Lukens - 1 Run IIb Project Motivations Integrated luminosity or duration of the run motivates us to Replace the silicon detector - Radiation damage to inner layers, optical interconnects - SVT trigger – new silicon implies new trigger hardware Replace level 2 processors - Running to 2008-09 with the Alpha is not wise Replace Level 3 processors - Running to 2008-09 with 500 Mhz. Instantaneous luminosity of Run IIb motivates us to Replace TDCs - Data rate bottleneck at 300 Hz Replace Event Builder - Data rate bottleneck at 300 Hz Replace XFT - Track fake rate at high occupancy Replace Preshower - Last accessible piece of gas calorimetry. Long memory is swamped by occupancy.

Upload: spencer-stevenson

Post on 11-Jan-2016

214 views

Category:

Documents


2 download

TRANSCRIPT

19Mar02Integrated luminosity or duration of the run motivates us to
Replace the silicon detector
SVT trigger – new silicon implies new trigger hardware
Replace level 2 processors
Replace Level 3 processors
Instantaneous luminosity of Run IIb motivates us to
Replace TDCs
Replace Event Builder
Replace XFT
Replace Preshower
Last accessible piece of gas calorimetry. Long memory is swamped by occupancy.
Lukens - *
Red – integrated luminosity
Blue – instantaneous lum.
Page &P
349051.97
2212918.131
970621.729
44%
3532591.83
349051.97
2212918.131
970621.729
44%
3532591.83
0
55000
799317.7227
262819.1611
33%
1117136.884
55000
799317.7227
262819.1611
33%
1117136.884
0
0
4680176.167
1742028.257
37%
6422204.424
0
4680176.167
1742028.257
37%
6422204.424
0
0
1430350.11
701335.9483
49%
2131686.058
0
1430350.11
701335.9483
49%
2131686.058
0
0
369235.2275
60244.27617
16%
429479.5037
0
369235.2275
60244.27617
16%
429479.5037
0
0
1626656.861
600357.5577
37%
2227014.418
0
1626656.861
600357.5577
37%
2227014.418
0
0
485212.365
145563.7095
30%
630776.0745
0
485212.365
145563.7095
30%
630776.0745
0
-853.79
17134330.21
7853191.339
46%
24986667.76
1199146.21
17134330.21
7853191.339
46%
26186667.76
1200000
&L&7File: &F &A&C&7Page &P of &N &D &T
Level 3
Silicon
$ 832
$ 9,703
$ 3,299
$ 3,219
$ (7,149)
$ 9,904
Calorimeter
$ 62
$ 1,313
$ 375
$ 51
$ (771)
$ 1,031
DAQ/Trigger
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Administration
$ 398
$ 1,029
$ 116
$ 157
$ (696)
$ 1,003
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Testing of Prototype DAQ Chain Complete- go ahead for #2
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Design Fixtures for removal of SVXII and installation of SVXIIB
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$30,000.00
$0.00
Assemble and Test fixtures for SVX removal and installation of SVXIIb
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Page &P
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Testing of Prototype DAQ Chain Complete- go ahead for #2
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Design Fixtures for removal of SVXII and installation of SVXIIB
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$15,000.00
$0.00
Assemble and Test fixtures for SVX removal and installation of SVXIIb
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Page &P
Sil Labor
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Testing of Prototype DAQ Chain Complete- go ahead for #2
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Design Fixtures for removal of SVXII and installation of SVXIIB
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$16,320.00
$0.00
Assemble and Test fixtures for SVX removal and installation of SVXIIb
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Page &P
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Testing of Prototype DAQ Chain Complete- go ahead for #2
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Design Fixtures for removal of SVXII and installation of SVXIIB
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Assemble and Test fixtures for SVX removal and installation of SVXIIb
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Page &P
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Testing of Prototype DAQ Chain Complete- go ahead for #2
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Design Fixtures for removal of SVXII and installation of SVXIIB
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$9,977.52
$0.00
Assemble and Test fixtures for SVX removal and installation of SVXIIb
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Page &P
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Testing of Prototype DAQ Chain Complete- go ahead for #2
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Design Fixtures for removal of SVXII and installation of SVXIIB
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$2,655.00
$0.00
Assemble and Test fixtures for SVX removal and installation of SVXIIb
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Page &P
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Testing of Prototype DAQ Chain Complete- go ahead for #2
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Design Fixtures for removal of SVXII and installation of SVXIIB
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Assemble and Test fixtures for SVX removal and installation of SVXIIb
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Page &P
Sil Japan
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Testing of Prototype DAQ Chain Complete- go ahead for #2
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Design Fixtures for removal of SVXII and installation of SVXIIB
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Assemble and Test fixtures for SVX removal and installation of SVXIIb
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Page &P
Sil Italy
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Testing of Prototype DAQ Chain Complete- go ahead for #2
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Design Fixtures for removal of SVXII and installation of SVXIIB
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Assemble and Test fixtures for SVX removal and installation of SVXIIb
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Page &P
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Procure parts for splitters & cable prototypes, misc test stand equip
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Prototype ASD tests with CEM Splitter, TDC cable, and TDC
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Procure parts for splitters & cable prototypes, misc test stand equip
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Prototype ASD tests with CEM Splitter, TDC cable, and TDC
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Procure parts for splitters & cable prototypes, misc test stand equip
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Prototype ASD tests with CEM Splitter, TDC cable, and TDC
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Procure parts for splitters & cable prototypes, misc test stand equip
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Prototype ASD tests with CEM Splitter, TDC cable, and TDC
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Procure parts for splitters & cable prototypes, misc test stand equip
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Prototype ASD tests with CEM Splitter, TDC cable, and TDC
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Procure parts for splitters & cable prototypes, misc test stand equip
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Prototype ASD tests with CEM Splitter, TDC cable, and TDC
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Procure parts for splitters & cable prototypes, misc test stand equip
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Prototype ASD tests with CEM Splitter, TDC cable, and TDC
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Procure parts for splitters & cable prototypes, misc test stand equip
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Prototype ASD tests with CEM Splitter, TDC cable, and TDC
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Procure parts for splitters & cable prototypes, misc test stand equip
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Prototype ASD tests with CEM Splitter, TDC cable, and TDC
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Procure parts for splitters & cable prototypes, misc test stand equip
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Prototype ASD tests with CEM Splitter, TDC cable, and TDC
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Procure parts for splitters & cable prototypes, misc test stand equip
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Prototype ASD tests with CEM Splitter, TDC cable, and TDC
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
Commission L2 Pulsar for each data path - proof of principle tests
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (ILL)
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (FNAL)
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
arrival of 70 Level3 and 15 DAQ PCs from the vendor
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
Commission L2 Pulsar for each data path - proof of principle tests
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (ILL)
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (FNAL)
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
arrival of 70 Level3 and 15 DAQ PCs from the vendor
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
Commission L2 Pulsar for each data path - proof of principle tests
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (ILL)
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (FNAL)
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
arrival of 70 Level3 and 15 DAQ PCs from the vendor
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
Commission L2 Pulsar for each data path - proof of principle tests
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (ILL)
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (FNAL)
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
arrival of 70 Level3 and 15 DAQ PCs from the vendor
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
Commission L2 Pulsar for each data path - proof of principle tests
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (ILL)
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (FNAL)
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
arrival of 70 Level3 and 15 DAQ PCs from the vendor
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
Commission L2 Pulsar for each data path - proof of principle tests
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (ILL)
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (FNAL)
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
arrival of 70 Level3 and 15 DAQ PCs from the vendor
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
Commission L2 Pulsar for each data path - proof of principle tests
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (ILL)
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (FNAL)
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
arrival of 70 Level3 and 15 DAQ PCs from the vendor
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
Commission L2 Pulsar for each data path - proof of principle tests
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (ILL)
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (FNAL)
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
arrival of 70 Level3 and 15 DAQ PCs from the vendor
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
Commission L2 Pulsar for each data path - proof of principle tests
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (ILL)
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (FNAL)
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
arrival of 70 Level3 and 15 DAQ PCs from the vendor
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
Commission L2 Pulsar for each data path - proof of principle tests
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (ILL)
Fixed Cost
Modification Level 2 Interface Board Schematic and PCB Layout (FNAL)
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
arrival of 70 Level3 and 15 DAQ PCs from the vendor
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
$0.00
$0.00
$0.00
$0.00
$0.00
Commission L2 Pulsar for each data path - proof of principle tests
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed Cost
Fixed