lq & lm status & plan for fy08 – fred nobrega 1 larp collab. meeting – slac, oct. 17-19,...
TRANSCRIPT
BNL - FNAL - LBNL - SLAC
Long Quadrupole (LQ)-Long Dipole Mirror (LM)
Status & Plan for FY08
Fred Nobrega
9th LARP Collaboration Meeting October 17-19, 2007
LQ & LM Status & Plan for FY08 – Fred Nobrega 2LARP Collab. Meeting – SLAC, Oct. 17-19, 2007
LQ Status
• Winding tooling complete. » All winding parts in IB3 or
inspection
• Curing tooling used is from LHCIR quad program.
Preassembly of first LQ practice coil parts.
LQ & LM Status & Plan for FY08 – Fred Nobrega 3LARP Collab. Meeting – SLAC, Oct. 17-19, 2007
LQ Status
• Cured coil roll over table is operational. (LHCIR quad tooling)
roll-over station 2m dipole coil
4m dipole coil being extracted from curing mold
LQ & LM Status & Plan for FY08 – Fred Nobrega 4LARP Collab. Meeting – SLAC, Oct. 17-19, 2007
LQ Status
• Reaction tooling is being fabricated and is a single cavity, laminated fixture that can be used for both reaction and epoxy impregnation.
LQ & LM Status & Plan for FY08 – Fred Nobrega 5LARP Collab. Meeting – SLAC, Oct. 17-19, 2007
LQ Status
• Splice tooling design is complete and being fabricated.
LQ & LM Status & Plan for FY08 – Fred Nobrega 6LARP Collab. Meeting – SLAC, Oct. 17-19, 2007
LQ Status
• Reaction fixture roll over tooling in procurement.
LQ & LM Status & Plan for FY08 – Fred Nobrega 7LARP Collab. Meeting – SLAC, Oct. 17-19, 2007
LQ Status
• Feasibility of coil handling and subassembly handling is demonstrated with the LM, long dipole mirror:» coils, 2 m and 4 m
» mirror magnets, 2 m and 4 m
LQ & LM Status & Plan for FY08 – Fred Nobrega 8LARP Collab. Meeting – SLAC, Oct. 17-19, 2007
LQ Status
• Coil and subassembly handling
4m Dipole Potted Coil
4m Dipole Potted Coil
4m Dipole Potted Coil
2m Dipole Cured Coil
LQ & LM Status & Plan for FY08 – Fred Nobrega 9LARP Collab. Meeting – SLAC, Oct. 17-19, 2007
4m Dipole Potted Coil 4m Dipole Potted Coil
LM02 Clamped Assy
LQ & LM Status & Plan for FY08 – Fred Nobrega 10LARP Collab. Meeting – SLAC, Oct. 17-19, 2007
LQ Plan for FY08
• Produce coils, produce coils, and produce coils!• Design & procure instrumentation traces.• Procure long lead magnet parts during the 1st
half of year.• Procure remaining LQ magnet parts in 2nd half
of year as money becomes available.• Prepare for magnet assembly in FY09.
LQ & LM Status & Plan for FY08 – Fred Nobrega 11LARP Collab. Meeting – SLAC, Oct. 17-19, 2007
FY08 LQ Schedule (as of Oct. 11)
LQ & LM Status & Plan for FY08 – Fred Nobrega 12LARP Collab. Meeting – SLAC, Oct. 17-19, 2007
LQ Conclusions
• The tooling length scale up for the LQ is nearly complete.
• Practice winding to begin within the next week.• Long generic tooling used for the LHC
quadrupoles is in place for the LQ practice coils in IB3.
• Valuable experience from moving LM dipole coils and subassemblies can be tapped into for LQ.
LQ & LM Status & Plan for FY08 – Fred Nobrega 13LARP Collab. Meeting – SLAC, Oct. 17-19, 2007
LM Status
• 2m LM01 PIT mirror: Successfully tested to short
sample limit (next page)
• 4m LM02 RRP mirror: Clamps installed last week Shell welding this week Send to VMTF by end Oct.
• Long magnet infrastructure: 100% complete.
Dipole Mirror Cross Section Schematic
LQ & LM Status & Plan for FY08 – Fred Nobrega 14LARP Collab. Meeting – SLAC, Oct. 17-19, 2007
15000
16000
17000
18000
19000
20000
21000
22000
0 5 10 15 20 25 30
Quench number
Qu
ench
cu
rren
t, A
LM01
HFDM03
LM 01, 2m PIT Mirror Dipole Quench History
Short Sample Limit
10000
15000
20000
25000
30000
35000
40000
7 8 9 10 11 12 13 14
Field [T]
Ca
ble
Ic
[A
]
Parameterization at 4.5 KB0BmaxW/10% degradationW/40% degradation
2.2K
By Emanuela Barzi
0
5000
10000
15000
20000
25000
0 10 20 30 40 50
Quench number
Qu
en
ch
cu
rre
nt,
A
4.5 K, 20 A/s
4.5 K, 50-325 A/s
2.2K, 20 A/s
LQ & LM Status & Plan for FY08 – Fred Nobrega 15LARP Collab. Meeting – SLAC, Oct. 17-19, 2007
LM02 Reaction Tooling Experience
LQ & LM Status & Plan for FY08 – Fred Nobrega 16LARP Collab. Meeting – SLAC, Oct. 17-19, 2007
LM02 Reaction Tooling Deflection
00.10.20.30.40.50.60.70.80.9
1
0 10 20 30 40 50 60
Bolt # from LE spaced 3" apart
Def
lect
ion
, (in
ches
)
LM01, 0.15"(extrapolated from
LM02 data)
LM02, 0.5"
LM01 coil length
LM02 Reaction Tooling Experience
LQ & LM Status & Plan for FY08 – Fred Nobrega 17LARP Collab. Meeting – SLAC, Oct. 17-19, 2007
LM02 Reaction Tooling Experience
• Data used to gain confidence in Ansys analysis• Magnet test will provide additional information on coil strain
PC02 Deflection vs WeightCoil Simply Supported at Both Ends (data normalized)
-0.6
-0.5
-0.4
-0.3
-0.2
-0.1
0
40.00 50.00 60.00 70.00 80.00 90.00 100.00
Distance From LE, inch
De
fle
cti
on
, in
ch
coil weight
5 lb
10 lb
15 lb
20 lb
25 lb
30 lb
35 lb
LQ & LM Status & Plan for FY08 – Fred Nobrega 18LARP Collab. Meeting – SLAC, Oct. 17-19, 2007
LM plans
• Test 4m mirror dipole magnet by end of Oct.• Investigate maximum coil strain.• Determine cause of reaction tooling bow after
heat treatment. » Does it cause degradation?
• Determine impact of tooling bow on LQ coils.
LQ & LM Status & Plan for FY08 – Fred Nobrega 19LARP Collab. Meeting – SLAC, Oct. 17-19, 2007
LM Conclusions
• The scale up of the 1m dipole mirrors to 2m using PIT strand was successfully demonstrated.
• The 4m (RRP) mirror magnet is about to be tested and will provide valuable information on coil degradation due to deflection.
• Feasibility of coil handling and subassembly handling is demonstrated with the long dipole mirror.