lter-europe – interim check before the big endspurt
DESCRIPTION
LTER-Europe – interim check before the big endspurt. ILTER. LTER-Europe Regional Group at ILTER, SK 5th LTER-Europe NNRC, 18th Aug 2008 Michael Mirtl (UBA). PART A. MONDAY 18th, 10:30-17:30. Who are WE? Bodies of LTER-Europe. National Networks Representatives Conference (NNRC). - PowerPoint PPT PresentationTRANSCRIPT
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
ILTER
LTER-Europe Regional Group at ILTER, SK5th LTER-Europe NNRC, 18th Aug 2008
Michael Mirtl (UBA)
LTER-Europe – interim check before the big endspurt...
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
Who are WE? Bodies of LTER-Europe
Scientific Site Co-ordinatorConference (SSCC)
National Networks Representatives Conference
(NNRC)
Co-ordinating Committee
(CC)
EC
Structure? Governance?
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
No ALTER WP I3 task groups LTER-Europe: structural objectives/ main fields of activity
9 Conceptual work towards LTER Europe Concepts
10 Communication and internal LTER networking Communication
11 Networking, community building and training
12 Case studies and proof of concept LTER projects, case studies and proof of concept
13 Information management, data architectures and IT tools
14 Strategic interfaces and fundraising
15 Formalization, institution building and management
LTER-Europe: Main fields of activity
This meeting: selection of issues relevant for National Networks:
Information Decisions Planning Division of tasks Resulting ToDo-list
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
Taking up the thread...
All documents and products of Sevilla/Donana and the processes since then:http://www.lter-spain.net/lter-europe/products.htm
4 sections switch to WEB browser
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
By the end of the MONDAY (4th NNRC, Sevilla) We survived Bylaws adopted Status of national networks assessed (implementation, activity)
Mind map of national networks checked First level criteria for LTER-Europe members adopted Editorial groups for Letters of Support & Commitment Overview of strategic environm. of LTER-Europe achieved Priority workflows for LTER-Europe adopted (incl. proj.proposals) Agreed structure of the WEB site and national informations Standard observations/parameter: agreed list for further specification by SSCC and
following national review Expert group: LTER-Europe research agenda List of responsibles for the interface with other networks Adopted working plan 2008 (as nat. netwerks concerned) 40 filled individual brainstormings (conference questionnairs)
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
Background documents (printouts in LTER-Europe regional group
folder)
Agenda Minutes of the 4th LTER-Europe NNRC (Sevilla) Protocol of the 2nd LTER-Europe SSCC
(Donana) 5th NNRC conference questionnaire LTER-Europe 2007/2008: Extract of ALTER-Net
annual report Bylaws, version 9: results of final checks
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
Some highlights
Participation statistics of this meeting: 14/16/18/43 Ecoinformatics confernece (EEA, US-EPA) & Interface
with SEIS LifeWatch start-up LTEM and LTER
EEA IM
ALTER-NAC, EC review LTER process, LTSER
Planning meeting in Rome Interface with UNECE/BR (Sept. 08) DivEurope Spain, Portugal (quality!) Bulgaria
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
LTER-Europe: January 2008
2008Discussion started
First concepts
Network implementation
Formal ILTER member
ALTER-I3/ M. Mirtl
Lobbying initiated
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
LTER-Europe: August 2008
2008Discussion started
First concepts
Network implementation
Formal ILTER member
ALTER-I3/ M. Mirtl
Lobbying initiated
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
How far have we gone from the starting point?
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
1a: National meetings outcome
SEE QUESTIONNAIRE and..... Who has designated SSC for his sites? Who is able to send his SSC to one annual meeting? feedback European coverage feedback standard observations Announcement: best examples report Announcement: best practice report Announcement: next meeting (date)
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
1: Will & Reality
Will your national netw ork have a meeting
before mid June 2008 to give qualif ied feedback to the questions raised in Sevilla/Donana?
12; 75%
3; 19%
1; 6%
yes
can try
no
Did your national netw ork have a meeting
before mid June 2008?
4; 25%
0; 0%
12; 75%
yes
can try
no
Answers from Sevilla NNRC questionnaire (2008-01)
Available information to LTER-Europe EC (2008-08)Qualified feed-back to questions: zero
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
1: Another interesting result with regard to the LTER-Europe management plan...
Could you pay membership due
0; 0%
13; 76%
2; 12%
2; 12%
yes
have to check
no
no answ er
Answers from Sevilla NNRC questionnaire (2008-01)
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
2: Completion of the LTER Infobase
Delivered national updates (4!) Constraints in efforts to centrally fill the ILTER
site database with European data Further discussion & decisions under
item 7 (European ecological ontology; Peterseil) item 15 (ToDo-lists for NN)
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
3: LTER-Europe 6th NNRC & 3rd SSCC, Dec. 2008
December 1-5, 2008 (Monday-Friday) Palma de Mallorca RIU Palace Bonanza Playa Target groups
National reps & deputies Site coordinators Platform managers Co-ordinators of scientific project proposals (LTSER, IDR) Key people involved in the LTSER concept development ALTER-Net expert groups fitting into the LTER-Europe
expert panels
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
3: LTER-Europe Dec.2008: Venue „RIU Palace Bonanza Playa“, Palma de Mallorca
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
3: Basic structure
Res.AgendaCommunication
Harmonisation LTSER
Technology Info Managem.
Site-Manag
Structure of SSC Conferences
Ple
nary
Ple
nary
Ple
nary
Ple
nary
? S
cie
nti
fic
LTER
Con
f.
NN
RC
CC
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
3: Program overview
Program: Open space: Scientific projects meet site/platform
responsibles (1 day) LTSER focus (1 day) Scientific strategy (0,5 day) NNRC (1 day) Excursion (0,5 day) LTER core group (1 day)
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
3: Development of LTER/LTSER projects
Format: open space Invitations/announcements
EURECO (folder in the conference map) EC web site National ecological societies (request for spreading
the information) LTER National Networks!!
Other aspects/ideas: Possible continuation of ALARM projects with LTER in
place of FSN xxx xxx
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
3: LTSER-focus
LTSER expert panel needs to fill that with live Furman, Singh, Fischer, Krauze, Mirtl
Contributions from LTSER management & training workshop (October, Zdenka)
Links with IDR goal of ALTER-Net Workshop in October (18-22) in Edinburgh
Contents Conceptual state of the art Proof of concpets (LTSER Projects) Lessons learned from LTSER platform implementations Required frame (funding, organisation of the science area)
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
3: NNRC (National Net Reps Conference)
Key notes EC: further expectations from LTER LifeWatch: LTER as a component of the European
observatories infrastructure EEA/UNECE: coupling with environmental monitoring Ramsar – possible cooperation and networking experience
Status of NNs and reports
Strategic partnerships Established and required partnerships Priorisation of interfaces
Funding mechanisms LTER-Europe secreatariat Membership dues?
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
3: LTER core group
Work package I3 meeting Wrapping up Division of tasks Editorial work on LTER-Europe management plan
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
3: Preparation
MM: preparatory trip/ negotiations with hotelsLocal travel agency? Donana teamWho else?
DISCUSSION AND FURTHER BRAINSTORMING IN THE END TO BE ABLE TO INCLUDE IDEAS FROM
THE MEETING
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
4, 5, 6, 7
4: "LTER-Europe best examples book" and "LTER-Europe best practice guidelines" (s. emails sent by K. Krauze)
5: Experiences with the Multi-site trampling experiment (MSE) and the 2008 vegetation re-survey work (Klotz; Parr/Groner)
6: Status of the Meta-analysis to test the hypothesis about changes in community composition (Groner/Krauze)
7: European ecological ontology (SERONTO) and how to contribute to the global ontology process (Peterseil), including LTER Infobase and reporting discipline
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
8: Update on level of activity of NNs
Intended to be a brief evaluation of the filled questionnaires
Main messages now in Flip charts filled in the beginning
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
9-12
9: Key note presentation by RO “Starting to organize the national LTERs in complyance with the structures of LTER-Europe” (Vadineanu)
10: WEB site presentation (Krauze/ Mirtl) 11: Logo discussion & decision (Krauze) 12: LTER-projects: proposals, initiatives,
ideas...: Life+/DivEurope (Petriccione)
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
13: Lifewatch is...
is a formal network of networks network of observatories (“sites”) from different realms (marine,
terrestric, aquatic) will promote a network of data producers and collections
has a focus on data management and provision will provide access to distributed data sources, also building on GBIF will provide analytical and modeling tools PLUS computational capacity
develop infrastructure for improved biodiversity and ecosystem research
will – as also for the other planned large European infrastructures - mainly be based on joint national funding in accordance with LifeWatch concepts
depends on the lobbying for national LifeWatch networks and their consideration in the respective national ESFRI road maps
will estimate the realistic costs and work on a legal framework enabling all the above
9 work packages, complex structure, comprising national networks and topical networks (ALTER, MARBEF) represented in the policy and science board
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
13: Lifewatch needs use cases...
What do potential clients of LifeWatch expect of LifeWach products and services in the mid- and long term? (e.g.: what data search, access and analytical support should LifeWatch have enabled? For what purposes?)
What infrastructural and technical framework shall LifeWatch have conceptualized (pilot phase) and implemented (after 2010)?
What interaction between the networked elements and their data/knowledge shall be enabled?
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
13: LifeWatch & LTER on the national level...
Significant overlap with the national mind maps of LTER (as recently updated at the LTER conference in Spain)
Most of these national LifeWatch consortia are currently established
Might be highly synergistic if the national LTER representatives contacted the LifeWatch responsibles in their countries
List of national LifeWatch contacts will be provided The implementation of LifeWatch will mainly be realised
through national fundings according to concepts developed on the European level
For that reason it is crucial to achieve a good recognition and consideration of LifeWatch in the national ESFRI roadmaps as ESFRI projects are competing amongst each other – a clear incentive to join forces with all other LifeWatch relevant actors in your countries.
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
14: UNESCO/BiosphereReserves – LTER:
Brainstorming on interface UNESCO/BiosphereReserves – LTER:
preparatory action for the complementary exercise in the ILTER part (strategic partnerships) (Mirtl)
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
15: ToDo List for National Networks (NN)
All national meetings 2008 before ILTER conf Fill the draft of the “questionnaire” or better standard LTER-Europe national
report BEFORE Mallorca2008 PLUS evaluate the standard report itself Feedback on European coverage of LTER (LTER-SER) Feedback on proposed standard observations Secure national contributions to “Best examples report” Secure national contributions to “Best practice manual” WEB sites
Check and comment on draft LTER-Europe WEB site in the one-week testing time (will be duely announced)
National WEB sites to which the LTER-Europe WEB site can link (smooth hand-over point, considering whats already on the LTER-Europe WEB site)
Provide appropriate references News, events and projects that should be put on the WEB site
Designated SSC for all sites Next LTER-conference (1-5 December) Beyond March 2009:
Who is able to send his SSC to one annual meeting? Who can host the LTER-Europe conference 2009 (8th NNRC)
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
15: Proposed issues that should not be touched by next NN meetings
LTER-Europe criteria LTER-Europe bylaws
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
16: Beyond 2009-03
16.1 LTER-Europen conference 2009: when? (later in the year, as we will meet 2009-03 at
the final ALTER conference), where?
16.2 LTER-Europe management plan draft to be finished asap an circulated for comments well elaborated draft to be worked on in Mallorca
2008-12
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
17: Other business: Necessary clarifications
OPEN (t. b. put in next questionnaire): Role of NNRs in the communication Should information in any case go through the NNRs to
avoid gaps and delays in the updating of mailing lists on the European level
Should this happen in parallel? How to deal with feed-backs from the community (through
NNRs, directly to LTER-Europe, in parallel)? DECIDED: How to organize national reporting/ feed-
backs? Questionnaire with standard questions on issues relevant
for LTER-Europe and onging processes (PLUS: changes in time traceable)
Indiv. reports Aditional: Oral reporting
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
17: Other issues: Critical points I
LTER-Europe process needs more engaged AND ACTIVELY CONTRIBUTING people (bigger core group rather than a few key persons)
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
17: Critical questions I
WHY DO WE EXIST AS INTERNATIONAL NETWORKS? What is the main purpose of LTER-Europe and ILTER
from your very national perspective? Central services are not used (see also: ALTER WEB
site) There are hardly any multi-site projects (difficult to
establish, even if pushed and financed...): Why? Do we need an umbrella to do/continue our small
projects at small sites with a few people? (but may be with a broader horizon and a bit differently, which makes the big difference)
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
Postponed for an ad hoc meeting later in the week
1-hour session on best examples book, focussing on the European dimension and brainstorming [item 4]
Agree on timeplan containing the national activities as decided by the 5th NNRC (10 min in above session) [item 15]
Voting for LTER-Europe logo (ticks on printouts on the wall: 1 per country) [item 11]
Quick vote on the final changes of the bylaws [item 1] LTER-Europe IT and information management issues
[item 7]
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
ILTER
LTER-Europe Regional Group at ILTER, SK5th LTER-Europe NNRC, 18th Aug 2008
Michael Mirtl (UBA)
LTER-Europe – interim check before the big endspurt...
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
Items which need to be finished
4: "LTER-Europe best examples book" and "LTER-Europe best practice guidelines" (s. emails sent by K. Krauze)
7: European ecological ontology (SERONTO) and how to contribute to the global ontology process (Peterseil), including LTER Infobase and reporting discipline
11: Logo results of voting 12: LTER-projects: announcement of meeting:
Life+/DivEurope group: 21:15 in lobby 14: Brainstorming on interface
UNESCO/BiosphereReserves – LTER: 15: ToDo List for National Networks (NN) and timeplan 17: Other business:
communication paths substantial contributions to the intense working phase until
March 2009
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
17/1: Other business: Necessary clarifications
OPEN (t. b. put in next questionnaire): Role of NNRs in the communication Should information in any case go through the NNRs
to avoid gaps and delays in the updating of mailing lists on the European level
Should this happen in parallel? How to deal with feed-backs from the community
(through NNRs, directly to LTER-Europe, in parallel)?
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
17/2: Other business: Involvement in LTER core team until March 2009
Preparation of LTER-conference in Mallorca Open space event: „Science meets sites“ LTSER-day
Best examples book Best practice manual LTER-Europe management plan Core team meetings
Federal Environment Agency
ILTER
M. Mirtl/ LTER-Europe
To end with the positive: Some highlights!
Participation statistics of this meeting: 14 formal members (1 passed vote in addition) 18 members by the end of the weeks (16 present) 9 countries from former west, 9 from former central/east 43 participants from Europe!!
Ecoinformatics confernece (EEA, US-EPA) & Interface with SEIS
LifeWatch start-up LTEM and LTER
EEA IM
ALTER-NAC, EC review LTER process, LTSER
Planning meeting in Rome Interface with UNECE/BR (Sept. 08) DivEurope Spain, Portugal (quality!) Bulgaria