lri iligan audit report for finish mill & crusher area (02-20-15).pdf
TRANSCRIPT
Beta Equipment Sales Corporation
TECHNICAL REPORT(AUDIT REPORT)
for
FINISH MILL & CRUSHERLAFARGE REPUBLIC, INC. ILIGAN PLANT
February 20, 2015
Date of Report
Approved by:
Marlon B. Diokno
Chief Operating Offiicer
Report No.: LRI-ILI-JSM-100315
March 10, 2015
Prepared by:
Jose Roie S. Manaog
Technical Service Engineer
Checked by:
Elmer B. Ningas
Operation Head
Noted by:
Joseph M. Ascaño
Operation Manager
BO. KIWALAN, ILIGAN CITY, PHILIPPINES
Date of Inspection
F-PES-TR Rev-0
Precisely Right.
RUNNING STOP
SCOPE OF INSPECTION :
BELT CLEANER BELT TRACKER TAIL PROTECTION SKIRTING IMPACT BED
CONVEYOR BELT PULLEY ROLLER OTHERS: ______________
RECOMMENDATIONS
1
2
3 Install belt cleaning system for carryback and material build-up solution at pulley and rollers.
INSPECTION REPORT
CUSTOMER LAFARGE REPUBLIC, INC. ILIGAN PLANT INSPECTION DATE February 20, 2014
PICTURES/ILLUSTRATIONS
2
3
ITEM OBSERVATION AND FINDINGS ANALYSIS
1
MATERIAL CLINKER DATE INSTALLED N/ACLINKER WF
OPERATION SITE FINISH MILL 1 TYPE OF INSPECTION
BELT WIDTH 1000MM CONVEYOR ID
Penetration of dust and water from peel-off at joint
portion.
Inappropriate belt for transporting hot materials.
Ineffective belt cleaning system installed. Belt cleaners
primary function is to remove the material that stick on
the belt surface after unloading zone (as seen in Fig.3),
thus preventing the material loses and also to protect
the conveyor accessories specially its idlers.
Peel-off at the joint portion of belt observed.
Cracks on top cover rubber
Carryback materials build-up underneath the conveyor.
Replacement of Heat Resistance Conveyor Belt designed for specific condition.
`
1 2
3
1 of 11
RUNNING STOP
SCOPE OF INSPECTION :
BELT CLEANER BELT TRACKER TAIL PROTECTION SKIRTING IMPACT BED
CONVEYOR BELT PULLEY ROLLER OTHERS: ______________
OPERATION SITE FINISH MILL 1 TYPE OF INSPECTION
BELT WIDTH 650MM CONVEYOR ID
INSPECTION REPORT
CUSTOMER LAFARGE REPUBLIC, INC. ILIGAN PLANT INSPECTION DATE February 20, 2014
PICTURES/ILLUSTRATIONS
ITEM OBSERVATION AND FINDINGS ANALYSIS
GYPSUM WF
MATERIAL GYPSUM DATE INSTALLED N/A
RECOMMENDATIONS
Install belt cleaning system for carryback and material build-up solution at pulley and rollers.
3Material build-up at the face of return rollers.
1
Ineffective belt cleaning system installed. Belt cleaners
primary function is to remove the material that stick on
the belt surface after unloading zone (as seen in Fig.1-3),
thus preventing the material loses and also to protect
the conveyor accessories specially its idlers.
1Carry back materials sticked to the conveyor belt.
2 Carryback materials build-up underneath the conveyor.
`
1 2
3
2 of 11
RUNNING STOP
SCOPE OF INSPECTION :
BELT CLEANER BELT TRACKER TAIL PROTECTION SKIRTING IMPACT BED
CONVEYOR BELT PULLEY ROLLER OTHERS: ______________
INSPECTION REPORT
BELT WIDTH 800MM CONVEYOR ID ADDITIVES WF
MATERIAL ADDITIVES DATE INSTALLED N/A
CUSTOMER LAFARGE REPUBLIC, INC. ILIGAN PLANT INSPECTION DATE February 20, 2014
OPERATION SITE FINISH MILL 1 TYPE OF INSPECTION
1Excessive carry back materials beneath the conveyor and
reached the return rollers and conveyor belt.
Ineffective belt cleaning system installed. Belt cleaners
primary function is to remove the material that stick on
the belt surface after unloading zone (as seen in Fig.1),
thus preventing the material loses and also to protect
the conveyor accessories specially its idlers.
2 Improper installation of conveyor belt.
Secondary cleaner can’t serve its purpose due to
improper installation of conveyor belt. The secondary
cleaner's blade should be below the installed conveyor
belt to scrape the carryback materials.
PICTURES/ILLUSTRATIONS
ITEM OBSERVATION AND FINDINGS ANALYSIS
RECOMMENDATIONS
1 Install belt cleaning system for carryback and material build-up solution at pulley and rollers.
2 Re-install Conveyor belt or Reposition of Secondary Cleaner.
`
1 2
Secondary Conveyor
3 of 11
RUNNING STOP
SCOPE OF INSPECTION :
BELT CLEANER BELT TRACKER TAIL PROTECTION SKIRTING IMPACT BED
CONVEYOR BELT PULLEY ROLLER OTHERS: ______________
CUSTOMER LAFARGE REPUBLIC, INC. ILIGAN PLANT INSPECTION DATE February 20, 2014
OPERATION SITE FINISH MILL 1 TYPE OF INSPECTION
INSPECTION REPORT
PICTURES/ILLUSTRATIONS
ITEM OBSERVATION AND FINDINGS ANALYSIS
BELT SPECS 750MM CONVEYOR ID COMMON CONVEYOR
MATERIAL CLINKER, GYPSUM & ADDITIVES DATE INSTALLED N/A
RECOMMENDATIONS
1Install Belt Tracker to provide immediate, powerful and continuous steering to correct belt's path, preventing
spillage, equipment damage and repairs.
2 Rubber lagging of Tail, Snub, Bend and Take-up pulleys.
1Worn-out rubber lagging of Tail Pulley and misalignment
of belt.
4 Worn-out rubber lagging of Take-up Pulley.
2 Worn-out rubber lagging of Snub pulley.
3 Worn-out rubber lagging of both Bend pulleys.
Worn-out rubber lagging will result premature damage
to the face of pulley, misalignment (as seen in Fig.1) and
slippage between the pulley and belt.
`
1
4
2
3
4 of 11
RUNNING STOP
SCOPE OF INSPECTION :
BELT CLEANER BELT TRACKER TAIL PROTECTION SKIRTING IMPACT BED
CONVEYOR BELT PULLEY ROLLER OTHERS: ______________
INSPECTION REPORT
BELT SPECS 750MM CONVEYOR ID COMMON CONVEYOR
MATERIAL CLINKER, GYMSUM & ADDITIVES DATE INSTALLED N/A
CUSTOMER LAFARGE REPUBLIC, INC. ILIGAN PLANT INSPECTION DATE February 20, 2014
OPERATION SITE CRUSHER TYPE OF INSPECTION
1 Conventional skirting system.
Existing skirting system cannot control the escape of
fugitive material that lead to spillages on the side and
beneath the conveyor in the loading point area.
2 Belt mistracking observed along the Conveyor System.
PICTURES/ILLUSTRATIONS
ITEM OBSERVATION AND FINDINGS ANALYSIS
RECOMMENDATIONS
1 Modification of skirting system and install rubber lining to achieve good sealing.
2Install Belt Tracker to provide immediate, powerful and continuous steering to correct belt's path, preventing
spillage, equipment damage and repairs.
3 Multiple belt edge damaged along the conveyor belt.
4 Excessive carry back materials beneath the conveyor.
Ineffective belt cleaning system installed. Belt cleaners
primary function is to remove the material that stick on
the belt surface after unloading zone (as seen in Fig.4),
thus preventing the material loses and also to protect
the conveyor accessories specially its idlers.
Misalignment entails other conveyor system problem if
not treated immediately. Those are like belt edge
damage, damaging conveyor strucure, excessive material
spillages and worst is unnecessary stop in operation.
3 Replacement of Conveyor Belt.
4 Install multiple belt cleaning system for carryback and material build-up solution at pulley and rollers.
1 2
3 4
5 of 11
RUNNING STOP
SCOPE OF INSPECTION :
BELT CLEANER BELT TRACKER TAIL PROTECTION SKIRTING IMPACT BED
CONVEYOR BELT PULLEY ROLLER OTHERS: ______________
CUSTOMER LAFARGE REPUBLIC, INC. ILIGAN PLANT INSPECTION DATE February 20, 2014
OPERATION SITE CRUSHER TYPE OF INSPECTION
INSPECTION REPORT
PICTURES/ILLUSTRATIONS
ITEM OBSERVATION AND FINDINGS ANALYSIS
BELT SPECS 1300MM CONVEYOR ID B04
MATERIAL LIMESTONE DATE INSTALLED N/A
3Without rubber lagging and excessive material build-up
at the face of both Bend Pulley.
1 Worn-out rubber lagging at the Head Pulley.
RECOMMENDATIONS
1Rubber lagging of Head, Bend and Take-up pulleys and remove fabricated scraper at the bend pulley to prevent
damage to the pulley.
2 Worn-out rubber lagging at the Take-up Pulley.
2 Install multiple belt cleaning system for carryback and material build-up solution at pulley and rollers.
Worn-out rubber lagging will result premature damage
to the face of pulley, misalignment and slippage
between the pulley and belt.Ineffective belt cleaning system installed. Belt cleaners
primary function is to remove the material that stick on
the belt surface after unloading zone, thus preventing
the material loses and also to protect the conveyor
accessories specially its idlers. (as seen in Fig.3)
`
1 2
3
6 of 11
RUNNING STOP
SCOPE OF INSPECTION :
BELT CLEANER BELT TRACKER TAIL PROTECTION SKIRTING IMPACT BED
CONVEYOR BELT PULLEY ROLLER OTHERS: ______________
INSPECTION REPORT
BELT SPECS 1300MM CONVEYOR ID B04
MATERIAL LIMESTONE DATE INSTALLED N/A
CUSTOMER LAFARGE REPUBLIC, INC. ILIGAN PLANT INSPECTION DATE February 20, 2014
OPERATION SITE CRUSHER TYPE OF INSPECTION
1
2
PICTURES/ILLUSTRATIONS
ITEM OBSERVATION AND FINDINGS ANALYSIS
Conventional skirting system and belt misalignment in
the tail area.
Existing skirting system cannot control the escape of
fugitive material that lead to spillages on the side and
beneath the conveyor in the loading point area.
RECOMMENDATIONS
1 Modification of skirting system and install rubber lining to achieve good sealing.
3 Multiple belt edge damaged along the conveyor belt.
Misalignment entails other conveyor system problem if
not treated immediately. Those are like belt edge
damage (as seen in Fig.3), damaging conveyor strucure,
excessive material spillages and worst is unnecessary
stop in operation.
2Install Belt Tracker to provide immediate, powerful and continuous steering to correct belt's path, preventing
spillage, equipment damage and repairs.
1
3
2
7 of 11
RUNNING STOP
SCOPE OF INSPECTION :
BELT CLEANER BELT TRACKER TAIL PROTECTION SKIRTING IMPACT BED
CONVEYOR BELT PULLEY ROLLER OTHERS: ______________
2Worn-out rubber lagging at Snub Pulley with fabricated
scraper.
INSPECTION REPORT
BELT SPECS 1000MM CONVEYOR ID BC07
PICTURES/ILLUSTRATIONS
ITEM OBSERVATION AND FINDINGS ANALYSIS
RECOMMENDATIONS
CUSTOMER LAFARGE REPUBLIC, INC. ILIGAN PLANT INSPECTION DATE February 20, 2014
OPERATION SITE CRUSHER TYPE OF INSPECTION
1Rubber lagging of Bend, Snub and Tail pulleys and remove fabricated scraper at the snub pulley to prevent damage
to the pulley.
3Worn-out rubber lagging and excessive material build-up
at Tail Pulley.
1 Worn-out rubber lagging at both Bend Pulley.
4 Conventional skirting system.
Existing skirting system cannot control the escape of
fugitive material that lead to spillages on the side and
beneath the conveyor in the loading point area.
Worn-out rubber lagging will result premature damage
to the face of pulley, misalignment and slippage
between the pulley and belt.
2 Modification of skirting system and install rubber lining to achieve good sealing.
1
4
2
3
8 of 11
RUNNING STOP
SCOPE OF INSPECTION :
BELT CLEANER BELT TRACKER TAIL PROTECTION SKIRTING IMPACT BED
CONVEYOR BELT PULLEY ROLLER OTHERS: ______________
Misalignment entails other conveyor system problem if
not treated immediately. Those are like belt edge
damage (as seen in Fig.2), damaging conveyor strucure
(as seen in Fig.1), excessive material spillages and worst
is unnecessary stop in operation.
CUSTOMER LAFARGE REPUBLIC, INC. ILIGAN PLANT INSPECTION DATE February 20, 2014
1 Conveyor belt hit the stucture.
2 Belt-edge Damage.
OPERATION SITE CRUSHER TYPE OF INSPECTION
INSPECTION REPORT
PICTURES/ILLUSTRATIONS
ITEM OBSERVATION AND FINDINGS ANALYSIS
BELT SPECS 1000MM CONVEYOR ID BC07
RECOMMENDATIONS
1Install Belt Tracker to provide immediate, powerful and continuous steering to correct belt's path, preventing
spillage, equipment damage and repairs.
3 Tied-off carrying roller. (Self aligning frame & roller)Unequal distance and not aligned or damaged frame of
carrying rollers can cause belt mistracking.
4Excessive carryback materials build-up at the face of the
return rollers.
Ineffective belt cleaning system installed. Belt cleaners
primary function is to remove the material that stick on
the belt surface after unloading zone, thus preventing
the material loses and also to protect the conveyor
accessories specially its idlers. (as seen in Fig.4)
2 Supply and replacement of carrying rollers.
3 Install multiple belt cleaning system for carryback and material build-up solution at pulley and rollers.
`
1
4
2
3
9 of 11
RUNNING STOP
SCOPE OF INSPECTION :
BELT CLEANER BELT TRACKER TAIL PROTECTION SKIRTING IMPACT BED
CONVEYOR BELT PULLEY ROLLER OTHERS: ______________
BELT SPECS 1000MM CONVEYOR ID BC10A
CUSTOMER LAFARGE REPUBLIC, INC. ILIGAN PLANT INSPECTION DATE February 20, 2014
OPERATION SITE CRUSHER TYPE OF INSPECTION
INSPECTION REPORT
1,2Worn-out rubber lagging and excessive material build-up
at the Snub and Take-up Pulley.
Worn-out rubber lagging will result premature damage
to the face of pulley, misalignment and slippage
between the pulley and belt.
PICTURES/ILLUSTRATIONS
ITEM OBSERVATION AND FINDINGS ANALYSIS
RECOMMENDATIONS
Rubber lagging of Snub and Take-up pulley.
2 Install multiple belt cleaning system for carryback and material build-up solution at pulley and rollers.
4 Vertical rollers installed at the carrying side.It will prevent belt edge damage but can't correct the
mistracking or misaligning of the conveyor belt.
3Install Belt Tracker to provide immediate, powerful and continuous steering to correct belt's path, preventing
spillage, equipment damage and repairs.
3Excessive carryback materials build-up at the face of the
return rollers.
Ineffective belt cleaning system installed. Belt cleaners
primary function is to remove the material that stick on
the belt surface after unloading zone, thus preventing
the material loses and also to protect the conveyor
accessories specially its idlers. (as seen in Fig.3)
1
`
1
4
2
3
10 of 11
RUNNING STOP
SCOPE OF INSPECTION :
BELT CLEANER BELT TRACKER TAIL PROTECTION SKIRTING IMPACT BED
CONVEYOR BELT PULLEY ROLLER OTHERS: ______________
CUSTOMER LAFARGE REPUBLIC, INC. ILIGAN PLANT INSPECTION DATE February 20, 2014
Rubber lagging of snub pulley.4
RECOMMENDATIONS
1 Modification of skirting system and install rubber lining to achieve good sealing.
3Carryback materials build-up at the face of the return
rollers.
Ineffective belt cleaning system installed. Belt cleaners
primary function is to remove the material that stick on
the belt surface after unloading zone, thus preventing
the material loses and also to protect the conveyor
4 Worn-out rubber lagging at snub pulley.
Worn-out rubber lagging will result premature damage
to the face of pulley, misalignment and slippage
between the pulley and belt.
1
Conventional skirting system.
Existing skirting system cannot control the escape of
fugitive material that lead to spillages on the side and
beneath the conveyor in the loading point area.
2
Belt mistracking observed along the Conveyor System.
Misalignment entails other conveyor system problem if
not treated immediately. Those are like belt edge
damage, damaging conveyor strucure, excessive material
spillages and worst is unnecessary stop in operation.
OPERATION SITE CRUSHER TYPE OF INSPECTION
INSPECTION REPORT
PICTURES/ILLUSTRATIONS
2Install Belt Tracker to provide immediate, powerful and continuous steering to correct belt's path, preventing
spillage, equipment damage and repairs.
3 Install multiple belt cleaning system for carryback and material build-up solution at pulley and rollers.
ITEM OBSERVATION AND FINDINGS ANALYSIS
BELT SPECS 1000MM CONVEYOR ID BC10B
1
4
2
3
11 of 11
Summary:
For Clinker WF
1. Replacement of Conveyor Belt (Heat Resistance)
2. Installation of (1) Martin Compact Cleaner for 1000mm BW.
For Gypsum WF
1. Installation of (1) Martin Compact Cleaner for 650mm BW.
For Additives WF
1. Installation of (1) Martin Compact Cleaner for 800mm BW.
For Common Conveyor
2. Rubber Lagging of (1) Tail Pulley 400mm dia. X 850mm length.
3. Rubber Lagging of (1) Snub Pulley.
4. Rubber Lagging of (2) Bend Pulley 280mm dia. X 850mm length.
5. Rubber Lagging of Take-Up Pulley 400mm dia. X 850mm length.
6. Installation of (1) Martin HD QC#1 Primary Belt Cleaner for 750mm BW.
7. Installation of (1) Martin SC16 Secondary Belt Cleaner for 750mm BW.
8. Installation of (1) Martin® Torsion V-Plow for 750mm BW.
9. Install (1) Remaskirt with clamp.
11. Replacement of Belt Conveyor.
1. Installation of (3) Martin® Belt Tracker upper and (3) lower unit for 750mm BW.
10. Installation of (1) Martin® Trac-mount MD Impact Cradles for 750mm BW.
For BC04
1. Rubber Lagging of (1) Head Pulley 800mm dia. X 1450mm length.
2. Rubber Lagging of (1) Take-Up Pulley 600mm dia. X 1450mm length.
3. Rubber Lagging of (2) Bend Pulley 400mm dia. X 1450mm length.
4. Installation of (1) Martin XHD QC#1 Primary Belt Cleaner for 1300mm BW.
5. Installation of (1) Martin SC16 Secondary Belt Cleaner for 1300mm BW.
6. Installation of (1) Martin® Torsion V-Plow for 1300mm BW.
7. Install (1) Remaskirt with clamp.
For BC07
1. Rubber Lagging of (2) Bend Pulley 400mm dia. X 1200mm length.
2. Rubber Lagging of (1) Tail Pulley 400mm dia. X 1200mm length.
3. Rubber Lagging of (1) Snub Pulley 300mm dia. X 1200mm length.
4. Install (1) Remaskirt with clamp.
7. Installation of (1) Martin HD QC#1 Primary Belt Cleaner for 1000mm BW.
8. Installation of (1) Martin SC16 Secondary Belt Cleaner for 1000mm BW.
9. Installation of (1) Martin® Torsion V-Plow for 1000mm BW.
10. Checking and replacement of carrying rollers.
8. Installation of (1) Martin® Trac-mount HD Impact Cradles for 1300mm BW.
9. Installation of (2) Martin® Belt Tracker upper and (3) lower unit for 1300mm BW.
5. Installation of (1) Martin® Trac-mount MD Impact Cradles for 1000mm BW.
6. Installation of (2) Martin® Belt Tracker upper and (3) lower unit for 1000mm BW.
For BC10A
1. Rubber Lagging of (1) Snub pulley.
2. Rubber Lagging of (1) Take-up Pulley.
3. Installation of (1) Martin XHD QC#1 Primary Belt Cleaner for 1000mm BW.
4. Installation of (1) Martin SC16 Secondary Belt Cleaner for 1000mm BW.
5. Installation of (1) Martin® Torsion V-Plow for 1000mm BW.
For BC10B
1. Install (1) Remaskirt with clamp.
4. Installation of (1) Martin XHD QC#1 Primary Belt Cleaner for 1000mm BW.
5. Installation of (1) Martin SC16 Secondary Belt Cleaner for 1000mm BW.
6. Installation of (1) Martin® Torsion V-Plow for 1000mm BW.
7. Rubber Lagging of Snub Pulley
6. Installation of (2) Martin® Belt Tracker upper and (3) lower unit for 1000mm BW.
2. Installation of (1) Martin® Trac-mount MD Impact Cradles for 1000mm BW.
3. Installation of (3) Martin® Belt Tracker upper and (3) lower unit for 1000mm BW.
PROPOSAL
Item No. Particular Qty U/M Part No. Price (Php) Total amount (Php)
1 Conveyor Belt Bridgestone NF315/2 1000 x 3.0 x 2.0 x 10m SF-180 (Endless) for Clinker WF 10 Mts n/a - -
2 Martin® Compact Cleaner (Green) for 1000mm BW 1 Assy. 33464-3600GR - -
3 Martin® Compact Cleaner (Orange) for 800mm BW 1 Assy. 33464-3000 - -
4 Martin® Compact Cleaner (Orange) for 650mm BW 1 Assy. 33464-3400 - -
5 QC® #1 Extra Heavy Duty Cleaner 52" BW with Martin® Extra Heavy Duty Spring Tensioner 1 Assy. 35899-540048T - -
6 QC® #1 Extra Heavy Duty Cleaner 40" BW with Martin® Extra Heavy Duty Spring Tensioner 2 Assy. 35899-420036T - -
7 QC® #1 Heavy Duty Cleaner 40" BW with Martin® with MARTIN® TWIST™ Tensioner 1 Assy. 36898-420036T - -
8 QC® #1 Heavy Duty Cleaner 30" BW with Martin® with MARTIN® TWIST™ Tensioner 1 Assy. 36898-300024T - -
9 MARTIN® SC#16™ with T Bracket for 1300mm BW 1 Assy. SC#16/HAR/1350 - -
10 MARTIN® SC#16™ for 1000mm BW 3 Assy. SC#16/HAR/1050 - -
11 MARTIN® SC#16™ for 750mm BW 1 Assy. SC#16/HAR/750 - -
12 Martin® Torsion V-Plow for 1300mm BW 1 Assy. 28488-48R - -
13 Martin® Torsion V-Plow for 1000mm BW 3 Assy. 28488-42R - -
14 Martin® Torsion V-Plow for 750mm BW 1 Assy. 28488-30R - -
15 Martin® Tracker™ - Performance Duty Upper Unit for 1300mm belt width 2 Assy. TKR-48US - -
16 Martin® Tracker™ - Performance Duty Lower Unit for 1300mm belt width 3 Assy. TKR-48LS - -
17 Martin® Tracker™ - Performance Duty Upper Unit for 1000mm belt width 7 Assy. TKR-42US - -
18 Martin® Tracker™ - Performance Duty Lower Unit for 1000mm belt width 9 Assy. TKR-42LS - -
19 Martin® Tracker™ - Performance Duty Upper Unit for 750mm belt width 3 Assy. TKR-30US - -
20 Martin® Tracker™ - Performance Duty Lower Unit for 750mm belt width 3 Assy. TKR-30LS - -
21 Martin® Trac-mount HD Impact Cradle for 1300mm BW 1 Assy. 37357-4845S - -
22 Martin® Trac-mount MD Impact Cradle for 1000mm BW 2 Assy. 30688-4245S - -
23 Martin® Trac-mount MD Impact Cradle for 750mm BW 1 Assy. 30688-3045S - -
24 Remaskirt with clamp 4 Lots n/a - -
25 Rubber lagging of Tail Pulley 400mm dia. X 850mm length 1 Lot n/a - -
26 Rubber lagging of Bend Pulley 280mm dia. X 850mm length 2 Lots n/a - -
27 Rubber lagging of Bend Pulley 400mm dia. X 850mm length 1 Lot n/a - -
28 Rubber lagging of Head Pulley 800mm dia. X 1450mm length 1 Lot n/a - -
29 Rubber lagging of Take-up Pulley 600mm dia. X 1450mm length 1 Lot n/a - -
30 Rubber lagging of Bend Pulley 400mm dia. X 1450mm length 2 Lots n/a - -
31 Rubber lagging of Bend Pulley 400mm dia. X 1200mm length 2 Lots n/a - -
32 Rubber lagging of Snub Pulley 300mm dia. X 1200mm length 1 Lot n/a - -
33 Rubber lagging of Tail Pulley 400mm dia. X 1200mm length 1 Lot n/a - -
34 Rubber lagging of Snub Pulley for Common Conv., BC10A and BC10B 3 Lots n/a - -
35 Rubber lagging of Take-up Pulley for BC10A 1 Lot n/a - -
36 Conveyor Belt for Common Conveyor (750mm) 1 Lot n/a - -
37 Carrying Roller Improvement (Mech'l works) 1 Lot n/a - -
1.1. Replacement and Installation of New Carrying Rollers.
1.2. Checking and squaring of roller frames.
Grand Total -
Note:
Item No. 21, 24, 34, 35, 36 and 37 for further inspection and evaluation.