luis fernando andrade moreno - portal ani · luis fernando andrade moreno president - agencia...

44
AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura

Upload: others

Post on 14-Jun-2020

20 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Luis Fernando Andrade Moreno

President - Agencia Nacional de Infraestructura

Page 2: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

2

The National Infrastructure Agency (“ANI” or the “Agency”) clarifies that the purpose of the event “The Fourth Generation (4G) of Road Concessions in Colombia” is to introduce the conceptual framework developed by the National Government of Colombia for the structuring of new projects in road concessions. Therefore, the ideas and documents presented by the Agency at this event are for indicative purposes only and do not imply any warranties with regards to tender processes within this program. Please be advised that there is a legal framework in place for the regulation of PPPs (Law 1508), including a legal decree that regulates some of their specific aspects. However, some aspects of the PPP Law are still under review for subsequent regulation by decree. The information presented at this event is preliminary and subject to change and continued review by the Agency. In addition, this document, the ideas contained herein, and the other presentations at this event do not constitute a request or solicitation for tenders or a commitment by the Agency to accept proposals for a future tender process.

DISCLAIMER

Page 3: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

3

1. GOVERNMENT OBJECTIVES

2. FOURTH GENERATION OF ROAD CONCESSIONS PROGRAM

3. EARLY VICTORIES

Page 4: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

4

1. GOVERNMENT OBJECTIVES

2. FOURTH GENERATION OF ROAD CONCESSIONS PROGRAM 3. EARLY VICTORIES

Page 5: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

5

• Lag in competitiveness due to underinvestment in transportation infrastructure

• US$3.3 billion invested in transportation infrastructure in 2011 (1% of GDP)

• 50/50 between public works and PPP.

The Lag

• Objective : Achieve 3% of GDP in 2014 (US$10 billion) •US$3.3 billion for public works (1% of GDP) •US$6.7 billion for PPP (2% of GDP)

• First step in 2012: US$4.4 billion (33% increase)

The Strategy

Page 6: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

6 Source: The Global Commpetitiveness Report 2012-2013 © World Economic Forum

0 20 40 60 80 100 120 140

Spain

Chile

México

Ecuador

Uruguay

Argentina

Perú

Colombia

Venezuela

Brasil

13

23

50

53

81

106

100

126

128

123

Ranking in Quality of Roads

Page 7: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Source: ANI calculations based on DNP figures

0.0%

1.0%

2.0%

3.0%

4.0%

5.0%

6.0%

1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

Inversión Comunicaciones / PIB Inversión Energía / PIB

Inversión Transporte / PIB

Investment in Communications/GDP

Investment in Transportation/GDP

Investment in Energy/GDP

Page 8: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Note: USD MM

Figures are preliminary and subject to change and further review 8

8,000 7,000 6,000 5,000 4,000 3,000 2,000

Existing road concessions New road concessions Ports Railways Airports

Investment under future programs

Page 9: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Δ 2.4

Δ 4.6

1773*

3400*

*Figures are estimated and subject to change

743 743

101

844

273

1117

267

1384

389

1773

2517

Base 2011 2012 2013 2014 2018

Kms of Four-lane Highways to be Built

105 Km have been built as of June 2012

Page 10: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

10

1. GOVERNMENT OBJECTIVES

2. FOURTH GENERATION OF ROAD CONCESSIONS PROGRAM

3. EARLY VICTORIES

Page 11: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

VILLAVICENCIO

CALI

BUGA

PEREIRA

SOGAMOSO

PALO DE LETRAS CAUCASIA

MONTERIA

SINCELEJO

CARMEN DE BOLIVAR

VALLEDUPAR

BARRANQUILLA

CARTAGENA

SANTA MARTA

RIOHACHA

PARAGUACHON

SAN ROQUE

NECOCLÍ

PASTO

ZIPAQUIRA

Pamplona

Simití

Achí

San Marcos

SAN PELAYO

GIRARDOT

CUCUTA

RUMICHACA

NEIVA

VILLAVICENCIO

PUERTO GAITAN

POPAYAN

CALI

SOGAMOSO

B/MANGA

CHACHAGÛÍ

ESPINAL

ARMENIA

IBAGUE

PTO. SALGAR

Cáqueza

CALERA

Sopó

LA PAILA

BUENAVENTURA

STDER. QUILICHAO

PTO CARRENO

YOPAL

TAME

ARAUCA

Sisga

EL SECRETO

MOCOA

CARTAGO

Planeta Rica

La Yé

Toluviejo

Cruz del Viso Carreto

Ponedera La Paz

San Juan Buenavista

Cuestecitas

Barbosa

Aguaclara

MANIZALES VILLETA

MEDELLIN

BOGOTA

BARRANCAB. REMEDIOS

Pto. Arimena

El Tigre

Pto. Berrío Santa fé de Ant.

Bolombolo

La Manuela

Camilo C

Tunel de

Occidente

TUNJA

Aguachica

Granada

11

ESTIMATED KILOMETERS

UNDER CONSTRUCTION 8,170

ESTIMATED TOTAL

INVESTMENT (Billion USD) 24.4

Existing Concessions

New Concessions

Page 12: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Santana

Pto Salgar La Dorada

Honda

Mariquita

Neiva

Girardot

Mocoa

Ibagué

BOGOTA

Girardot - Neiva (166 km)

Neiva – Mocoa- Santana (400 km)

Ibagué – Puerto Salgar – Girardot ( 313 km)

SPECIFICATIONS

P

P

P

P

P

P

Kilometers: 879 Km Existing Toll Booths: 6 New Toll Booths: 7-9 TOTAL CAPEX (Billion USD): $1.29

CORRIDORS:

P Existing Toll Booth Early Victory

Pto Bogotá

* Estimated figures, subject to change

Page 13: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Ibagué

La Paila

Buga

Chachagüi

Stder Quilichao

B/ventura

Rumichaca

Pasto

Cali

Mulalo

Loboguerrero

Dagua

Buga – Buenaventura ( 118km)

Mulaló – Loboguerrero (90km)

Ibagué – La Paila (135km)

SPECIFICATIONS

Kilometers: 783 Km Existing Toll Booths: 8 New Toll Booths: 3 TOTAL CAPEX (Billion USD): $2.76

CORRIDORS:

Santander de Quilichao –Chachagüí/Pasto Rumichaca (440km)

P P

P

P

P

P

P

P

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 14: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

14

Pte Arimena

Guasca

La Calera

Choachí

Caqueza

Briceño

El Tablón

Chirajara

Aguaclara

Granada

Sisga

PTO CARREÑO

ARAUCA

Hato Corozal

Tame

YOPAL

Pore

Pto López

Pto Gaitán Villaviecio

Doble calzada Bogotá – Villavicencio ( 72km)

Villavicencio – Arauca (823km)

Corredor Perimetral del Oriente (154km)

CORRIDORS:

Malla Vial del Meta (340km)

SPECIFICATIONS

Kilometers: 1,389Km Existing Toll Booths: 14 New Toll Booths: 5 TOTAL CAPEX (Billion USD): $3.93

P P

P

P

P P P

P

P P

P

P

P

P

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 15: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

15

Cartagena

B/quilla

Malambo

Sta Marta

Ye de Ciénaga

Ponedera

Carreto Arjona

Cruz del Viso

Cereté

San Juan Nepomuceno

Ciénaga De Oro

El Viajando San Marcos

Sahagún

Sincelejo Yatí

Puerta De Hierro

Corozal

Cuestecitas

San Roque

La Paz

Valledupar

El Burro

Tamalameque

Distracción

La Florida

Paraguachón

Caucasia

San Juan Del Cesar

Barranquilla – Santa Marta (93km)

San Roque - Paraguachón (474 km)

Cartagena – Barranquilla - Malambo ( 152 km)

SPECIFICATIONS

Kilometers: 1,487 Km Existing Toll Booths: 11 New Toll Booths: 6 TOTAL CAPEX (Billion USD): $2.91

CORRIDORS:

Caucasia – Cruz del Viso (434 km)

Cereté - Ponedera (334 km)

P

P

P

P

P

P

P

P P

P

P P

Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 16: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Bogotá –Bucaramanga – Pamplona (543 km)

Duitama – Pamplona –Cúcuta (309 km)

Puerto Gaitán – Puerto Araujo (571 km)

SPECIFICATIONS

Kilometers: 2,266 Km Existing Toll Booths: 11 TOTAL CAPEX (Billion USD): $ 5.43

CORRIDORS:

Cúcuta –Aguaclara- Puerto Capulco (257 km)

Cúcuta – Puerto Santander (51km)

Tunja –Chiquinquirá – Puerto Boyacá (315 km)

Manizales – Honda –Villeta (220km)

Ocaña

Aguaclara

Villeta

Honda

MANIZALES

Pto Gaitán

Duitama

TUNJA

Pto Boyacá

Pto Araujo

B/MAGA

Pamplona

Pto Santander

CUCUTA

BOGOTA

P

P P

P

P P

P

P

P

P

P

P

P

Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 17: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

El Tigre

Sta. De Antioquia

MEDELLIN

Portal Occidental T. de Occidente

T. Dolores Porcesito

S.J Nus

Caucasia

Remedios

Pto. Berrio

Ancón Sur

Camilo C

Bolombolo La Pintada

La Virginia La Manuela

Irra

SPECIFICATIONS

Kilometers: 1,160 Km Existing Toll Booths: 10 New Toll Booths: 14-18 TOTAL CAPEX (Billion USD): $7.25

CORRIDORS:

Grupo 2

Grupo 3

Grupo 1

P

P

P

P

P

P P

P

P

P

P

Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 18: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

SPECIFICATIONS

Kilometers: 459 Km Existing Toll Booths: 2 TOTAL CAPEX (Billion USD): $0.87

CORRIDORS:

Cúcuta –Tibú – La Mata (331 Km)

P

Bucaramanga – Barrancabermeja – Yondó (128 Km)

La Mata

P

Convención

Tibu

CÚCUTA

B/Bermeja

P

Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 19: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

19

1. GOVERNMENT OBJECTIVES

2. FOURTH GENERATION OF ROAD CONCESSIONS PROGRAM

3. EARLY VICTORIES

Page 20: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Pto Salgar La Dorada

Honda

Mariquita

Girardot Ibague

BOGOTA

P

Ibagué – Puerto Salgar – Girardot

Pto Bogotá

TOTAL KM 313 TOTAL CAPEX (MM USD)

$524.99

Type of Activity: Rehabilitation of existing roads Construction of bridges over Magdalena river Construction of two additional lanes Road improvement

Existing Toll Booths

1 New Toll Booths*

3

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 21: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Pto Salgar La Dorada

Honda

Mariquita

Girardot Ibague

BOGOTA

P

KM CAPEX

(MM USD) ACTIVITY TERRAIN

6 $58.83 Bridge + Construction of two additional lanes

Undulated

Flandes – Girardot

Pto Bogotá

SPECIFICATIONS

Road length 6km

Design speed 70 km/h

Maximum slope 5%

Minimum curve radius 160m

Bridge and viaduct length 399m

Length of tunnels

Traffic (2012)

Flandes

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 22: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Pto Salgar La Dorada

Honda

Mariquita

Girardot Ibague

BOGOTA

P

KM CAPEX

(MM USD) ACTIVITY TERRAIN

126 $267.57 Improvement Undulated

Girardot – Puerto Bogotá

Pto Bogotá

SPECIFICATIONS

Road length 126 km

Design speed 70km/h

Maximum slope 5%

Minimum curve radius 160m

Bridge and viaduct length

Length of tunnels

Traffic (2012) 2,808

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 23: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Pto Salgar La Dorada

Honda

Mariquita

Girardot Ibague

BOGOTA

P

KM CAPEX

(MM USD) ACTIVITY TERRAIN

35 $130.23 Improvement Undulated

Puerto Bogotá – Puerto Salgar

Pto Bogotá

SPECIFICATIONS

Road length 35Km

Design speed 70km/h

Maximum slope 5%

Minimum curve radius 160m

Bridge and viaduct length

Length of tunnels

Traffic (2012) 2,808

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 24: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Pto Salgar La Dorada

Honda

Mariquita

Girardot Ibague

BOGOTA

P

KM CAPEX

(MM USD) ACTIVITY TERRAIN

39 $29.18 Bridge + rehabilitation Flat

Honda – Puerto Salgar

Pto Bogotá

SPECIFICATIONS

Road length 39km

Design speed 70km/h

Maximum slope 5%

Minimum curve radius 160m

Bridge and viaduct length

Length of tunnels

Traffic (2012) 6,679

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 25: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Pto Salgar La Dorada

Honda

Mariquita

Girardot Ibague

BOGOTA

P

KM CAPEX

(MM USD) ACTIVITY TERRAIN

107 $39.18 Rehabilitation Flat

Ibagué – Mariquita

Pto Bogotá

SPECIFICATIONS

Road length 107km

Design speed 70km/h

Maximum slope 5%

Minimum curve radius 160m

Bridge and viaduct length

Length of tunnels

Traffic (2012) 2,874

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 26: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Mulaló – Loboguerrero - Cali

TOTAL KM 90 TOTAL CAPEX (MM USD)

$585.27

Type of Activity: Rehabilitation of existing road Construction of new two-way single lane road

Existring Toll Booths

- New Toll Booths*

2

Cali

Mulalo Dagua

Loboguerrero

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 27: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Mulaló – Loboguerrero

Cali

Mulalo Dagua

Loboguerrero KM

CAPEX (MM USD)

ACTIVITY TERRAIN

32 $573.18 New single lane road Mountainous

SPECIFICATIONS

Road length 32 km

Design speed 80 km/h

Maximum slope 9%

Minimum curve radius 235

Bridge and viaduct length 5,715 m

Length of tunnels 11,075 m

Traffic (2017) 2,694

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 28: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Cali- Dagua - Loboguerrero

Cali

Mulalo Dagua

Loboguerrero KM

CAPEX (MM USD)

ACTIVITY TERRAIN

58 $12.09 Rehabilitation Mountainous

SPECIFICATIONS

Road length 58 km

Design speed 40-60km/h

Maximum slope 9%

Minimum curve radius

Bridge and viaduct length

Length of tunnels

Traffic (2017) 4,956

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 29: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Perimetral del Oriente Corridor

TOTAL KM 154 TOTAL CAPEX (MM USD)

$339.13

Type of Activity: Rehabilitation of existing road Construction of two additional lanes Road improvement

Existing Toll Booths

2 New Toll Booths*

2

Sopo

La Calera

Choachí

Caqueza

Briceño

El Salitre Guasca

BOGOTA

P

P

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 30: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Briceño -Sopo

KM CAPEX

(MM USD) ACTIVITY TERRAIN

4 $10.44 Construction of additional two lanes, rehabilitation

Flat

SPECIFICATIONS

Road length 4 km

Design speed 60 km/h

Maximum slope 5%

Minimum curve radius 200 m

Bridge and viaduct length

Length of tunnels

Traffic (2012) 5,080

Sopo

La Calera

Choachí

Caqueza

Briceño

El Salitre Guasca

BOGOTA

P

P

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 31: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Sopo – La Calera

KM CAPEX

(MM USD) Activities Terrain

25 $43.72 Rehabilitation + Improvement in critical areas

Undulated

SPECIFICATIONS

Road length 25 km

Design speed 60-80 km/h

Maximum slope 6%

Minimum curve radius 200 m

Bridge and viaduct length

Length of tunnels

Traffic (2012) 3,698

Sopo

La Calera

Choachí

Caqueza

Briceño

El Salitre Guasca

BOGOTA

P

P

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 32: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Sopo

La Calera

Choachí

Caqueza

Briceño

El Salitre Guasca

BOGOTA

Salitre - Guasca

KM CAPEX

(MM USD) ACTIVITY TERRAIN

14 $10.69 Rehabilitation Mountainous

SPECIFICATIONS

Road length 14 km

Design speed 60-80 km/h

Maximum slope 8%

Minimum curve radius 200 m

Bridge and viaduct length

Length of tunnels

Traffic (2012) 3,068

P

P

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 33: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Sopo

La Calera

Choachí

Caqueza

Briceño

El Salitre Guasca

BOGOTA

La Calera - Bogotá

KM CAPEX

(MM USD) ACTIVITY TERRAIN

16 $14.48 Rehabilitation Mountainous

SPECIFICATIONS

Road length 16 km

Design speed 60 km/h

Maximum slope 8%

Minimum curve radius 113 m

Bridge and viaduct length

Length of tunnels

Traffic (2012) 8,636

P

P

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 34: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Sopo

La Calera

Choachí

Caqueza

Briceño

El Salitre Guasca

BOGOTA

La Calera – Choachí - Caqueza

KM CAPEX

(MM USD) ACTIVITY TERRAIN

53 $221.30 Improvement Mountainous

SPECIFICATIONS

Road length 53 Km

Design speed 60 km/h

Maximum slope 8%

Minimum curve radius 113 m

Bridge and viaduct length 700 m

Length of tunnels

Traffic (2012) 507

P

P

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 35: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Sopo

La Calera

Choachí

Caqueza

Briceño

El Salitre Guasca

BOGOTA

Bogotá -Choachí

KM CAPEX

(MM USD) ACTIVITY TERRAIN

42 $38.50 Rehabilitation Mountainous

SPECIFICATIONS

Road length 42km

Design speed 60 km/h

Maximum slope 8%

Minimum curve radius 113 m

Bridge and viaduct length

Length of tunnels

Traffic (2012) 1,544

P

P

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 36: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Cartagena – Barranquilla - Malambo

TOTAL KM 152

Type of Activity: Construction of two additional lanes Rehabilitation and maintenance Construction of new road Improvement of roads with poor technical specifications

Existing Toll Booths

2 New Toll Booths*

1

CARTAGENA

BARRANQUILLA

Malambo

P

P

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 37: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

KM CAPEX

(MM USD) ACTIVITY TERRAIN

78 $527.83

Construction of two additional lanes, rehabilitation and maintenance

Flat

Cartagena - Barranquilla

SPECIFICATIONS

Road length 78 km

Design speed 80 km/h

Maximum slope 4%

Minimum curve radius 250 m

Bridge and viaduct length 721 m

Length of tunnels

Traffic (2012) 10,797

CARTAGENA

BARRANQUILLA

Malambo

P

P

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 38: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

KM CAPEX

(MM USD) ACTIVITY TERRAIN

74 $224.33 Construction of new road

Flat

Barranquilla - Malambo

SPECIFICATIONS

Road length 74 km

Design speed 80 km/h

Maximum slope 4%

Minimum curve radius 250 m

Bridge and viaduct length 580 m

Length of tunnels

Traffic (2012) 17,200

CARTAGENA

BARRANQUILLA

Malambo

P

P

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 39: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

MEDELLIN

Alto de Dolores

Remedios

Pto. Berrio

La Pintada

La Virginia La Manuela

Irra

Conexión Ruta del

Sol

TOTAL KM 268 TOTAL CAPEX (MM USD)

$2,095.23

Type of activity: Construction of new road Improvement of existing road

Existing Toll Booths

4 New Toll Booths*

TBD

P

P

P

P

GROUP 1

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 40: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

KM CAPEX

(MM USD) ACTIVITY TERRAIN

126 $1,356.09 Construction of new road

Undulated, Mountainous

Remedios - Alto Dolores - Puerto Berrío -

Conexión Ruta del Sol

SPECIFICATIONS

Road length 126 km

Design speed 80 km/h

Maximum slope 4%

Minimum curve radius 250 m

Bridge and viaduct length

Length of tunnels 4,430 m

Traffic (2012) 1,274

MEDELLIN

Alto de Dolores

Remedios

Pto. Berrio

La Pintada

La Virginia La Manuela

Irra

Conexión Ruta del

Sol

P

P

P

P

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 41: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

KM CAPEX

(MM USD) ACTIVITY TERRAIN

142 $739.14

Improvement of existing road and construction of new road

Undulated, Mountainous

La Pintada – Irra – La Manuela , La Virginia –

Irra

SPECIFICATIONS

Road length 142 km

Design speed 80 km/h

Maximum slope 6%

Minimum curve radius 229 m

Bridge and viaduct length 680 m

Length of tunnels 3,740 m

Traffic (2012) 4,799

MEDELLIN

Alto de Dolores

Remedios

Pto. Berrio

La Pintada

La Virginia La Manuela

Irra

Conexión Ruta del

Sol

P

P

P

P

P Existing Toll Booth Early Victory

* Estimated figures, subject to change

Page 42: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

Time Line

PROJECT STRUCTURING AND COMPLEMENTARY STUDIES

Integral structuring of the projects

Dec 2012

CONCESSION - ANI

DURATION OF THE CONCESSION PROJECT

Tender process opens

Ene 2013

Operation and maintenance –

20-25 years

Tender process

ends May 2013

Award of the concession Jun 2013

Phase III designs, environmental permits and

studies, land purchases – Jul 2013-Jul 2014

Construction –

2-5 years

42

Prequalification Dec 2012 – Jan

2013

Page 43: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

43

Contractual Scheme

Insurance and Real Estate, Social, and Environmental Risks

Financing for the Fourth Generation of Road Concessions (Infrastructure Bonds)

The Vision of Multilaterals Regarding the Fourth Generations of Road Concessions

Ensuring Transparency in the Fourth Generation of Road Concessions

Page 44: Luis Fernando Andrade Moreno - Portal ANI · Luis Fernando Andrade Moreno President - Agencia Nacional de Infraestructura . AGENCIA NACIONAL DE INFRAESTRUCTURA Ministerio de Transporte

GRACIAS

AGENCIA NACIONAL DE INFRAESTRUCTURA

República de Colombia

www.ani.gov.co