lynn helms

57
600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020 (701) 328-8000 North Dakota Department of Mineral Resources http://www.state.nd.us/ndgs http://www.oilgas.nd.gov

Upload: thestateof

Post on 21-Dec-2014

1.785 views

Category:

Technology


2 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Lynn Helms

600 East Boulevard Ave. - Dept 405Bismarck, ND 58505-0840

(701) 328-8020 (701) 328-8000

North Dakota Department of Mineral Resources

http://www.state.nd.us/ndgshttp://www.oilgas.nd.gov

Page 2: Lynn Helms

North Dakota Industrial Commission Cases Heard

0

500

1000

1500

2000

2500

3000

1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010 2015

Page 3: Lynn Helms
Page 4: Lynn Helms

100 years ago wells were drilled wherever they would fit (rule of capture), and were not spaced on the basis of geology and engineering as is currently done by the North Dakota Industrial Commission.

This wasted a great deal of the oil and gas.

Page 5: Lynn Helms
Page 6: Lynn Helms
Page 7: Lynn Helms

Vern Whitten Photography

Page 8: Lynn Helms

North Dakota Average Monthly Rig Count

0

50

100

150

200

250

1975 1979 1983 1987 1991 1995 1999 2003 2007 2011 2015

Rig

s

Rig Count ND Sweet Oil Price

Page 9: Lynn Helms

192 Rigs

Page 10: Lynn Helms

Typical Bakken Well Production

0

200

400

600

800

1000

1200

0 5 10 15 20 25 30

Year

Ba

rre

ls o

f O

il p

er

Da

y

Page 11: Lynn Helms

What Does Every New Bakken Well Mean to North Dakota

A typical 2010 North Dakota Bakken well will produce for 28 years

If economic, enhanced oil recovery efforts canextend the life of the well

In those 28 years the average Bakken well:

Produces more than 575,000 barrels of oil

Generates over $20 million net profit

Pays approximately $4,250,000 in taxes$1,930,000 gross production taxes$2,000,000 extraction tax$320,000 sales tax

Pays royalties of $6,900,000 to mineral owners

Pays salaries and wages of $1,550,000

Pays operating expenses of $1,900,000

Costs $6,600,000 to drill and complete

Page 12: Lynn Helms

Western North Dakota

• 1,100 to 2,700 wells/year = 2,000 expected• 100-225 rigs = 12,000 – 27,000 jobs = 20,000 expected

• 15 - 30 million gallons frac water/day

• 10 to 20 years• 26,000 new wells = thousands of long term jobs

Page 13: Lynn Helms

North Dakota Oil Production and Price

0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,00019

70

1975

1980

1985

1990

1995

2000

2005

2010

2015

2020

2025

2030

2035

2040

2045

2050

2055

Bar

rels

per

Day

$0

$100

$200

$300

$400

$500

$600

$700

$800

ND

Sw

eet

Pri

ce $

/bar

rel

History Bakken - Three Forks P10 Bakken - Three Forks P50

Bakken - Three Forks P90 $/Barrel History & DOE-EIA Projected $/Barrel P50

$/Barrel P10

2,600 Bakken and Three Forks wells drilled and completed

26,000+ more new wells possible in thermal mature area

P90=5 BBO – P50=7 BBO – P10=11 BBO (billion barrels of oil)

P90

P50

P10

Page 14: Lynn Helms

Hydraulic Fracturing

Lifeline to Domestic Energy

• Hydraulic Fracturing• Why• How

• State Regulation• Frac fluid

Page 15: Lynn Helms

WHY FRACK THE ROCK?

• Easy oil is already developed• oil that flows without fracing

• Unconventional Reserves• reservoirs are tight

• look at sample• uneconomic to produce without fracing • must create a path for oil to flow

Page 16: Lynn Helms

Performing hydraulic fracture stimulation south of Tioga• all Bakken wells must be hydraulically fractured to produce• > 2-4 million gallons of water• > 3-5 million pounds of sand or ceramic beads• cost > $2 million

Page 17: Lynn Helms

Thousands of fractures are created

• pumping water at 6,000-9,000 psi

• millions of pounds of sand and ceramic beads are pumped with the water to hold the fractures open.

Ball and Sleeve

• up to 40 stages

• ball opens the liner sleeve

Page 18: Lynn Helms

Stage Fracturing

• up to 40 stages

Page 19: Lynn Helms
Page 20: Lynn Helms
Page 21: Lynn Helms

Purposes of frac fluid

• crack the reservoir

• gel strength to carry sand

Frac fluid is produced back as flowback and produced water

Page 22: Lynn Helms

Each hydraulic fracturing stage creates hundreds of fractures

extending several hundred feet from wellbore

Page 23: Lynn Helms

4.5”FracString

Upper Bakken Shale

Lower Bakken Shale

Middle Bakken

Potable Waters

TYPICAL HORIZONTAL OIL WELL

Cement

Packer

Run in hole with:• 4.5” liner• 30-40 swell packers

• sliding sleeves

4.5” liner

Page 24: Lynn Helms

States have been regulating the full life cycle of hydraulic

fracturing for decades

• Geology of each sedimentary basin is different• Water Appropriation Regulation• Oil & Gas Regulation• Health and Environmental Regulation

Page 25: Lynn Helms
Page 26: Lynn Helms

North Dakota has been regulating the full life cycle of

hydraulic fracturing for decades

• Water Commission—water supply• Industrial Commission—well permitting &

disposal of flowback water• Health Department—spill cleanup

Page 27: Lynn Helms

Water Commission Regulation

• Regulate water appropriations

• Guard against withdrawals exceeding recharge

Page 28: Lynn Helms

Thirsty Horizontal Wells

• 2,000 - 3,000 wells / year• 15 - 25 years duration• 20 - 30 million gallons water / day

Page 29: Lynn Helms

Glacial Drift Aquifers

Page 30: Lynn Helms

FRAC WATER NEEDS

• Lake Sakakawea (Missouri River) is the best water resource

• one inch contains 10 billion gal water• =5,000 wells @ 2 million gal/well• 2 - 2.5-year supply

Page 31: Lynn Helms

Industrial Commission Regulation

• Hydraulic fracturing• Two casing strings required• Both strings must be cemented• Pressure tests required• Frac is > 1 mile below potable water

Page 32: Lynn Helms

4 ½” Frac String

Upper Bakken Shale

Lower Bakken Shale

Middle Bakken

Potable Waters

• Drill with fresh water• Total depth below lowest potable water• Run in hole with surface casing• 1st layer of surface water protection• Cement casing back to surface of ground• 2nd layer of surface water protection

TYPICAL HORIZONTAL OIL WELL

9-5/8” in 13.5” Hole

Page 33: Lynn Helms

7” Casing

Upper Bakken Shale

Lower Bakken Shale

Middle Bakken

Potable Waters

TYPICAL HORIZONTAL OIL WELL

9-5/8” in 13.5” Hole

Cement

Kick-off Point • Drill vertically to kick-off point

• Run in hole with bent assembly• Downhole mud motor

Page 34: Lynn Helms

7” Casing

Upper Bakken Shale

Lower Bakken Shale

Middle Bakken

Potable Waters

• Drill 8-3/4” hole to pay• Run in hole with 7” casing• 3rd layer of protection• Cement 7” casing• 4th layer of protection

TYPICAL HORIZONTAL OIL WELL

9-5/8” in 13.5” Hole

Cement

Kick-off Point

BuildSection

Page 35: Lynn Helms

7” Casing

Upper Bakken Shale

Lower Bakken Shale

Middle Bakken

Potable Waters

• Drill lateral in pay• Run in hole with 7” casing• Cement 7” casing• 2nd layer of protection

TYPICAL HORIZONTAL OIL WELL

9-5/8” in 13.5” Hole

Cement

Kick-off Point

Horizontal lateral

BuildSection • Drill 6” horizontal hole in pay

Page 36: Lynn Helms

4.5”FrackString

Upper Bakken Shale

Lower Bakken Shale

Middle Bakken

Potable Waters

TYPICAL HORIZONTAL OIL WELL

Cement

Packer

Run in hole with:• 4.5” liner• 30-40 swell packers• sliding sleeves• 4.5” frack string• 5th layer of protection

4.5” liner

Page 37: Lynn Helms

Sea Level

Oil & GasBakken/Three Forks

PrecambrianBasement

Base of fresh water

Page 38: Lynn Helms
Page 39: Lynn Helms
Page 40: Lynn Helms

Industrial Commission Regulation

• Water flowback after frac• Storage in open pits prohibited• Disposal wells permitted through Underground Injection Program• Disposal zone is 2,500 feet below potable waters with impermeable shale between

Page 41: Lynn Helms

Salt-Water Disposal Dakota Fm.

Sea Level

300 disposal wells

450,000 barrels wtr/day

Bakken Fm.

Base of fresh water

Page 42: Lynn Helms

Health Department Regulation

• Cleanup of discharge to environment• Coordinate with local Emergency Managers• Emergency Planning and Community Right-to-know Act (EPCRA)• Congress passed for storing and handling of

chemicals•Requires material safety data sheet (MSDS)

for each chemical on location

Page 43: Lynn Helms

• Compound– Purpose

• Common application

• Fresh Water – 80.5%• Proppant – 19.0%

– Allows the fractures to remain open so the oil and gas can escape• Drinking water filtration, play ground sand

• Acids - 0.12%– Help dissolve minerals and initiate fractures in rock (pre-fracture)

• Swimming pool cleaner

• Petroleum distillates – 0.088%– Dissolve polymers and minimize friction

• Make-up remover, laxatives, and candy

• Isopropanol – 0.081%– Increases the viscosity of the fracture fluid

• Glass cleaner, antiperspirant, and hair color

• Potassium chloride – 0.06%– Creates a brine carrier fluid

• Low-sodium table salt substitute

• Guar gum – 0.056%– Thickens the water to suspend the sand

• Thickener used in cosmetics, baked goods, ice cream, toothpaste, sauces, and salad dressing

• Ethylene glycol – 0.043%– Prevents scale deposits in the pipe

• Automotive antifreeze, household cleansers, deicing, and caulk

Page 44: Lynn Helms

• Sodium or potassium carbonate – 0.011%– Improves the effectiveness of other components, such as cross-linkers

• Washing soda, detergents, soap, water softeners, glass and ceramics• Sodium Chloride – 0.01%

– Delays break down of the gel polymer chains• Table Salt

• Polyacrylamide – 0.009%– Minimizes friction between fluid and pipe

• Water treatment, soil conditioner• Ammonium bisulfite – 0.008%

– Removes oxygen from the water to protect the pipe from corrosion• Cosmetics, food and beverage processing, water treatment

• Borate salts – 0.007%– Maintain fluid viscosity as temperature increases

• Used in laundry detergents, hand soaps and cosmetics• Citric Acid – 0.004%

– Prevents precipitation of metal oxides• Food additive; food and beverages; lemon juice

• N, n-Dimethyl formamide – 0.002%– Prevents the corrosion of the pipe

• Used in pharmaceuticals, acrylic fibers and plastics• Glutaraldehyde – 0.001%

– Eliminates bacteria in the water• Disinfectant; Sterilizer for medical and dental equipment

Page 45: Lynn Helms

Hydraulic Fracturing Stimulation is Safe

• IOGCC survey—no contamination• EPA survey – no contamination• GWPC study verifies State’s regs• GWPC National Registry f/chemicals

•FracFocus

Page 46: Lynn Helms
Page 47: Lynn Helms

Oil and gas well locations are built (stockpiling top soil and lining reserve pits) to make reclamation easier.

Page 48: Lynn Helms

Drilling rigs are leased on a daily rental. A horizontal Bakken well costs approximately $1/second.

Page 49: Lynn Helms
Page 50: Lynn Helms
Page 51: Lynn Helms

Well head

TreaterTanks

Page 52: Lynn Helms
Page 53: Lynn Helms
Page 54: Lynn Helms
Page 55: Lynn Helms
Page 56: Lynn Helms

The future looks promising for sustained Bakken/Three Forks

development

Cap and trade proposals in congress

could reduce activity an estimated 35-40%

EPA regulation of hydraulic fracturing

could halt drilling activity for 18-24 months

production decline of 25-30%

Current administration budget contains tax rule

changes that could reduce activity an estimated 35-50%

Federal regulations require 6 -12 months longer for drilling and surface use approval

Page 57: Lynn Helms