Madhya Pradesh Metro Rail Co Limited Palika Bhawan, Shivaji Nagar, Bhopal (Ph:-0755-2552730) Email id: [email protected] No: 3318 /MRTS/2016/ Dated: 17/06/2016 ADDENDUM-II The addendum will be part of the RFQ cum RFP document and all clauses as on addendum will replace the respective bid clauses published by MPMRCL vide RFP No. 01/GC/MPMRCL/2016 Dated 06/05/2016 and addendum on No. MRTS/2016/3276 dated 31/05/2016. S. No Section/Clause /Page No Particulars Read As / Add 1 Clause 19 and 19(i) b Page No. 40 & 43 Experience in India Clause 19 shall be read as :- (a). …………………….. (b) Experience in Developing Countries * …………………………. (c) ………….” With regard to aforesaid amendment revised Attachment-1: for datasheet page no. 43-44 is annexed as Annexure-1. . 2 Attachment III(A) Page No. 162-168 and Section-6 Terms of reference of RFQ cum RFP It seems that there is a discrepancy in the Man-Months summary (As per S.N. 6 of addendum) and Annexure-4 of addendum. Attachment III (A) - Revised format for Position and No. of Man Months for Staff is attached as Annexure-2. 3 Attachment III(A) Page No. 162-168 and Attachment III(B) Page No. 169-176 Section-6 Terms of reference of RFQ cum RFP As per Annexure-4 of Addendum, Sr. No. 138 is shown as a Non-key Position, while the position code is mentioned K-51. Attachment III (A) - Revised format for Position and No. of Man Months for Staff is attached as Annexure-1. Attachment III (B): Revised format for Qualification and Experience Required for Key and Non-Key is attached as Annexure-3. * Developing Countries will be as defined by IMF/World Bank or any other organization of UNO. Sd/- Managing Director, MP Metro Rail Co Ltd.

Upload: others

Post on 10-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Madhya Pradesh Metro Rail Co Limited · Senior Project Execution Expert (Elevated) Key Local 2 72 36 K-21 Sr. Structure Execution Expert Key Local 4 96 37 NK-16 Section Engineer

Madhya Pradesh Metro Rail Co Limited Palika Bhawan, Shivaji Nagar, Bhopal

(Ph:-0755-2552730) Email id: [email protected]

No: 3318 /MRTS/2016/ Dated: 17/06/2016

ADDENDUM-II

The addendum will be part of the RFQ cum RFP document and all clauses as on addendum will replace the respective bid clauses

published by MPMRCL vide RFP No. 01/GC/MPMRCL/2016 Dated 06/05/2016 and addendum on No. MRTS/2016/3276 dated

31/05/2016.

S.

No

Section/Clause

/Page No Particulars Read As / Add

1 Clause 19 and 19(i) b

Page No. 40 & 43 Experience in India

Clause 19 shall be read as :-

“ (a). ……………………..

(b) Experience in Developing Countries * ………………………….

(c) ………….”

With regard to aforesaid amendment revised Attachment-1: for

datasheet page no. 43-44 is annexed as Annexure-1. .

2

Attachment III(A)

Page No. 162-168 and

Section-6 Terms of reference of

RFQ cum RFP

It seems that there is a discrepancy in

the Man-Months summary (As per

S.N. 6 of addendum) and Annexure-4

of addendum.

Attachment –III (A) - Revised format for Position and No. of Man Months

for Staff is attached as Annexure-2.

3

Attachment III(A)

Page No. 162-168 and

Attachment III(B)

Page No. 169-176

Section-6 Terms of reference of

RFQ cum RFP

As per Annexure-4 of Addendum, Sr.

No. 138 is shown as a Non-key

Position, while the position code is

mentioned K-51.

Attachment –III (A) - Revised format for Position and No. of Man Months

for Staff is attached as Annexure-1.

Attachment III (B): Revised format for Qualification and Experience

Required for Key and Non-Key is attached as Annexure-3.

* Developing Countries will be as defined by IMF/World Bank or any other organization of UNO.

Sd/-

Managing Director,

MP Metro Rail Co Ltd.

Page 2: Madhya Pradesh Metro Rail Co Limited · Senior Project Execution Expert (Elevated) Key Local 2 72 36 K-21 Sr. Structure Execution Expert Key Local 4 96 37 NK-16 Section Engineer

Annexure-1

Attachment1:For Data sheet

Ground for number of points to be assigned against above criteria, sub-criteria and point system as mentioned under clause 19 of Data Sheet

Clause No Particulars Points

19. (i) Experience of the Consultants relevant* to the eligible assignment (In case of a common project, eligible projects for each

partner shall be considered for evaluation.)

Amounts relating to the year prior to 2015 will be escalated by multiplying corresponding escalation factor based on yearly

compounded method at the rate of 5% per year for Indian Rupees and 2% per year for foreign currency(ies) for calculating

received consultancy fees at price level of year 2015.

*Relevant eligible assignments shall be projects of General Consultancy / General Engineering Consultancy//Project

Management Consultancy for Metro/ LRT. Projects of Detail Design/Feasibility/Detailed Project Report shall not be

considered as eligible projects.

19. (i).a. Experience of international projects of comparable size, complexity and technical specialty 16

The number of points to be assigned shall be determined considering the following:

The Bidder having done and claimed highest numbers of eligible projects for carrying out consulting services similar to the

ones requested under this assignment will be awarded full Points (i.e. 16 Points). Points for other Bidder will be awarded

proportionately with respect to the highest numbers of eligible projects.

Eligible projects are the similar projects of Metro/ LRT in which fee excluding indirect taxes valued at not less than Rs 900

million (Rs 90 crore) have been received by the member(s) of the bidding consortium in the previous 10 years i.e. from year

2006 to 2015 up to Dec 2015.

Necessary information regarding these will be submitted in TECH -2 (B)

19. (i).b. Experience in Developing Countries

The number of points for projects to be assigned shall be determined considering as mentioned below:

Eligible Projects in developing countries as a sole consultant/ lead member/ member of joint venture/consortium, in which fee

12

Page 3: Madhya Pradesh Metro Rail Co Limited · Senior Project Execution Expert (Elevated) Key Local 2 72 36 K-21 Sr. Structure Execution Expert Key Local 4 96 37 NK-16 Section Engineer

excluding indirect taxes valued at not less than INR 800 million (INR 80 crores) have been received by the member of the

bidding consortium in the previous 07 years i.e. from year Jan 2009 to Dec 2015.

05 or more no of projects – 12 Points

Points for other Bidder will be awarded proportionately with respect to the highest numbers of eligible projects.

Necessary information regarding these will be submitted in TECH -2 (C)

19. (i).c. Experience in JICA funded projects

The number of points to be assigned shall be determined considering the following –

Experience of JICA funded eligible projects as a sole consultant/ lead member/ member of joint venture/consortium, in which

fee excluding indirect taxes valued at not less than INR 800 million (INR 80 crore) have been received by the member of the

bidding consortium in the previous 07 years i.e. from year Jan 2009 to Dec 2015.

05 or more no’s of projects- 2 Points

Points for other Bidder will be awarded proportionately with respect to the highest numbers of eligible projects

Necessary information regarding these will be submitted in TECH -2 ( )

02

Total points for criterion (i): 30

19. (ii) Adequacy of the proposed methodology and work plan in responding to the Terms of Reference:

19. (ii).a Technical approach and methodology 10

19. (ii).b Work plan 8

19. (ii).c Organization and staffing 2

Total points for criterion (ii): 20

19. (iii) Key Experts’ qualifications and competence for the assignment:

Each Team (separately for Bhopal and Indore) shall be having 43 Key experts. Out of which CVs of 23 key experts given below is to be

submitted along with proposal (separately for Bhopal and Indore) and will be evaluated.

In addition to this a Core team of strategic / financial and technical expert will be made for both cities for which CV of 04 experts is to be

submitted along with proposal and will be evaluated.

Page 4: Madhya Pradesh Metro Rail Co Limited · Senior Project Execution Expert (Elevated) Key Local 2 72 36 K-21 Sr. Structure Execution Expert Key Local 4 96 37 NK-16 Section Engineer

Annexure-2

Attachment III (A): Positions and Number of Man-Months for Staff

Sr. No.

Expert Position

Type Nos.

Per

Month

Total

Minimum

Man-

month Sl. Type Sl.

(Key/

Non-Key/

Support)

(International/

Local)

A CORE GROUP

1 K-1 Project Director / Project

Leader / Project Coordinator Key International

2 96

2 K-2 Dy. Project Director/ Dy.

Project Leader Key Local 2 120

3 K-3 Chief Contracts Manager Key International 2 48

4 K-4 Dy. Chief Contracts Manager Key Local 2 120

5 NK-1 Sr. Contract Expert Non-Key Local 2 80

6 K-5 Chief Programme Expert Key Local 2 96

7 K-6

Dy. Chief Programme

Manager / Sr. Programme

Expert

Key Local

2 120

8 K-7 Chief Cost control Expert Key Local 2 84

9 K-8 Sr. Cost control Expert Key Local 2 84

10 K-9 Chief Quality Assurance

Expert Key Local

2 48

11 K-10 Sr. Quality Assurance Expert

(Civil) Key Local 2 120

12 K-11 Chief Safety Expert Key Local 2 48

13 K-12 Sr. Safety Expert Key Local 2 120

14 NK-2 Safety Engineer Non-Key Local 4 160

15 NK-3 Safety Inspector Non-Key Local 16 384

16 K-13 Chief Environment Expert Key Local 2 72

17 NK-4 Environment Engineer Non-Key Local 4 96

18 K-14 Chief Architectural Expert Key Local 2 96

19 K-15 Chief Testing &

Commissioning Expert Key Local

2 72

20 NK-5 Senior Testing and

Commissioning Expert Non-Key Local 6 216

21 K-16 Operation & Maintenance

Expert Key Local

2 36

22 NK-6 Sr. Engineer O&M Non-Key Local 4 144

23 NK-7 Traffic Engineer Non-Key Local 2 72

24 NK-8 Traffic Inspector Non-Key Local 8 192

25 NK-9 Utility Engineer Non-Key Local 4 144

26 K-17 Multimodal Transport

Planner Key Local

2 48

27 NK-10 Sr. Property Development

Planner Non-Key Local 2 36

28 K-18 Chief Geo Technical Expert Key Local

2

36

Page 5: Madhya Pradesh Metro Rail Co Limited · Senior Project Execution Expert (Elevated) Key Local 2 72 36 K-21 Sr. Structure Execution Expert Key Local 4 96 37 NK-16 Section Engineer

Sr. No.

Expert Position

Type Nos.

Per

Month

Total

Minimum

Man-

month Sl. Type Sl.

(Key/

Non-Key/

Support)

(International/

Local)

29 NK-11 Senior Project Coordinator Non-Key Local 2 96

30 NK-12 Cost Controller Non-Key Local 4 160

31 NK-13 Sr. Procurement Engg Non-Key Local 2 72

32 NK-14 Procurement Engg Non-Key Local 4 96

Sub-Total for Group A

Key International 144

Key Local 1320

Non-Key Local 1948

Support Local 0

B VIADUCT, ELEVATED STATIONS, SERVICE BUILDING INCLUDING DEPOT

33 NK-15 Alignment Engineer Non-Key Local 2 48

34 K-19 Chief Structures expert –

Elevated Key Local 2 48

35 K-20 Senior Project Execution

Expert (Elevated) Key Local

2 72

36 K-21 Sr. Structure Execution

Expert Key Local 4 96

37 NK-16 Section Engineer/ Elevated

Stations and Viaduct Non-Key Local

8 192

38 NK-17 Site Engineer/ Elevated

Stations and Viaduct Non-Key Local

8 192

39 K-22 Sr. Geotechnical Expert Key Local 2 48

40 K-23 Sr. Architect (Elevated

viaduct, Depot and Station) Key Local

4 144

41 NK-18 Architect Non-Key Local 6 144

42 NK-19 Section Engineer (E & M) Non-Key Local 4 144

43 NK-20 Site Engineer (E&M) Non-Key Local 8 240

44 K-24 Senior Depot Resident

Engineer Key Local

2 72

45 NK-21 Section Engineer-Depot Non-Key Local 4 144

46 NK-22 Site Engineer-Depot Non-Key Local 4 144

Sub-Total for Group B only

Key International 0

Key Local 480

Non-Key Local 1248

Support Local 0

C UNDERGROUND SECTION GROUP

47 K-25 Chief Structures expert –

Underground Key International 2 72

48 K-26 Senior Structures expert –

Underground Key Local 2 72

49 K-27 Sr. Bored Tunnel Expert Key Local 2

48

Page 6: Madhya Pradesh Metro Rail Co Limited · Senior Project Execution Expert (Elevated) Key Local 2 72 36 K-21 Sr. Structure Execution Expert Key Local 4 96 37 NK-16 Section Engineer

Sr. No.

Expert Position

Type Nos.

Per

Month

Total

Minimum

Man-

month Sl. Type Sl.

(Key/

Non-Key/

Support)

(International/

Local)

50 NK-23 Section Engineer/ UG Non-Key Local 4 144

51 NK-24 Site Engineer/ UG Non-Key Local 6 216

52 K-28 Sr. Engineer E&M /UG Key Local 2 72

53 NK-25 Section Engineer E&M /UG Non-Key Local 2 72

54 NK-26 Site Engineer E&M /UG Non-Key Local 6 216

55 NK-27 Section Engineer (cut &

Cover) Non-Key Local

2 72

56 NK-28 Section Engineer (TBM) Non-Key Local 2 72

57 NK-29 Geotechnical Engineer Non-Key Local 2 48

58 NK-30 Geologist Non-Key Local 2 36

59 NK-31 Architect - UG Non-Key Local 4 144

60 K-29 Chief Ventilation and Air-

conditioning (VAC) Expert Key Local

2 72

61 K-30

Sr. Engineer - Tunnel

Ventilation, Station Air-

conditioning

Key Local

2 72

62 NK-32

Resident Engineer/ Tunnel

Ventilation, Station Air-

conditioning and E&M

Engineer -UG

Non-Key Local

4 144

63 NK-33 Contract Expert - UG Non-Key Local 2 48

Sub-Total for Group C

Key International 72

Key Local 336

Non-Key Local 1212

Support Local 0

D SYSTEMS GROUP

64 K-31 Chief Project Expert / System

(system Integration) Key International 2 48

65 K-32 Sr. Project Expert / System

(system Integration) Key Local 2 96

66 NK-34 System Training Expert Non-Key Local 2 36

D-1 POWER SUPPLY & TRACTION

67 K-33 Chief Power Supply &

Traction Expert Key Local 2 96

68 NK-35 Sr. Traction Power Supply

Expert Non-Key Local 2 72

69 NK-36 Sr. Engineer - Traction/OHE Non-Key Local 2 120

70 NK-37 Site Engineers -

Traction/OHE Non-Key Local 4

144

Page 7: Madhya Pradesh Metro Rail Co Limited · Senior Project Execution Expert (Elevated) Key Local 2 72 36 K-21 Sr. Structure Execution Expert Key Local 4 96 37 NK-16 Section Engineer

Sr. No.

Expert Position

Type Nos.

Per

Month

Total

Minimum

Man-

month Sl. Type Sl.

(Key/

Non-Key/

Support)

(International/

Local)

71 NK-38 Sr. Engineer - Power Supply Non-Key Local 2 96

72 NK-39 Site Engineers - Power

Supply Non-Key Local 4 144

73 NK-40 Sr. Engineer SCADA Non-Key Local 2 72

74 NK-41 Engineer SCADA Non-Key Local 2 72

D-2 TRACK

75 K-34 Chief Track Expert Key Local 2 96

76 NK-42 Sr. Track Design Expert Non-Key Local 2 60

77 NK-43 Sr. Engineer - Track

Installation Non-Key Local 4 144

78 NK-44 Site Engineer - Track

Installation Non-Key Local 4 144

D-3 SIGNALING

79 K-35 Chief Signaling Expert Key International 2 48

80 K-36 Dy.Chief Signaling Expert Key Local 2 96

81 NK-45 Sr. Signaling Expert Non-Key Local 2 120

82 NK-46 Site Engineer - Signaling Non-Key Local 4 144

83 NK-47 Sr. RAMS Engineer Non-Key Local 2 72

D-4 TELECOMMUNICATION

84 K-37 Chief Telecom Expert Key Local 2 96

85 NK-48 Sr. Telecom Expert Non-Key Local 2 84

86 NK-49 Site Engineer - Telecom Non-Key Local 4

160

D-5 AUTOMATIC FARE COLLECTION

87 K-38 Chief Automatic Fare

Collection Expert Key Local 2 96

88 NK-50 Sr. Automatic Fare Collection

Expert Non-Key Local 2 84

89 NK-51 Site Engineer - AFC Non-Key Local 4 144

D-7 E&M

90 K-39 Chief E&M Expert Key Local 2 96

91 K-40 Sr. Lift, Escalators etc. Expert Key Local 2 84

92 NK-52 Engineer Lift, Escalators etc. Non-Key Local 2 48

D-8 ROLLING STOCK

93 K-41 Chief Rolling Stock Expert Key International 2 48

94 K-42 Sr. Engineer Rolling Stock Key Local 2 96

95 NK-53 Rolling Stock Engineer —

Electrical System Non-Key Local

2 84

96 NK-54 Rolling Stock Engineer—

Mechanical System Non-Key Local

2 72

Page 8: Madhya Pradesh Metro Rail Co Limited · Senior Project Execution Expert (Elevated) Key Local 2 72 36 K-21 Sr. Structure Execution Expert Key Local 4 96 37 NK-16 Section Engineer

Sr. No.

Expert Position

Type Nos.

Per

Month

Total

Minimum

Man-

month Sl. Type Sl.

(Key/

Non-Key/

Support)

(International/

Local)

97 NK-55

Senior Maintenance Engineer

for Rolling Stock, Signaling

& Depot.

Non-Key Local 2 48

D-9 DEPOT PLANT & MACHINERIES

98 K-43 Chief Depot facility Expert

(M&P) Key Local

2 72

99 NK-56 Depot Plant & Machineries

Specification Engineer Non-Key Local

2 72

100 NK-57 Depot Plant & Machineries

Installation Engineer Non-Key Local 4 84

Sub-Total for Group D

Key International 144

Key Local 924

Non-Key Local 2320

Support Local 0

E -1 TECHNICAL/STRATEGIC / FINANCIAL CONSULTANCY CORE TEAM (AT HEAD

OFFICE)

101 K-44 Head Strategic/ Financial

Expert Key Local 1 12

102 K-45 Real Estate Expert/PPP

Expert Key Local 1 12

103 K-46 Project Controls Expert Key Local 1 48

104 K-47 Transport Economist Key Local 1 48

105 NK-58

Risk, Governance,

Compliance & Reporting

Expert

Non-Key Local 1 48

106 NK-59 Schedule and Program

management Expert Non-Key Local 1 48

107 NK-60 Cost and Financial

Management expert Non-Key Local 1 48

108 NK-61 Scheduling Assistant Non-Key Local 2 96

109 NK-62 Executive Assistant Non-Key Local 1 48

110 NK-63 Procurement Manager Non-Key Local 1

48

E-2 TECHNICAL TEAM (AT HEAD OFFICE)

111 NK-64 Sr. Engineer - Rolling Stock Non-Key Local 1 48

112 NK-65 Sr. Engineer - Signaling Non-Key Local 1 48

113 NK-66 Sr. Engineer - Power Supply Non-Key Local 1 48

114 NK-63 Sr. Engineer - E&M Non-Key Local 1 48

115 NK-64 Sr. Engineer - AFC Non-Key Local 1 48

116 NK-65 Sr. Engineer -

Communication Non-Key Local 1 48

117 NK-66 Sr. Engineer - Civil

(Station/Depot) Non-Key Local 1 48

118 NK-67 Sr. Engineer - Civil

(Underground) Non-Key Local 1

48

Page 9: Madhya Pradesh Metro Rail Co Limited · Senior Project Execution Expert (Elevated) Key Local 2 72 36 K-21 Sr. Structure Execution Expert Key Local 4 96 37 NK-16 Section Engineer

Sr. No.

Expert Position

Type Nos.

Per

Month

Total

Minimum

Man-

month Sl. Type Sl.

(Key/

Non-Key/

Support)

(International/

Local)

119 NK-68 Sr. Engineer - Civil

(Elevated) Non-Key Local 1 48

120 NK-69 Sr. Architect Non-Key Local 1 48

121 NK-70 Section Engineer - Rolling

Stock Non-Key Local 1 36

122 NK-71 Section Engineer - Signaling Non-Key Local 1 36

123 NK-72 Section Engineer - Power

Supply Non-Key Local 1 36

124 NK-73 Section Engineer - E&M Non-Key Local 1 36

125 NK-74 Section Engineer - AFC Non-Key Local 1 36

126 NK-75 Section Engineer -

Communication Non-Key Local 1 36

127 NK-76 Section. Engineer - Civil

(Station/Depot) Non-Key Local 1 36

128 NK-77 Section. Engineer - Civil

(Underground) Non-Key Local 1 36

129 NK-78 Sr. Engineer - Civil

(Elevated) Non-Key Local 1 36

130 NK-79 Architect Non-Key Local 1 36

131 K-48 Legal Expert Key Local 1 36

132 NK-80 Deputy Legal Expert Non-Key Local 2 84

133 K-49 IEC/PR Expert Key Local 1 48

134 NK-81 Deputy IEC/PR Expert Non-key Local 2 96

135 NK-82 Sr. Urban Planner/ TOD

Expert Non-key Local 1 48

136 NK-83 Marketing Expert Non-key Local 1 24

137 K-50 5-D BIM Expert Key Local 1 48

138 NK-84 5-D BIM Manager Non-Key Local 1 48

Sub-Total for Group E

Key International 0

Key Local 252

Non-Key Local 1476

Support Local 0

F SUPPORT GROUP FOR THE PROJECT GROUP AND HEAD OFFICE

139 S-1 IT-Manager Support Local 3 180

140 S-2 IT Engineer Support Local 6 288

141 S-3 Receptionist Support Local 3 144

142 S-4 Secretary to P.D. Support Local 3 144

143 S-5 Secretary to D.P.D. Support Local 3 180

144 S-6 Office Manager Support Local 3 144

145 S-7 Office Assistant Support Local 9 432

146 S-8 Office Boy Support Local 12 576

Page 10: Madhya Pradesh Metro Rail Co Limited · Senior Project Execution Expert (Elevated) Key Local 2 72 36 K-21 Sr. Structure Execution Expert Key Local 4 96 37 NK-16 Section Engineer

147 S-9 Pantry Boy Support Local 12 576

148 S-10 Finance Manager Support Local 3 144

149 S-11 Account Asst. Support Local 3 180

150 S-15 Senior Cad Operator Support Local 3 144

151 S-16 Document Control Support Local 3 144

152 S-17 Asst. Document Controller Support Local 9 432

Sr. No.

Expert Position

Type Nos.

Per

Month

Total

Minimum

Man-

month Sl. Type Sl.

(Key/

Non-Key/

Support)

(International/

Local)

153 S-18 Quantity Estimator Support Local 4 192

154 S-19 CAD Draftsman - Elevated

Stations + Structures Support Local

6 288

155 S-20 CAD Draftsman - UG Support Local 4 192

156 S-21 CAD Draftsman - (E&M) Support Local 4 192

Sub-Total for Group F

Key International 0

Key Local 0

Non-Key Local 0

Support Local 4572

After negotiation positions, numbers and man months can be changed as per

requirement of the project. Firstly for new positions existing positions shall be

adjusted and if aforesaid positions/ numbers/man months could not be changed

looking in the need of the project then new positions would be provisioned and

against those position as per mutual consent payment would be made to the

consultant.

Page 11: Madhya Pradesh Metro Rail Co Limited · Senior Project Execution Expert (Elevated) Key Local 2 72 36 K-21 Sr. Structure Execution Expert Key Local 4 96 37 NK-16 Section Engineer

Annexure- 3

Attachment III (B): Qualification and Experience Required for Key and Non-Key

Sr No

Expert Position

(Key/

Non-Key/

Support)

Post

Qualification

Experience

Assignment

relevant

Experience

Qualification Sl.

Type

Sl.

A CORE GROUP

1 K-1

Project Director / Project

Leader / Project

Coordinator

Key 15+ Years 5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

2 K-2 Dy. Project Director/ Dy.

Project Leader Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

3 K-3 Chief Contracts Manager Key 15+ Years 5+ or 5>3

years

PG or relevant professional

qualification or MBA after

graduation/Diploma in

respective field

4 K-4 Dy. Chief Contracts

Manager Key 15+ Years

5+ or 5>3

years

PG or relevant professional

qualification or MBA after

graduation/Diploma in

respective field

5 NK-1 Sr. Contract Expert Non-Key 15 + years 5 + years Grad. Engineer/Diploma

6 K-5 Chief Programme Expert Key 15+ Years 5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

7 K-6

Dy. Chief Programme

Manager / Sr. Programme

Expert

Key 15+ Years 5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

8 K-7 Chief Cost control Expert Key 15+ Years 5+ or 5>3

years

PG or relevant professional

qualification or MBA after

graduation/Diploma in

respective field

9 K-8 Sr. Cost control Expert Key 15+ Years 5+ or 5>3

years

PG or relevant professional

qualification or MBA after

graduation/Diploma in

respective field

10 K-9 Chief Quality Assurance

Expert Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

11 K-10 Sr. Quality Assurance

Expert (Civil) Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

12 K-11 Chief Safety Expert Key 15+ Years 5+ or 5>3

years

PG or relevant professional

qualification or MBA after

graduation/Diploma in

respective field

13 K-12 Sr. Safety Expert Key 15+ Years 5+ or 5>3

years

PG or relevant professional

qualification or MBA after

graduation/Diploma in

respective field

14 NK-2 Safety Engineer Non-Key 10 + years 4 + years Grad. Engineer/Diploma

Page 12: Madhya Pradesh Metro Rail Co Limited · Senior Project Execution Expert (Elevated) Key Local 2 72 36 K-21 Sr. Structure Execution Expert Key Local 4 96 37 NK-16 Section Engineer

Sr No

Expert Position

(Key/

Non-Key/

Support)

Post

Qualification

Experience

Assignment

relevant

Experience

Qualification Sl.

Type

Sl.

15 NK-3 Safety Inspector Non-Key 8 + years 3 + years Grad. Engineer/Diploma

16 K-13 Chief Environment Expert Key 15+ Years 5+ or 5>3

years

PG or relevant professional

qualification or MBA after

graduation/Diploma in

respective field

17 NK-4 Environment Engineer Non-Key 10 + years 4 + years Grad. Engineer/Diploma

18 K-14 Chief Architectural Expert Key 15+ Years 5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

19 K-15 Chief Testing &

Commissioning Expert Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation

20 NK-5 Senior Testing and

Commissioning Engineer Non-Key 10 + years 4 + years Grad. Engineer/Diploma

21 K-16 Operation & Maintenance

Expert Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

22 NK-6 Sr. Engineer O&M Non-Key 10 + years 4 + years Grad. Engineer/Diploma

23 NK-7 Traffic Engineer Non-Key 8 + years 3 + years Grad. Engineer/Diploma

24 NK-8 Traffic Inspector Non-Key 5 + years 2 + years Grad. Engineer/Diploma

25 NK-9 Utility Engineer Non-Key 10 + years 4 + years Grad. Engineer/Diploma

26 K-17 Multimodal Transport

Planner Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

27 NK-10 Sr Property Development

Planner Non-Key 10 + years 4 + years Grad. Engineer/Diploma

28 K-18 Chief Geo Technical

Expert Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

29 NK-11 Senior Project Coordinator Non-Key 10 + years 4 + years Grad. Engineer/Diploma

30 NK-12 Cost Controller Non-Key 10 + years 4 + years Grad. Engineer/Diploma

31 NK-13 Sr. Procurement Engg. Non-Key 10 + years 4 + years Grad. Engineer/Diploma

32 NK-14 Procurement Engg Non-Key 10 + years 4 + years Grad. Engineer/Diploma

B VIADUCT, ELEVATED STATIONS, SERVICE BUILDING INCLUDING DEPOT

33 NK-15 Alignment Engineer Non-Key 10 + years 4 + years Grad. Engineer/Diploma

34 K-19 Chief Structures expert –

Elevated Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

35 K-20 Senior Project Execution

Expert (Elevated) Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

36 K-21 Sr. Structure Execution

Expert Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

37 NK-16 Section Engineer/ Elevated

Stations and Viaduct Non-Key 8 + years 3 + years Grad. Engineer/Diploma

Page 13: Madhya Pradesh Metro Rail Co Limited · Senior Project Execution Expert (Elevated) Key Local 2 72 36 K-21 Sr. Structure Execution Expert Key Local 4 96 37 NK-16 Section Engineer

Sr No

Expert Position

(Key/

Non-Key/

Support)

Post

Qualification

Experience

Assignment

relevant

Experience

Qualification Sl.

Type

Sl.

38 NK-17 Site Engineer/ Elevated

Stations and Viaduct Non-Key 6 + years 2 + years Grad. Engineer/Diploma

39 K-22 Sr. Geotechnical Expert Key 15+ Years 5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

40 K-23 Sr. Architect (Elevated

viaduct,Depot and Station) Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

41 NK-18 Architect Non-Key 8 + years 3 + years Grad. Engineer/Diploma

42 NK-19 Section Engineer (E & M) Non-Key 8 + years 3 + years Grad. Engineer/Diploma

43 NK-20 Site Engineer (E&M) Non-Key 6 + years 2 + years Grad. Engineer/Diploma

44 K-24 Senior Depot Resident

Engineer Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

45 NK-21 Section Engineer-Depot Non-Key 8 + years 3 + years Grad. Engineer/Diploma

46 NK-22 Site Engineer-Depot Non-Key 6 + years 2 + years Grad. Engineer/Diploma

C Senior Depot Resident Engineer

47 K-25 Chief Structures expert –

Underground Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

48 K-26 Senior Structures expert –

Underground Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

49 K-27 Sr. Bored Tunnel Expert Key 15+ Years 5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

50 NK-23 Section Engineer/ UG Non-Key 8 + years 3 + years Grad. Engineer/Diploma

51 NK-24 Site Engineer/ UG Non-Key 6 + years 2 + years Grad. Engineer/Diploma

52 K-28 Sr. Engineer E&M /UG Key 15+ Years 5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

53 NK-25 Section Engineer E&M

/UG Non-Key 8 + years 3 + years Grad. Engineer/Diploma

54 NK-26 Site Engineer E&M /UG Non-Key 6 + years 2 + years Grad. Engineer/Diploma

55 NK-27 Section Engineer (cut &

Cover) Non-Key 8 + years 3 + years Grad. Engineer/Diploma

56 NK-28 Section Engineer (TBM) Non-Key 8 + years 3 + years Grad. Engineer/Diploma

57 NK-29 Geotechnical Engineer Non-Key 10 + years 4 + years Grad. Engineer/Diploma

58 NK-30 Geologist Non-Key 8 + years 3 + years Grad. Engineer/Diploma

59 NK-31 Architect - UG Non-Key 10 + years 4 + years Grad. Engineer/Diploma

60 K-29 Chief Ventilation and Air-

conditioning (VAC) Expert Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

61 K-30

Sr. Engineer - Tunnel

Ventilation, Station Air-

conditioning

Key 15+ Years 5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

Page 14: Madhya Pradesh Metro Rail Co Limited · Senior Project Execution Expert (Elevated) Key Local 2 72 36 K-21 Sr. Structure Execution Expert Key Local 4 96 37 NK-16 Section Engineer

Sr No

Expert Position

(Key/

Non-Key/

Support)

Post

Qualification

Experience

Assignment

relevant

Experience

Qualification Sl.

Type

Sl.

62 NK-32

Resident Engineer/ Tunnel

Ventilation, Station Air-

conditioning and E&M

Engineer -UG

Non-Key 15 + years 5 + years Grad. Engineer/Diploma

63 NK-33 Contract Expert - UG Non-Key 10 + years 4 + years Grad. Engineer/Diploma

D SYSTEMS GROUP

64 K-31

Chief Project Expert /

System (system

Integration)

Key 15+ Years 5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

65 K-32 Sr. Project Expert / System

(system Integration) Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

66 NK-34 System Training Expert Non-Key 10 + years 4 + years Grad. Engineer/Diploma

D-1 POWER SUPPLY & TRACTION

67 K-33 Chief Power Supply &

Traction Expert Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

68 NK-35 Sr. Traction Power Supply

Expert Non-Key 15 + years 5 + years Grad. Engineer/Diploma

69 NK-36 Sr. Engineer -

Traction/OHE Non-Key 10 + years 4 + years Grad. Engineer/Diploma

70 NK-37 Site Engineers -

Traction/OHE Non-Key 6 + years 2 + years Grad. Engineer/Diploma

71 NK-38 Sr. Engineer - Power

Supply Non-Key 10 + years 4 + years Grad. Engineer/Diploma

72 NK-39 Site Engineers - Power

Supply Non-Key 6 + years 2 + years Grad. Engineer/Diploma

73 NK-40 Sr. Engineer SCADA Non-Key 10 + years 4 + years Grad. Engineer/Diploma

74 NK-41 Engineer SCADA Non-Key 6 + years 2 + years Grad. Engineer/Diploma

D-2 TRACK

75 K-34 Chief Track Expert Key 15+ Years 5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

76 NK-42 Sr. Track Design Expert Non-Key 15 + years 5 + years Grad. Engineer/Diploma

77 NK-43 Sr. Engineer - Track

Installation Non-Key 10 + years 4 + years Grad. Engineer/Diploma

78 NK-44 Site Engineer - Track

Installation Non-Key 6 + years 2 + years Grad. Engineer/Diploma

D-3 SIGNALING

79 K-35 Chief Signalling Expert Key 15+ Years 5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

80 K-36 Dy.Chief Signalling Expert Key 15+ Years 5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

81 NK-45 Sr. Signalling Expert Non-Key 15 + years 5 + years Grad. Engineer/Diploma

82 NK-46 Site Engineer - Signaling Non-Key 6 + years 2 + years Grad. Engineer/Diploma

Page 15: Madhya Pradesh Metro Rail Co Limited · Senior Project Execution Expert (Elevated) Key Local 2 72 36 K-21 Sr. Structure Execution Expert Key Local 4 96 37 NK-16 Section Engineer

Sr No

Expert Position

(Key/

Non-Key/

Support)

Post

Qualification

Experience

Assignment

relevant

Experience

Qualification Sl.

Type

Sl.

83 NK-47 Sr. RAMS Engineer Non-Key 10 + years 4 + years Grad. Engineer/Diploma

D-4 TELECOMMUNICATION

84 K-37 Chief Telecom Expert Key 15+ Years 5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

85 NK-48 Sr. Telecom Expert Non-Key 10 + years 4 + years Grad. Engineer/Diploma

86 NK-49 Site Engineer - Telecom Non-Key 6 + years 2 + years Grad. Engineer/Diploma

D-5 AUTOMATIC FARE COLLECTION

87 K-38 Chief Automatic Fare

Collection Expert Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

88 NK-50 Sr. Automatic Fare

Collection Expert Non-Key 10 + years 4 + years Grad. Engineer/Diploma

89 NK-51 Site Engineer - AFC Non-Key 6 + years 2 + years Grad. Engineer/Diploma

D-7 E&M

90 K-39 Chief E&M Expert Key 15+ Years 5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

91 K-40 Sr. Lift, Escalators etc.

Expert Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

92 NK-52 Engineer Lift, Escalators

etc. Non-Key 10 + years 4 + years Grad. Engineer/Diploma

D-8 ROLLING STOCK

93 K-41 Chief Rolling Stock Expert Key 15+ Years 5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

94 K-42 Sr. Engineer Rolling Stock Key 15+ Years 5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

95 NK-53 Rolling Stock Engineer —

Electrical System Non-Key 10 + years 4 + years Grad. Engineer/Diploma

96 NK-54 Rolling Stock Engineer—

Mechanical System Non-Key 10 + years 4 + years Grad. Engineer/Diploma

97 NK-55

Senior Maintenance

Engineer for Rolling

Stock, Signaling & Depot.

Non-Key 10 + years 4 + years Grad. Engineer/Diploma

D-9 DEPOT PLANT & MACHINERIES

98 K-43 Chief Depot facility Expert

(M&P) Key 15+ Years

5+ or 5>3

years

PG (or higher) in engineering/

MBA after engineering

graduation/Diploma

99 NK-56 Depot Plant & Machineries

Specification Engineer Non-Key 10 + years 4 + years Grad. Engineer/Diploma

100 NK-57 Depot Plant & Machineries

Installation Engineer Non-Key 10 + years 4 + years Grad. Engineer/Diploma

E -1 Strategic / Financial Consultancy Team (At Head Office)

Page 16: Madhya Pradesh Metro Rail Co Limited · Senior Project Execution Expert (Elevated) Key Local 2 72 36 K-21 Sr. Structure Execution Expert Key Local 4 96 37 NK-16 Section Engineer

Sr No

Expert Position

(Key/

Non-Key/

Support)

Post

Qualification

Experience

Assignment

relevant

Experience

Qualification Sl.

Type

Sl.

101 K-44 Head Strategic/ Financial

Expert Key 15 + years 5 + years

CA/ Post-Graduation in

Business Administration/

Management from a reputed

institute

OR

Phd./ PG in Economics/

Finance or equivalent or higher

preferred

102 K-45 Real Estate Expert Key 10 + years 4 + years

Post-Graduation Degree in

Business Administration/

Planning

103 K-46 Project Controls Expert Key 10 + years 4 + years

Post-Graduation from a

recognized university +

Bachelor Degree in

Engineering

104 K-47 Transport Economist Key 10 + years 4 + years

Post-Graduation from a

recognized university +

Bachelor Degree in

Engineering

105 NK-58

Risk, Governance,

Compliance & Reporting

Expert

Non-Key 10 + years 4 + years Grad./Diploma

106 NK-59 Schedule and Program

management Expert Non-Key 10 + years 4 + years Grad. Engineer/Diploma

107 NK-60 Cost and Financial

Management expert Non-Key 8 + years 3 + years PG in Finance/equivalent

108 NK-61 Scheduling Assistant Non-Key 5 + years 2 + years Grad. Engineer/Diploma

109 NK-62 Executive Assistant Non-Key 3 + years 0 Degree in any discipline

110 NK-63 Procurement Manager Non-Key 8 + years 3 + years Grad. Engineer/Diploma

E-2 Technical Team (At Head Office)

111 NK-64 Sr. Engineer - Rolling

Stock Non-Key 10 + years 4 + years Grad. Engineer/Diploma

112 NK-65 Sr. Engineer - Signalling Non-Key 10 + years 4 + years Grad. Engineer/Diploma

113 NK-66 Sr. Engineer - Power

Supply Non-Key 10 + years 4 + years Grad. Engineer/Diploma

114 NK-63 Sr. Engineer - E&M Non-Key 10 + years 4 + years Grad. Engineer/Diploma

115 NK-64 Sr. Engineer - AFC Non-Key 10 + years 4 + years Grad. Engineer/Diploma

116 NK-65 Sr. Engineer -

Communication Non-Key 10 + years 4 + years Grad. Engineer/Diploma

117 NK-66 Sr. Engineer - Civil

(Station/Depot) Non-Key 10 + years 4 + years Grad. Engineer/Diploma

118 NK-67 Sr. Engineer - Civil

(Underground) Non-Key 10 + years 4 + years Grad. Engineer/Diploma

119 NK-68 Sr. Engineer - Civil

(Elevated) Non-Key 10 + years 4 + years Grad. Engineer/Diploma

120 NK-69 Sr. Architect Non-Key 10 + years 4 + years Graduate Architect

121 NK-70 Section Engineer - Rolling Non-Key 8 + years 3 + years Grad. Engineer/Diploma

Page 17: Madhya Pradesh Metro Rail Co Limited · Senior Project Execution Expert (Elevated) Key Local 2 72 36 K-21 Sr. Structure Execution Expert Key Local 4 96 37 NK-16 Section Engineer

Sr No

Expert Position

(Key/

Non-Key/

Support)

Post

Qualification

Experience

Assignment

relevant

Experience

Qualification Sl.

Type

Sl.

Stock

122 NK-71 Section Engineer -

Signalling Non-Key 8 + years 3 + years Grad. Engineer/Diploma

123 NK-72 Section Engineer - Power

Supply Non-Key 8 + years 3 + years Grad. Engineer/Diploma

124 NK-73 Section Engineer - E&M Non-Key 8 + years 3 + years Grad. Engineer/Diploma

125 NK-74 Section Engineer – AFC Non-Key 8 + years 3 + years Grad. Engineer/Diploma

126 NK-75 Section Engineer -

Communication Non-Key 8 + years 3 + years Grad. Engineer/Diploma

127 NK-76 Section. Engineer - Civil

(Station/Depot) Non-Key 8 + years 3 + years Grad. Engineer/Diploma

128 NK-77 Section. Engineer - Civil

(Underground) Non-Key 8 + years 3 + years Grad. Engineer/Diploma

129 NK-78 Section Engineer - Civil

(Elevated) Non-Key 8 + years 3 + years Grad. Engineer/Diploma

130 NK-79 Architect Non-Key 8 + years 3 + years Grad. Engineer/Diploma

131 K-48 Legal Expert Key 20 + years 5 + years LLB or Higher

132 NK-80 Deputy Legal Expert Non- Key 15 + years 5 + years LLB or Higher

133 K-49 IEC/PR expert Key 15 + years 5 + years

PG in Mass

Communication/Public

Relation or relevant

134 NK-81 Deputy IEC/PR expert Non-Key 10 + years 3 + years

PG in Mass

Communication/Public

Relation or relevant

135 NK-82 Sr. Urban Planner/ TOD

Expert Non-Key 10 + years 3 + years

Post-Graduation Degree in

Urban Panning or relevant

136 NK-83 Marketing Expert Non-Key 10 + years 3 + years MBA(marketing) or relevant

137 K-50 5-D BIM Experts Key 10 + years 3 + years Engineering/Diploma or

Architect Graduate

138 NK-84 5-D BIM Manager Non Key 10 + years 3 + years Engineering/Diploma or

Architect Graduate

F SUPPORT GROUP FOR THE PROJECT GROUP AND HEAD OFFICE

139 S-1 IT-Manager Support 6 + years 2 + years Grad. Engineer/Diploma

140 S-2 IT Engineer Support 4 + years 2 + years Grad. Engineer/Diploma

141 S-3 Receptionist Support 3 + years 1 + years Grad.

142 S-4 Secretary to P.D. Support 3 + years 1 + years Grad.

143 S-5 Secretary to D.P.D. Support 3 + years 1 + years Grad.

144 S-6 Office Manager Support 6 + years 2 + years Grad.

145 S-7 Office Assistant Support 4 + years 1 + years Grad.

146 S-8 Office Boy Support 1 + years 0 8th

Pass

147 S-9 Pantry Boy Support 1 + years 0 8th

Pass

148 S-10 Finance Manager Support 6 + years 2 + years Grad.

149 S-11 Account Asst. Support 4 + years 2 + years Grad.

Page 18: Madhya Pradesh Metro Rail Co Limited · Senior Project Execution Expert (Elevated) Key Local 2 72 36 K-21 Sr. Structure Execution Expert Key Local 4 96 37 NK-16 Section Engineer

Sr No

Expert Position

(Key/

Non-Key/

Support)

Post

Qualification

Experience

Assignment

relevant

Experience

Qualification Sl.

Type

Sl.

150 S-15 Senior Cad Operator Support 6 + years 2 + years Diploma/ITI

151 S-16 Document Control Support 6 + years 2 + years Grad.

152 S-17 Asst. Document Controller Support 4 + years 2 + years Grad.

153 S-18 Quantity Estimator Support 6 + years 2 + years Grad. Engineer/Diploma

154 S-19 CAD Draftsman - Elevated

Stations + Structures Support 4 + years 2 + years Diploma/ITI

155 S-20 CAD Draftsman - UG Support 4 + years 2 + years Diploma/ITI

156 S-21 CAD Draftsman - (E&M) Support 4 + years 2 + years Diploma/ITI

Where:

Grad. Engineer: Graduate Engineer

Grad.: Graduate

Note:

(i) Diploma candidate shall have 5 years more experience to the experience shown

against each position in attachment III (B)

(ii) Duration of diploma course should be mentioned i.e. it is of 1 year or 2 years.

After negotiation aforesaid positions could be either interchanged or changed with new

positions as per requirement of the project.