Page 1: M1H Transfer Function Georg Gassner, March 6 th, 2013

M1H Transfer Function

Georg Gassner, March 6th, 2013

Page 2: M1H Transfer Function Georg Gassner, March 6 th, 2013

2LCLS-II Phys. Meeting / March 6, 2013

Measurement Setup

Seismometer

Seismometer

Vibco

Buttkicker

Page 3: M1H Transfer Function Georg Gassner, March 6 th, 2013

3LCLS-II Phys. Meeting / March 6, 2013

M1H Background Noise – X-Axis

Page 4: M1H Transfer Function Georg Gassner, March 6 th, 2013

4LCLS-II Phys. Meeting / March 6, 2013

M1H Background Noise – Y-Axis

Page 5: M1H Transfer Function Georg Gassner, March 6 th, 2013

5LCLS-II Phys. Meeting / March 6, 2013

Vibrating the Stand

Buttkicker

43.6Hz

Page 6: M1H Transfer Function Georg Gassner, March 6 th, 2013

6LCLS-II Phys. Meeting / March 6, 2013

Applied Freq. vs. X-Axis Sensor on Top

31nm Amplitude

3nm Amplitude

3µm Amplitude

Page 7: M1H Transfer Function Georg Gassner, March 6 th, 2013

7LCLS-II Phys. Meeting / March 6, 2013

Applied Freq. vs. Y-Axis Sensor on Top

Y- motion mostly caused by crosstalk due to sensor placement off axis

3nm Amplitude

Page 8: M1H Transfer Function Georg Gassner, March 6 th, 2013

8LCLS-II Phys. Meeting / March 6, 2013

Vibrating the Floor

Vibco

Page 9: M1H Transfer Function Georg Gassner, March 6 th, 2013

9LCLS-II Phys. Meeting / March 6, 2013

Applied Freq. vs. X-Axis Sensors

31nm Amplitude 3nm Amplitude

Page 10: M1H Transfer Function Georg Gassner, March 6 th, 2013

10LCLS-II Phys. Meeting / March 6, 2013

Applied Freq. vs. Y-Axis Sensors

3nm Amplitude 3nm Amplitude

Page 11: M1H Transfer Function Georg Gassner, March 6 th, 2013

11LCLS-II Phys. Meeting / March 6, 2013

Result - Transfer Function

- Y-axis vibration 1=1

- X-axis response varies

by the induced

frequency.

Page 12: M1H Transfer Function Georg Gassner, March 6 th, 2013

12LCLS-II Phys. Meeting / March 6, 2013

Construction Activity test Aug 1st 2012

Road Header• M1H top 1.0µm @ 24Hz (27; 29)• M2H top 0.1µm @ 20Hz• M1H floor 0.3µm @ <20Hz

Integrated raw data:

Statistics @ 23Hz

Page 13: M1H Transfer Function Georg Gassner, March 6 th, 2013

13LCLS-II Phys. Meeting / March 6, 2013

Construction Activity test Aug 1st 2012

Concrete Drill• M1H top 0.1µm @ 30Hz (24; 45)

Integrated raw data:

Statistics @ 30Hz

Page 14: M1H Transfer Function Georg Gassner, March 6 th, 2013

14LCLS-II Phys. Meeting / March 6, 2013

Outlook

Mirror yaw measurements:

- No measurement device available to measure yaw

movement with 1µrad resolution @100Hz sampling rate.

- Solution: Use x-ray beam to measure effect of mirror

vibration in FEH.- Install vibration device and seismometer sensors on

PAMM of 3/20.

Measure construction activity:

- Installed sensors in BTH today.

- Construction activities and vibration measurements on

3/19.

Page 15: M1H Transfer Function Georg Gassner, March 6 th, 2013

Construction Equipment Activities – Sensor Placement

Slide 15

QT41, 42, 43

QUM1 &2

QEM1 & 2

Construction Activities

Page 16: M1H Transfer Function Georg Gassner, March 6 th, 2013

16LCLS-II Phys. Meeting / March 6, 2013

Sensors on QUM#1 & #2 and QEM#1 & #2

Page 17: M1H Transfer Function Georg Gassner, March 6 th, 2013

17LCLS-II Phys. Meeting / March 6, 2013

Sensors on QT41, QT42 & QT43