Area Around the Hoover Dam
• Extreme temperatures up to 125 F
• Sunshine almost every day
• Rainfall about 4 inches per year
![Page 3: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/3.jpg)
Early Settlers were probably Hohokam
Indians.
• Believed to have become the Tohono O’Odham
Indians
![Page 4: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/4.jpg)
First European Explorers
• Were Spanish Conquistadors/Catholic Missionaries
• Major barrier to development - Colorado River and
Grand Canyon
![Page 5: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/5.jpg)
Following Mexican War (1848)
• The USA “acquired” Arizona, Nevada ,New
Mexico and California
• Serious exploration began of this region
![Page 6: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/6.jpg)
• 1850 California Imperial Valley already wanted
water from the Colorado River
• 1901 California Development Company
constructed canals
![Page 7: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/7.jpg)
• Created mistrust between California and
Nevada and Arizona, “They (California)
want to steal our water!”
![Page 8: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/8.jpg)
Time Line Pre Construction
• 1902 - Bureau of Reclamation begins study
of dam sites
• 1918 – Investigation of a “High Dam” for
water storage and flood control
![Page 9: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/9.jpg)
Pre Construction Timeline, cont.
1920 – Seven states discuss dam
– Herbert Hoover (Secretary of Commerce under
President Harding) served as the Government’s
representative
![Page 10: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/10.jpg)
• Called the project, “The Boulder Canyon
Project,” even before the site was selected!
![Page 11: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/11.jpg)
Two sites were selected as meeting the geological
requirements for a high dam:
* Boulder Canyon
* Black Canyon
![Page 12: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/12.jpg)
Pre Construction Timeline, cont.
• 1924 - Selection of the Black Canyon for
dam site
![Page 13: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/13.jpg)
Pre Construction Timeline, cont.
• 1924 – Design of a concrete arch gravity
structure proposed
• 1928 –Engineering and Geological review
completed
![Page 14: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/14.jpg)
• 1930 – Congress appropriated funds for the
Construction
* 119 bid items
* Specifications were 100 pages with 76 drawings
* $5 per set
Pre Construction Timeline, cont.
![Page 15: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/15.jpg)
Pre Construction Timeline, cont.
* 3.7 million cubic yards of rock
* 4.4 million cubic yards of concrete
* 45 million tons of structural steel
and pipe
* 7 year construction schedule
![Page 16: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/16.jpg)
Pre Construction Timeline, cont.
• Major Problems
* $2,000,000 bid bond
* $5,000,000 performance bond,
if awarded contract
Money was difficult to raise in
Depression times
![Page 17: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/17.jpg)
Bond requirements
• Too big for western companies
• Had to form alliances
• Most contractors gave up before bidding
![Page 18: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/18.jpg)
• Government to provide cement and steel
• Contractor to provide manpower, machinery,
tools, vehicles and supplies
![Page 19: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/19.jpg)
Bids opened on March 4, 1931
![Page 20: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/20.jpg)
First Bid
Edwin A. Smith, Kentucky
$80,000 less than lowest bid you get
No Bid Bond
Bid was invalid
![Page 21: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/21.jpg)
Second Bid
• John Bernard Simon Company,
New York
• $200 Million or Cost plus 10%
• No Bid Bond
• Bid was invalid
![Page 22: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/22.jpg)
Third Bid
• Arundel Corporation, Maryland
• $53.9 Million
• Bid Bond provided
• Bid was valid
![Page 23: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/23.jpg)
Fourth Bid
• Wood Brother Company, Nebraska
• $58.6 Million
• Bid Bond provided
• Bid was valid
![Page 24: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/24.jpg)
Fifth Bid
• Six Companies, California
• $48,890,955
• Bond provided
• Bid was valid
![Page 25: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/25.jpg)
• Engineering estimate - $48,857,000
• Although about $34,000 above the
engineering estimate
• Project awarded to the Six Companies
![Page 26: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/26.jpg)
– Morrison Knudsen
– Utah Construction
– Pacific Bridge Company
– J.F. Shea
– McDonald & Kahn
• Partnership of:
–Henry Kaiser Co.
–Warren Bros Paving
–Bechtel
Six Companies, Inc.
![Page 27: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/27.jpg)
Why was their bid successful?
• Required to place 3.4 million cubic yards
(CY) of concrete
• Six Companies bid $2.70 per CY
• $1.35 per CY less than Arundel (second
bid)
• $0.55 less than Engineers’ estimates
![Page 28: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/28.jpg)
Why Successful ?
Bid was front loaded – Six Companies planned
to make money on the tunneling
![Page 29: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/29.jpg)
Start of work
Started to mobilize as soon as bids were
opened by the insistence of the Federal
Government.
The government felt they had to get work
going to ease the 25% unemployment rate.
![Page 30: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/30.jpg)
Infrastructure to be Built
• Houses
• Provide power
• Dorms
• Dining facilities
• Hospital
• Police
• Fire department
![Page 31: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/31.jpg)
People needed jobs
Created Ragtown
![Page 32: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/32.jpg)
Hoover Dam Worker Wages
-
0.200
0.400
0.600
0.800
Jackhammer
men
Truck
Drivers
Cement
Finisher
Laborers American
Crane
Operator
$/p
er
ho
ur
![Page 33: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/33.jpg)
1930's Comparable Wages
-
0.200
0.400
0.600
0.800
1.000
1.200
1.400
1.600
Engin
eer
Coa
l Miner
Lawye
r
Bus D
river
Civi
l Ser
vice
$/p
er
ho
ur
![Page 34: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/34.jpg)
Working conditions were horrible by
today’s standards.
The workforce attempted to unionize and
strike for safer working conditions.
This resulted in them being fired.
![Page 35: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/35.jpg)
Challenges to Project
• 100 F + Temperatures
• 24 hour construction schedule
• (pleasure to work the night shift?)
![Page 36: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/36.jpg)
Working the Night Shift
![Page 37: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/37.jpg)
• Police – Prohibition still “enforced”
– Majority of crimes were drunkenness
• Hospital – Dealt with accidents from
Construction Site
– State of the Art Orthopedic Care Unit
• Dorms – ($1.60 per day)
• Married Housing Cottages - $30 per
month
![Page 38: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/38.jpg)
Dining Hall
![Page 39: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/39.jpg)
Taking People to Work
![Page 40: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/40.jpg)
Aggregates
• Found alluvial about 6 miles up stream in
Arizona
– Excavated by dragline
– Moved by rail to screening and wash
plant in Nevada
![Page 41: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/41.jpg)
![Page 42: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/42.jpg)
Aggregates, Cont.
• Screening into 4 sizes
– Fine
– Intermediate
– Coarse
– Cobble – 3-9 inch diameter
• If over 9 inches it was crushed, re-screened
• Moved to batch plant by rail.
![Page 43: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/43.jpg)
Batch Plants
• Operational in 1932
– Provided concrete for tunnels
• First concrete in Dam June 6, 1933
![Page 44: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/44.jpg)
Second Batch Plant
• Added at the
canyon rim
• Produced all
concrete in top part
of the dam
![Page 45: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/45.jpg)
“Modern” Batching Facility
![Page 46: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/46.jpg)
Central Batch Plant
![Page 47: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/47.jpg)
Batching Details
• 4 cubic yard central mixers
• Capable of producing 24 cubic yards every
3 minutes
• Record total daily placement was over
10,000 cubic yards
• Four gradation’s of aggregate blended
together to give economy and workability
![Page 48: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/48.jpg)
Details on Concrete Mixture
• Used Type IV Cement
– Reduced C3A (lots of heat, little strength)
– Increased C2S (slow strength gains)
• Thus reducing the heat of hydration as
much as possible
![Page 49: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/49.jpg)
Mixture Design - General
• Cement - 4 sacks
• Maximum size aggregate - 9 inches
• W/C ratio - 0.58
![Page 50: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/50.jpg)
Mixture Design – Detail(pounds per cubic yard)
Cement 380 Type IV
Fly Ash 0
Fine Aggregate 931
Coarse Aggregate 2679 Limestone and Granite maximum
size 9 inches
Water 220
W/C Ratio 0.58
Air Entrainment 0
Water Reducers 0
Slump 3”
Density 155.9 pcf
![Page 51: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/51.jpg)
Final Concrete Properties
Compressive Strength PSI
28 Day 3030
90 Day 3300
365 Day 4290
Modulus of Elasticity 106 psi
28 Day 5.5
90 Day 6.2
365 Day 6.8
Poisson Ratio 28 Day 0.18
90 Day 0.20
365 Day 0.21
![Page 52: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/52.jpg)
Concrete moved to
jobsite by 4 and 8
cubic yard buckets
Superintendent
Frank Crowe was
an expert on aerial
cableways
![Page 53: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/53.jpg)
A relatively new concept
• Concrete placed using internal vibrators to
consolidate concrete
![Page 54: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/54.jpg)
Concrete Construction
• Series of 5 feet high
blocks with horizontal
and vertical key ways
– Varied between 25
to 60 square feet
• Concrete to cure 72
hours before next lift
• No more than 7 lifts
in 30 days
![Page 55: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/55.jpg)
Curing
• Dam was water cured
During the summer, 20
men’s sole job was to
spray water on the
dam’s surface.
![Page 56: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/56.jpg)
Cooling Concrete
• If Hoover Dam was
placed in a continuous
placement method, the
heat stress would crack
the dam.
![Page 57: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/57.jpg)
Cooling Concrete, Cont.
• Experiments by the Bureau of Reclamation
at Owyhee Dam in Idaho used piping
throughout the concrete
• Used cooled water to remove heat
![Page 58: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/58.jpg)
Cooling Concrete, Cont.
• At Hoover Dam – built in sections, one inch pipes were installed by looping thru concrete
– River Water
– Refrigerated Water
• When cooling in a section was completed, cooling pipes were cut off and pressure grouted
![Page 59: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/59.jpg)
Piping to cool concrete
![Page 60: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/60.jpg)
Cooling Concrete, Cont.
• By 1935, cooling was completed
• 590 miles of piping was used in the dam
• 159 billion BTU removed through cooling
process
![Page 61: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/61.jpg)
Testing of Concrete
• Excellent Quality Control due to the state of the art
testing facilities
![Page 62: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/62.jpg)
Testing of Concrete, cont
Used 36” x 72” cylinders for design
Wanted 4 times maximum size of the
aggregates
Had 4,000,000 pound testing machine
![Page 63: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/63.jpg)
Mass concrete cylinder with apparatus for
measuring longitudinal and lateral deformations
![Page 64: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/64.jpg)
Mix 1-2.45-7.05 by weight with 9 inch aggregate.
-W/C = 0.81 by volume 3 inch slump
Typical Double - Cone Failure of
36” x 72” Cylinder
![Page 65: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/65.jpg)
Typical Cone failures from 36”, 24”, 12” and 8”
cylinders
![Page 66: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/66.jpg)
Safety Issues
• No one is entombed in the concrete
• Deaths during construction
– 96 people, not counting heat related
deaths
![Page 67: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/67.jpg)
Major cause of deaths – not recorded
Heat prostration killed one worker every other day
– summer 1931
![Page 68: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/68.jpg)
Major Study on Heat Related
Sickness
Workers need to drink water
![Page 69: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/69.jpg)
Safety Issues, Cont.
• State of Arizona paid more than the State of
Nevada in death benefits.
– Injured/Dead workers carried to Arizona
– Stories of injured workers crawling to
Arizona
– Debated by experts if this is true
![Page 70: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/70.jpg)
Last concrete placed May 29th, 1935
![Page 71: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/71.jpg)
Remains of the Construction
• Divers’ Paradise
![Page 72: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/72.jpg)
Aggregate Washing FacilityUnderwater
![Page 73: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/73.jpg)
Aggregate Washing FacilityDuring Construction
![Page 74: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/74.jpg)
Gravel Plant/RailroadUnderwater
![Page 75: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/75.jpg)
Gravel Plant/RailroadDuring Construction
![Page 76: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/76.jpg)
Core from Hoover Dam
At Portland Cement Association
Headquarters
![Page 77: Luke Snell, P.E. Concrete Consultant Edwardsville, IL• At Hoover Dam –built in sections, one inch pipes were installed by looping thru concrete –River Water –Refrigerated Water](https://reader033.vdocuments.net/reader033/viewer/2022042413/5f2d5fb447cb7f60e777b931/html5/thumbnails/77.jpg)
Acknowledgements to
Billie Snell
for her research