Page 1: LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct. 17-19, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole

BNL - FNAL - LBNL - SLAC

Long Quadrupole (LQ)-Long Dipole Mirror (LM)

Status & Plan for FY08

Fred Nobrega

9th LARP Collaboration Meeting October 17-19, 2007

Page 2: LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct. 17-19, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole

LQ & LM Status & Plan for FY08 – Fred Nobrega 2LARP Collab. Meeting – SLAC, Oct. 17-19, 2007

LQ Status

• Winding tooling complete. » All winding parts in IB3 or

inspection

• Curing tooling used is from LHCIR quad program.

Preassembly of first LQ practice coil parts.

Page 3: LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct. 17-19, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole

LQ & LM Status & Plan for FY08 – Fred Nobrega 3LARP Collab. Meeting – SLAC, Oct. 17-19, 2007

LQ Status

• Cured coil roll over table is operational. (LHCIR quad tooling)

roll-over station 2m dipole coil

4m dipole coil being extracted from curing mold

Page 4: LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct. 17-19, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole

LQ & LM Status & Plan for FY08 – Fred Nobrega 4LARP Collab. Meeting – SLAC, Oct. 17-19, 2007

LQ Status

• Reaction tooling is being fabricated and is a single cavity, laminated fixture that can be used for both reaction and epoxy impregnation.

Page 5: LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct. 17-19, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole

LQ & LM Status & Plan for FY08 – Fred Nobrega 5LARP Collab. Meeting – SLAC, Oct. 17-19, 2007

LQ Status

• Splice tooling design is complete and being fabricated.

Page 6: LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct. 17-19, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole

LQ & LM Status & Plan for FY08 – Fred Nobrega 6LARP Collab. Meeting – SLAC, Oct. 17-19, 2007

LQ Status

• Reaction fixture roll over tooling in procurement.

Page 7: LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct. 17-19, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole

LQ & LM Status & Plan for FY08 – Fred Nobrega 7LARP Collab. Meeting – SLAC, Oct. 17-19, 2007

LQ Status

• Feasibility of coil handling and subassembly handling is demonstrated with the LM, long dipole mirror:» coils, 2 m and 4 m

» mirror magnets, 2 m and 4 m

Page 8: LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct. 17-19, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole

LQ & LM Status & Plan for FY08 – Fred Nobrega 8LARP Collab. Meeting – SLAC, Oct. 17-19, 2007

LQ Status

• Coil and subassembly handling

4m Dipole Potted Coil

4m Dipole Potted Coil

4m Dipole Potted Coil

2m Dipole Cured Coil

Page 9: LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct. 17-19, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole

LQ & LM Status & Plan for FY08 – Fred Nobrega 9LARP Collab. Meeting – SLAC, Oct. 17-19, 2007

4m Dipole Potted Coil 4m Dipole Potted Coil

LM02 Clamped Assy

Page 10: LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct. 17-19, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole

LQ & LM Status & Plan for FY08 – Fred Nobrega 10LARP Collab. Meeting – SLAC, Oct. 17-19, 2007

LQ Plan for FY08

• Produce coils, produce coils, and produce coils!• Design & procure instrumentation traces.• Procure long lead magnet parts during the 1st

half of year.• Procure remaining LQ magnet parts in 2nd half

of year as money becomes available.• Prepare for magnet assembly in FY09.

Page 11: LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct. 17-19, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole

LQ & LM Status & Plan for FY08 – Fred Nobrega 11LARP Collab. Meeting – SLAC, Oct. 17-19, 2007

FY08 LQ Schedule (as of Oct. 11)

Page 12: LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct. 17-19, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole

LQ & LM Status & Plan for FY08 – Fred Nobrega 12LARP Collab. Meeting – SLAC, Oct. 17-19, 2007

LQ Conclusions

• The tooling length scale up for the LQ is nearly complete.

• Practice winding to begin within the next week.• Long generic tooling used for the LHC

quadrupoles is in place for the LQ practice coils in IB3.

• Valuable experience from moving LM dipole coils and subassemblies can be tapped into for LQ.

Page 13: LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct. 17-19, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole

LQ & LM Status & Plan for FY08 – Fred Nobrega 13LARP Collab. Meeting – SLAC, Oct. 17-19, 2007

LM Status

• 2m LM01 PIT mirror: Successfully tested to short

sample limit (next page)

• 4m LM02 RRP mirror: Clamps installed last week Shell welding this week Send to VMTF by end Oct.

• Long magnet infrastructure: 100% complete.

Dipole Mirror Cross Section Schematic

Page 14: LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct. 17-19, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole

LQ & LM Status & Plan for FY08 – Fred Nobrega 14LARP Collab. Meeting – SLAC, Oct. 17-19, 2007

15000

16000

17000

18000

19000

20000

21000

22000

0 5 10 15 20 25 30

Quench number

Qu

ench

cu

rren

t, A

LM01

HFDM03

LM 01, 2m PIT Mirror Dipole Quench History

Short Sample Limit

10000

15000

20000

25000

30000

35000

40000

7 8 9 10 11 12 13 14

Field [T]

Ca

ble

Ic

[A

]

Parameterization at 4.5 KB0BmaxW/10% degradationW/40% degradation

2.2K

By Emanuela Barzi

0

5000

10000

15000

20000

25000

0 10 20 30 40 50

Quench number

Qu

en

ch

cu

rre

nt,

A

4.5 K, 20 A/s

4.5 K, 50-325 A/s

2.2K, 20 A/s

Page 15: LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct. 17-19, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole

LQ & LM Status & Plan for FY08 – Fred Nobrega 15LARP Collab. Meeting – SLAC, Oct. 17-19, 2007

LM02 Reaction Tooling Experience

Page 16: LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct. 17-19, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole

LQ & LM Status & Plan for FY08 – Fred Nobrega 16LARP Collab. Meeting – SLAC, Oct. 17-19, 2007

LM02 Reaction Tooling Deflection

00.10.20.30.40.50.60.70.80.9

1

0 10 20 30 40 50 60

Bolt # from LE spaced 3" apart

Def

lect

ion

, (in

ches

)

LM01, 0.15"(extrapolated from

LM02 data)

LM02, 0.5"

LM01 coil length

LM02 Reaction Tooling Experience

Page 17: LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct. 17-19, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole

LQ & LM Status & Plan for FY08 – Fred Nobrega 17LARP Collab. Meeting – SLAC, Oct. 17-19, 2007

LM02 Reaction Tooling Experience

• Data used to gain confidence in Ansys analysis• Magnet test will provide additional information on coil strain

PC02 Deflection vs WeightCoil Simply Supported at Both Ends (data normalized)

-0.6

-0.5

-0.4

-0.3

-0.2

-0.1

0

40.00 50.00 60.00 70.00 80.00 90.00 100.00

Distance From LE, inch

De

fle

cti

on

, in

ch

coil weight

5 lb

10 lb

15 lb

20 lb

25 lb

30 lb

35 lb

Page 18: LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct. 17-19, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole

LQ & LM Status & Plan for FY08 – Fred Nobrega 18LARP Collab. Meeting – SLAC, Oct. 17-19, 2007

LM plans

• Test 4m mirror dipole magnet by end of Oct.• Investigate maximum coil strain.• Determine cause of reaction tooling bow after

heat treatment. » Does it cause degradation?

• Determine impact of tooling bow on LQ coils.

Page 19: LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct. 17-19, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole

LQ & LM Status & Plan for FY08 – Fred Nobrega 19LARP Collab. Meeting – SLAC, Oct. 17-19, 2007

LM Conclusions

• The scale up of the 1m dipole mirrors to 2m using PIT strand was successfully demonstrated.

• The 4m (RRP) mirror magnet is about to be tested and will provide valuable information on coil degradation due to deflection.

• Feasibility of coil handling and subassembly handling is demonstrated with the long dipole mirror.