5/27/2018 M52-HVACHeatLoadCalculation_A-slidepdf.com http://slidepdf.com/reader/full/m52-hvac-heat-load-calculationa 1/119  BIEN DONG 1 PROJECT PROJECT PACKAGE NUMBER: BD1-10-126-HVAC SYSTEM (WHP- MT1) DOCUMENT TITLE HVAC – HEAT LOAD CALCULATION TOTAL NO. OF PA GES 119 VENDOR'S ORDER NO. 16-2010/PTSCMC/MHH  VENDOR'S OWN DOCUMENT NO. REV TRANSMITTA L NO. DATE 758913-HVAC-M-CA-001 A 002 29 Nov 2010 SUBMITTED FOR: REVIEW / APPROVAL INFO FINAL REVIEW DOES NOT CONSTITUTE ACCEPTANCE OF DESIGN DETAILS, CALCULATIONS, TEST METHODS OR MATERIALS DEVELOPED OR SELECTED BY VENDOR, NOR DOES IT RELIEVE VENDOR FROM FULL COMPLIANCE WITH CONTRACTUAL OR OTHER OBLIGATIONS. VENDOR NAME: PVD TRADING & DRILLING TECHNICAL SERVICES LTD., CO. PACKAGE DESCRIPTION: HVAC SYSTEM (WHP-MT1)  A. ACCEPTED TAG NO: MODEL TYPE: B. ACCEPTED, PROCEED WITH WORK AND INCORPORATE COMMENTS AND RE-SUBMIT. NA NA VENDOR DOCUMENT NUMBER (IF APPLICABLE): P745/171 C. NOT ACCEPTED. REVISE AND RE- SUBMIT. VDRL DOC CODE:  M52 D. FOR INFORMATION ONLY.

Upload: ho-ngoc-thanh-quang

Post on 17-Oct-2015

238 views

Category:

Documents


5 download

TRANSCRIPT

  • BIEN DONG 1 PROJECT PROJECT PACKAGE NUMBER: BD1-10-126-HVAC SYSTEM (WHP- MT1)

    DOCUMENT TITLE

    HVAC HEAT LOAD CALCULATION

    TOTAL NO. OF PAGES 119 VENDOR'S ORDER NO. 16-2010/PTSCMC/MHH VENDOR'S OWN DOCUMENT NO. REV TRANSMITTAL NO. DATE 758913-HVAC-M-CA-001 A 002 29 Nov 2010

    SUBMITTED FOR:

    REVIEW / APPROVAL INFO FINAL REVIEW DOES NOT CONSTITUTE ACCEPTANCE OF

    DESIGN DETAILS, CALCULATIONS, TEST METHODS OR MATERIALS DEVELOPED OR SELECTED BY VENDOR, NOR DOES IT RELIEVE VENDOR FROM FULL COMPLIANCE WITH CONTRACTUAL OR OTHER OBLIGATIONS.

    VENDOR NAME:

    PVD TRADING & DRILLING TECHNICAL SERVICES LTD., CO. PACKAGE DESCRIPTION:

    HVAC SYSTEM (WHP-MT1) A. ACCEPTED TAG NO: MODEL TYPE:

    B. ACCEPTED, PROCEED WITH WORK AND INCORPORATE COMMENTS AND RE-SUBMIT.

    NA NA VENDOR DOCUMENT NUMBER (IF APPLICABLE):

    P745/171 C. NOT ACCEPTED. REVISE AND RE-

    SUBMIT.

    VDRL DOC CODE:

    M52

    D. FOR INFORMATION ONLY. NAME: DATE: PTSC PO No. PURCHASER DOCUMENT NUMBER

    PKG NO. TYPE SEQUENCE REV

    SIGNATURE: BD1-10-126 M52 001 A

  • BIEN DONG PETROLEUM OPERATING COMPANY

    BIEN DONG 1 PROJECT

    DOC. NO. WHP-MT1-H-C-0021 OFFSHORE FACILITIES

    Page 1 of 118

    0 08/10/10 Approved For Use MFO MZN/TBH BE ER Rev Date Description Prepd Checkd WP Appd BDPOC

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    Location: Kuala Lumpur, Malaysia.

    WHPMT1HC0021_0

    CALCULATION FOR HVAC-WHP MT1

  • Title: Calculation For HVAC-WHP MT1 Document No: WHP-MT1-H-C-0021 Date : 08-OCT-10 Page : Page 2 of 118 Rev : 0

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    Location: Kuala Lumpur, Malaysia.

    WHPMT1HC0021_0

    TABLE OF CONTENTS

    1.0 INTRODUCTION 3

    1.1 Project Description 3 1.2 Acronyms and Abbreviations 3

    2.0 SCOPE 5

    2.1 General 5

    3.0 REFERENCES 5

    4.0 CONCLUSION 6

    ATTACHMENT 1: Design Input Data A1

    (10 Pages) ATTACHMENT 2: Design Summary Electrical & Instrument Building A2

    (18 Pages) ATTACHMENT 3: Design Summary 24 man Living Quarters A3

    (36 Pages) ATTACHMENT 4: Design Summary Transformer Room A4

    (8 Pages) ATTACHMENT 5: Equipment Layout Drawing A5

    (3 Pages) ATTACHMENT 6: HVAC Flow Schematic A6

    (2 Pages)

  • Title: Calculation For HVAC-WHP MT1 Document No: WHP-MT1-H-C-0021 Date : 08-OCT-10 Page : Page 3 of 118 Rev : 0

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    Location: Kuala Lumpur, Malaysia.

    WHPMT1HC0021_0

    1.0 INTRODUCTION 1.1 Project Description

    The Bien Dong 1 Project involves offshore development of the Hai Thach and Moc Tinh gas/condensate Fields in Blocks 05.2 and 05.3 approximately 340km south of the coast of Vietnam. The fields lie approximately 20km apart.

    The project includes: A Wellhead platform in Moc Tinh (WHP-MT1) A Wellhead platform in Hai Thach (WHP-HT1) A Production and Quarter Platform in Hai Thach (PQP-HT) A Floating Storage and Offloading (FSO) vessel in Hai Thach An in-field pipeline from the WHP-MT1 to WHP-HT1

    Condensate export lines from the PQP HT to the FSO

    A fuel gas line from the PQP HT to the FSO

    A gas export pipeline from the PQP HT to link up to the existing Nam Con Son pipeline.

    Submarine Cable from the PQP HT to the WHP-MT1.

    The FSO design will be conducted under a separate contract.

    1.2 Acronyms and Abbreviations

    BDPOC Bien Dong Petroleum Operating Company

    WP WorleyParsons Ltd

    WHP-HT1 Hai Thach Wellhead Platform

    PQP HT Hai Thach Production and Quarters Platform

    FSO Floating Storage and Offloading Vessel

    WHP-MT1 Moc Tinh Wellhead Platform

    FEED Front End Engineering and Design

    AHU Air Handling Unit

    ASHRAE American Society for Heating, Refrigeration and Air-Conditioning Engineers

    DB Dry Bulb

    CH Air Cooled Condensing Unit

    DX Direct Expansion

    LCP HVAC Control Panel

  • Title: Calculation For HVAC-WHP MT1 Document No: WHP-MT1-H-C-0021 Date : 08-OCT-10 Page : Page 4 of 118 Rev : 0

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    HVAC Heating, Venting and Air-Conditioning

    IAQ Indoor Air Quality.

    LER Local Equipment Room

    PPM Part per Million

    RH Relative Humidity

    WB Wet Bulb

    WG Water Gauge

  • Title: Calculation For HVAC-WHP MT1 Document No: WHP-MT1-H-C-0021 Date : 08-OCT-10 Page : Page 5 of 118 Rev : 0

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    2.0 SCOPE 2.1 General

    The preliminary heat load estimation of the heating, ventilation and air-conditioning (HVAC) systems for Bien Dong; Moc Tinh Wellhead Platform (WHP MT-1) is documented in this report. The HVAC systems were simulated using Carrier E20-II Rev.4.30 software of which heat load analysis is based on the AHSRAE transfer function method. The cooling capacity generated by this software provided the coincident peak load calculated on an hourly basis over a period of 12 month.

    The areas covered in the analysis include:

    o 24 man Living Quarters

    o Electrical & Instrument Building

    - Electrical & Instrument Room

    - Battery Room

    - HV Switchgear Room

    - Transformer Room

    3.0 REFERENCES i. HVAC Design Basis BD1-00-H-A-0002

    ii. ASHRAE Fundamentals Handbook 2005

    iii. Electrical Equipment Layout (WHP-MT1-E-D-5000) iv. Architectural Drilling Layout Plan (WHP-MT1-S-D-9001) v. SMACNA HVAC System Duct Design

    vi. ASHRAE 62.1 2007; Ventilation for Acceptable Indoor Air Quality

    vii. NFPA 90A; Installation of Air Conditioning and Ventilation System

    viii. IP 15; Area Classification Code for Installations Handling Flammable Fluids

  • Title: Calculation For HVAC-WHP MT1 Document No: WHP-MT1-H-C-0021 Date : 08-OCT-10 Page : Page 6 of 118 Rev : 0

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    4.0 CONCLUSION The analytical result generate by Carrier E-20-II Rev.4.30 software programme are summarized below:

    Air Handling Unit Tag No Total Coil

    Load (kWR)

    Sensible Coil Load

    (kWR) Flowrate

    (l/s)

    System 1 E&I Building MT1-AHU-7101 72.7 41.4 2853 System 2 24 man Living Quarters MT1-AHU-7121 98.4 34.0 1697

    Fan Tag No Flowrate (l/s) System 1 Exhaust Fan - Battery Room MT1-FN-7103 A/B 256 System 2 Exhaust Fan Smoking Room MT1-FN-7123 A/B 66 Exhaust Fan - Toilet & Laundry room MT1-FN-7124 A/B 426 Exhaust Fan - Galley MT1-FN-7125 A/B 512 Supply Fan - Galley MT1-FN-7126 A/B 146 Exhaust Fan First Aid Room MT1-FN-7127 A/B 46 System 3 Exhaust Fan Transformer Room MT1-FN-7104 A/B 491

  • Title: Calculation For HVAC-WHP MT1 Document No: WHP-MT1-H-C-0021 Date : 08-OCT-10 Page : A1 Rev : 0

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    Location: Kuala Lumpur, Malaysia.

    WHPMT1HC0021_0

    ATTACHMENT 1: Design Input Data

    (10 Pages) Attachment 1.1: Design Input Summary (7 pages) Attachment 1.2: Design Weather Parameter & MSHGs (1 page) Attachment 1.3: Wall, Roof & Floor U-Value (2 pages)

  • Title: Calculation For HVAC-WHP MT1 Document No: WHP-MT1-H-C-0021 Date : 08-OCT-10 Page : A1-1 Rev : 0

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    Location: Kuala Lumpur, Malaysia.

    WHPMT1HC0021_0

    ATTACHMENT 1.1: Design Input Summary (7 Pages)

    Table 1.1: Room Temperature Data

    Table 1.2: Space and system Input Data Summary Table 1.3: Electrical and Instrument Heat Dissipation

    Table 1.4: Electrical Panel Heat Dissipation

    Table 1.5: Telecommunication Equipment Heat Dissipation

    Table 1.6: Instrumentation Panel Heat Dissipation

  • Bien Dong 1 Project (WHP-MT1)

    TABLE 1-1 ROOM TEMPERATURE DATA

    Design RoomTemperature

    (Winter)

    Design RoomTemperature

    (Summer)RelativeHumidity

    Minimum Air

    Change per Hour

    Direct Exhaust

    C DB C DB % ACH Yes/No

    Upper Deck

    1 Office/Radio room 22 2 22 2 50 5 6 No2 First Aid room 22 2 22 2 50 5 6 Yes 100% exhaust, No recirculation.3 4 man cabin 22 2 22 2 50 5 6 No4 Mess room 22 2 22 2 50 5 6 No5 Air lock 20 2 24 2 NC 4 No6 Galley 22 2 24 2 50 5 6 Yes Note 17 Laundry/Linen store 20 2 24 2 50 5 6 Yes 100% exhaust, No recirculation.8 Toilet & Locker area 22 2 24 2 50 5 12 Yes 100% exhaust, No recirculation.9 Corridor 20 2 22 2 50 5 6 No10 Smoking Room 20 2 22 2 NC 12 Yes

    Mezzanine Deck11 HV Switchroom 22 2 24 2 50 5 6 No12 Battery room 20 2 24 2 NC 12 Yes 100% exhaust, No recirculation.13 Transformer Room 22 2 35 2 NC 12 Yes Natural ventilation only14 UPS Room 22 2 22 2 50 5 6 No

    Cellar Deck15 Electrical & Instrument room 22 2 22 2 50 5 6 No

    Notes :

    1 Additional filtered fresh air from outside shall be supplied to make-up for the air extracted from the kitchen hood.

    Item Room Remarks

    O:\4211xxx\4211281\1-Mechanical\02-Calculation\B-Issued\HVAC\Detail\AFU\WHP MT1\WHP-MT1 1 of 7

  • Bien Dong 1 Project (WHP-MT1)

    TABLE 1-2 SPACE & SYSTEM INPUT DATA SUMMARY

    External Design Conditions: Others Design Input Data:Summer Maximum: +32.4 C dry bulb, +32.1 C wet bulb a) Max. U value of the external envelop = (Refer to E20 printout) w/m2/KWinter Minimum: +20.7 C dry bulb, +15.8 C wet bulbDaily Range: 8.2 K

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 51

    S

    e

    n

    s

    i

    b

    l

    e

    (

    W

    )

    L

    a

    t

    e

    n

    t

    (

    W

    )

    W

    a

    l

    l

    A

    r

    e

    a

    (

    m

    2

    )

    W

    i

    n

    d

    o

    w

    A

    r

    e

    a

    (

    m

    2

    )

    W

    a

    l

    l

    A

    r

    e

    a

    (

    m

    2

    )

    W

    i

    n

    d

    o

    w

    A

    r

    e

    a

    (

    m

    2

    )

    W

    a

    l

    l

    A

    r

    e

    a

    (

    m

    2

    )

    W

    i

    n

    d

    o

    w

    A

    r

    e

    a

    (

    m

    2

    )

    W

    a

    l

    l

    A

    r

    e

    a

    (

    m

    2

    )

    W

    i

    n

    d

    o

    w

    A

    r

    e

    a

    (

    m

    2

    )

    Upper Deck1 Office/Radio room 1 AC 21.4 4.0 2.7 2 20 0.3 2.5 11 11 6 96 124 124 11 142 First Aid room 1 ACMV 8.0 4.0 2.7 1 20 6 36 0.3 2.5 5 36 46 46 53 4 man cabin W 1 AC 12.0 4.0 2.7 4 20 0.3 2.5 14 14 6 54 85 85 84 Mess room 1 AC 20.3 4.0 2.7 12 20 0.9 3.8 64 50 1 0.006 36 36 64 6 91 191 191 105 Air lock 1 AC 5.2 4.0 2.7 20 0.3 2 30 1 0.006 28 28 28 4 16 28 28 56 Galley 1 ACMV 30.5 4.0 2.7 2 20 1,000 6 137 3.5 107 50 50 1 0.008 47 47 137 211 211 21 133 4 man cabin E 1 AC 12.0 4.0 2.7 4 20 0.3 2.5 14 14 6 54 86 86 87 Laundry/Linen store 1 ACMV 8.8 4.0 2.7 1 20 6 40 0.6 2.5 8 150 150 150 150 68 Toilet & Locker area 1 ACMV 30.7 4.0 2.7 4 20 12 276 2.5 77 35 276 276 276 11 219 Corridor S 1 AC 11.2 4.0 2.7 20 0.3 3 3 6 50 54 5410 Corridor N 1 AC 7.9 4.0 2.7 20 0.3 2 20 1 0.006 23 23 23 6 36 38 3811 Smoking Room 1 AC 6.2 4.0 2.7 5 20 12 56 0.3 10.0 52 56 66 66 5 10

    Mezzanine Deck12 HV Switchroom 1 AC 15.3 4.0 4.0 20 300 0.6 5.0 9 50 1 0.008 47 47 47 6 102 102 102 13 1513 Battery room 1 ACMV 21.3 4.0 4.0 20 584 12 284 7.5 160 50 1 0.006 36 36 284 312 312 23 4 21

    14 Transformer room 1 MV 14.0 4.0 4.0 20 10,500 6 93 7.5 105 105 491 491 13 15 1415 UPS Room 1 AC 19.1 4.0 4.0 20 4,800 0.6 5.0 11 50 1 0.006 36 36 36 6 127 574 574 32 10 10 19

    Cellar Deck16 Electrical & Instrument room 1 AC 71.7 4.5 4.5 2 20 15,879 0.6 5.0 53 50 1 0.006 23 1 0.008 47 70 70 6 538 1,836 1,836 36 33 36 4117 Electrical & Instrument room Airlock 1 AC 3.4 4.5 4.5 20 0.3 1 30 1 0.006 28 28 28 4 17 28 28 9 8 9

    Notes :1 Required exhaust air flow shall be either calculated exhaust air flow based on air change per hour or minimum outdoor air requirements based on ASHRAE Standard 62.1-2007 requirements, whichever is larger.

    2 Total outdoor air required shall be based on fresh air required for human for Living AreasReference from ASHRAE Standard 62.1-2007 "Ventilation for Acceptable Indoor Air Quality", Table 6-1; Minimum Ventilation Rates in Breathing Zone

    3 Formula for Exfiltration Flow Rate :Q = 0.839 * 1000 * Area * sqrt(diff press.) - ASHRAE Applications 51.5

    4 Required ventilation air shall be based on either directly exhausted air plus exfiltration air or outdoor air required based on ASHRAE Standard 62.1-2007 requirements, whichever is larger.

    5 Conditioned supply air shall be selected based on minimum required air change per hour per room or calculated airflow based on heat load requirements, whichever is higher.

    6 Cooking hood exhaust rate based on exhaust flow rate by cooking equipment categoryReference from 2007 ASHRAE Handbook -HVAC Application (SI); Chapter 31, Table 2

    Q = 465 x 1.1 (linear meter of hood) 512 l/s

    7 Abbrevations : - AC - AIR-CONDITIONED ACH- AIR CHANGE PER HOURMV - MECHANICAL VENTILATION OA- OUTDOOR AIR

    8 Formula for calculating flowrate based on nos. of Air Changes per Hour:Flowrate (L/s) = Room Volume (m3) * ACH / 3.6

    9 The breathing zone outdoor airflow shall be determined in accordance with Equation 6-1; ASHRAE Standard 62.1-2007

    T

    o

    t

    a

    l

    E

    x

    f

    i

    l

    t

    r

    a

    t

    i

    o

    n

    A

    i

    r

    F

    l

    o

    w

    t

    h

    r

    u

    '

    D

    o

    o

    r

    s

    (

    L

    /

    s

    )

    (

    N

    o

    t

    e

    3

    )

    N

    o

    .

    o

    f

    R

    o

    o

    m

    s

    L

    /

    S

    p

    e

    r

    p

    e

    r

    s

    o

    n

    (

    N

    o

    t

    e

    2

    )

    Breathing Zone Outdoor Airflow (L/s) (Note 9)

    F

    l

    o

    o

    r

    A

    r

    e

    a

    (

    m

    2

    )

    Supply Air (L/s)

    R

    e

    q

    d

    .

    F

    r

    e

    s

    h

    A

    i

    r

    i

    n

    L

    /

    s

    (

    N

    o

    t

    e

    4

    )

    A

    r

    e

    a

    o

    f

    g

    a

    p

    a

    l

    o

    n

    g

    t

    h

    e

    p

    e

    r

    i

    m

    e

    t

    e

    r

    o

    f

    d

    o

    o

    r

    w

    i

    t

    h

    1

    .

    0

    m

    m

    w

    i

    d

    t

    h

    g

    a

    p

    O

    t

    h

    e

    r

    E

    l

    e

    c

    t

    r

    i

    c

    a

    l

    A

    p

    p

    l

    i

    a

    n

    c

    e

    s

    (

    w

    /

    m

    2

    ) Equipment Heat

    Exfiltration Thru' Doors only (litre/sec)

    L

    /

    S

    p

    e

    r

    s

    q

    m

    (

    N

    o

    t

    e

    2

    )

    N

    o

    s

    .

    o

    f

    D

    o

    o

    r

    s

    (

    1

    8

    0

    0

    m

    m

    x

    2

    1

    0

    0

    m

    m

    )

    P

    r

    e

    s

    s

    u

    r

    e

    D

    i

    f

    f

    e

    r

    e

    n

    c

    e

    i

    n

    P

    a

    S

    e

    l

    e

    c

    t

    e

    d

    S

    u

    p

    p

    l

    y

    A

    i

    r

    (

    L

    /

    s

    )

    (

    N

    o

    t

    e

    5

    )

    A

    C

    M

    V

    P

    r

    o

    v

    i

    s

    i

    o

    n

    (

    N

    o

    t

    e

    7

    )

    A

    r

    e

    a

    o

    f

    g

    a

    p

    a

    l

    o

    n

    g

    t

    h

    e

    p

    e

    r

    i

    m

    e

    t

    e

    r

    o

    f

    d

    o

    o

    r

    w

    i

    t

    h

    1

    .

    0

    m

    m

    w

    i

    d

    t

    h

    g

    a

    p

    A

    C

    H

    S

    u

    p

    p

    l

    y

    A

    i

    r

    (

    L

    /

    s

    )

    m

    2

    /

    p

    e

    r

    s

    o

    n

    M

    i

    n

    i

    m

    u

    m

    e

    x

    h

    a

    u

    s

    t

    r

    a

    t

    e

    (

    L

    /

    s

    )

    E

    x

    f

    i

    l

    t

    r

    a

    t

    i

    o

    n

    t

    h

    r

    o

    u

    g

    h

    d

    o

    o

    r

    (

    1

    8

    0

    0

    m

    m

    x

    2

    1

    0

    0

    m

    m

    )

    (

    L

    /

    s

    )

    I

    t

    e

    m Room Description

    N

    o

    s

    .

    F

    l

    o

    o

    r

    t

    o

    F

    l

    o

    o

    r

    H

    e

    i

    g

    h

    t

    (

    m

    )

    C

    e

    i

    l

    i

    n

    g

    H

    e

    i

    g

    h

    t

    (

    m

    )

    E

    x

    f

    i

    l

    t

    r

    a

    t

    i

    o

    n

    t

    h

    r

    o

    u

    g

    h

    d

    o

    o

    r

    (

    9

    0

    0

    m

    m

    x

    2

    1

    0

    0

    m

    m

    )

    (

    L

    /

    s

    )

    Internal Heat Load

    L

    i

    g

    h

    t

    i

    n

    g

    (

    w

    /

    m

    2

    )

    Wall Exposure (m2)

    N

    o

    s

    .

    o

    f

    D

    o

    o

    r

    s

    (

    9

    0

    0

    m

    m

    x

    2

    1

    0

    0

    m

    m

    )

    T

    o

    t

    a

    l

    (

    L

    /

    s

    )

    Population

    A

    i

    r

    C

    h

    a

    n

    g

    e

    p

    e

    r

    H

    o

    u

    r

    C

    a

    l

    c

    u

    l

    a

    t

    e

    d

    E

    x

    h

    a

    u

    s

    t

    A

    i

    r

    F

    l

    o

    w

    b

    a

    s

    e

    d

    o

    n

    A

    C

    H

    (

    L

    /

    s

    )

    (

    N

    o

    t

    e

    8

    )

    Direct Mechanical

    Exhaust (L/s)

    R

    o

    o

    f

    (

    m

    2

    )

    H

    e

    a

    t

    L

    o

    a

    d

    (

    H

    A

    P

    )

    S

    u

    p

    p

    l

    y

    A

    i

    r

    (

    L

    /

    s

    )

    A

    i

    r

    C

    h

    a

    n

    g

    e

    p

    e

    r

    H

    o

    u

    r

    RemarksSouth (S) East (E) North (N) West (W)

    O:\4211xxx\4211281\1-Mechanical\02-Calculation\B-Issued\HVAC\Detail\AFU\WHP MT1\WHP-MT1 2 of 7

  • Bien Dong 1 Project (WHP-MT1)

    TABLE 1-3 ELECTRICAL & INSTRUMENT HEAT DISSIPATION

    Item Room Estimated Electrical Heat LoadEstimated Telecomm.

    Heat LoadEstimated Instrument

    Heat Load

    Total Electrical, Telecomunication &

    Instrument Heat LoadRemarks

    (Watts) (Watts) (Watts) (Watts)

    Upper Deck1 Galley 1,000 1,000 (Note 1)

    Mezzanine Deck2 HV Switchroom 300 300 (Note 1)3 Battery Room 584 584 (Note 1)4 Transformer Room 10,500 10,500 (Note 1)5 UPS room 4,800 4,800 (Note 1)

    Cellar Deck6 Electrical & Instrument room 3,870 1,850 10,159 15,879 (Note 1)

    Notes:

    1. Heat dissipation values are tentative and shall be checked against final manufacturers' values.

    O:\4211xxx\4211281\1-Mechanical\02-Calculation\B-Issued\HVAC\Detail\AFU\WHP MT1\WHP-MT1 3 of 7

  • Bien Dong 1 Project (WHP-MT1)

    Table 1-4 Electrical Panel Heat Dissipation

    Length Depth Height Unit weight Total

    Unit Heat Dissipation

    Load factor Total

    1 11kV RING MAIN UNIT 1216 710 1140 1 1500 1500 500 0.6 300 ESTIMATION2 415V SWITCHBOARD/MCC 4200 1600 2200 12 500 6000 550 0.5 3300 ABB3 240V AC UPS - 40kVA 3400 800 1900 2 3120 6240 6000 0.4 4800 GUTOR4 NAV-AID BATTERY CHARGER 2100 800 1900 2 580 1160 100 1 200 ESTIMATION5 SMALL POWER DISTRIBUTION BOARD 600 250 800 1 100 100 300 0.6 180 ESTIMATION6 LIGHTING & SMALL POWER DISTRIBUTION BOARD 600 250 800 1 100 100 300 0.6 180 ESTIMATION7 THYRISTOR 600 250 800 1 100 100 100 0.6 60 ESTIMATION8 220V DC BATTERY BANK (230V AC UPS) 2250 930 1911 187 20 3740 2 0.5 187 ESTIMATION9 220V DC BATTERY BANK (230V AC UPS) 2250 930 1911 187 20 3740 2 0.5 187 ESTIMATION

    10 NAV AIDS BATTERY 10 20 200 2 0.5 10 ESTIMATION11 ROOM LIGHTING 23 0 10 1 230 ESTIMATION12 UCP 800 1 500 500 300 0.5 150 ESTIMATION

    TOTAL 22880 9784

    HV Switchroom: 300 WE&I Room: 3870 WUPS Room: 4800 WBattery Room: 584 W

    Heat Dissipation (Watt)RemarksItem Description

    DimensionQty

    Weight (kg)

    O:\4211xxx\4211281\1-Mechanical\02-Calculation\B-Issued\HVAC\Detail\AFU\WHP MT1\WHP-MT1 4 of 7

  • Bien Dong 1 Project (WHP-MT1)

    Table 1-5 Telecomunication Equipment Heat Dissipation

    Location Supply

    Duration of

    Battery

    Support

    Maximum Load Duty Cycle Duty Load

    Load Factor (80%)

    4 MT1-PA-9201B PAGA System B Cabinet Platform Office -2 Ventilation Panel DUPS 3 45 I 13.5 17 0.07 0.004 14.402 Internal Light DUPS 3 40 NU 4 5 0.02 0.001 4.272 General Purpose Outlets DUPS 3 800 NU 80 100 0.42 0.025 85.352 PAGA System B Cabinet DUPS 3 3000 I 900 1125 4.69 0.281 960.19

    4 MT1-ME-9001 Meteorological Cabinet Platform Office -4 Ventilation Panel DUPS 0.5 45 I 13.5 17 0.07 0.004 14.404 Internal Light DUPS 0.5 40 NU 4 5 0.02 0.001 4.274 General Purpose Outlets DUPS 0.5 800 NU 80 100 0.42 0.025 85.354 Meteorological System computer DUPS 0.5 200 C 200 250 1.04 0.063 213.384 Meteorological Monitor DUPS 0.5 100 C 100 125 0.52 0.031 106.69

    2 MT1-RT-9030 Radio Cabinet Platform Office -2 Ventilation Panel DUPS 3 45 I 13.5 17 0.07 0.004 14.402 Internal Light DUPS 3 40 NU 4 5 0.02 0.001 4.272 General Purpose Outlets DUPS 3 800 NU 80 100 0.42 0.025 85.352 MT1-UHF-9011 UHF Repeater 1 DUPS 3 300 I 90 113 0.47 0.028 96.022 MT1-UHF-9012 UHF Repeater 2 DUPS 3 300 I 90 113 0.47 0.028 96.023 MT1-UHF-9013 UHF Repeater 3 DUPS 3 300 I 90 113 0.47 0.028 96.024 MT1-RT-9031 Digital Radio (Narrow Band Data) DUPS 3 100 C 100 125 0.52 0.031 106.69

    2 MT1-EN-9300 Entertainment Cabinet Platform Office -2 Ventilation Panel NUPS 0 45 I 13.5 17 0.07 0.004 14.402 Internal Light NUPS 0 40 NU 4 5 0.02 0.001 4.272 General Purpose Outlets NUPS 0 800 NU 80 100 0.42 0.025 85.353 MT1-EN-9301 TV monitor NUPS 0 100 C 100 125 0.52 0.031 106.693 MT1-EN-9302 Radio monitor NUPS 0 100 C 100 125 0.52 0.031 106.693 MT1-EN-9303 Optical fibre receiver NUPS 0 300 C 300 375 1.56 0.094 320.063 MT1-EN-9305 Launch amplifier NUPS 0 100 C 100 125 0.52 0.031 106.69

    2 MT1-TEC-9000 Telecommunications Console Platform Office -2 Internal Light DUPS 0.5 40 NU 4 5 0.02 0.001 4.272 General Purpose Outlets DUPS 0.5 800 NU 80 100 0.42 0.025 85.352 MT1-ME-9001 Meteorological System Display DUPS 0.5 100 C 100 125 0.52 0.031 106.694 MT1-NDB-9001 NDB Remote Control DUPS 0.5 50 I 15 19 0.08 0.005 16.002 MT1-CCTV-9407 CCTV Control Keyboard DUPS 0.5 200 C 200 250 1.04 0.063 200.002 MT1-VHF-9001 VHF-FM Marine Radio DUPS 24 200 I 60 75 0.31 0.019 64.012 MT1-VHF-9002 VHF-AM Aero Radio DUPS 3 200 I 60 75 0.31 0.019 64.012 MT1-UHF-9015 UHF Open Channel Radio DUPS 3 200 I 60 75 0.31 0.019 64.012 MT1-AUE-9203 PAGA Remote Access Station DUPS 3 0 I 0 0 0.00 0.000 0.00

    4 Power Outlet Platform office -4 MT1-MON-9402 CCTV Monitor (Wall Mounted) NUPS 0 125 I 37.5 47 0.20 0.012 150.00

    4 Power Outlet Platform office -2 MT1-RBC-9005 Battery Charger (UHF Radio) NUPS 0 125 I 37.5 47 0.20 0.012 40.01

    4 Power Outlet Platform office -2 MT1-RBC-9004 Battery Charger (VHF FM Radio) NUPS 0 125 I 37.5 47 0.20 0.012 40.01

    4 Power Outlet Platform office -2 MT1-RBC-9006 Battery Charger (UHF Radio) NUPS 0 125 I 37.5 47 0.20 0.012 40.01

    4 Power Outlet Platform office -4 MT1-FAX-9102 Business Facsimile NUPS 0 100 I 30 38 0.16 0.009 32.01

    4 MT1-PA-9201A PAGA System A Cabinet E&I Room -2 Ventilation Panel DUPS 3 45 I 13.5 17 0.07 0.004 14.402 Internal Light DUPS 3 40 NU 4 5 0.02 0.001 4.272 General Purpose Outlets DUPS 3 800 NU 80 100 0.42 0.025 85.352 PAGA System A DUPS 3 3000 I 900 1125 4.69 0.281 960.19

    2 MT1-PBX-9100 PABX Cabinet E&I Room -2 Ventilation Panel DUPS 3 45 I 13.5 17 0.07 0.004 14.402 Internal Light DUPS 3 40 NU 4 5 0.02 0.001 4.272 General Purpose Outlets DUPS 3 800 NU 80 100 0.42 0.025 85.354 PABX DUPS 3 800 NU 80 100 0.42 0.025 85.35

    4 MT1-DEE-9101 DATA Cabinet E&I Room -2 Ventilation Panel DUPS 3 45 I 13.5 17 0.07 0.004 14.40

    Rev. Tag Number DESCRIPTION

    Ratings based on nominal voltage240 VAC

    0.31 1064.21

    (kW) (Btu/hr)

    Design Load(Watts) Load

    (A)

    Estimated Heat

    Dissipation

    0.22 744.15

    0.15 498.76

    0.12 424.08

    0.01 40.01

    0.01 150.00

    0.18 604.35

    0.01 32.01

    0.01 40.01

    0.01 40.01

    0.35 1192.23

    0.06 189.37

    0.31 1064.21

    O:\4211xxx\4211281\1-Mechanical\02-Calculation\B-Issued\HVAC\Detail\AFU\WHP MT1\WHP-MT1 5 of 7

  • Bien Dong 1 Project (WHP-MT1)

    Table 1-5 Telecomunication Equipment Heat Dissipation

    Location Supply

    Duration of

    Battery

    Support

    Maximum Load Duty Cycle Duty Load

    Load Factor (80%)

    Rev. Tag Number DESCRIPTION

    Ratings based on nominal voltage240 VAC

    (kW) (Btu/hr)

    Design Load(Watts) Load

    (A)

    Estimated Heat

    Dissipation

    2 Internal Light DUPS 3 40 NU 4 5 0.02 0.001 4.272 General Purpose Outlets DUPS 3 800 NU 80 100 0.42 0.025 85.354 MT1-DEE-9102/3 Ethernet Switch Office LAN DUPS 3 300 C 300 375 1.56 0.094 320.064 MT1-DEE-9105 Ethernet Switch Telecoms LAN DUPS 3 300 C 300 375 1.56 0.094 320.064 MT1-DEE-9110 Firewall DUPS 3 200 C 200 250 1.04 0.063 213.384 MT1-DEE-9108 Router DUPS 3 200 C 200 250 1.04 0.063 213.384 MT1-DEE-9107 WiFi Access Point (PoE) LQ Rm 102 DUPS 3 20 C 20 25 0.10 0.006 21.34

    2 MT1-CCTV-9400 CCTV Cabinet E&I Room -2 Ventilation Panel DUPS 0.5 45 I 13.5 17 0.07 0.004 14.402 Internal Light DUPS 0.5 40 NU 4 5 0.02 0.001 4.272 General Purpose Outlets DUPS 0.5 800 NU 80 100 0.42 0.025 85.352 MT1-CCTV-9401 CCTV Monitor DUPS 0.5 200 C 200 250 1.04 0.063 213.382 MT1-CCTV-9402 CCTV DVR loop recorder DUPS 0.5 200 C 200 250 1.04 0.063 213.382 MT1-CCTV-9401 CCTV Control Server DUPS 0.5 200 C 200 250 1.04 0.063 213.382 CCTV Video Input DUPS 0.5 50 C 50 63 0.26 0.016 53.342 MT1-CAE-9420 Cameras 1 (CCTV) PTZ Deck Areas DUPS 0.5 200 C 200 250 1.04 0.063 213.382 MT1-CAE-9421 Cameras 2 (CCTV) PTZ Deck Areas DUPS 0.5 200 C 200 250 1.04 0.063 213.382 MT1-CAE-9422 Cameras 3 (CCTV) PTZ Deck Areas DUPS 0.5 200 C 200 250 1.04 0.063 213.382 MT1-CAE-9423 Cameras 4 (CCTV) PTZ Deck Areas DUPS 0.5 200 C 200 250 1.04 0.063 213.382 MT1-CAE-9424 Cameras 5 (CCTV) PTZ Deck Areas DUPS 0.5 200 C 200 250 1.04 0.063 213.38

    4 MT1-CARS-9020 Radar Cabinet E&I Room -2 Ventilation Panel DUPS 0.5 45 I 13.5 17 0.07 0.004 14.402 Internal Light DUPS 0.5 40 NU 4 5 0.02 0.001 4.272 General Purpose Outlets DUPS 0.5 800 NU 80 100 0.42 0.025 85.352 MT1-CARS-9021 CARS Control unit DUPS 0.5 380 C 380 475 1.98 0.119 405.412 MT1-CARS-9024 CARS Display unit DUPS 0.5 380 I 114 143 0.59 0.036 121.624 MT1-CARS-9023 AIS Transponder DUPS 24 150 I 45 56 0.23 0.014 48.014 MT1-RAC-9001 RACON Interface DUPS 0.5 10 I 3 4 0.02 0.001 3.204 MT1-CARS-9022 Camera Controller (Option) DUPS 0.5 200 I 60 75 0.31 0.019 64.014 MT1-CARS-9023 Camera DVR (Option) DUPS 0.5 200 I 60 75 0.31 0.019 64.01

    4 Cabinet Spare E&I Room -2 Ventilation Panel DUPS 0.5 45 I 13.5 17 0.07 0.004 14.402 Internal Light DUPS 0.5 40 NU 4 5 0.02 0.001 4.272 General Purpose Outlets DUPS 0.5 800 NU 80 100 0.42 0.025 85.35

    3 Power Outlet - Mess/Dining Hall Mess/Dining Hall -3 MT1-TV-9301 Television NUPS 0 125 I 37.5 47 0.20 0.012 40.01

    3 Power Outlet - Mess/Dining Hall Mess/Dining Hall -3 MT1-DVD-9301 DVD Player NUPS 0 80 I 24 30 0.13 0.008 25.61

    4 Power Outlet - Muster Point Mess/Dining Hall -4 MT1-RBC-9000 Battery Charger (VHF Marine Radio) NUPS 0 40 I 12 15 0.06 0.004 12.80

    4 Junction Box - Muster Point Cellar Deck -4 MT1-RBC-9003 Battery Charger (VHF Marine Radio) NUPS 0 40 I 12 15 0.06 0.004 12.80

    4 Junction Box - NDB System Power Heli-deck -4 MT1-NDB-9003/4 Dual redundant NDB NUPS 0 800 I 240 300 1.25 0.075 256.054 MT1-NDB-9006 NDB ATU

    4 Junction Box - Radar System Power Heli-deck -4 MT1-ANT-9021 Radar Scanner NUPS 0 380 C 380 475 1.98 0.119 405.41

    3 Power Outlet - Mess/Dining Hall Mess/Dining Hall -3 Computer Power Point NUPS 0 200 NU 20 25 0.10 0.006 21.34

    3 Power Outlet - Mess/Dining Hall Mess/Dining Hall -3 Computer Power Point NUPS 0 200 NU 20 25 0.10 0.006 21.34

    2 Junction Box - Crane Radio System Crane Cab 1 -2 MT1-UHF-9016 Crane Radio UHF System UPS1 0.5 100 I 30 38 0.16 0.009 32.012 MT1-VHF-9003 Crane Radio VHF System UPS1 0.5 100 I 30 38 0.16 0.009 32.012 MT1-SPK-9001 Shout Loudspeaker UPS1 0.5 50 I 15 19 0.08 0.005 16.00

    -

    SUB-TOTAL 26,045.00 9,036.50 11,295.63 47.0720% SPARE CAPACITY FOR FUTURE LOADS 5,209.00 1,807.30 2,259.13 9.41TOTAL 31,254.00 10,843.80 13,554.75 56.48

    0.03 104.02

    0.24 810.29

    0.55 1864.36

    0.00 12.80

    0.01 25.61

    0.01 40.01

    0.12 405.41

    0.08 256.05

    0.00 12.80

    0.02 80.02

    0.01 21.34

    0.01 21.34

    0.56 1,947.493.39 11,684.92

    2.82 9,737.43

    O:\4211xxx\4211281\1-Mechanical\02-Calculation\B-Issued\HVAC\Detail\AFU\WHP MT1\WHP-MT1 6 of 7

  • Bien Dong 1 Project (WHP-MT1)

    Table 1-6 Instrumentation Panel Heat Dissipation

    Unit Watts Total watts Unit BTU/hr Total BTU/hr 1 Monitor 22 " 2 28 56 95 1912 T105 Server 2 305 610 1,040 2,0803 DCS System Cabinet #1 for WHP-MT1 1 663 663 2,261 2,2614 DCS System Cabinet #2 for WHP-MT1 1 441 441 1,504 1,5045 DCS System Cabinet #3 for WHP-MT1 1 853 853 2,909 2,9096 DCS Marshalling Cabinet for WHP-MT1 2 648 1,296 2,210 4,4197 SDS System Cabinet #1 for WHP-MT1 1 3,462 3,462 11,805 11,8058 FGS System Cabinet #1 for WHP-MT1 1 2,778 2,778 9,473 9,473

    Total 10,159 34,642

    Heat dissipation S/No Power Consumption

    220VAC Description Quantity

    O:\4211xxx\4211281\1-Mechanical\02-Calculation\B-Issued\HVAC\Detail\AFU\WHP MT1\WHP-MT1 7 of 7

  • Title: Calculation For HVAC-WHP MT1 Document No: WHP-MT1-H-C-0021 Date : 08-OCT-10 Page : A1-2 Rev : 0

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    Location: Kuala Lumpur, Malaysia.

    WHPMT1HC0021_0

    ATTACHMENT 1.2: Design Weather Parameter & MSHGs (1 Page)

  • Design Weather Parameters & MSHGs WHP-MT1 AFU Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 1 of 1

    Design Parameters:

    City Name .................................................................................... Bien Dong WHP-MT1 Location ............................................................................................................. Vietnam Latitude ..................................................................................................................... 10.8 Deg. Longitude ............................................................................................................... -106.7 Deg. Elevation ................................................................................................................... 18.9 m Summer Design Dry-Bulb ......................................................................................... 32.4 C Summer Coincident Wet-Bulb .................................................................................. 32.1 C Summer Daily Range ................................................................................................. 8.2 K Winter Design Dry-Bulb ............................................................................................ 20.7 C Winter Design Wet-Bulb ........................................................................................... 15.8 C Atmospheric Clearness Number ............................................................................... 1.00 Average Ground Reflectance ................................................................................... 0.20 Soil Conductivity ..................................................................................................... 1.385 W/(m-K) Local Time Zone (GMT +/- N hours) .......................................................................... -7.0 hours Consider Daylight Savings Time ................................................................................ No Simulation Weather Data ........................................................................................... N/A Current Data is ........................................................................................ User Modified Design Cooling Months .............................................................. January to December

    Design Day Maximum Solar Heat Gains

    (The MSHG values are expressed in W/m )

    Month N NNE NE ENE E ESE SE SSE S January 99.3 99.3 213.5 478.6 690.5 794.2 774.6 665.6 553.5 February 106.1 106.1 339.7 578.7 740.2 788.1 714.0 547.5 396.3 March 114.0 201.2 468.3 646.9 743.5 727.3 600.8 373.1 209.2 April 126.4 349.0 559.5 680.5 697.2 611.8 437.5 191.4 124.9 May 201.3 437.4 604.6 680.9 654.1 528.3 317.5 126.1 124.8 June 249.2 473.7 618.5 671.7 626.1 488.4 267.9 125.9 122.4 July 209.6 441.4 600.8 670.3 641.1 518.1 309.1 128.6 126.6 August 134.3 343.4 540.2 655.3 674.0 593.1 421.2 183.6 130.4 September 118.3 194.3 454.2 630.4 710.1 686.4 574.8 367.8 212.5 October 108.9 108.9 337.4 573.9 714.6 744.3 687.4 529.1 387.9 November 100.7 100.7 211.6 487.4 670.6 769.9 766.3 651.0 547.7 December 95.9 95.9 166.4 439.2 653.4 782.9 791.2 699.5 603.9 Month SSW SW WSW W WNW NW NNW HOR Mult January 664.7 778.2 792.0 683.1 479.7 215.8 99.3 833.7 1.00 February 543.0 714.9 779.6 724.3 584.1 347.7 106.1 904.6 1.00 March 373.9 600.4 725.8 741.1 650.2 470.2 201.2 932.0 1.00 April 188.3 443.7 623.3 707.0 684.2 559.0 340.1 909.5 1.00 May 126.0 324.7 538.5 663.1 689.6 613.3 444.4 877.7 1.00 June 125.8 273.1 496.0 634.6 679.9 624.4 476.8 854.8 1.00 July 128.6 309.8 519.0 642.3 671.4 601.7 441.9 858.7 1.00 August 181.8 423.7 598.0 680.9 662.7 546.7 341.4 885.0 1.00 September 367.3 576.0 702.5 722.8 633.2 446.3 188.7 907.1 1.00 October 532.1 678.4 758.7 721.9 574.0 328.0 108.9 890.2 1.00 November 653.8 757.0 775.9 684.9 487.2 196.4 100.7 832.4 1.00 December 699.8 782.0 784.4 664.5 438.8 163.1 95.9 798.6 1.00

    Mult. = User-defined solar multiplier factor.

  • Title: Calculation For HVAC-WHP MT1 Document No: WHP-MT1-H-C-0021 Date : 08-OCT-10 Page : A1-3 Rev : 0

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    Location: Kuala Lumpur, Malaysia.

    WHPMT1HC0021_0

    ATTACHMENT 1.3: Wall, Roof & Floor U-Value (2 Pages)

  • Wall Constructions WHP-MT1 AFU Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 1 of 1

    A60 Wall

    Wall Details Outside Surface Color ........................................ Light Absorptivity ......................................................... 0.450 Overall U-Value .................................................. 0.370 W/(m-K)

    Wall Layers Details (Inside to Outside)

    Thickness Density Specific Ht. R-Value Weight Layers mm kg/m kJ / (kg - K) (m-K)/W kg/m Inside surface resistance 0.000 0.0 0.00 0.12064 0.0 TNF Panel 25.000 495.0 1.34 0.56818 12.4 Air space 180.000 0.0 0.00 0.24039 0.0 Batt Insulation 60.000 130.0 0.84 1.71429 7.8 Steel Deck 4.500 7833.0 0.50 0.00010 35.2 Outside surface resistance 0.000 0.0 0.00 0.05864 0.0

    Totals 269.500 -

    2.70224 55.4

  • Roof / Floor Constructions WHP-MT1 AFU Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 1 of 1

    Roof / Floor

    Roof / Floor Details Outside Surface Color ................................... Medium Absorptivity ......................................................... 0.675 Overall U-Value .................................................. 0.756 W/(m-K)

    Roof / Floor Layers Details (Inside to Outside)

    Thickness Density Specific Ht. R-Value Weight Layers mm kg/m kJ / (kg - K) (m-K)/W kg/m Inside surface resistance 0.000 0.0 0.00 0.12064 0.0 Batt Insulation 40.000 130.0 0.84 1.14286 7.8 Steel Deck 4.500 7833.0 0.50 0.00010 35.2 Outside surface resistance 0.000 0.0 0.00 0.05864 0.0

    Totals 44.500 -

    1.32224 43.0

  • Title: Calculation For HVAC-WHP MT1 Document No: WHP-MT1-H-C-0021 Date : 08-OCT-10 Page : A2 Rev : 0

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    Location: Kuala Lumpur, Malaysia.

    WHPMT1HC0021_0

    ATTACHMENT 2: Design Summary Electrical & Instrument Building

    (18 Pages) Attachment 2.1 Space Input Data (6 pages) Attachment 2.2 AHU Input Data (2 pages) Attachment 2.3 Air System Sizing Summary (1 page) Attachment 2.4 Zone Sizing Summary (1 page) Attachment 2.5 Ventilation Sizing Summary (1 page) Attachment 2.6 Air System Design Load Summary (1 page) Attachment 2.7 Zone Design Load Summary (3 pages) Attachment 2.8 System Psychrometrics (2 pages) Attachment 2.9 Psychrometric Analysis (1 page)

  • Title: Calculation For HVAC-WHP MT1 Document No: WHP-MT1-H-C-0021 Date : 08-OCT-10 Page : A2-1 Rev : 0

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    Location: Kuala Lumpur, Malaysia.

    WHPMT1HC0021_0

    ATTACHMENT 2.1: Space Input Data (6 Pages)

  • Space Input Data WHP-MT1 AFU Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 1 of 6

    Battery Room

    1. General Details: Floor Area ............................................................ 21.3 m Avg. Ceiling Height ................................................ 4.0 m Building Weight .................................................. 341.8 kg/m 1.1. OA Ventilation Requirements: Space Usage ......................................... User-Defined OA Requirement 1 ................................................ 100 % of supply air OA Requirement 2 ................................................. 0.0 L/s Space Usage Defaults .......... ASHRAE Std 62.1-2004

    2. Internals: 2.1. Overhead Lighting: Fixture Type ............................ Recessed (Unvented) Wattage .............................................................. 20.00 W/m Ballast Multiplier ................................................... 1.25 Schedule ....................................................... Lighting

    2.4. People: Occupancy ............................................................. 0.0 Person Activity Level ........................................... Office Work Sensible ............................................................... 71.8 W/person Latent .................................................................. 60.1 W/person Schedule ........................................................... None

    2.2. Task Lighting: Wattage ................................................................ 0.00 W/m Schedule ............................................................ None

    2.5. Miscellaneous Loads: Sensible .................................................................... 0 W Schedule ........................................................... None Latent ....................................................................... 0 W Schedule ........................................................... None

    2.3. Electrical Equipment: Wattage .............................................................. 584.0 Watts Schedule .................................................. Equipment

    3. Walls, Windows, Doors:

    Exp. Wall Gross Area (m) Window 1 Qty. Window 2 Qty. Door 1 Qty. N 4.0 0 0 0 E 22.9 0 0 0

    3.1. Construction Types for Exposure N Wall Type .............................................................. A60 Wall

    3.2. Construction Types for Exposure E Wall Type .............................................................. A60 Wall

    4. Roofs, Skylights:

    Exp. Roof Gross Area (m) Roof Slope (deg.) Skylight Qty. H 21.3 0 0

    4.1. Construction Types for Exposure H Roof Type ..................................................................... Roof

    5. Infiltration: Design Cooling ..................................................... 0.00 L/s Design Heating ..................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off.

    6. Floors: Type ...................... Floor Above Conditioned Space (No additional input required for this floor type).

    7. Partitions: (No partition data).

  • Space Input Data WHP-MT1 AFU Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 2 of 6

    Battery Room Air Lock

    1. General Details: Floor Area ............................................................. 2.8 m Avg. Ceiling Height ................................................ 4.0 m Building Weight .................................................. 341.8 kg/m 1.1. OA Ventilation Requirements: Space Usage ......................................... User-Defined OA Requirement 1 ................................................ 100 % of supply air OA Requirement 2 ................................................. 0.0 L/s Space Usage Defaults .......... ASHRAE Std 62.1-2004

    2. Internals: 2.1. Overhead Lighting: Fixture Type ............................ Recessed (Unvented) Wattage .............................................................. 20.00 W/m Ballast Multiplier ................................................... 1.25 Schedule ....................................................... Lighting

    2.4. People: Occupancy ............................................................. 0.0 Person Activity Level ........................................... Office Work Sensible ............................................................... 71.8 W/person Latent .................................................................. 60.1 W/person Schedule ........................................................... None

    2.2. Task Lighting: Wattage ................................................................ 0.00 W/m Schedule ............................................................ None

    2.5. Miscellaneous Loads: Sensible .................................................................... 0 W Schedule ........................................................... None Latent ....................................................................... 0 W Schedule ........................................................... None

    2.3. Electrical Equipment: Wattage ................................................................. 0.0 Watts Schedule ............................................................ None

    3. Walls, Windows, Doors:

    Exp. Wall Gross Area (m) Window 1 Qty. Window 2 Qty. Door 1 Qty. N 9.4 0 0 0 E 4.8 0 0 0 W 4.8 0 0 0

    3.1. Construction Types for Exposure N Wall Type .............................................................. A60 Wall

    3.2. Construction Types for Exposure E Wall Type .............................................................. A60 Wall

    3.3. Construction Types for Exposure W Wall Type .............................................................. A60 Wall

    4. Roofs, Skylights:

    Exp. Roof Gross Area (m) Roof Slope (deg.) Skylight Qty. H 2.8 0 0

    4.1. Construction Types for Exposure H Roof Type ..................................................................... Roof

    5. Infiltration: Design Cooling ..................................................... 0.00 L/s Design Heating ..................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off.

    6. Floors: Type ...................... Floor Above Conditioned Space (No additional input required for this floor type).

    7. Partitions: (No partition data).

  • Space Input Data WHP-MT1 AFU Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 3 of 6

    E&I Room

    1. General Details: Floor Area ............................................................ 71.7 m Avg. Ceiling Height ................................................ 4.5 m Building Weight .................................................. 341.8 kg/m 1.1. OA Ventilation Requirements: Space Usage ......................................... User-Defined OA Requirement 1 ................................................. 5.0 L/s/person OA Requirement 2 ................................................ 0.60 L/(s-m) Space Usage Defaults .......... ASHRAE Std 62.1-2004

    2. Internals: 2.1. Overhead Lighting: Fixture Type ............................ Recessed (Unvented) Wattage .............................................................. 20.00 W/m Ballast Multiplier ................................................... 1.25 Schedule ....................................................... Lighting

    2.4. People: Occupancy ............................................................. 2.0 People Activity Level ........................................... Office Work Sensible ............................................................... 71.8 W/person Latent .................................................................. 60.1 W/person Schedule ......................................................... People

    2.2. Task Lighting: Wattage ................................................................ 0.00 W/m Schedule ............................................................ None

    2.5. Miscellaneous Loads: Sensible .................................................................... 0 W Schedule ........................................................... None Latent ....................................................................... 0 W Schedule ........................................................... None

    2.3. Electrical Equipment: Wattage .......................................................... 15879.0 Watts Schedule .................................................. Equipment

    3. Walls, Windows, Doors:

    Exp. Wall Gross Area (m) Window 1 Qty. Window 2 Qty. Door 1 Qty. W 41.0 0 0 0 N 35.5 0 0 0 E 33.3 0 0 0 S 35.5 0 0 0

    3.1. Construction Types for Exposure W Wall Type .............................................................. A60 Wall

    3.2. Construction Types for Exposure N Wall Type .............................................................. A60 Wall

    3.3. Construction Types for Exposure E Wall Type .............................................................. A60 Wall

    3.4. Construction Types for Exposure S Wall Type .............................................................. A60 Wall

    4. Roofs, Skylights: (No Roof or Skylight data).

    5. Infiltration: Design Cooling ..................................................... 0.00 L/s Design Heating ..................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off.

    6. Floors: Type .................. Floor Above Unconditioned Space Floor Area ............................................................ 71.7 m Total Floor U-Value ............................................ 0.756 W/(m-K) Unconditioned Space Max Temp. ......................... 32.4 C Ambient at Space Max Temp. ............................... 32.4 C Unconditioned Space Min Temp. .......................... 20.7 C Ambient at Space Min Temp. ................................ 20.7 C

    7. Partitions: (No partition data).

  • Space Input Data WHP-MT1 AFU Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 4 of 6

    E&I Room Air Lock

    1. General Details: Floor Area ............................................................. 3.4 m Avg. Ceiling Height ................................................ 4.5 m Building Weight .................................................. 341.8 kg/m 1.1. OA Ventilation Requirements: Space Usage ......................................... User-Defined OA Requirement 1 ................................................ 100 % of supply air OA Requirement 2 ................................................. 0.0 L/s Space Usage Defaults .......... ASHRAE Std 62.1-2004

    2. Internals: 2.1. Overhead Lighting: Fixture Type ............................ Recessed (Unvented) Wattage .............................................................. 20.00 W/m Ballast Multiplier ................................................... 1.25 Schedule ....................................................... Lighting

    2.4. People: Occupancy ............................................................. 0.0 Person Activity Level .......................................... User defined Sensible ................................................................. 0.0 W/person Latent .................................................................... 0.0 W/person Schedule ........................................................... None

    2.2. Task Lighting: Wattage ................................................................ 0.00 W/m Schedule ............................................................ None

    2.5. Miscellaneous Loads: Sensible .................................................................... 0 W Schedule ........................................................... None Latent ....................................................................... 0 W Schedule ........................................................... None

    2.3. Electrical Equipment: Wattage ................................................................. 0.0 Watts Schedule ............................................................ None

    3. Walls, Windows, Doors:

    Exp. Wall Gross Area (m) Window 1 Qty. Window 2 Qty. Door 1 Qty. N 9.0 0 0 0 E 7.7 0 0 0 S 9.0 0 0 0

    3.1. Construction Types for Exposure N Wall Type .............................................................. A60 Wall

    3.2. Construction Types for Exposure E Wall Type .............................................................. A60 Wall

    3.3. Construction Types for Exposure S Wall Type .............................................................. A60 Wall

    4. Roofs, Skylights: (No Roof or Skylight data).

    5. Infiltration: Design Cooling ..................................................... 0.00 L/s Design Heating ..................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off.

    6. Floors: Type .................. Floor Above Unconditioned Space Floor Area ............................................................. 3.4 m Total Floor U-Value ............................................ 0.756 W/(m-K) Unconditioned Space Max Temp. ......................... 32.4 C Ambient at Space Max Temp. ............................... 32.4 C Unconditioned Space Min Temp. .......................... 20.7 C Ambient at Space Min Temp. ................................ 20.7 C

    7. Partitions: (No partition data).

  • Space Input Data WHP-MT1 AFU Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 5 of 6

    HV Switchroom

    1. General Details: Floor Area ............................................................ 15.3 m Avg. Ceiling Height ................................................ 4.0 m Building Weight .................................................. 341.8 kg/m 1.1. OA Ventilation Requirements: Space Usage ......................................... User-Defined OA Requirement 1 ................................................. 5.0 L/s/person OA Requirement 2 ................................................ 0.60 L/(s-m) Space Usage Defaults .......... ASHRAE Std 62.1-2004

    2. Internals: 2.1. Overhead Lighting: Fixture Type ............................ Recessed (Unvented) Wattage .............................................................. 20.00 W/m Ballast Multiplier ................................................... 1.25 Schedule ....................................................... Lighting

    2.4. People: Occupancy ............................................................. 0.0 Person Activity Level ........................................... Office Work Sensible ............................................................... 71.8 W/person Latent .................................................................. 60.1 W/person Schedule ........................................................... None

    2.2. Task Lighting: Wattage ................................................................ 0.00 W/m Schedule ............................................................ None

    2.5. Miscellaneous Loads: Sensible .................................................................... 0 W Schedule ........................................................... None Latent ....................................................................... 0 W Schedule ........................................................... None

    2.3. Electrical Equipment: Wattage .............................................................. 300.0 Watts Schedule .................................................. Equipment

    3. Walls, Windows, Doors:

    Exp. Wall Gross Area (m) Window 1 Qty. Window 2 Qty. Door 1 Qty. W 12.9 0 0 0

    3.1. Construction Types for Exposure W Wall Type .............................................................. A60 Wall

    4. Roofs, Skylights:

    Exp. Roof Gross Area (m) Roof Slope (deg.) Skylight Qty. H 15.3 0 0

    4.1. Construction Types for Exposure H Roof Type ..................................................................... Roof

    5. Infiltration: Design Cooling ..................................................... 0.00 L/s Design Heating ..................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off.

    6. Floors: Type ...................... Floor Above Conditioned Space (No additional input required for this floor type).

    7. Partitions: (No partition data).

  • Space Input Data WHP-MT1 AFU Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 6 of 6

    UPS Room

    1. General Details: Floor Area ............................................................ 19.1 m Avg. Ceiling Height ................................................ 4.0 m Building Weight .................................................. 341.8 kg/m 1.1. OA Ventilation Requirements: Space Usage ......................................... User-Defined OA Requirement 1 ................................................. 5.0 L/s/person OA Requirement 2 ................................................ 0.60 L/(s-m) Space Usage Defaults .......... ASHRAE Std 62.1-2004

    2. Internals: 2.1. Overhead Lighting: Fixture Type ............................ Recessed (Unvented) Wattage .............................................................. 20.00 W/m Ballast Multiplier ................................................... 1.25 Schedule ....................................................... Lighting

    2.4. People: Occupancy ............................................................. 0.0 Person Activity Level ........................................... Office Work Sensible ............................................................... 71.8 W/person Latent .................................................................. 60.1 W/person Schedule ........................................................... None

    2.2. Task Lighting: Wattage ................................................................ 0.00 W/m Schedule ............................................................ None

    2.5. Miscellaneous Loads: Sensible .................................................................... 0 W Schedule ........................................................... None Latent ....................................................................... 0 W Schedule ........................................................... None

    2.3. Electrical Equipment: Wattage ............................................................ 4800.0 Watts Schedule .................................................. Equipment

    3. Walls, Windows, Doors:

    Exp. Wall Gross Area (m) Window 1 Qty. Window 2 Qty. Door 1 Qty. W 9.7 0 0 0 E 9.7 0 0 0 S 31.5 0 0 0

    3.1. Construction Types for Exposure W Wall Type .............................................................. A60 Wall

    3.2. Construction Types for Exposure E Wall Type .............................................................. A60 Wall

    3.3. Construction Types for Exposure S Wall Type .............................................................. A60 Wall

    4. Roofs, Skylights:

    Exp. Roof Gross Area (m) Roof Slope (deg.) Skylight Qty. H 19.1 0 0

    4.1. Construction Types for Exposure H Roof Type ..................................................................... Roof

    5. Infiltration: Design Cooling ..................................................... 0.00 L/s Design Heating ..................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off.

    6. Floors: Type ...................... Floor Above Conditioned Space (No additional input required for this floor type).

    7. Partitions: (No partition data).

  • Title: Calculation For HVAC-WHP MT1 Document No: WHP-MT1-H-C-0021 Date : 08-OCT-10 Page : A2-2 Rev : 0

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    Location: Kuala Lumpur, Malaysia.

    WHPMT1HC0021_0

    ATTACHMENT 2.2: AHU Input Data (2 Pages)

  • MT1-AHU-7101 Input Data Project Name: WHP-MT1 AFU Prepared by: Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 1 of 2

    1. General Details: Air System Name .................................................................... MT1-AHU-7101 Equipment Class ............................................................................ Split AHU Air System Type .................................................. CAV with Terminal Reheat Number of zones ........................................................................................... 6

    2. System Components: Ventilation Air Data: Airflow Control .................................................. Constant Ventilation Airflow Ventilation Sizing Method ................................... Sum of Space OA Airflows Unocc. Damper Position ......................................................................... Open Outdoor Air CO2 Level .............................................................................. 400 ppm

    Central Cooling Data: Supply Air Temperature ............................................................................ 12.5 C Coil Bypass Factor ................................................................................. 0.100 Cooling Source ........................................................................ Air-Cooled DX Schedule ............................................................................ JFMAMJJASOND Capacity Control ............................ Cycled or Staged Compressor - Fan On

    Supply Fan Data: Fan Type .............................................. Backward Inclined or Airfoil (BI/AF) Configuration .................................................................................. Draw-thru Fan Performance ....................................................................................... 700 Pa Overall Efficiency ......................................................................................... 54 %

    Duct System Data: Supply Duct Data: Duct Heat Gain .............................................................................................. 0 % Duct Leakage ................................................................................................ 0 %

    Return Duct or Plenum Data: Return Air Via ......................................................................... Ducted Return

    3. Zone Components: Space Assignments:

    Zone 1: E&I room

    E&I Room x1 Zone 2: HV Switchroom

    HV Switchroom x1 Zone 3: Battery room

    Battery Room x1 Zone 4: E&I Room Air Lock

    E&I Room Air Lock x1 Zone 5: Battery Room Air Lock

    Battery Room Air Lock x1 Zone 6: UPS Room

    UPS Room x1

    Thermostats and Zone Data:

    Zone Cooling T-Stat

    Occ. Cooling T-Stat

    Unocc. Heating T-Stat

    Occ. Heating T-Stat

    Unocc.

    T-Stat Throttling

    Range Diversity Factor

    Direct Exhaust Airflow

    (C) (C) (C) (C) (C) (%) (L/s) 1 22.0 22.0 22.0 22.0 2.00 100 70.0 2 24.0 24.0 22.0 22.0 2.00 100 47.0 3 24.0 24.0 20.0 20.0 2.00 100 284.0 4 24.0 24.0 20.0 20.0 2.00 100 28.0 5 24.0 24.0 20.0 20.0 2.00 100 28.0 6 22.0 22.0 22.0 22.0 2.00 100 36.0

    Thermostat Schedule .................................................................... Thermostat Unoccupied Cooling is ..................................................................... Available

    Supply Terminals Data:

    Zone Terminal Type Min. Airflow 1 Diffuser 6.00 ACH

  • MT1-AHU-7101 Input Data Project Name: WHP-MT1 AFU Prepared by: Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 2 of 2

    Zone Terminal Type Min. Airflow 2 Diffuser 6.00 ACH 3 Diffuser 12.00 ACH 4 Diffuser 4.00 ACH 5 Diffuser 4.00 ACH 6 Diffuser 6.00 ACH

    Zone Heating Units:

    Zone Unit Heat Source ................................................... Electric Resistance Zone Heating Unit Schedule ............................................... JFMAMJJASOND

    4. Sizing Data (Computer-Generated): System Sizing Data: Cooling Supply Temperature .................................................................... 12.5 C Supply Fan Airflow ................................................................................ 2852.5 L/s Ventilation Airflow ................................................................................... 493.0 L/s

    Hydronic Sizing Specifications: Chilled Water Delta-T ................................................................................. 5.6 K Hot Water Delta-T ..................................................................................... 11.1 K

    Safety Factors: Cooling Sensible .......................................................................................... 10 % Cooling Latent ............................................................................................. 10 % Heating ........................................................................................................ 10 %

    Zone Sizing Data: Zone Airflow Sizing Method ................................ Sum of space airflow rates Space Airflow Sizing Method ............................ Individual peak space loads

  • Title: Calculation For HVAC-WHP MT1 Document No: WHP-MT1-H-C-0021 Date : 08-OCT-10 Page : A2-3 Rev : 0

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    Location: Kuala Lumpur, Malaysia.

    WHPMT1HC0021_0

    ATTACHMENT 2.3: Air System Sizing Summary (1 Page)

  • Air System Sizing Summary for MT1-AHU-7101 Project Name: WHP-MT1 AFU Prepared by: Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 1 of 1

    Air System Information Air System Name ................................ MT1-AHU-7101 Equipment Class ....................................... SPLT AHU Air System Type ............................................ CAV/RH

    Number of zones .......................................................... 6 Floor Area .............................................................. 133.6 m Location ........................ Bien Dong WHP-MT1, Vietnam

    Sizing Calculation Information Zone and Space Sizing Method:

    Zone L/s ......................... Sum of space airflow rates Space L/s ..................... Individual peak space loads

    Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

    Central Cooling Coil Sizing Data

    Total coil load ....................................................... 72.7 kW Sensible coil load .................................................. 41.4 kW Coil L/s at Jul 1400 .............................................. 2853 L/s Max block L/s ...................................................... 2853 L/s Sum of peak zone L/s .......................................... 2853 L/s Sensible heat ratio .............................................. 0.569 m/kW .................................................................... 1.8 W/m .................................................................. 544.0 Water flow @ 5.6 K rise ....................................... N/A

    Load occurs at .................................................. Jul 1400 OA DB / WB ................................................... 32.2 / 31.9 C Entering DB / WB ........................................... 24.8 / 19.9 C Leaving DB / WB ........................................... 12.8 / 12.4 C Coil ADP .................................................................. 11.5 C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 50 % Design supply temp. ................................................ 12.5 C Zone T-stat Check ................................................. 6 of 6 OK Max zone temperature deviation ................................ 0.0 K

    Supply Fan Sizing Data

    Actual max L/s ..................................................... 2853 L/s Standard L/s ........................................................ 2846 L/s Actual max L/(s-m) ............................................ 21.35 L/(s-m)

    Fan motor BHP ........................................................ 4.96 BHP Fan motor kW .......................................................... 3.70 kW Fan static .................................................................. 700 Pa

    Outdoor Ventilation Air Data Design airflow L/s ................................................. 493 L/s L/(s-m) ................................................................. 3.69 L/(s-m)

    L/s/person ............................................................ 246.50 L/s/person

  • Title: Calculation For HVAC-WHP MT1 Document No: WHP-MT1-H-C-0021 Date : 08-OCT-10 Page : A2-4 Rev : 0

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    Location: Kuala Lumpur, Malaysia.

    WHPMT1HC0021_0

    ATTACHMENT 2.4: Zone Sizing Summary (1 Page)

  • Zone Sizing Summary for MT1-AHU-7101 Project Name: WHP-MT1 AFU Prepared by: Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 1 of 1

    Air System Information Air System Name ................................ MT1-AHU-7101 Equipment Class ....................................... SPLT AHU Air System Type ............................................ CAV/RH

    Number of zones .......................................................... 6 Floor Area .............................................................. 133.6 m Location ........................ Bien Dong WHP-MT1, Vietnam

    Sizing Calculation Information Zone and Space Sizing Method: Zone L/s ......................... Sum of space airflow rates Space L/s ..................... Individual peak space loads

    Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

    Zone Sizing Data

    Maximum Design Minimum Time Maximum Zone

    Cooling Air Air of Heating Floor

    Sensible Flow Flow Peak Load Area Zone Zone Name (kW) (L/s) (L/s) Load (kW) (m) L/(s-m) E&I room 21.0 1836 1836 Jul 1700 0.2 71.7 25.61 HV Switchroom 1.2 102 102 Aug 1300 0.0 15.3 6.67 Battery room 1.9 284 284 Aug 1200 0.0 21.3 13.33 E&I Room Air Lock 0.2 28 28 Jul 1600 0.0 3.4 8.24 Battery Room Air Lock 0.2 28 28 Jul 1500 0.0 2.8 10.00 UPS Room 6.6 574 574 Sep 1300 0.0 19.1 30.06

    Zone Terminal Sizing Data

    Reheat Zone

    Reheat Coil Htg

    Coil Water Coil

    Load L/s Load Zone Name (kW) @ 11.1 K (kW) E&I room 0.0 - 21.2 HV Switchroom 0.0 - 1.2 Battery room 0.0 - 0.0 E&I Room Air Lock 0.0 - 0.0 Battery Room Air Lock 0.0 - 0.0 UPS Room 0.0 - 6.6

    Space Loads and Airflows

    Cooling Time Air Heating Floor

    Zone Name /

    Sensible of Flow Load Area Space Space Name Mult. (kW) Load (L/s) (kW) (m) L/(s-m) E&I room E&I Room 1 21.0 Jul 1700 1836 0.2 71.7 25.61 HV Switchroom HV Switchroom 1 1.2 Aug 1300 102 0.0 15.3 6.67 Battery room Battery Room 1 1.9 Aug 1200 284 0.0 21.3 13.33 E&I Room Air Lock E&I Room Air Lock 1 0.2 Jul 1600 28 0.0 3.4 8.24 Battery Room Air Lock Battery Room Air Lock 1 0.2 Jul 1500 28 0.0 2.8 10.00 UPS Room UPS Room 1 6.6 Sep 1300 574 0.0 19.1 30.06

  • Title: Calculation For HVAC-WHP MT1 Document No: WHP-MT1-H-C-0021 Date : 08-OCT-10 Page : A2-5 Rev : 0

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    Location: Kuala Lumpur, Malaysia.

    WHPMT1HC0021_0

    ATTACHMENT 2.5: Ventilation Sizing Summary (1 Page)

  • Ventilation Sizing Summary for MT1-AHU-7101 Project Name: WHP-MT1 AFU Prepared by: Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 1 of 1

    1. Summary Ventilation Sizing Method ................................... Sum of Space OA Airflows Design Ventilation Airflow Rate, Corrected for Exhaust Air ........................ 493 L/s Design Ventilation Airflow Rate .................................................................. 414 L/s

    2. Space Ventilation Analysis Table

    Floor

    Maximum Required Required Required Required Uncorrected

    Area Maximum Supply Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Zone Name / Space Name Mult. (m) Occupants (L/s) (L/s/person) (L/(s-m)) (L/s) (% of supply) (L/s) E&I room

    E&I Room 1 71.7 2.0 1836.4 5.00 0.60 0.0 0.0 53.0 HV Switchroom

    HV Switchroom 1 15.3 0.0 102.0 5.00 0.60 0.0 0.0 9.2 Battery room

    Battery Room 1 21.3 0.0 284.0 0.00 0.00 0.0 100.0 284.0 E&I Room Air Lock

    E&I Room Air Lock 1 3.4 0.0 28.0 0.00 0.00 0.0 100.0 28.0 Battery Room Air Lock

    Battery Room Air Lock 1 2.8 0.0 28.0 0.00 0.00 0.0 100.0 28.0 UPS Room

    UPS Room 1 19.1 0.0 574.1 5.00 0.60 0.0 0.0 11.5 Totals (incl. Space Multipliers)

    2852.5

    413.7

  • Title: Calculation For HVAC-WHP MT1 Document No: WHP-MT1-H-C-0021 Date : 08-OCT-10 Page : A2-6 Rev : 0

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    Location: Kuala Lumpur, Malaysia.

    WHPMT1HC0021_0

    ATTACHMENT 2.6: Air System Design Load Summary (1 Page)

  • Air System Design Load Summary for MT1-AHU-7101 Project Name: WHP-MT1 AFU Prepared by: Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 1 of 1

    DESIGN COOLING DESIGN HEATING

    COOLING DATA AT Jul 1400 HEATING DATA AT DES HTG

    COOLING OA DB / WB 32.2 C / 31.9 C HEATING OA DB / WB 20.7 C / 15.8 C

    Sensible Latent

    Sensible Latent ZONE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 0 m 0 - 0 m - - Wall Transmission 281 m 1211 - 281 m 101 - Roof Transmission 59 m 1385 - 59 m 34 - Window Transmission 0 m 0 - 0 m 0 - Skylight Transmission 0 m 0 - 0 m 0 - Door Loads 0 m 0 - 0 m 0 - Floor Transmission 75 m 487 - 75 m 70 - Partitions 0 m 0 - 0 m 0 - Ceiling 0 m 0 - 0 m 0 - Overhead Lighting 3340 W 3340 - 0 0 - Task Lighting 0 W 0 - 0 0 - Electric Equipment 21563 W 21562 - 0 0 - People 2 144 120 0 0 0 Infiltration - 0 0 - 0 0 Miscellaneous - 0 0 - 0 0 Safety Factor 10% / 10% 2813 12 10% 20 0 >> Total Zone Loads - 30941 132 - 225 0 Zone Conditioning - 31007 132 - 304 0 Plenum Wall Load 0% 0 - 0 0 - Plenum Roof Load 0% 0 - 0 0 - Plenum Lighting Load 0% 0 - 0 0 - Return Fan Load 2360 L/s 0 - 2360 L/s 0 - Ventilation Load 493 L/s 6676 31158 493 L/s 687 0 Supply Fan Load 2853 L/s 3698 - 2853 L/s -3698 - Space Fan Coil Fans - 0 - - 0 - Duct Heat Gain / Loss 0% 0 - 0% 0 - >> Total System Loads - 41381 31290 - -2706 0 Central Cooling Coil - 41381 31291 - -2891 0 Zone Heating Unit Coils - 0 - - 185 - >> Total Conditioning - 41381 31291 - -2706 0 Key: Positive values are clg loads Positive values are htg loads

    Negative values are htg loads Negative values are clg loads

  • Title: Calculation For HVAC-WHP MT1 Document No: WHP-MT1-H-C-0021 Date : 08-OCT-10 Page : A2-7 Rev : 0

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    Location: Kuala Lumpur, Malaysia.

    WHPMT1HC0021_0

    ATTACHMENT 2.7: Zone Design Load Summary (3 Pages)

  • Zone Design Load Summary for MT1-AHU-7101 Project Name: WHP-MT1 AFU Prepared by: Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 1 of 3

    E&I room DESIGN COOLING DESIGN HEATING

    COOLING DATA AT Jul 1700 HEATING DATA AT DES HTG

    COOLING OA DB / WB 31.6 C / 31.3 C HEATING OA DB / WB 20.7 C / 15.8 C

    OCCUPIED T-STAT 22.0 C OCCUPIED T-STAT 22.0 C

    Sensible Latent

    Sensible Latent ZONE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 0 m 0 - 0 m - - Wall Transmission 145 m 825 - 145 m 70 - Roof Transmission 0 m 0 - 0 m 0 - Window Transmission 0 m 0 - 0 m 0 - Skylight Transmission 0 m 0 - 0 m 0 - Door Loads 0 m 0 - 0 m 0 - Floor Transmission 72 m 463 - 72 m 70 - Partitions 0 m 0 - 0 m 0 - Ceiling 0 m 0 - 0 m 0 - Overhead Lighting 1793 W 1792 - 0 0 - Task Lighting 0 W 0 - 0 0 - Electric Equipment 15879 W 15878 - 0 0 - People 2 144 120 0 0 0 Infiltration - 0 0 - 0 0 Miscellaneous - 0 0 - 0 0 Safety Factor 10% / 10% 1910 12 10% 14 0 >> Total Zone Loads - 21013 132 - 154 0

    HV Switchroom DESIGN COOLING DESIGN HEATING

    COOLING DATA AT Aug 1300 HEATING DATA AT DES HTG

    COOLING OA DB / WB 31.5 C / 31.2 C HEATING OA DB / WB 20.7 C / 15.8 C

    OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 22.0 C

    Sensible Latent

    Sensible Latent ZONE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 0 m 0 - 0 m - - Wall Transmission 13 m 38 - 13 m 6 - Roof Transmission 15 m 379 - 15 m 15 - Window Transmission 0 m 0 - 0 m 0 - Skylight Transmission 0 m 0 - 0 m 0 - Door Loads 0 m 0 - 0 m 0 - Floor Transmission 0 m 0 - 0 m 0 - Partitions 0 m 0 - 0 m 0 - Ceiling 0 m 0 - 0 m 0 - Overhead Lighting 383 W 382 - 0 0 - Task Lighting 0 W 0 - 0 0 - Electric Equipment 300 W 300 - 0 0 - People 0 0 0 0 0 0 Infiltration - 0 0 - 0 0 Miscellaneous - 0 0 - 0 0 Safety Factor 10% / 10% 110 0 10% 2 0 >> Total Zone Loads - 1209 0 - 23 0

  • Zone Design Load Summary for MT1-AHU-7101 Project Name: WHP-MT1 AFU Prepared by: Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 2 of 3

    Battery room DESIGN COOLING DESIGN HEATING

    COOLING DATA AT Aug 1200 HEATING DATA AT DES HTG

    COOLING OA DB / WB 30.5 C / 30.2 C HEATING OA DB / WB 20.7 C / 15.8 C

    OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 20.0 C

    Sensible Latent

    Sensible Latent ZONE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 0 m 0 - 0 m - - Wall Transmission 27 m 129 - 27 m 0 - Roof Transmission 21 m 521 - 21 m 0 - Window Transmission 0 m 0 - 0 m 0 - Skylight Transmission 0 m 0 - 0 m 0 - Door Loads 0 m 0 - 0 m 0 - Floor Transmission 0 m 0 - 0 m 0 - Partitions 0 m 0 - 0 m 0 - Ceiling 0 m 0 - 0 m 0 - Overhead Lighting 533 W 532 - 0 0 - Task Lighting 0 W 0 - 0 0 - Electric Equipment 584 W 584 - 0 0 - People 0 0 0 0 0 0 Infiltration - 0 0 - 0 0 Miscellaneous - 0 0 - 0 0 Safety Factor 10% / 10% 177 0 10% 0 0 >> Total Zone Loads - 1943 0 - 0 0

    E&I Room Air Lock DESIGN COOLING DESIGN HEATING

    COOLING DATA AT Jul 1600 HEATING DATA AT DES HTG

    COOLING OA DB / WB 32.2 C / 31.9 C HEATING OA DB / WB 20.7 C / 15.8 C

    OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 20.0 C

    Sensible Latent

    Sensible Latent ZONE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 0 m 0 - 0 m - - Wall Transmission 26 m 105 - 26 m 0 - Roof Transmission 0 m 0 - 0 m 0 - Window Transmission 0 m 0 - 0 m 0 - Skylight Transmission 0 m 0 - 0 m 0 - Door Loads 0 m 0 - 0 m 0 - Floor Transmission 3 m 18 - 3 m 0 - Partitions 0 m 0 - 0 m 0 - Ceiling 0 m 0 - 0 m 0 - Overhead Lighting 85 W 85 - 0 0 - Task Lighting 0 W 0 - 0 0 - Electric Equipment 0 W 0 - 0 0 - People 0 0 0 0 0 0 Infiltration - 0 0 - 0 0 Miscellaneous - 0 0 - 0 0 Safety Factor 10% / 10% 21 0 10% 0 0 >> Total Zone Loads - 229 0 - 0 0

  • Zone Design Load Summary for MT1-AHU-7101 Project Name: WHP-MT1 AFU Prepared by: Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 3 of 3

    Battery Room Air Lock DESIGN COOLING DESIGN HEATING

    COOLING DATA AT Jul 1500 HEATING DATA AT DES HTG

    COOLING OA DB / WB 32.4 C / 32.1 C HEATING OA DB / WB 20.7 C / 15.8 C

    OCCUPIED T-STAT 24.0 C OCCUPIED T-STAT 20.0 C

    Sensible Latent

    Sensible Latent ZONE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 0 m 0 - 0 m - - Wall Transmission 19 m 88 - 19 m 0 - Roof Transmission 3 m 58 - 3 m 0 - Window Transmission 0 m 0 - 0 m 0 - Skylight Transmission 0 m 0 - 0 m 0 - Door Loads 0 m 0 - 0 m 0 - Floor Transmission 0 m 0 - 0 m 0 - Partitions 0 m 0 - 0 m 0 - Ceiling 0 m 0 - 0 m 0 - Overhead Lighting 70 W 70 - 0 0 - Task Lighting 0 W 0 - 0 0 - Electric Equipment 0 W 0 - 0 0 - People 0 0 0 0 0 0 Infiltration - 0 0 - 0 0 Miscellaneous - 0 0 - 0 0 Safety Factor 10% / 10% 22 0 10% 0 0 >> Total Zone Loads - 237 0 - 0 0

    UPS Room DESIGN COOLING DESIGN HEATING

    COOLING DATA AT Sep 1300 HEATING DATA AT DES HTG

    COOLING OA DB / WB 30.4 C / 30.1 C HEATING OA DB / WB 20.7 C / 15.8 C

    OCCUPIED T-STAT 22.0 C OCCUPIED T-STAT 22.0 C

    Sensible Latent

    Sensible Latent ZONE LOADS Details (W) (W) Details (W) (W) Window & Skylight Solar Loads 0 m 0 - 0 m - - Wall Transmission 51 m 208 - 51 m 24 - Roof Transmission 19 m 488 - 19 m 19 - Window Transmission 0 m 0 - 0 m 0 - Skylight Transmission 0 m 0 - 0 m 0 - Door Loads 0 m 0 - 0 m 0 - Floor Transmission 0 m 0 - 0 m 0 - Partitions 0 m 0 - 0 m 0 - Ceiling 0 m 0 - 0 m 0 - Overhead Lighting 478 W 477 - 0 0 - Task Lighting 0 W 0 - 0 0 - Electric Equipment 4800 W 4800 - 0 0 - People 0 0 0 0 0 0 Infiltration - 0 0 - 0 0 Miscellaneous - 0 0 - 0 0 Safety Factor 10% / 10% 597 0 10% 4 0 >> Total Zone Loads - 6570 0 - 48 0

  • Title: Calculation For HVAC-WHP MT1 Document No: WHP-MT1-H-C-0021 Date : 08-OCT-10 Page : A2-8 Rev : 0

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    Location: Kuala Lumpur, Malaysia.

    WHPMT1HC0021_0

    ATTACHMENT 2.8: System Psychrometrics (2 Pages)

  • System Psychrometrics for MT1-AHU-7101 Project Name: WHP-MT1 AFU Prepared by: Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 1 of 2

    July DESIGN COOLING DAY, 1400

    TABLE 1: SYSTEM DATA

    Dry-Bulb Specific

    Sensible Latent

    Temp Humidity Airflow CO2 Level Heat Heat Component Location (C) (kg/kg) (L/s) (ppm) (W) (W) Ventilation Air Inlet 32.2 0.03035 493 400 6676 31158 Vent - Return Mixing Outlet 24.8 0.01258 2853 466 - - Central Cooling Coil Outlet 12.8 0.00885 2853 466 41381 31291 Supply Fan Outlet 13.9 0.00885 2853 466 3698 - Cold Supply Duct Outlet 13.9 0.00885 2853 466 - - Zone Air - 23.3 0.00886 2853 480 31007 132 Zone Direct Exhaust Outlet 23.3 0.00886 493 480 - - Return Plenum Outlet 23.3 0.00886 2360 480 0 -

    Air Density x Heat Capacity x Conversion Factor: At sea level = 1.207; At site altitude = 1.204 W/(L/s-K) Air Density x Heat of Vaporization x Conversion Factor: At sea level = 2947.6; At site altitude = 2941.0 W/(L/s) Site Altitude = 18.9 m

    TABLE 2: ZONE DATA

    Zone

    Terminal Zone

    Sensible

    Zone Zone Zone CO2 Heating Heating

    Load T-stat Cond Temp Airflow Level Coil Unit Zone Name (W) Mode (W) (C) (L/s) (ppm) (W) (W) E&I room 20841 Cooling 20894 23.3 1836 482 0 0 HV Switchroom 1195 Deadband 1132 23.1 102 476 0 0 Battery room 1898 Deadband 1968 19.6 284 476 0 0 E&I Room Air Lock 220 Deadband 243 21.1 28 476 0 0 Battery Room Air Lock 236 Deadband 243 21.1 28 476 0 0 UPS Room 6551 Cooling 6526 23.3 574 476 0 0

  • System Psychrometrics for MT1-AHU-7101 Project Name: WHP-MT1 AFU Prepared by: Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 2 of 2

    WINTER DESIGN HEATING

    TABLE 1: SYSTEM DATA

    Dry-Bulb Specific

    Sensible Latent

    Temp Humidity Airflow CO2 Level Heat Heat Component Location (C) (kg/kg) (L/s) (ppm) (W) (W) Ventilation Air Inlet 20.7 0.00921 493 400 -687 0 Vent - Return Mixing Outlet 21.8 0.00921 2853 441 - - Central Cooling Coil Outlet 20.9 0.00921 2853 441 2891 0 Supply Fan Outlet 22.0 0.00921 2853 441 3698 - Cold Supply Duct Outlet 22.0 0.00921 2853 441 - - Zone Air - 22.0 0.00921 2853 450 -304 0 Zone Direct Exhaust Outlet 22.0 0.00921 493 450 - - Return Plenum Outlet 22.0 0.00921 2360 450 0 -

    Air Density x Heat Capacity x Conversion Factor: At sea level = 1.207; At site altitude = 1.204 W/(L/s-K) Air Density x Heat of Vaporization x Conversion Factor: At sea level = 2947.6; At site altitude = 2941.0 W/(L/s) Site Altitude = 18.9 m

    TABLE 2: ZONE DATA

    Zone

    Terminal Zone

    Sensible

    Zone Zone Zone CO2 Heating Heating

    Load T-stat Cond Temp Airflow Level Coil Unit Zone Name (W) Mode (W) (C) (L/s) (ppm) (W) (W) E&I room -154 Heating -153 22.0 1836 450 0 127 HV Switchroom -23 Heating -23 22.0 102 450 0 19 Battery room 0 Deadband -49 21.9 284 450 0 0 E&I Room Air Lock 0 Deadband -18 21.5 28 450 0 0 Battery Room Air Lock 0 Deadband -14 21.6 28 450 0 0 UPS Room -48 Heating -47 22.0 574 450 0 39

  • Title: Calculation For HVAC-WHP MT1 Document No: WHP-MT1-H-C-0021 Date : 08-OCT-10 Page : A2-9 Rev : 0

    This document is the property of BD POC. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

    Location: Kuala Lumpur, Malaysia.

    WHPMT1HC0021_0

    ATTACHMENT 2.9: Psychrometric Analysis (1 Page)

  • Psychrometric Analysis for MT1-AHU-7101 Project Name: WHP-MT1 AFU Prepared by: Ranhill Worley Sdn Bhd

    Hourly Analysis Program v.4.3 Page 1 of 1

    1. Outdoor Air 2. Mixed Air 3. Central Cooling Coil Outlet 4. Supply Fan Outlet 5. Room Air

    1

    2