    Light Weight Taut Wire Mk 15B Operation Manual

    2

    Documentrevisions

    Written by Checked by Approved byRev.Date Sign. Date Sign. Date Sign.

    A 21/9-04 SL 25/9-04 HT 30/9-04 SL

    B 14/5-08 SL 15/5-08 HT 26/5-08 SL

    C 29/10-08 SL 30/10-08 HT 31/10-08 SL

    D

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    3/25

    Light Weight Taut Wire Mk 14B Operation Manual

    3

    Table of contents

    1 INTRODUCTION..........................................................................................................5

    2 ABBREVIATIONS ........................................................................................................6

    3 TECHNICAL DATA .....................................................................................................7

    3.1 Operational Specifications ........................................................................................7

    3.2 System Accuracy.......................................................................................................7

    4 TECHNICAL DESCRIPTION..................................................................................... 9

    4.1 Principle of Operation .............................................................................................23

    4.2 Hydraulic System .................................................................................................... 12

    4.3 Winch System..........................................................................................................13

    4.4 Tension Compensating System ...............................................................................13

    4.5 Control System........................................................................................................13

    4.6 Heating System........................................................................................................14

    5 OPERATION................................................................................................................ 15

    5.1 Setting in Operation................................................................................................. 17

    5.2 Parking..................................................................................................................... 21

    5.3 Adjusting Wire ........................................................................................................23

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    4/25

    Light Weight Taut Wire Mk 15B Operation Manual

    4

    Document History

    Rev AInitial Issue

    Rev B Revised fig. 5.2 Optional Remote Control Panel and table 5.2 Remote

    Control Panel Button Functions both available from SN BAN-090.

    Rev C Revised chapter 5, Operation; due to change of operation terminal.

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    5/25

    Light Weight Taut Wire Mk 14B Operation Manual

    5

    1INTRODUCTIONThe Taut Wire is a position reference system intended for a

    deck-mounted, starboard or portside position, on most surface vessels.

    The purpose of the Taut Wire is to give accurate input data, related to

    vessel movement, to the vessel's data processing system to calculate

    vessel position corrections.

    The purpose of this manual is to provide the user a general

    understanding of the principles, and instructions for operation of the

    MK15 Taut Wire System.

    Note All technical description, information and specification given in thismanual are subject to change without further notice.

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    6/25

    Light Weight Taut Wire Mk 15B Operation Manual

    6

    2ABBREVIATIONS

    Abbreviation Explanation

    DC

    DP

    KM

    LTW

    PLC

    TB

    Direct Current

    Dynamic Positioning

    Kongsberg Maritime

    Light Weight Taut Wire

    Programmable Logic Controller

    Terminal Board

    TW Taut Wire

    UPS Uninterruptible Power Supply

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    7/25

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    8/25

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    9/25

    Light Weight Taut Wire Mk 14B Operation Manual

    9

    4TECHNICAL DESCRIPTION

    4.1 Principle of Operation

    The purpose of the Taut Wire is to give accurate input data, related to

    vessel movement, to the vessel data processing system to calculate

    vessel position corrections.

    The Taut Wire system is fundamentally electro-hydraulic-pneumatic

    and requires electrical and air supply from the vessel.

    The wire rope, although thin to reduce the "offsets" caused by

    underwater current disturbance, is strong enough to heave the weight

    with a safety factor of 400 percent. Control of the system is effected

    from either of two control panels; main control panel (local) or optional

    bridge control panel (remote).

    The wire rope is tightened against the depressor weight (on the seabed)

    with a constant tension by means of a pneumatically and servo electric

    "mooring" control system. Any movement of the vessel in either or

    both of the X (alongship) or Y (beam) co-ordinates, will cause a

    deviation of the tensioned wire rope from the vertical. This deviation

    activates potentiometers mounted in the gimbal (sensor) head and

    produce changes of analogue data directly proportional to the X-Y

    inclination of the gimbal head.

    The analogue wire length measurement is obtained from a measuring

    device driven by the moving wire.

    The DP system contains an accurate model of the dynamics of the

    vessel which simulates the vessel's response to various forces e.g. wind,

    wave and current disturbance.

    Deviations in the specified position of the vessel (detected by changes

    above analogue input parameters) will be processed by the software

    model to generate appropriate corrective commands to the vessel's

    propeller and rudder system.

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    10/25

    Light Weight Taut Wire Mk 15B Operation Manual

    10

    FeedForward

    GainOptimum

    Wave and CurrentDisturbance

    Wind

    WeightDepressor

    RudderPropeller/

    Command

    +

    +

    StateMeasured

    Taut Wire

    Figure 4.1 Principle of DP System Operation

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    11/25

    Light Weight Taut Wire Mk 14B Operation Manual

    11

    Figure 4.2 Taut Wire Main Parts

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    12/25

    Light Weight Taut Wire Mk 15B Operation Manual

    12

    4.2 Hydraulic System

    The Hydraulic System operates the boom between the parked and theoperating position.

    The system is powered by a small hydraulic power unit, and is

    automatically controlled and operated by the PLC system.

    The hydraulic system gear pump is driven by a 3-phase, 440 V, 60 Hz,

    1.5 kW AC motor IP class 56.

    Hydraulic oil tank has a capacity of 10 litres Mobile DTE 13 M or

    equivalent

    Figure 4.2 Cabinet Door Removed

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    13/25

    Light Weight Taut Wire Mk 14B Operation Manual

    13

    4.3 Winch System

    The winch lower and hoist the depressor weight to and from the seabed.

    The winch is powered by a electrical powered servomotor, and theservo system is equipped with a fail-safe magnetic brake located

    between the servomotor and the gear.

    The system is automatically controlled and is operated by the amplifier

    and the PLC.

    Electrical power are from the vessels own supply.

    A MDFRARS 132 Mx4 IP 66 Special Asynchron Servomotor, giving

    84Nm at 2030 rpm/18 kW powers the winch drum. Max. moment is

    168 Nm.

    The SEW gear system (gear ratio 1:12) is bringing the maximum torqueup to 1200 Nm.

    4.4 Tension Compensating System

    The system activates the electrical powered servomotor whenever the

    wire tension is deviating from the set-point in mooring mode.

    Compensating cylinders air pressure is manually set and automatically

    controlled by the pressure regulator. Actual pressure is indicated on the

    manometer. Wire tension is directly related to the cylinder air pressure

    i.e. increased pressure gives increased tension and visa versa.

    Pressurised air is from the vessels own supply.

    Wire tension is recorded by the load cells (2) located under the wire

    angle compensator and visualized on a gauge located on the local

    operating panel.

    4.5 Control System

    The hydraulic and winch drive systems are automatically controlled

    and operated by a Telemecanique TSX Micro PLC system.The local control panel, is situated on the taut wire cabinet R/H side

    and has the following equipment

    Main power switch

    PLC terminal

    Mooring indicator lamp

    Mooring tension indicator (optional)

    Joystick for manual hoisting and lowering

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    14/25

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    15/25

    Light Weight Taut Wire Mk 14B Operation Manual

    15

    5OPERATION

    Figure 5.1 Local Operator Panel

    Button Display Action

    Hoist Wirelength: 0 m

    TW Control Hoist Hoisting weight.

    Stop Wirelength: 0 m

    TW Control TW Stopped

    Activating brake.

    Lower Wirelength: 0 m

    TW Control Lower Lower weight.

    Boom In Wirelength: 0 m

    TW Control Boom In Boom to parked position.

    Boom Out Wirelength: 0 mTW Control Boom Out Boom to operating position.

    WireAdjust

    Codeword: 0

    New Wire : 0 m

    Adjusting wirelenght after cutting and newwire installation.

    LocalControl

    TW Control TW Ready LTW manually controlled from local panel

    BridgeControl

    Bridge Control TW ready LTW manually controlled from bridge

    ResetAlarm

    Resetting alarms

    Alarm

    Page

    Alarm history

    Table 5.1 Local Control Panel Button Functions

    Local

    Control

    BandakDate Time

    Wirelenght Out (m)

    0

    TW READY

    Hoist

    Stop

    Lower Boom In Boom

    Out

    Wire

    Ad ust

    Bridge

    Reset

    Alarm

    Alarm/Warnin

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    16/25

    Light Weight Taut Wire Mk 15B Operation Manual

    16

    Figure 5.2 Optional Remote Operator Panel

    Button Display Action

    F 1 Wirelength: 0 mTW Control Hoist

    Hoisting depressor weight.

    F 2 Wirelength: 0 m

    TW Control TW Ready

    Activating brake.

    Controlled braking

    F 3 Wirelength: 0 m

    TW Control Lower

    Lower weight.

    F 4 Bridge Control TW Ready Bridge Control Selected

    ENTER N/A N/A

    ESC N/A N/A

    Table 5.2 Remote Control Panel Button Functions

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    17/25

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    18/25

    Light Weight Taut Wire Mk 15B Operation Manual

    18

    Figure 5.3 Operational Mode

    The starting procedure is for safety reasons solely effected from the

    Taut Wire Control Panel, but the Taut Wire Control may be transferred

    to the Bridge Control Panel (option) where it remains throughout the

    positioning operation.

    Note Hydraulic power will only be available when BOOM OUT, or BOOMIN mode is activated, and 10 seconds after

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    19/25

    Light Weight Taut Wire Mk 14B Operation Manual

    19

    STEP PROCEDURE COMMENT

    1 Check air lubricating system Fill up with Mecman oil if necessary

    2 Drain and pressurise tensioncompensating system.

    3 bar is theoretically corresponding to 200 kptension (appox. 4.2 bar = 300 kp)

    NOTE!

    Do not exceed recommended pressure limits asthis may result in damaged gimbal head andloss of depressor weight.

    3 Check wire rope for proper alignmentwith regard to wire guide wheels etc.

    4 Set MAIN SWITCH to "ON" CONNECTING is displayed throughout the PLCself test program.

    WARNING!

    Do not operate buttons or joystick before TWREADY is displayed.

    5 Press HOIST Check that weight is stabilised in weight catcher.

    WARNING!

    Never activate Stop prior to operating the boom. Ifdoing so, the brake will be activated and the boomin/out movement will most likely cut the wire.

    NOTE!

    With reference to the warning above, its vital thattaut wire is still in HOIST mode during boom in/outoperation to allow wire to be paid off the drum.

    6 Check that WIRELENGTH 0 m is displayed before

    proceeding to next step. Please see table 5.3.3.

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    20/25

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    21/25

    Light Weight Taut Wire Mk 14B Operation Manual

    21

    5.2 Parking

    For both practical and safety reasons this procedure is effectedsolely from the local panel.

    Note This procedure should always be carried out at completion ofevery operation before attempting to move the vessel to a new

    operational area.

    WARNING Due to the boom over-centre position when parked, theDepressor Weight is part of the boom locking system and

    must not be removed unless the boom is mechanically

    secured.

    Figure 5.4 Parked Mode

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    22/25

    Light Weight Taut Wire Mk 15B Operation Manual

    22

    STEP PROCEDURE COMMENT

    1 Press Local Control TW CONTROL is displayed.

    2 Press "WINCH HOIST" Winch starts hoisting.

    Hoisting speed reduces to 0,3 m/s the last 3 metre.

    NOTE!

    "WINCH HOIST" can be overridden by the joystick.

    For safer hoisting and better weight control it isrecommended to stop weight a few meters belowthe water surface and manually hoist the weight up

    to the weight catcher. Note also that the lastmeters of hoisting have reduced speed.

    Check that weight is secured in catcher beforeproceeding to next step.

    If joystick is used to override the hoist function,stop mode is activated when joystick is released.(Zero position)

    WARNING!

    Before BOOM IN, ensure that taut wire is inHOIST mode.

    3 Press "BOOM IN" NOTE!

    The boom can be stopped in any position

    4 Operate the joystick and manuallylower the weight into the basket.

    WARNING!

    For safety reasons, use manual lowering only.

    5 Turn MAIN SWITCH to "OFF" position

    6 Close and secure panel door

    7 Drain water from air reservoir and airpressure regulators

    NOTE!

    In case of long operation stops, depressurise airsystem.

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    23/25

    Light Weight Taut Wire Mk 14B Operation Manual

    23

    5.3 Adjusting Wire

    NOTE!

    This procedures are used for resetting wirelength whenever new wire is

    installed/cut or if the wirelength displayed differ from the actual situation.

    5.3.1 Installing new wire

    STEP PROCEDURE COMMENT

    1 Turn MAIN SWITCH to "ON" Wait till "T W READY" is displayed.

    2 Using joystick unwind old wire Disconnect wire both from depressor weight andwiredrum.

    3 Spool on new wire using Joystick

    Keep a tension of 100-150 kp when spooling onwire to prevent the wire from penetrating the layerson the wiredrum.

    4 Connect wire to the depressor weight

    5 Pull in the slack and hoist the weightinto the weightcatcher and then lower itback to the cradle.

    It might be an usefull safety action to lower theweight into the sea till the last layer is visible on thewiredrum and then pull it up again.

    6 Press Wire Adjust Keep pressed till new menu is displayed.

    7 Insert code 7533 and enter

    8 Press New Wire Keep pressed till new menu is displayed

    9 Insert new wirelength 500 alternatively 700 meters

    10 Press Main Returning to main menu.

  • 8/10/2019 LTW MK15 Operation Manual_vol 2 Rev C

    24/25

    Light Weight Taut Wire Mk 15B Operation Manual

    24

    5.3.2 Cutting wire

    NoteThis procedure is calculating remaining wire on the drum after cutting.

    STEP PROCEDURE COMMENT

    1 Turn MAIN SWITCH to "ON" Wait till "T W READY" is displayed.

    2 Using joystick, unwind wire

    3 Cut off necessary length of wire and re-attach wire to weight

    4 Using joystick, pull in wire slack.

    5 Press Wire Adjust Keep pressed until new menu is displayed.

    6 Insert actual m cut and press enter

    7 Press Main Returning to main menu

    5.3.3 Wirelength 0-point reset

    STEP PROCEDURE COMMENT

    1 Press Wire Adjust Keep pressed till new menu appears

    2 Press Reset Wirelength