrant Fuel Lines
Reinforce, Form and Pour Columns
Backfill and Prep Final Subgrade Lift
Form, Reinforce, and Pour Slab on Grade
Compacted Aggregate Base Fill at GSE Paving
Form, Reinforce and Pour GSE Paving
Form Level 2 Podium
Reinforce Level 2 Podium
Pour Level 2 Podium
Strip Form Work Level 2 Podium
Erect and Detail Structural Steel Mezzanine Floor
Erect and Detail Strucutral Steel High Roof
RFP Mezzanine Slab on Metal Deck
Apron and CSB Removal at Building Footprint (Includes Cut at LD)
Demo Existing Utilities and IT Duct Bank
Demo/Abate Fuel Lines and Backfill (unknown depth)
Partial Subgrade Backfill and Prep (-1 Ft)
Drilled Piers (Includes JF Conflicted Piers in Area 4)
Drill Piers (Grids A, B, C)
FRP Wall Footing and Retaining Walls
Building Underground Utilities and MEP
Excavate, Reinforce and Pour Grade Beams/Caps
Reinforce, Form and Pour Columns
Drilled Piers, Grade Beams and Columns at Conflicts with Hydrant Fuel Lines
Backfill and Prep Final Subgrade Lift
Form, Reinforce, and Pour Slab on Grade
Compacted Aggregate Base Fill at GSE Paving
Form, Reinforce and Pour GSE Paving
Form Level 2 Podium
Reinforce Level 2 Podium
Pour Level 2 Podium
Reinforce, Form and Pour Level 2 V Column Plinths
Strip Form Work Level 2 Podium
Erect and Detail Structural Steel Mezzanine Floor
Apron and CSB Removal at Building Footprint
Demo Existing Utilities
Drill Piers (Grid A, A.4, A.8, B, C)
Mass Excavation at Utilador Tie-in and Basement
Partial Subgrade Backfill and Prep (-1 Ft)
FRP Wall Footing and Retaining Walls
Demo/Abate Fuel Lines and Backfill (unknown depth)
Drilled Piers
Drilled Piers, Grade Beams and Columns at Conflicts with Hydrant Fuel Lines
Building Underground Utilities and MEP
Reinforce, Form and Pour Columns
Backfill and Prep Final Subgrade Lift
Excavate, Reinforce and Pour Grade Beams/Caps
Form, Reinforce, and Pour Slab on Grade
Compacted Aggregate Base Fill at GSE Paving
Form, Reinforce and Pour GSE Paving
Form Level 2 Podium
Start Date 19-Aug-14
Finish Date 27-Feb-17
Data Date 21-Jan-15
Run Date 09-Feb-15
Page 2 OF 3
File CN05
Remaining Level of ...
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining ...
New Terminal C North
Houston, Texas
MCC Project #3665.10
-
# Activity ID Activity Orig
Dur
Rem
Dur
Start Finish
164 S07120 Reinforce Level 2 Podium 5 5 15-Jan-16 21-Jan-16
165 S07130 Pour Level 2 Podium 1 1 22-Jan-16 22-Jan-16
166 S07150 Reinforce, Form and Pour Level 2 V Column Plinths 2 2 25-Jan-16 26-Jan-16
167 S07190 Strip Form Work Level 2 Podium 5 5 28-Jan-16 03-Feb-16
168 S07140 Erect and Detail Structural Steel Mezzanine Floor 10 10 04-Feb-16 17-Feb-16
169 S07170 Erect and Detail Structural Steel High Roof 25 25 18-Feb-16 23-Mar-16
170 S07035 RFP Mezzanine Slab on Metal Deck 5 5 29-Mar-16 04-Apr-16
171 Pour 08 (Grid 30.5 - 37.5)Pour 08 (Grid 30.5 - 37.5)Pour 08 (Grid 30.5 - 37.5)Pour 08 (Grid 30.5 - 37.5)Pour 08 (Grid 30.5 - 37.5)Pour 08 (Grid 30.5 - 37.5)
172
173
174 S08000 Apron and CSB Removal at Building Footprint 5 5 08-Sep-15 14-Sep-15
175 S08010 Demo Existing Utilities 10 10 15-Sep-15 28-Sep-15
176 S08020 Partial Subgrade Backfill and Prep (-1 Ft) 8 8 19-Oct-15 28-Oct-15
177 S08170 Drill Piers (Grid A) 3 3 19-Oct-15 21-Oct-15
178 S08150 FRP Wall Footing and Retaining Walls 8 8 20-Oct-15 29-Oct-15
179 S08005 Demo/Abate Fuel Lines and Backfill (unknown depth) 15 15 23-Oct-15 12-Nov-15
180 S08030 Drilled Piers 7 7 09-Nov-15 17-Nov-15
181 S08160 Drilled Piers, Grade Beams and Columns at Conflicts with Hydrant Fuel Lines 5 5 13-Nov-15 19-Nov-15
182 S08040 Building Underground Utilities and MEP 8 8 18-Nov-15 01-Dec-15
183 S08050 Excavate, Reinforce and Pour Grade Beams/Caps 5 5 02-Dec-15 08-Dec-15
184 S08060 Reinforce, Form and Pour Columns 7 7 02-Dec-15 10-Dec-15
185 S08070 Backfill and Prep Final Subgrade Lift 8 8 04-Dec-15 15-Dec-15
186 S08080 Form, Reinforce, and Pour Slab on Grade 7 7 23-Dec-15 05-Jan-16
187 S08090 Compacted Aggregate Base Fill at GSE Paving 2 2 06-Jan-16 07-Jan-16
188 S08100 Form, Reinforce and Pour GSE Paving 3 3 08-Jan-16 12-Jan-16
189 S08110 Form Level 2 Podium 6 6 20-Jan-16 27-Jan-16
190 S08120 Reinforce Level 2 Podium 3 3 26-Jan-16 28-Jan-16
191 S08130 Pour Level 2 Podium 1 1 29-Jan-16 29-Jan-16
192 S08180 Strip Form Work Level 2 Podium 5 5 04-Feb-16 10-Feb-16
193 S08140 Erect and Detail Structural Steel 15 15 14-Mar-16 04-Apr-16
194 Pour 09 (Grid 6.67 -13.5)Pour 09 (Grid 6.67 -13.5)Pour 09 (Grid 6.67 -13.5)Pour 09 (Grid 6.67 -13.5)Pour 09 (Grid 6.67 -13.5)Pour 09 (Grid 6.67 -13.5)
195
196
197 S09000 Apron and CSB Removal at Building Footprint 5 5 15-Sep-15 21-Sep-15
198 S09010 Demo Existing Utilities 15 15 29-Sep-15 19-Oct-15
199 S09020 Partial Subgrade Backfill and Prep (-1 Ft) 9 9 20-Oct-15 30-Oct-15
200 S09170 Drill Piers (Grids A and B) 4 4 22-Oct-15 27-Oct-15
201 S09150 FRP Wall Footing and Retaining Walls. 10 10 23-Oct-15 05-Nov-15
202 S09005 Demo/Abate Fuel Lines and Backfill (unknown depth) 15 15 29-Oct-15 18-Nov-15
203 S09030 Drilled Piers 6 6 18-Nov-15 25-Nov-15
204 S09160 Drilled Piers, Grade Beams and Columns at Conflicts with Hydrant Fuel Lines 5 5 19-Nov-15 25-Nov-15
205 S09040 Building Underground Utilities and MEP 9 9 02-Dec-15 14-Dec-15
206 S09050 Excavate, Reinforce and Pour Grade Beams/Caps 5 5 15-Dec-15 21-Dec-15
207 S09060 Reinforce, Form and Pour Columns 8 8 15-Dec-15 28-Dec-15
208 S09070 Backfill and Prep Final Subgrade Lift 8 8 17-Dec-15 30-Dec-15
209 S09080 Form, Reinforce, and Pour Slab on Grade 5 5 06-Jan-16 12-Jan-16
210 S09090 Compacted Aggregate Base Fill at GSE Paving 5 5 08-Jan-16 14-Jan-16
211 S09100 Form, Reinforce and Pour GSE Paving 5 5 15-Jan-16 21-Jan-16
212 S09110 Form Level 2 Podium 7 7 28-Jan-16 05-Feb-16
213 S09120 Reinforce Level 2 Podium 4 4 04-Feb-16 09-Feb-16
214 S09130 Pour Level 2 Podium 1 1 10-Feb-16 10-Feb-16
215 S09180 Strip Form Work Level 2 Podium 5 5 15-Feb-16 19-Feb-16
216 S09140 Erect and Detail Structural Steel 15 15 24-Mar-16 14-Apr-16
217 Pour 10 (Grid .80 - 6.67)Pour 10 (Grid .80 - 6.67)Pour 10 (Grid .80 - 6.67)Pour 10 (Grid .80 - 6.67)Pour 10 (Grid .80 - 6.67)Pour 10 (Grid .80 - 6.67)
218
219
220 S10000 Apron and CSB Removal at Building Footprint 5 5 22-Sep-15 28-Sep-15
221 S10010 Demo Existing Utilities 15 15 12-Oct-15 30-Oct-15
222 S10160 Drill Piers (Grid A) 2 2 28-Oct-15 29-Oct-15
223 S10150 FRP Wall Footing and Retaining Walls 8 8 29-Oct-15 09-Nov-15
224 S10020 Partial Subgrade Backfill and Prep (-1 Ft) 9 9 02-Nov-15 12-Nov-15
225 S10005 Demo/Abate Fuel Lines and Backfill (unknown depth) 5 5 13-Nov-15 19-Nov-15
226 S10015 Drilled Piers, Grade Beams and Columns at Conflicts with Hydrant Fuel Lines 5 5 20-Nov-15 30-Nov-15
227 S10030 Drilled Piers 7 7 30-Nov-15 08-Dec-15
228 S10040 Building Underground Utilities and MEP 5 5 15-Dec-15 21-Dec-15
229 S10050 Excavate, Reinforce and Pour Grade Beams/Caps 4 4 23-Dec-15 30-Dec-15
230 S10060 Reinforce, Form and Pour Columns 7 7 29-Dec-15 07-Jan-16
231 S10070 Backfill and Prep Final Subgrade Lift 8 8 06-Jan-16 15-Jan-16
232 S10080 Form, Reinforce, and Pour Slab on Grade 3 3 15-Jan-16 19-Jan-16
233 S10090 Compacted Aggregate Base Fill at GSE Paving 5 5 15-Jan-16 21-Jan-16
234 S10100 Form, Reinforce and Pour GSE Paving 8 8 22-Jan-16 02-Feb-16
235 S10110 Form Level 2 Podium 7 7 08-Feb-16 16-Feb-16
236 S10120 Reinforce Level 2 Podium 4 4 15-Feb-16 18-Feb-16
237 S10130 Pour Level 2 Podium 1 1 19-Feb-16 19-Feb-16
238 S10170 Strip Form Work Level 2 Podium 5 5 25-Feb-16 02-Mar-16
239 S10140 Erect and Detail Structural Steel 20 20 06-Apr-16 03-May-16
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
Qtr 4, 2014 Qtr 1, 2015 Qtr 2, 2015 Qtr 3, 2015 Qtr 4, 2015 Qtr 1, 2016 Qtr 2, 2016 Qtr 3, 2016 Qtr 4, 2016 Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018
Reinforce Level 2 Podium
Pour Level 2 Podium
Reinforce, Form and Pour Level 2 V Column Plinths
Strip Form Work Level 2 Podium
Erect and Detail Structural Steel Mezzanine Floor
Erect and Detail Structural Steel High Roof
RFP Mezzanine Slab on Metal Deck
Apron and CSB Removal at Building Footprint
Demo Existing Utilities
Partial Subgrade Backfill and Prep (-1 Ft)
Drill Piers (Grid A)
FRP Wall Footing and Retaining Walls
Demo/Abate Fuel Lines and Backfill (unknown depth)
Drilled Piers
Drilled Piers, Grade Beams and Columns at Conflicts with Hydrant Fuel Lines
Building Underground Utilities and MEP
Excavate, Reinforce and Pour Grade Beams/Caps
Reinforce, Form and Pour Columns
Backfill and Prep Final Subgrade Lift
Form, Reinforce, and Pour Slab on Grade
Compacted Aggregate Base Fill at GSE Paving
Form, Reinforce and Pour GSE Paving
Form Level 2 Podium
Reinforce Level 2 Podium
Pour Level 2 Podium
Strip Form Work Level 2 Podium
Erect and Detail Structural Steel
Apron and CSB Removal at Building Footprint
Demo Existing Utilities
Partial Subgrade Backfill and Prep (-1 Ft)
Drill Piers (Grids A and B)
FRP Wall Footing and Retaining Walls.
Demo/Abate Fuel Lines and Backfill (unknown depth)
Drilled Piers
Drilled Piers, Grade Beams and Columns at Conflicts with Hydrant Fuel Lines
Building Underground Utilities and MEP
Excavate, Reinforce and Pour Grade Beams/Caps
Reinforce, Form and Pour Columns
Backfill and Prep Final Subgrade Lift
Form, Reinforce, and Pour Slab on Grade
Compacted Aggregate Base Fill at GSE Paving
Form, Reinforce and Pour GSE Paving
Form Level 2 Podium
Reinforce Level 2 Podium
Pour Level 2 Podium
Strip Form Work Level 2 Podium
Erect and Detail Structural Steel
Apron and CSB Removal at Building Footprint
Demo Existing Utilities
Drill Piers (Grid A)
FRP Wall Footing and Retaining Walls
Partial Subgrade Backfill and Prep (-1 Ft)
Demo/Abate Fuel Lines and Backfill (unknown depth)
Drilled Piers, Grade Beams and Columns at Conflicts with Hydrant Fuel Lines
Drilled Piers
Building Underground Utilities and MEP
Excavate, Reinforce and Pour Grade Beams/Caps
Reinforce, Form and Pour Columns
Backfill and Prep Final Subgrade Lift
Form, Reinforce, and Pour Slab on Grade
Compacted Aggregate Base Fill at GSE Paving
Form, Reinforce and Pour GSE Paving
Form Level 2 Podium
Reinforce Level 2 Podium
Pour Level 2 Podium
Strip Form Work Level 2 Podium
Erect and Detail Structural Steel
Start Date 19-Aug-14
Finish Date 27-Feb-17
Data Date 21-Jan-15
Run Date 09-Feb-15
Page 3 OF 3
File CN05
Remaining Level of ...
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining ...
New Terminal C North
Houston, Texas
MCC Project #3665.10
BIG PICTURE DOCS1.1 SITE ACCESS SEQ-BC 1 GAN-Exhibit J1.2 LOGISTICS-BC 3 GANT-Overall Site Logistics 21.3 GEN INFO-BC3 GANT-003 - G0.002 - PROJECT INFORMATION SHEET INDEX
1.9SCHEDULE-OG Exhibit F - Project Schedule