luis gestoso inundaciones 2012 eng v1

21
1

Upload: know4drr

Post on 30-Jun-2015

59 views

Category:

Education


1 download

TRANSCRIPT

Page 1: Luis gestoso inundaciones 2012 eng v1

1

Page 2: Luis gestoso inundaciones 2012 eng v1

2

On September 28th of 2012, a solid rain episode took place in Puerto Lumbreras that poured 120 litres/m2 in one hour

Watercourses of Béjar and Viznaga overflowed

A wide area was flooded and several roads were completely closed. As a result part of the population had to be evacuated and even rescued from the rooftops

6 people deceased

Page 3: Luis gestoso inundaciones 2012 eng v1

3

One day accumulated precipitation;

Page 4: Luis gestoso inundaciones 2012 eng v1
Page 5: Luis gestoso inundaciones 2012 eng v1

5

112 Emergency Center received 1.649 calls which have led the emergency device presence in 1.463 incidents releated to heavy rains.

Ø 456 balling actuations

Ø 152 rescues and lifesavings

Ø  64 actuations for falling debris and partial colapses

Ø 221 public safety actuations

Ø 570 attention and information actions to the citizens

Page 6: Luis gestoso inundaciones 2012 eng v1

6

FLOOD EMERGENCY PLAN OF CIVIL PROTECTION IN THE REGION OF MURCIA (INUNMUR)

Page 7: Luis gestoso inundaciones 2012 eng v1

7

q  INUNMUR Plan was activated in pre-emergency stage on September

27th, because of AEMET warning. (State Meteorological Agency)

q  Emergency Stage Level 1 for INUNMUR, was activated at 12:45 on

September 28th, and became a Level 2 at 13:05 due to unfavorable

evolution of the meteorological conditions. Military Emergency Unit (UME)

intervention was requested.

Page 8: Luis gestoso inundaciones 2012 eng v1

8

6 people deceased

More than 8.000 heads of cattle lost

Large farming damages

Page 9: Luis gestoso inundaciones 2012 eng v1

9

Emergency Specialists Firefighters Healthcare professionals State Forces & Corps Environmental brigades Military Emergency Unit Red Cross Housing Directorate staff Regional Farming Office staff Public Health staff Civil Defence volunteers …..

Page 10: Luis gestoso inundaciones 2012 eng v1

10

Page 11: Luis gestoso inundaciones 2012 eng v1

11

PUESTO DE MANDO AVANZADO

MANDO DEL GRUPO DE INTERVENCIÓN

COORDINADOR DEL GRUPO DE DAÑOS

COORDINADOR DEL GRUPO DE

RESTABLECIMIENTO DE SERVICIOS ESENCIALES

COORDINADOR DEL GRUPO SANITARIO

MANDO DEL GRUPO DE ORDEN

COORDINADOR DEL GRUPO LOGÍSTICO

COORDINADOR DEL GRUPO ACCIÓN SOCIAL

Advanced Command Position

Intervention Team Command

Damage evaluation team Coordinator

Essential recovery services group Coordinator

Health group Coordinator

Logistic group Coordinator

Social action group Coordinator

Order group Command

Page 12: Luis gestoso inundaciones 2012 eng v1

12

PMA (advanced command position)

Page 13: Luis gestoso inundaciones 2012 eng v1

13

MANDO DEL GRUPO DE INTERVENCIÓN

EQUIPO DE BOMBEROS

EQUIPO DE BÚSQUEDA Y RESCATE

EQUIPO DE EVACUACIÓN

Firefighters Team

Evacuation Team

Search&Rescue Team

Intervention group Command

Page 14: Luis gestoso inundaciones 2012 eng v1

14

Primary actuations

•  Evacuation of people on risk situation •  Main people rescues •  Lost people searching •  Dead animals management •  Roads opening, cleaning and balling

works •  Drinkable water supply for houses and

cattle tanks

Page 15: Luis gestoso inundaciones 2012 eng v1

15

COORDINADOR DEL GRUPO DE

RESTABLECIMIENTO DE SERVICIOS ESENCIALES

EQUIPO DE RESTABLECIMIENTO DE

AGUA POTABLE

EQUIPO DE RESTABLECIMIENTO DE

GAS

EQUIPO DE RESTABLECIMIENTO DE

ELECTRICIDAD

EQUIPO DE RESTABLECIMIENTO DE TELEFONÍA, RADIO Y TV

EQUIPO DE RESTABLECIMIENTO DE

CARRETERAS

EQUIPO DE RESTABLECIMIENTO DE

SANEAMIENTO

EQUIPO DE RESTABLECIMIENTO DE

VÍAS URBANAS

Coordinator

Drinkable water Team

Gas recovery Team

Phone, radio, TV recovery Team

Roads recovery Team

Streets & Lanes recovery Team

Water&Sanitation recovery Team

Electricity recovery Team

Page 16: Luis gestoso inundaciones 2012 eng v1

16

ROADS affected:

–  A-7 Puerto Lumbreras-Lorca, through Béjar watercourse, due to bridge collapse.

–  A-7 Puerto Lumbreras-Almería, on km. 583.

–  RM-D20 Garrobillo-Ramonete, close to city of Lorca.

–  RM-621 Lorca-Purias, from km. 4 to km. 4,8.

–  RM-517 , around Cehegín, from km. 2 to km. 4.

–  RM-D10 around councils Campillo Purias.

–  D-4 exit from Mazarrón direction Leiva y Morata.

–  E-10 between Alhama y Costera road, around industrial area Las Salinas.

–  RM-23 Km 0 to Km 0,25

–  RM 303 Santomera- Alquerías Km 0,1 to 0,3

TRAIN: completely interrupted railway traffic on Lorca-Águilas & Lorca-La Hoya lines.

DRINKABLE WATER: Drinkable net serius damages around districts of Lorca and Puerto Lumbreras: El Campillo, Almenara, Altobordo, La Escucha

PUERTO LUMBRERAS COMMUNITY HEALTH CENTER: it was moved to El Riscal Hotel, in the same district.

PHONE: Interrupted in Puerto Lumbreras only 1 day (September 28th).

Page 17: Luis gestoso inundaciones 2012 eng v1

17

A7 motorway, over Béjar watercourse

Page 18: Luis gestoso inundaciones 2012 eng v1

18

Railway Lorca - Baza

Page 19: Luis gestoso inundaciones 2012 eng v1

19

Page 20: Luis gestoso inundaciones 2012 eng v1

20

EMERGENCY STAGE DESACTIVATED ON OCTOBER 11st 2012 TO STANDAR STAGE

Page 21: Luis gestoso inundaciones 2012 eng v1

21

THANK YOU FOR YOUR ATTENTION