MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected]
Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in
No.07-05/SG-9B-II/30 Jabalpur, dated:06.01.2020
To
As per distribution list
Sub: Minutes of 72nd meeting of Operation and Coordination Committee of MP.
…
The Minutes of 72nd meeting of the Operation and Coordination Committee of MP held on
19th November 2019 at Conference Hall, SLDC, MPPTCL, Jabalpur has been uploaded on the
website of SLDC ‘www.sldcmpindia.com’ and can be downloaded.
(R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur
Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email-
[email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email-
[email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. Email-
[email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura,
Bhopal, email- [email protected]. 6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email-
[email protected] 7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email –
[email protected] 8. The Chief Engineer(EHT:Const.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2661618, E-mail-
[email protected]. 9. The Chief Engineer(EHT:Maint&insp.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2665593, E-mail-
[email protected]. 10. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749,
Email- [email protected], Email- [email protected] 11. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 12. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected] 13. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]. 14. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur,
Fax No- 0761-2668503, Email – [email protected]. 15. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited,
Bhopal, Fax No-0755-2580611,Email- [email protected]. 16. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near
Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]. 17. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email –
[email protected]. 18. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email –
[email protected] 19. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046,
[email protected] 20. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal –
462013., Fax No- 0755-4030130,Email – [email protected] [email protected] 21. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical
Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected], [email protected], M-
9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR). 22. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa
(MP) – 450 119, Fax No- 07323-284080, Email – [email protected] 23. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP)
– 450 554, FaxNo-07280-271703, Email- [email protected] , [email protected] . 24. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551,
Fax No. 07791-243667 / 243669, Email – [email protected] 25. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina-
470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected] [email protected],
26. The Chief Executive Officer, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, Email – [email protected]
27. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :[email protected] 28. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row,
Email- [email protected], Indore – 452010, [email protected]
The 72nd meeting of Operation & Coordination Committee of MP was held on 19th November 2019 at
11:00 AM at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur. The list of participants is enclosed at
Annexure -1.0.
Shri K.K.Parbhakar, C.E.(SLDC) & Chairman OCC welcomed all the guests & participants to 72nd
OCCM of MP. Chairman OCC stated that in the month of October 2019, the demand of all of the states of
India, except J&K and Uttrakhand demand, was less compared to previous year demand. Demand of some of
the states have been reduced by 40% and even the demand of Industrial states like Maharashtra, Gujarat,
Haryana, Punjab etc. has also reduced. The average demand of India for October 2019 is about 30% less
compared to last year demand of October 2018, this feature required to be analyzed.
In MP also the demand has not increased as expected and stated that Discoms can forecast the
expected increase in demand and its pattern in a better way as Discoms can calculate and have the records of
pump connections and expected to be connected in near future. Further he added that the installed capacity
of state is not sufficient to meet the rabi season demand, hence MPPMCL & SLDC will require correct
forcasting from Discoms so that arrangement for required power can be made accordingly by power purchase,
banking etc.
Chairman OCC also shown concern about coal shortage in Generating company and informed the
committee that the available coal stock has to be used optimally so that the grid parameters may be
maintained within limit for safe & secure grid operation. He further requested generators to arrange for coal
and maintain sufficient coal stock. Further he requested all the departments to review the power flow after
commissioning of new elements in the system in prevailing circumstances and emphasized for better
coordination between EHT and T&C for availing shut down on elements. Thereafter he requested Shri.
R.A.Sharma, Addl. CE, SLDC & Member Secretary OCCM to take up the agenda points.
ShriR.A.Sharma, Addl. CE, SLDC has further added that now days the power system is not technical
subject only but it is techno-commercial. The Discoms shall explore possibilities to improve their demand
forecasting method so as to further reduce the deviation charges payable by Discoms. The requisition for
drawl schedule of Discoms must be given by MPPMCL, matching with the actual drawl of Discoms. By
maintaining MP drawl as per schedule, shall reduce the deviation charges payable by Discoms & with the help
in safe grid operation. Thereafter the agenda points were taken up, which are narrated here under:-
ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 71st meeting of Operation & Coordination Committee of MP held on 09th July 2019 at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/2886 Jabalpur dated 31.09.2019. No comments have been received. Committee confirms the minutes.
ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTHS AUGUST 2019 TO SEPTEMBER 2019.
2.1. Frequency Particulars: The committee was apprised that during AUGUST 2019 the system frequency
was below 49.90 Hz for 7.28% of time against 4.57% of time during SEPTEMBER 2019. The system
MINUTES OF 72nd MEETING OF OPERATION & COORDINATION COMMITTEE OF MP HELD ON 19th NOVEMBER 2019 AT 11:00 AM AT Conference Hall, SLDC, MPPTCL,
Nayagaon, Jabalpur.
frequency was above 50.05 Hz for 20.03% of time during AUGUST 2019 against 20.18 % of time during
SEPTEMBER 2019. The system frequency was within the IEGC range of 49.90-50.05 Hz for 72.69 % of the
time during AUGUST 2019 against 75.25 % of time during SEPTEMBER 2019. The average monthly
frequency was 50.00 Hz during month of AUGUST 2019 and 50.01 Hz during month of SEPTEMBER 2019.
The detailed frequency particulars for the month of AUGUST 2019 and SEPTEMBER 2019 are
enclosed at Annexure-2.1. The brief detail of frequency profile is given here under:-
Month Average frequency
Minimum Integrated frequency over an hour
Maximum integrated frequency over an hour
Instantaneous Minimum Frequency
Instantaneous Maximum Frequency
AUGUST 2019
50.00 Hz 49.81 Hz 50.26 Hz 49.55 Hz 50.32 Hz
SEPTEMBER 2019
50.01 Hz 49.80 Hz 50.14 Hz 49.62 Hz 50.27 Hz
2.2 Operational Matters
2.2.1 Operational Discipline : The committee was apprised that System operated in terms of frequency
profile for the months AUGUST 2019 & SEPTEMBER 2019 is as given below for discussion by the committee
:
Month % of time Frequency Below 49.90 Hz
% of time Frequency above 50.05 Hz
% of time frequency within the permissible range of 49.90-50.05 Hz.
Average monthly frequency
AUGUST 2019
7.28% 20.03% 72.69% 50.00 Hz
SEPTEMBER 2019
4.57% 20.18% 75.25% 50.01 Hz
2.2.2 Voltage Profile: During the months AUGUST 2019 & SEPTEMBER 2019 the maximum and minimum
voltage as recorded at following important 400 KV s/s in MP Grid:-
Sr. No.
Name of 400 KV
Substation
AUGUST 2019 SEPTEMBER 2019
Max. Voltage Min. Voltage Max. Voltage Min. Voltage
Observed Observed Observed Observed
Voltage KV Date Voltage
KV Date Voltage
KV Date Voltage
KV Date
1 Bhopal 420.09 15.08.19 400.18 18.08.19 418.89 29.09.19 401.53 30.09.19
2 Bina 418.99 15.08.19 398.21 18.08.19 417.39 29.09.19 397.42 13.09.19
3 Gwalior 414.94 15.08.19 388.23 18.08.19 414.33 20.09.19 390.14 02.09.19
4 Indore 418.75 15.08.19 403.46 19.08.19 417.95 21.09.19 403.28 13.09.19
5 ISP 420.3 07.08.19 407.1 05.08.19 420.9 13.09.19 408.7 13.09.19
6 Julwaniya 429.15 10.08.19 412.47 19.08.19 431.7 10.09.19 403.47 13.09.19
7 Katni 425.25 08.08.19 403.26 18.08.19 426.14 13.09.19 405.63 13.09.19
8 Nagda 423.04 15.08.19 391.08 02.08.19 421.77 29.09.19 403.28 13.09.19
9 Pithampur 419.24 15.08.19 403.72 19.08.19 419.99 13.09.19 403.66 13.09.19
10 Birsinghpur 430.43 15.08.19 413.35 18.08.19 427.38 29.09.19 409.68 13.09.19
11 Singhaji 422.33 27.08.19 409.5 19.08.19 424.53 22.09.19 405.59 13.09.19
12 Satpura 426.14 16.08.19 413.84 18.08.19 427.31 12.09.19 410.9 13.09.19
13 Itarsi 424.97 15.08.19 407.39 18.08.19 424.97 29.09.19 409.73 30.09.19
14 Ashta 426.42 15.08.19 410.84 18.08.19 427.58 21.09.19 410.55 30.09.19
15 Chhegaon 424.82 10.08.19 410.74 19.08.19 427.88 12.09.19 412.63 30.09.19
16 Kirnapur 447.53 08.08.19 419.8 08.08.19 439.67 29.09.19 427.36 27.09.19
17 Badnawar 425.15 15.08.19 408.15 18.08.19 425.33 21.09.19 410.95 06.09.19 The committee was intimated that at 400kv Kirnapur the high voltage is persisting and measures for controlling the voltage is being taken at EHV level and installation of reactor at Kirnapur & Seoni(PG) end is also being planned at EHV level. Further Discoms shall also check the status of the capacitor banks installed at 33kv and ensure that the voltage is maintained at Discom level by switching off the capacitor banks during high voltage conditions. East Discom was requested to provide the status of capacitor banks installed at in Balaghat & Kirnapur regions during high voltage period. Representative from P&D MPPTCL informed the committee that the reactor at 400 KV S/s Kirnapur is planned and is in the proposal stage. Thereafter, Member Secretary OCC stated that P&D shall expedite the work of reactor installation. Chairman OCC stated that the generators shall also provide their support by absorbing MVAR during High voltages in the system, especially JP Bina and Singhaji TPS which are observed to inject MVAr during high voltages.
2.2.3 Status of Capacitor Banks in sub-transmission system: The committee was apprised that the
updated information of the status of capacitor banks in sub-transmission system as on 31th MAY 2019 as
submitted by DISCOMs is detailed below:
The matter was discussed in the meeting and all the Discoms were requested to ensure healthiness of
the capacitor banks during rabi season for maintaining quality supply to consumers.
2.2.4 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The
committee was apprised about the updated information of the status of installed capacitor banks (in MVAR) in
EHV transmission system as on 31.10.2019 as submitted by MPPTCL is given below:-
Voltage
Class
Capacitor bank
installed as on
Capacity Added
after Last OCC
Capacitor banks
already covered
TOTAL
CAPACITY AS
Capacitor Bank
Installed but
DIS
CO
M
Capacitor bank
installed in good
condition (No)
Capacitor
Banks healthy
but not in
service due to
control ckt
problem
Capacitor bank
installed but
defective & are
repairable (No)
Require
ment of
repair
against
each
unit (No)
Requiremen
t against
non-
repairable
capacitor
banks
Capacitor
banks already
covered under
ADB T-V
Balance
capacitor
banks to be
covered in
other
schemes
600
KVAR
1200
KVAR
1500
KVAR
600
KVA
R
1200
KVA
R
1500
KVA
R
600
KVAR
1200
KVAR
1500
KVAR
No of 100
KVAR
Units
required
600
KVAR
1200
KVAR
600
KVAR
1200
KVAR
600
KVAR
1500
KVAR
EZ 449 156 75 3 5 3 5 6 0 25 32 6 0 0 0 0
CZ 1 685 875 - - - 0 0 0 3 0 0 0 0 0 0
WZ 613 550 725 10 3 1 23 12 15 207 08 16 - - - 0
31.08.19(MVAR) Meeting (MVAR) under ADB T-V ON 31.10.19
(MVAR)
defective & are not
repairable (No &
MVAR)
220 KV 100.00 0.00 - 100.00 All in Service
132 KV 1238.00 0.00 - 1238.00
33 KV 5399.50 36.00 - 5435.50
Total 6737.50 0.00 - 6773.50
The matter was discussed in the meeting.
2.2.5 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: The
committee was apprised about the various ongoing Transmission Schemes completed during the financial
year 2019-2020 (up to MAY 2019) and plan for completion of various ongoing Transmission Schemes for the
Year 2019-2020 is enclosed as Annexure 2.2.5(i) and 2.2.5(ii) respectively.
2.2.6 U/F and df/dt Relay Operation
(i) U/F and df/dt Relay Operation: The committee was apprised that the Frequency did not touch 49.20 Hz
during AUGUST 2019 and SEPTEMBER 2019. There was no df/dt operation during the same period. MPPTCL informed that under Frequency Plan for all the stages have been implemented and in operation.
(ii) Defective u/f, df/dt relays: The committee was apprised that MPPTCL has informed that all the df/dt and U/F relays are in operation, where the U/F relays are not available, the numerical relays programmed for under frequency operation.
2.3 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to
33 KV feeders: (i) The committee was apprised about the details of DISCOM wise Power supply given to various domestic
categories during the period AUGUST 2019 and SEPTEMBER 2019 is enclosed at Annexure 2.3(i).
(ii) Group Allocation to Newly Commissioned existing EHV substations:- The committee was apprised
about the region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV
substations for which groups have not been allocated is given in Annexure 2.3 (ii). The DISCOM wise details
of pending group allocation to 33 KV feeders is given below:-
SN DISCOM Region No of 33 KV feeders for which groups
to be allocated
01
EAST
Jabalpur 21
02 Sagar 00
03 Rewa 00
04 Total 21
05
WEST
Indore 05
06 Ujjain 04
07 Total 09
08 CENTRAL
Bhopal 17
09 Gwalior 00
10 Total 17
TOTAL Grand Total 47
The matter was discussed.
ITEM NO. 3 : OPERATIONAL PLANNNING:
3.1 Generating Units under planned outage and proposed maintenance programme: The committee was
apprised about the annual maintenance /outages of thermal generating units of MPPGCL for FY 2019-2020 as
intimated by ED(O&M:Gen.) is NIL for the month OCT-19 to DEC-19.
3.2 Proposed shutdown programme of Transmission lines / Transformers: The committee was apprised
about the proposed shutdown of transmission elements for the period 01.09.2019 to 31.12.2019 as submitted
by T&C, MPPTCL is enclosed as Annexure-3.2.
3.3 Long Outages of transmission elements and protections: The committee was apprised about the
status submitted by MPPGCL /MPPTCL are given below:-
Sr.
No
Line/Transformer/ etc
under long Outage
Outage date Reason Response from Utility
1. 20MVA BHEL make X’mer at 132KV S/S Khachrod.
27.03.2019
X’mer was taken under for pre monsoon maintenance and testing work on
27.03.2019. Shutdown is continue
as the tan-delta values of transformer
windings are measured
considerably high.
The transformer is replaced by 50MVA transformer on 23-09-19.
2 20MVA BBL X’mer at 220 KV S/s Rajgarh(Biora).
30.05.2019 X’mer tripped on
differential indication
Transformer declared failed, and replaced by another 20MVA transformer, spared from 220KV S/S Ganjbasoda on Dt. 01-10-2019.
3 40 MVA BBL, 132/33KV Transformer at 132KV S/S Sagar
07.07.2019 X’mer tripped on
differential trip indication.
Transformer tripped on Differential trip indications and declared failed after testing. Transformer replaced by 50MVA X’mer on Dt. 19-10-19.
4 63 MVA GEC, 132/33KV Transformer at 220KV S/S Mahalgaon, Gwalior
10.07.2019 X’mer tripped on
differential trip indication.
Transformer tripped on Differential trip indications and declared failed after testing. Transformer replaced by 63MVA transformer on Dt. 16-09-19
5 160MVA, 220/132KV BHEL X’mer – 2 at 220KV S/s Satna.
14.08.2019
B-Phase bushing & OLTC selector switch failed due to heavy
lightening.
The 220/132KV, 160MVA BHEL Transformer Sl.No. 6005055 tripped on Differential trip indications due to failure of 132KV R phase bushing, declared failed. Transformer installed on 14.11.2019.
6 160MVA CGL, 220/132KV X’mer at 220KV S/S Shujalpur.
Sl. No. T-8318-3
31.08.2019
Tripped on Differential & PRV trip indication during heavy rains and lightning.
160MVA CGL X’mer declared failed due to fire. MPPTCL informed that the X’mer is expected to be commissioned by Feb-2020.
7
12.5MVA EMCO, 132/33KV X’mer at 132KV S/S Chanderi (Sl.No. 1023-10789)
11.09.2019 X’mer Tripped on Differential Trip indications
12.5MVA EMCO X’mer found defective in testing and is being replaced by 20MVA transformer by Nov-19 end. Latest status may please be intimated by MPPTCL in the meeting.
8 12.5MVA BHEL, 132/33KV at 132KV S/S Bhanegaon (Sl.No. 6000191)
25.09.2019 X’mer Tripped on Differential Trip indications
12.5MVA BHEL X’mer found defective in testing and is being replaced by 16MVA transformer by Nov-19 end. Latest status may please be intimated by MPPTCL in the meeting.
9 500 MVA, 400/220 KV X’mer at STPS.
19.04.2018
X’mer tripped at 21:55 Hrs. due to LA Burst. Emergency shutdown taken for 15 days from
21.04.18 to 05.05.18 for CPRI oil filtering and
RLA testing work.
Dismanteling & shifting work of 500 MVA ICT bank has been completed. Presently civil work is under progress. The work is expected to be completed by June 2020. MPPGCL intimated that X’mer winding is under inspection at Company.
10 50 MVAR (Make GE) Line Reactor at 400KV Sarni-Asta Ckt-I.
31.03.2018
Under outage since 31.03.18 due to concentration of
Acetylene gas. DGA test of transformer oil of
reactor was carried out by M/s CPRI, Bhopal.
M/s GE(T&D) India (OEM) deputed their team on dtd-30.10.2019 for internal inspection of reactor. Presently work is under progress. MPPGCL intimated that inspection has been completed and busing need to be replaced.
The matter was discussed.
ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF AUGUST 2019 AND SEPTEMBER 2019: The committee was apprised about the actual generation, Schedule from Central Sector, demand etc. are given in the following Annexures: Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of
MPPGCL & NHDC Hydel Units.
Annex. 4.2 Power Supply Position(Energy Balance Sheet).
POWER SUPPLY POSITION FOR THE MONTH : Aug 19
All Fig in MW
Particulars Max Dem Met on : 12-Aug-19
AT : 07-30
Average 01-10 Aug
Average 11-20 Aug
Average 21-31 Aug
Average
Monthly
STATE PEAK DEMAND MET 8606 7443 6978 7195 7205
BREAKUP :-
STATE THERMAL (Actual Gen) 1807 2315 1283 1228 1596
STATE THERMAL (RSD) Total MW
730 229 1542 1778 1202
STATE HYDEL 1586 386 1657 1823 1306
IPP (STATE) 327 285 326 330 314
CENTRAL SECTOR (Schedule) 3270 3017 2562 2944 2844
CENTRAL SECTOR (Surrender)
96 352 849 574 591
IPP (INTER STATE) 2102 1761 1500 1630 1630
RAILWAY 222 235 228 199 220
RENEWABLE ENERGY 873 777 986 623 790
OTHERS -303 -154 -292 -254 -234
BANKING / PURCHASE / SALE -1520 -901 -1112 -1195 -1073
DEVIATION 242 -62 -160 -133 -119
DEVIATION (AVERAGE) Between (-804 to 782)
Between (-877 to 282)
Between (-828 to 541)
Between(-877 to 782)
ENERGY SUPPLY STATE (LU)
1909.77
POWER SUPPLY POSITION FOR THE MONTH : Sep 19
All Fig in MW
Particulars Max Dem Met on : 06-Sep-19 AT : 19-15
Average 01-10 Sep
Average 11-20 Sep
Average21-31 Sep
AverageMonthly
STATE PEAK DEMAND MET 8685 7544 6939 6060 6822
BREAKUP :-
STATE THERMAL (Actual Gen) 2099 1667 1282 927 1280
STATE THERMAL (RSD) Total MW
1705 1899 2875 3064 2627
STATE HYDEL 1985 1759 1801 1840 1802
IPP (STATE) 341 330 321 274 307
CENTRAL SECTOR (Schedule) 2984 2664 2396 2332 2460
CENTRAL SECTOR (Surrender)
7 525 800 886 737
IPP (INTER STATE) 1851 1684 1790 1694 1722
RAILWAY 229 217 211 198 209
RENEWABLE ENERGY 197 387 737 366 492
OTHERS -10 -230 -277 -262 -256
BANKING / PURCHASE / SALE -879 -811 -1197 -1208 -1077
DEVIATION -113 -124 -126 -100 -116
DEVIATION (AVERAGE) Between (-601 to 509)
Between (-565 to 335)
Between (-741 to 543)
Between (-741 to 543)
ENERGY SUPPLY STATE (LU)
1903.32
Annex. 4.3 Hourly Average of Availability and Demand.
Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs.
ITEM NO. 5 : SYSTEM DISTURBANCE IN MP DURING OF AUGUST 2019 AND SEPTEMBER 2019: The committee was apprised about the Grid Disturbances and Grid Incidents in MP
during these months are given in Annexure 5.
MPPTCL was requested to submit the details/report of tripping at 400KV S/s Ashta on 21.09.2019 at
14:50Hrs. due to PT failure. ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:-
6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF
REACTORS / TRANSMISSION ELEMENTS:- The committee was apprised about the present status
regarding schedule and commissioning of reactors / transmission elements is as below:-
S.No. 400 KV S/s Size MVAR Implementi
ng Agency
Expected Date of Commissioning
as intimated in last OCC
1. Line Reactor on 400 kV Sapura–ISP line at STPS
50 MVAR MPPGCL
In 66th OCC MPPGCL informed that the price bid has to be opened and the reactor will be commissioned by June 2019. MPPGCL informed that previous tender was dropped & new tendering is under process.
2. Bus Reactor at SSTPS 125 MVAR MPPGCL
Work will be carried out under PSDF as intimated by MPPGCL in 62nd OCC in 66th OCC MPPGCL informed the committee that the drawing has been approved and reactor is expected to be commissioned by March 2019. In 68th OCC, MPPGCL informed the committee that reactor will be commissioned by October 2019. MPPGCL was apprised that considering commissioning of unit 3 and 4 at SSTPS stage II, early commissioning of 125 MVA reactor is required to ensure secure operation of grid. MPPGCL informed the committee that the civil work is completed and reactor is expected to be commissioned soon.
6.2 EXCESSTIVE TRIPPING OF 33 KV FEEDERS RADIATING FROM EHV SUB STATIONS:-
The committee was apprised that CE(T&C), MPPTCL vide letter no-1972 dtd-19.09.2019 informed about the
excessive tripping of 33KV Discome feeders emanating from EHV-substation. It was also mentioned that due
to lack of maintenance of these lines, during faults these lines trips along with 33KV incomers of 132/33KV
EHV X’mers, resulting in supply failures in the entire area fed by respective X’mer/EHV Sub-station. MPERC
also monitors these tripping and MD, MPPTCH has showed the concern about such excessive tripping of
33KV feeders. A sub-station wise list of 33KV & 11KV feeders under the control of Discoms on which
excessive tripping (10 & more that 10) is enclosed as Annexure-6.2.
In view of the above it is to mention that proper maintenance of these lines shall be shall be carried
out regularly by Discoms to reduce fault tripping for safe & secure grid operation. Further it is also requested to
issue suitable instruction to field officer to take necessary and corrective action so that the tripping may be
reduced which will improve the performance of company and increase revenue.
Representative from West Discom informed the committee that the reason for excessive tripping was
the bad weather and extended rainy season. Further the maintenance is being carried out regularly and
resulting in reduced trippings. The matter was discussed in the meeting.
6.3 IMPLEMENTATION OF PILOT PROJECT OF RRAS IN THE STATE OF MP:- The
committee was apprised that Hon’ble Central Electricity Regulatory Commission (CERC) vide order dated 13th
Oct 2015 in petition no 11/SM/2015 has given a roadmap for operationalization of generation reserves in the
country. To accelerate the implementation of Ancillary Services at State level a sub-group on “Reserves and
Ancillary Services at State Level” under FOR standing Technical Committee was formed. MP SLDC, MPPTCL,
Jabalpur and MPERC, Bhopal are also members of the sub-group. The task given by the committee to the
state SLDCs was to get hands on experience on Security Constraint Economic Despatching (SCED) through
“Solver” of MS Excel. MP SLDC had demonstrated the use of this model for economic dispatching in the
meetings of the committee.
In the third meeting of the sub-group the committee has opined and suggested MP SLDC to go ahead
in the matter to implement the system of SCED at MP State level on pilot basis. In the demonstrations it was
found that the application of SCED system may reduce the cost of operation considerably. Specially during
low demand period in different seasons of year or at different times of the day. It is, therefore, beneficial to
implement the SCED system at SLDC, MPPTCL, Jabalpur. In fifth meeting of the committee, the
representative of CERC has opined that instead of pilot projects in various states it would be more prudent to
bring a regulation for implementation of SCED. MP SLDC is ready to take up the project, whenever related
regulation is issued by CERC. After issuance of the regulation, It is expected that the implementation of the
SCED system at MP shall take place in the FY 2020-21, as implementation time of the system is approx. 6
months. For information to the members.
Member Secretary OCC stated that to bring the state close to techno-commercial scheduling and
dispatch and hence reduce the financial losses beard by the consumers. Thereafter Chairman OCC briefed
about the process.
6.4 DATA FOR WRPC OCCM OUTAGE APPROVAL:- WEB BASED OCC OUTAGES
SOFTWARE FOR REPLACING THE EXISTING GOOGLE SHEET:- The committee was
apprised that discussed in various MP-OCC, WRLDC has prepared Web Based Application Software for
planned outage coordination that would replace the existing coordination through Google Sheet. The Software
comprising following features and process:-
a) The proposed outages for upcoming OCC uploaded in web based portal before 5th of every month.
b) Compiled OCC outage could be viewed and commented before the OCC meeting.
c) Outage after approval in OCC, will be used for further processing.
d) The readiness of D-3 days will be filled in Web portal by concerned utilities through their login
credentials.
e) Non-OCC outages will be updated and same is presented to WRPC for approval, before being
considered for approval.
f) Anyone could comment and give their feedback before D-3 days.
g) The necessary utility concurrence may be availed before processing any outage.
h) The outage considered for approval could be viewed on D-2 days.
i) The outage approved by WRLDC on D-2 days could be viewed on web portal.
j) The final approved outage after NLDC concurrence is available on D-1 days in individual login
credential.
k) The re-schedule of outages is also done as per the approved guideline.
l) Everyone could view the outage approval status online.
The matter was discussed.
6.5 IMPLEMENTATION OF AUTOMATIC GENERATION CONTROL (AGC) AT SSTPP,
STAGE-I, KHANDWA:- The committee was apprised that Hon’ble Central Electricity Regulatory
Commission (CERC) vide order dated 13th Oct 2015 in petition no 11/SM/2015 has given a roadmap for
operationalization of generation reserves in the country. The objective of the Order was to provide a vision to
introduce Spinning Reserves in the country, which is one of the components for ensuring grid security, quality
and reliability by achieving adequacy of supply and maintaining load-generation balance Essentially, AGC
delivers reserve power to bring back the frequency and the area interchange schedules to their target values
and restores the delivered primary control reserves.
In view of the above MP SLDC has also planned and proposed to implement AGC in Singhaji STPP,
Khandwa Stage-I. The criteria for identification of SSTPP for AGC is similar to approach adopted by NLDC for
NTPC Generating Plants. The SSTPP has comparatively high variable cost, which will enable to keep
Spinning Reserves in the same, due to high chances of surrender of power by the beneficiaries. Further, the
plant has 100% capacity allocation tied up with MPPMCL and is having updated technology because of it’s
latest inception. For information to the members.
The matter was discussed.
6.6 FREQUENT TRIPPING OF 132 KV VSTPS – WAIDHAN CKT – I AND 132 KV
VSTPS – WAIDHAN – MORWA CKT – II:- The committee was apprised that 132 KV VSTPS –
Waidhan Ckt – I & 132 KV VSTPS – Waidhan – Morwa Ckt – II is tripping frequently as detailed below:-
NAME OF ELEMENT OCT 2019
132 KV VSTPS – WAIDHAN CKT – I 12:00/16.10.2019
10:05/24.10.2019
132 KV VSTPS – WAIDHAN –
MORWA CKT – II
10:40/13.10.2019
It is to intimate that the above mentioned circuits are inter-state circuits and frequent tripping of these
circuits causes interruption Waidhan, Morwa &Rajmilan substations. MPPTCL is requested to kindly
investigate the reason for frequent tripping of these circuits and address the issue so that the tripping of these
circuits is not repeated in future.
T&C and EHT-M MPPTCL was requested to kindly investigate the issue of frequent tripping of the
above mentioned elements.
EHT-M MPPTCL informed the committee that tree cutting & chopping has been done after rainy
season and it is expected that the tripping of these circuits will be reduced.
The matter was discussed.
6.7 REVIEW AND UPDATING LOAD DROPPING SCHEME/ SYSTEM PROTECTION
SCHEMS (SPS) AT SUBSTATIONS IN M.P TO HANDLE EMERGENCY CONDITION: -
The committee was apprised that the integration of new transmission elements in the grid it is to bring to the
notice that the existing load drop scheme shall also be reviewed and updated timely as per the updated
network. It is also to bring to the notice that at 132 KV S/s Chambal on dtd- 28.05.2019 at 13:04 Hrs. 132 KV
Chambal – North Zone Ckt – I & II tripped as Y-Phase conductor of ckt – II snapped resulting in overloading &
tripping of 132 KV Indore SZ – Satsai Ckt & 132 Kv Indore SZ – E.Complex ckt even after operation of load
drop scheme. Hence it can be gathered that after up gradation of 132 KV North Zone S/s to 220 KV S/s North
Zone the load drop scheme has not been revise accordingly. It is also to intimate that the load drop scheme
shall also be reviewed according to the increasing 33 KV load.
MPPTCL is requested to review the existing load drop scheme (SPS) and to implement new load drop
scheme as per requirement as per undated network and submit to SLDC.
In view of the above it is requested that the complete details of all SPS commissioned in MP by
MPPTCL along with load shed quantum, may be submitted to SLDC so that the copy of the same could be
placed in Control room of SLDC and concerned substation / power station for reference & record and the
same can also be submitted to WRLDC. The matter was discussed.
6.8 WRLDC TRIPPING PORTAL:- The committee was apprised that as intimated by WRLDC in
529th WR-OCCM, that WRLDC has started a tripping portal from 01.06.2019 for uploading FIR, DR/EL and
other details related to the tripping of all 400KV elements, important grid elements, inter-state/inter-regional
links and lines connected to PGCIL. Further details major Grid Disturbance resulting in significant load
loss/generation loss is also required to be uploaded on the WR-Portal and as per IEGC 54.2(r), utilities need
to submit the data within 24 hours of the event. The link
(https://portal.wrldc.in/Trippingnew/Account/Login.aspx) , common user ID & password for the entities of MP
has been shared with all the entities vide this office letter No.07-05/RPC-51/ 18.06.2019. As advised in 529th WR-OCCM, all Utilities are requested to use and submit the data through the
WRLDC tripping portal. Therefore, entities are requested to use and upload the FIR, DR/EL and other details
related to the tripping of elements mentioned above, in the Tripping Monitoring System of WRLDC within
stipulated time.
It is to inform that despite of continuous reminders the DR/EL files for the tripping incidences is not
being uploaded on the WRLDC tripping portal. The list of incidences for which the submission & uploading of
DR/EL on WRLDC tripping portal is pending for the month of OCTOBER 2019 is as detail below:-
S.NO. NAME OF ELEMENT TIME & DATE OF TRIPPING
1. 220 KV GWALIOR - GWALIOR - I 02:55HRS. ON 02.10.2019
2. 220 KV GWALIOR - GWALIOR - II 02:55HRS. ON 02.10.2019
3. 220 KV GWALIOR - MAHALGAON(MP) - II 02:55HRS. ON 02.10.2019
4. 220 KV HOSHNGABAD-ITARSI CKT-1 04:50HRS. ON 12.10.2019
5. 132KV VSTPS-WAIDHAN-2 10:40HRS. ON 13.10.2019
6. 400 KV INDIRASAGAR - SATPURA - I 20:53HRS. ON 18.10.2019
7. 400 KV INDIRASAGAR - INDORE - II 20:53HRS. ON 18.10.2019
8. INDIRASAGAR - 400KV - BUS 2 20:53HRS. ON 18.10.2019
9. 400KV SEONI - KIRNAPUR 01:57HRS. ON 24.10.2019
10. 400KV SEONI - KIRNAPUR 23:25HRS. ON 24.10.2019
11. 400KV SEONI - KIRNAPUR 13:01HRS. ON 25.10.2019
12. 400KV BHILLAI- KIRNAPUR 12:53HRS. ON 26.10.2019
13. 400KV BHILLAI- KIRNAPUR 14:59HRS. ON 26.10.2019
14. 220 KV BHANUPURA - MODAK – I 21:56HRS. ON 31.10.2019
The matter was discussed.
6.9 PROTECTION COORDINATION DURING INTEGRATION OF NEW INTRA-STATE
ELEMENTS:- The committee was apprised that in compliance to the IEGC & WRLDC operating procedure
the protection coordination of the existing elements & adjacent substations shall be prior to integration of new
intra state elements. All the concerned entities are requested to ensure/review the protection coordination of
adjacent substations/elements and confirm the same along with the firsttime charging documents for intra
state elements also.
6.10 AVAILING SHUT DOWN ON NON-ISTS ELEMENTS (ELEMENTS FOR WHICH
ONLY APPROVAL OF MP-SLDC IS REQUIRED) AND OUTAGE MODULE THEREOF:-
The committee was apprised that parallel run of the ABT, OA & MIS system is in progress and the outage
module has already been initiated (link:- http://223.31.122.117:8080/EltrixPortal/login.jsp). Further it is to
inform that the User ID and Password for all the circles/generating stations/EHT-M/EHT-C along with user
manual of the outage module has already been provided vide this office e-mail dtd-14.01.2019. Also vide this
office letter no. No No.07-05/174-B/Kalki/131 dtd-15.01.2019 all the concerned entities/authorities were
requested to communicate the User ID/Password & issue necessary directives to the respective authorities to
initiate the use of web based outage module.
In view of the reliability and safe & secure grid operation entities were requested to follow the outage
procedure and submit the outage request well in advance i.e., on D-3 basis by 17:00 Hrs. only the emergency
shut down request shall be made on D-1 day or in real time.
In view of the above all the concerned entities were requested to submit/process the outage, tripping,
generator outage, generator start/stop, new element charging request through web based outage module in
addition to the existing practice. It is also to mention that from 01.04.2019 it will be mandatory to process the
outage request through outage module only, hence all the entities shall approach for approval of shut down
through outage module. In case of any queries/addition of element/etc the entities can write to us on e-mail:-
[email protected], [email protected]. It is also to mention that WRLDC has developed a separate
portal for WR-OCCM approval of outage of ISTS elements which shall be discussed separately.
The matter was discussed.
6.11 MAPPING OF FEEDERS:- The committee was apprised it has been requested to initiate the
process of mapping of AUFLS feeders in SCADA system, however no any progress in this regard noticed so
far. In 8th NPC, it has been decided that WRPC would submit the details / progress of feeder mapping to NPC
Secretariat on regular basis (quarterly).
In view of above, it has been requested quarterly details/ progress of mapping of feeders may kindly
be furnished so that same may be communicated to WRPC for onward communication.
6.12 INSPECTION OF RELAYS OF AUTOMATIC UNDER FREQUENCY LOAD
SHEDDING AND CERTIFICATION THEREOF: - The committee was apprised that it is desired that
for safe & secure operation of integrated system, the under frequency relay should be connected in the system
in healthy condition. Accordingly, WRPC is pressing hard to provide the self-certified status of healthiness of
relays of Automatic Under Frequency Load Shedding (AUFLS) and periodic checking of the same. Vide this
office various correspondence. The CE (T&C) and also SE(T&Cs) were requested to provide status of
healthiness of relays of Automatic Under Frequency Load Shedding on priority basis to SLDC, so that same
may be communicated to WRPC. Inspite of repeated request vide various correspondence, moreover the
matter had been raised in OCC meeting of MP in time to time, however the desired information are still
awaited from utilities.
It is therefore desired that the above matter may be treated as urgent and status of healthiness of
Automatic Under Frequency Relays may be provided to SLDC and also the under frequency may be tested
periodically. In this context it is also mentioned that time to time WRPC official as well as SLDC official shall
visit the sub-stations to ascertain the healthiness of under frequency relay.
The matter was discussed.
6.13 PROVISION OF SYNCHRONIZATION FACILITY AT EHV SUB-STATIONS OF MPPTCL
AND AT ALL POWER HOUSE: - The committee was apprised that as per Grid Code, the synchronization
facility should be available at all the Power Stations, 400 KV Sub-stations, 220 KV Sub-stations and 132 KV
sub-stations in the path of black start. In 60TH OCC meeting MPPTCL representative informed the committee
that order for 69 no. synchronization trolleys has been placed and 1 no. synchronization trolley has been
delivered for checking and testing purpose at 220KV S/S Barwaha. In subsequent meetings this issue has
been discussed. However, no any fruitful progress has been observed so far. In the above context it is
indicated that at Manikheda HPS and Rajghat HPS synchronization facility is not available. It is felt that every
Hydel Power station should be equipped with synchronization facilities invariably for system reliability and
Crises Management. Also at Manikheda HPS & Rajghat HPS single bus system exists, hence MPPGCL is
requested to explore the possibility for commissioning of Double Main Transfer Bus system. Thus, MPPGCL is
requested to provide synchronization facility at Manikheda HPS and Rajghat HPS and MPPGCL may kindly
provide status of making synchronization facility in aforesaid HPS.
The MPPTCL may kindly provide the status of installation and commissioning of
synchronization trolleys at different substations. Further, is also requested to indicate, whether
synchronization facility could be provided at Karera & Pichhore substation on priority basis. The
matter has been discussed with officers of T&C wing, it is conveyed that they are making arrangement
for installation of synchronizing trolley at Pichhore S/s at the earliest. T&C may please update the
position.
The matter was discussed in the meeting.
ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS :
Black Start mock drill of Hydel stations of MPPGCL:- During 2019-2020 the proposed / tentative dates for
conducting black start mock drill at various Hydel power station of MP is detailed as mentioned below:-
S.NO. NAME OF HPS PROPOSED/TENTATIVE
DATE OF MOCK DRILL
1 BIRSINGHPUR HPS 28.11.2019
2 PENCH HPS 04.12.2019
3 BARGI HPS 24.12.2019
4 MANIKHEDA HPS 26.12.2019
5 ISP
To be discussed. 6 OSP
7 TONS HPS
All the concerned entities are requested to review the proposed tentative dates for conducting black
start mock drill and confirm the readiness in the meeting. It is also requested that the generators shall intimate
the Unit No. and the Bus No. on which the mock drill is to be conducted.
MPPGCL confirmed the proposed dates for conducting the mock drill.
ITEM NO. 08: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES:
8.1 TESTING &CALIBRATION OF METERS AND NON-RECEIPT OF TIMELY JMR
DATA:
1. SLDC representative requested CE(T&C) office to apprise about the status of testing / calibration of
interface meters as per Regulations 10 and 18 of Central Electricity Authority (Installation and operation of
meter) Regulation 2010 to the committee. CE(T&C) office representative informed that order for testing /
calibration of all interface meters is under process.
2. SLDC representative informed that the complete load survey data of ABT meters installed at the
interface points of Open Access Customers, HT Consumers, Railways TSS end and REGs is not received
through AMR System and site officials are also not furnishing the load survey data timely. CE(T&C) office is
requested to include these meters under AMC contract of M/s Secure Meters Ltd. and issue instructions to
field offices for downloading and furnishing the missing data to SLDC on time. CE(T&C) office representative
informed that letters will be issued to concerned entities for including the ABT meters installed at the interface
points of Open Access Customers, HT Consumers, Railways TSS end and REGs under AMC contract of M/s
Secure Meters Ltd. and also instructions will be issued to field offices for downloading and furnishing the
missing data to SLDC on time.
8.2 NON RECEIPT OF ABT METER DATA OF RAILWAY TSS THROUGH AMR
SYSTEM:- SLDC representative informed that ABT meter data of following TSS of Railways is not being
received through AMR system:
1. Railway TSS Mansakra.
2. Railway TSS Khirkiya
3. Railway TSS Bhitoni.
4. Railway TSS Narsinghpur.
5. Railway TSS Mungaoli.
6. Railway TSS Pandurna.
7. Railway TSS Manjhgawan.
8. Railway TSS Nainpur.
Railway representative informed that in above TSS, SIM’s have been replaced and problem regarding
downloading of meter data shall be resolved shortly. SLDC requested the Railways to include all TSS end
meters under AMC contract of M/s Secure Meters Ltd. in coordination with MPPTCL. SLDC also requested
Railways to coordinate with MPPTCL for resolving the problems related with downloading of meter data of
remaining TSS through AMR installed at SLDC. Railways assured for the same.
8.3 AMR FACILITY FOR THE ABT METERS INSTALLED AT MPPGCL:-SLDC representative
informed that MPPGCL has provided AMR facility on 107 Nos ABT meters installed at the interface points and
all the meters were successfully integrated with AMR server. He also informed that every month data of
around 35-40 Nos. meters do not received through AMR to SLDC. MPPGCL requested to take up the matter
with site officials and M/s Secure Meters Ltd. to resolve the problems related with non readability of meters
which were integrated successfully and provide AMC of AMR facility to M/s Secure Meters Ltd. so that
complete data is received by SLDC. MPPGCL representative intimated that matter is being taken up with M/s
Secure Meters Ltd for providing AMC of AMR system.
SLDC representative informed that 15 minutes blockwise data recorded in the meter no. XD435287
installed at GT of SSTPS PH-II unit-III do not match with midnight data i.e monthly injection data. The issue
was informed to CE, SSTPP and ED(O&M:Gen), Jabalpur vide letter No.07-05/SG-11/SEM/347 dated
14.02.2019. The same problem was also observed in the meter no. XD435284 installed at GT of SSTPS PH-II
unit-IV and in the meter no. XD435283 & XD435282 installed at 400KV SSTPS- Pithampur Ckt-3 &4.
MPPGCL representative intimated that matter has been taken up with M/s Secure Meters Ltd. and with M/s
L&T for resolving the problem.
8.4 TIME DRIFT IN ABT METER INSTALLED AT THE POOLING STATIONS OF WIND
AND SOLAR GENERATING STATIONS AND SLIDING WINDOW PROBLEM:- SLDC
representative stated that as already informed in previous OCCMs, the following ABT meters installed at
Pooling Stations of Solar Power Projects has time drift and thus not recording the correct data. He also
informed that SLDC has already requested to Generators with copy to concerned licensee vide letter no. 2353
dated 31/08/2019 for time synchronization of the ABT meters with GPS so that correct DSM account of these
Wind and Solar Projects is issued by SLDC.
Sr.No. FEEDER NAME LOCATION NAME Location VOLTAGE
LEVEL Meter No
1. 33 KV UJAS -2
ICHHAWAR 132KV S/S ICHHAWARGrid S/s End 33 MPC59975
2. 33KV
BHADRESH_SUSNER 132KV S/S SUSNER Grid S/s End 33 XB593639
3. UJAAS-1 AGAR 132KV S/S AGAR Grid S/s End 33 MPC59595
4. UJAAS-2 AGAR 132KV S/S AGAR Grid S/s End 33 MPC59596
5. 33 KV UJAAS 1 BERCHHA 132KV S/S BERCHHA Grid S/s End 33 XB571652
6. 33 KV UJAAS 1 SUSNER 132KV S/S SUSNER Grid S/s End 33 XB571653
SLDC representative further informed that ABT meters installed at the following Wind and Solar
Generating Stations are recording the 15 minutes block wise data on sliding window principal thus block wise
data do not match with midnight data. These meters need immediate replacement. The ABT meters installed
at the following Wind and Solar Generating Stations are recording the 15 minutes block wise data on slinding
window principal thus blockwise data do not match with midnight data. SLDC has requested to Generators
with copy to concerned licensee vide letter no. 2353 dated31/08/2019 for immediate replacement of these
ABT meters.
Sr.No. Feeder Name Substation ABT Meter No. QCA NAME
1 33KV SUZLON-I SAILANA
132 KV S/S
SAILANA
XE479853
REConnect Energy Solution
Pvt Ltd
2 33KV SUZLON-II SAILANA
132 KV S/S
SAILANA
XE479854
REConnect Energy Solution
Pvt Ltd
3
33KV SUZLON-III SAILANA
132 KV S/S
SAILANA
XE479855
REConnect Energy Solution
Pvt Ltd
4 33KV SUZLON-I RATLAM
132KV S/S
JAORA
XE479856
REConnect Energy Solution
Pvt Ltd
5
33KV SUZLON- IV RATLAM
132KV S/S
JAORA
XE479859
REConnect Energy Solution
Pvt Ltd
6 33KV SUZLON- V RATLAM
132KV S/S
JAORA
XE479860
REConnect Energy Solution
Pvt Ltd
7 33KV SUZLON-IV AGAR
132KV S/S
AGAR
XE479864
REConnect Energy Solution
Pvt Ltd
8 33KV SUZLON-V (SUSNER-
III)
132KV S/S
SUSNER
XE479867
REConnect Energy Solution
Pvt Ltd
9 33KV SUZLON-III (AGAR- I),
132KV S/S
AGAR
XE479863
REConnect Energy Solution
Pvt Ltd
10 33KV SUZLON BEHAPUR
DALODA-I
220 KV S/s
DALODA
XE479862
REConnect Energy Solution
Pvt Ltd
11 33KV SUZLON BEHPUR
DALODA-II
220 KV S/s
DALODA
XE479861
REConnect Energy Solution
Pvt Ltd
12 33KV SUZLON I (SUSNER-
I),
132KV S/S
SUSNER
XE479866
REConnect Energy Solution
Pvt Ltd
13 33KV SUZLON I (SUSNER-
II),
132KV S/S
SUSNER
XE479865
REConnect Energy Solution
Pvt Ltd
14 33KV AVP POWER INFRA
PVT LTD.,
132KV S/S
SONKATCH
XD595991
XD595994
REConnect Energy Solution
Pvt Ltd
15 33KV BADONI POWER PVT.
LTD.
132KV S/S MAXI
XD522128
XD558031
REConnect Energy Solution
Pvt Ltd
16 33 KV M P Wind Farm,
Nagda Hill
220
KVS/SDewas XE525393 Manikaran Analytics Ltd.
17 33 KV Suzlon Gujrat Wind
Park , Barod
220 KV S/S
Barod
XD595984
XD595980 Manikaran Analytics Ltd.
SLDC representative requested to DDCs, Indore & Bhopal to take-up the issue with concerned officials for
time synchronization and replacement of ABT meters. DCCs Bhopal assured to take up the issue with
concerned officials of Discoms. DCCs Indore representative have not attended the meeting.
ITEM NO. 9: SCADA and E&T RELATED ISSUES: 9.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & 132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS /TRACTION FEEDERS:-
It was informed during the meeting that integration of telemetry of 132 KV VFJ with SLDC SCADA is
pending. MPPTCL informed that integration work shall be completed within a week time.
SLDC informed that 220 KV Sheopurkalan S/s has been charged but telemetry of this substation is
not yet provided to SLDC despite various pursuances by SLDC. MPPTCL informed that the RTU has been
dispatched and its integration shall be done shortly.
Further, SLDC informed that telemetry of Birsinghpur HPS and Zinna HPS is also not available and
same needs to be provided by MPPGCL. MPPGCL informed that the order for RTU has already been placed
and drawing has been approved & RTU will be delivered within 3 months.
SLDC informed that MPERC regularly monitors & enquires about the reason of RTUs pending for
integration & thus SLDC requested MPPTCL & MPPGCL to take up this matter on topmost priority.
9.2 TELEMETRY OF BUS VOLTAGE IN DFE RTUS:- SLDC informed that in substations having
DFE RTUs, the telemetry of Bus voltage is extended through MFM provided for transformer telemetry. This
results in wrong Bus Voltage in case of outage of transformer.
MPPTCL (T&C) informed that this work shall be done in a phased manner. Firstly, the telemetry
integration of bus voltage through separate MFM shall be done for 400 KV Substations which will be
completed within a month. In second phase, the same shall be done for important 220 KV S/s depending upon
the availability of spare MFM. CE(T&C) office will also work out the requirement of MFM for all 220 KV S/s, for
which providing separate voltage shall be taken up in second phase.
9.3 PROVIDING TELEMETRY OF ISOLATORS OF 400 KV SUBSTATIONS:- SLDC informed
that telemetry of isolators is required for real time grid monitoring as well as for better functioning of EMS
system. NLDC & WRLDC are constantly requesting to provide the telemetry of isolators of 400 KV, 220 KV
substations & Generating Stations; and reason for non-integration of telemetry of isolator status.
MPPTCL informed that auxiliary contacts are not present in isolators of MPPTCL substation & thus it is
not possible to provide the telemetry of isolators. However MPPTCL informed that arrangement of auxiliary
contacts & extension of telemetry of isolators will be ensured for new substations.
MPPGCL informed that telemetry integration of isolators shall be done on top most priority wherever
possible and in places where RTUs are under replacement, provision of isolators shall be made while
procurement of new RTUs.
SLDC also requested ISP to provide telemetry of isolators in response to which ISP informed that
isolator signals are already available in ISP SCADA system from where telemetry to SLDC is proposed to be
provided through IEC gateway. Accordingly, while commissioning of telemetry through ISP SCADA, the
isolators status shall be provided to SLDC.
SLDC pursued the matter with JP Bina to provide the telemetry of isolators in which JP Bina informed
that their SCADA upgradation is being carried out & the telemetry of isolators will be extended to SLDC after
completion of upgradation of their SCADA by end of December 2019.
9.4 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED
VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS:- SLDC informed
that the telemetry discrepancies pertaining to MPPGCL generating stations is detailed below :-
1. Satpura TPS :-
Sr.No. Description Unit Pending
since
MPPGCL
response in
meeting
dtd.30.10.18
MPPGCL response in 72nd OCC
1 400 KV Satpura -
Itarsi
MW 8 months - MPPGCL informed that transducer has
been replaced in 400 KV Satpura-Koradi
and transducers of 400 KV Satpura-Seoni
& 400 KV 400 KV Satpura-Itarsi shall be
replaced soon.
2 400 KV Satpura-
Koradi
MW 8 months -
3 400 KV Satpura- MW 8 months -
Seoni
4. Gen-7 GT MVAR More than 1
year
- MPPGCL informed that the unit is to be
dismantled, so procurement of transducer
is not possible. SLDC requested MPPGCL
to utilize the spare transducers, if any, for
replacement. SLDC informed that
transducers may also be arranged from
MPPTCL wherein some RTU having
same transducres is replaced with
Dongfeng RTUS. However no progress in
the matter has been observed.
5. 400 KV Astha 1 &
2
Line
Reacto
r
Commission
ing
MPPGCL informed
that signals of
reactor are
configured in
database of
Satpura SCADA
system but values
are not being
conveyed to
SLDC. NIT has
been issued for
configuration of
point & it shall be
completed within
one month.
MPPGCL informed that engineer of service
provider will visit the site & it will be
configured at the earliest. However despite
continuous pursuance, the telemetry is still
not available to SLDC.
6. Gen-8,9
Generating
Transformer
MW,M
VAR
One week
2. SGTPS :-
Sr.No. Description Unit Pending
since
MPPGCL response in meeting
dtd.30.10.18
MPPGCL response in
72nd OCC
1. STN TR 1 (220
KV)
CB More than
one year
MPPGCL informed that cabling work of
breaker upto RTU panel is required to
be done & shall be done within one
month.
MPPGCL informed that no
work has been done.
MPPGCL is requested to
provide current progress in
the matter.
2. 220/33 KV
Transformer
MW/MVA
R
More than
one year
MPPGCL informed that it shall be
provided within one month.
MPPGCL informed that all
the discrepancies will be
rectified after procurement
of transducers. MPPGCL
is requested to provide the
current progress in the
matter.
No response from
MPPGCL in the matter
from MPPGCL has been
observed.
3. 400 KV Bus 1
Freq More than
ten months
MPPGCL informed that corrective
action including testing of
transducer/arrangement of new
transducer shall be completed within a
month.
4. 220 KV Bus 2 Voltage More than
ten months
MPPGCL informed that procurement of
transducer is under process & it shall
be commissioned by March-19. SLDC
informed that recently RTU of Rajghat
& Devlond has been replaced, so
transducers can be arranged from
Rajghat & Devlond till procurement of
new transducers.
3. Gandhi Sagar HPS :- SLDC informed that restoration of telemetry of GS HPS is pending due to fault in
RTU. MPPGCL informed that the problem will attended within a month.
4. Rajghat HPS :-
Sr.No. Description Unit Pending
since
MPPGCL response in meeting
dtd.30.10.18
MPPGCL response in
72nd OCC
1. 33 KV
Rajasthan(Kuakh
eda) feeder
MW/MVA
R
Commission
ing
SLDC informed that the telemetry of
this feeder is of utmost importance as it
is an inter-regional feeder. MPPGCL
informed that they will arrange for the
telemetry of this feeder on priority.
MPPGCL informed that
these discrepancies shall
be rectified after
upgradation of RTUs.
2. 132 KV Bus 1 Voltage 2 months Wrong Values No response from
MPPGCL
3. 132 KV Bus 2 Voltage 2 months Wrong Values No response from
MPPGCL
Sr.N
o.
Description Unit Pending
since
MPPGCL response in meeting
dtd.30.10.18
MPPGCL response in 72nd
OCC
1. Gen-3 CB Commission
ing of new
RTU
MPPGCL informed that it shall
be rectified at the earliest.
SLDC informed that all above issues are pending since long time creating problem in grid
management. In response, MPPGCL informed that a separate meeting shall be conducted at SLDC
with officers from Power Stations and SLDC, so that exact problems may be identified. SLDC
requested MPPGCL to arrange the meeting on top most priority.
SLDC informed the list of telemetry discrepancies pertaining to MPPTCL/IPP substations is detailed
below:-
(a) Transmission/ other Generating Substations :-
Sl
No. Name of Substation Name of feeders/transformers
01 400 ISP
1.Telemetry of 125 MVAR Bus Reactor not available.
2.Telemetered values of 400 KV Nagda MW & MVAR
is 10 times of actual value.
3. Telemetered values of 400 KV Indore-1 MW.
4. MVAR values of all generators
5. Non-current data of generators in OFF
condition.
6. Digital telemetry including CB status,
RGMO/FGMO & SOE is not available.
02 220 KV Rajgarh Biaora 1. 220 KV TBC CB status
2. 220/132 KV Xmer 2 MVAR
03 400 KV Chhegaon Wrong CB status of :-
1. 400 KV Transfer Bus Coupler
04 400 KV Julwaniya This problem is persisting since last 8 months. No
action in the matter has been taken.
1. All 132 KV CB status showing open.
2.CB of 220KV Sendhwa feeders 1,2
3. CB of 220/132 KV Xmer-1
05 400 KV Katni Wrong CB status of 400 KV Damoh-1 & 125 MVAR Bus
Reactor
06 400 KV Kirnapur Wrong values of 132 KV Balaghat 1 & 2 (in case of load
above 30 MW)
07 400 KV Pithampur Faulty CB status of 400 KV Singhaji Ckt-4
08 220 KV Nimrani Telemetry of 33 KV Maral is to be provided
09 220 KV Kotar Faulty CB status of 132 KV RTS
10 220 KV Panagar Faulty CB status of 220 KV Sukha
11 220 KV Ujjain 1. Faulty CB status of 132 KV Bus Coupler
2. Faulty CB status of 220/132 KV Xmer-2
12 220 KV Chhatarpur Faulty CB status of 220 KV Bus Coupler
13 220 KV Rajgarh Dhar 1. 220 KV all feeders CB suspected
2. 132 KV all feeders CB suspected
3. 220 KV Bus-1 Voltage
14 220 KV Ratlam 1. 220 KV TBC CB faulty
2. 220 KV Daloda CB faulty
15 220 KV Julwaniya Wrong MW value of 220/132 KV Xmer
16 132 KV Umariya All Analog Values are zero (PT Burst)
ISP informed that case for addition of IEC gateway in ISP SCADA/EMS shall be completed by
Dec-19. MPPTCL informed that telemetry discrepancies pertaining to substations telemetered through
DFE RTUs will be attended within 1 week. The telemetry discrepancies pertaining to substations
telemetered through other RTUs shall be attended within 2 weeks if possible, otherwise the telemetry
of these substations will also be integrated through DFE RTUs.
9.5 EXTENSION OF RGMO/FGMO SIGNAL TO SLDC/WRLDC :- SLDC informed that
extension of RGMO/FGMO signal of following generating units is still pending:-
S.No. Name of Generating
Station
Unit.No. MPPGCL response
1 SGTPS 1,2,3,4 MPPGCL informed that integration of RGMO/FGMO
status shall be done by March-2020.
2 BARGI HPS 1,2 MPPGCL informed that integration will be done by
Jan-20.
Wrong RGMO/FGMO signal status :-
S.No. Name of Generating
Station
Unit.No. Remarks
1 TONS 1,2,3 MPPGCL informed that the shift officials will be
instructed to manually ON/OFF the RGMO status
after taking unit in/out of service.
2 ISP All units ISP informed that it will be available after
commissioning of telemetry through IEC gateway.
3. SSTPS Phase II 3,4 MPPGCL informed that it will be completed within a
month time.
9.6(A) NON AVAILABILITY/ UNRELIABLE TELEMETRY OF HYDEL POWER STATIONS
:- SLDC informed that the telemetry of Hydel Power Stations is very unreliable & frequent long outage with
abnormal delay in restoration of same is observed. The RTU availability of MPPGCL HPS is as detailed here
under :-
RTU AVAILABILITY SEP AVAILABILITY OCT
RAJGHAT HPS 90 95
BARGI HPS 86 85
MADIKHEDA HPS 80 79
GANDHI SAGAR HPS 0 0
PENC HPS 98 99
DEOLOND HPS 84 79
TONS HPS 82 80
SLDC informed that in hydel power stations, skilled manpower is not available for attending the telemetry
issues & considerable time is taken for restoration of telemetry.
SLDC further informed that the matter regarding arrangement of RTU/PLCC spares, measuring
instruments & adequate trained manpower at MPPGCL stations has been discussed in last various OCC
meetings. However MPPGCL has not taken any actions regarding this matter.
MPPGCL was thus again requested to take following measures to ensure round the clock availability of
real time data to SLDC:-
1. Arrangement of essential spares at power stations and one set of all spares at centralized location
with intimation to all power stations
2. Arrangement of training to persons looking after telemetry work.
3. Arrangement of measuring instruments like level meters wherever not available.
4. Ensuring availability of RTU configuration at all power stations.
MPPGCL agreed to look into the matter on highest priority. Further, it was decided to discuss these issues
in separate meeting proposed at SLDC with power station officers.
9.6(B) NON AVAILABILITY/ UNRELIABLE VOICE COMMUNICATION BETWEEN SLDC
TO THERMAL/ HYDEL POWER STATIONS :- SLDC informed that despite constant pursuance
most of the PLCC voice communication of various power stations to SLDC is out since long time. The details
of outage are here as under:-
Sr.No Name of
HPS/TPS
2 wire PLCC
channel
MPPGCL response in meeting
dtd.30.10.18
Remark
1.
Bansagar- IV
PLCC voice
communication is not
established
Mr.Vinay, AE, Tons HPS informed
that he will visit Bansagar-IV for
restoration of voice communication of
Bansagar-IV at the earliest.
Restoration of PLCC
channel is still
pending.NO action in
the matter is initiated
by MPPGCL.
2.
Madikheda
PLCC voice channel
is not working since
last two and half
years.
Restoration of PLCC
channel is still pending.
In last two OCCM,
MPPTCL was
requested to arrange
for extension of voice
channel utilizing
Mahalgaon wideband
node in coordination
with Madikheda HPS.
3
Birsinghpur HPS
/TPS
PLCC voice channel
is not working since
long time due to faulty
PLCC exchange at
Birsinghpur.
AE Birsinghpur informed that
presently voice communication
between SLDC to thermal power
house is proper & the commissioning
of EPAX at site is under progress. AE
Birsinghpur assured that the voice
channel of Birsinghpur HPS shall be
restored within one month.
Restoration of voice
channel is still pending.
SLDC informed that matter regarding Non Availability/ Unreliable voice communication Between SLDC to
Thermal/ Hydel Power Stations was discussed in last various OCC meeting & special meeting on 30.10.18,
however 2 wire voice facility extension of Singhaji 1 & 2 TPS, Madikheda HPS is still pending.
MPPGCL agreed to arrange for the same. Further, it was decided that the matter shall be discussed in
the proposed meeting with MPPGCL filed officers.
9.6(C) REPLACEMENT OF RTUS IN THERMAL POWER STATIONS:- SLDC informed that
large no. of discrepancies pertaining to MPPGCL Thermal Power Station are pending since long time. The
various discrepancies are due to non-availability of desired spares, non renewal of AMC contract of RTUs,
Modems, PLCC equipments. The replacement of RTUS in thermal power stations is required to be arranged
to ensure round the clock availability of telemetry. SLDC informed that it was requested earlier to arrange the
replacement of RTUs. However, no feedback in the matter is provided to SLDC. SLDC has also pursued the
matter vide UO dtd.12.09.19. MPPGCL was thus again requested to arrange for replacement of RTUs in
Thermal Power Stations. MPPGCL informed that matter shall be discussed in proposed separate meeting with
MPPGCL field officers.
9.7 DUAL DATA CHANNEL CONNECTIVITY FOR POWER STATIONS:- SLDC informed that
presently most of the Power Stations to SLDC/Backup SLDC only single channel is established. Looking the
data availability of Power Stations and recently implemented CERC new DSM regulation w.e.f. 1st January,
2019 it is required that each Power Station shall have dual data channel to avoid any outage/discrepancy in
real time data of Generation Station. Therefore to reduce outage due to single data channel failure, MPPGCL
& NHDC were requested to arrange / ensure dual data channel from each Power Stations so that continuity of
real time data to SLDC/Backup SLDC SCADA all the time may be achieved. MPPGCL representative informed
that the matter shall be discussed in proposed separate meeting with MPPGCL field officers.
9.8 NON AVAILABLITY & WRONG TIME STAMPING OF SOE AT SLDC SCADA:-SLDC
informed that on some instances, it has been observed that the SOE was not received or wrong time stamping
of SOE was received in SLDC SCADA system. The matter was taken up with field for verification for proper
configuration /connections of SOE data in RTUs & after long pursuance, the matter was investigated and it
was found that the settings “inf code 2” & “inf code 4” were not correct in Dongfeng make RTUs. These
settings have now verified and changed in some of the RTUs and SOE with correct time stamping from RTUS
where settings were modified is now receipt in SLDC SCADA/EMS system.
Further SLDC informed that the SOE verification of all RTUs is being done & out of 175 RTUs, SOE
verification of 165 RTUs has been done & requested MPPTCL to expedite the SOE verification of balance
RTUs at the earliest. MPPTCL informed that they have instructed all the field offices to coordinate with SLDC
for SOE verification.
9.9 UTILIZATION OF W.B NODE AT BIRSINGHPUR TPS :- SLDC informed that despite
constant pursuance utilization of node at Birsingpur TPS is still pending since last two years due to pending
work of laying of cable form W.B node location to PLCC room, Exchange room and RTU. It was informed by
SLDC that complete scheme to extend wideband facility upto RTU was prepared by SLDC and forwarded to
SGTPS around two years back. The matter is pursued by SLDC constantly. However, required converter and
laying of fiber optic cable is still pending. MPPGCL informed that matter shall be discussed in proposed
separate meeting with MPPGCL field officers.
9.10 MAINTENANCE OF OPGW NETWORK :- SLDC informed that under the MP portion of Master
Telecom project executed by PGCIL,36 No. of wideband nodes has commissioned. As per agreement
between MPPTCL and PGCIL, the subsequent maintenance of these links is to be looked after by MPPTCL.
While execution of the project, it was informed by PGCIL that the AMC of the terminal equipments is covered
under the equipments contract. However, modalities for AMC payment is to be finalised by MPPTCL with
PGCIL. Further, separate arrangement towards maintenance of OPGW cable (upto FODP) involving OPGW
restoration, OPGW LILO work, OTDR testing, OPGW shifting during line diversion etc is to be made by
MPPTCL, the details for which has already been forwarded by SLDC. SLDC further informed that as per order
of CERC, the expenditure towards maintenance under the project shall be done by MPPTCL.
SLDC informed that due to non-availability of maintenance plan, the restoration of any fault is taking
long time. SLDC informed that recently due to fiber cut issue is 220 KV Bina-Shivpuri ckt, the telemetry was
out for more than 15 days.
MPPTCL informed that the matter shall be finalised on top most priority.
9.11 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS &
INTERMITTENT TELEMETRY DUE TO NOISE IN COMMUNICATION CHANNEL :- The
long outage of telemetry & substations having intermittent telemetry due to heavy noise in communication
channel was discussed in detail:-
Sl No. Name of Sub Station Out from /Remark
01 220 KV Chichli
The telemetry was out since last 5 months
due to outage in 220 KV Jabalpur-Narsinghpur
Ckt 1 & 2. However both the circuits has now
been charged but the telemetry of substations
is still not available.
02 132 KV Gadarwara
03 132 KV Pondar
04 BLA TPS
05 GandhiSagar HPS Out since last 3 months
06 132 KV Kannod Out since last 1 month
07 Satpura TPS Very intermittent
MPPTCL & MPPGCL ensured that they will arrange for round the clock availability of telemetry of these
RTUs to SLDC.
9.12 TELEMETRY OF RAILWAY TSS SUB STATIONS: - SLDC informed that the telemetry of
existing 38 Nos railway Traction Sub Stations & upcoming 25 new railway TSS is required to be provided by
railway for monitoring of drawal by each TSS and also monitoring of demand of railway in MP.
SLDC further informed that testing of telemetry for 2 Railway TSS has been done in SLDC SCADA,
however it is currently offline due to non-availability of UPS in Railway Zonal Office. Railways further informed
that currently they have extended the telemetry of 8 TSS upto Railway Zonal Office & telemetry integration of
all Railway TSS with SLDC shall be done within 6 months.
SLDC requested Railways to extend the telemetry of TSS which have been integrated upto Railway
Zonal Office to SLDC and also arrange UPS on highest priority. Railways agreed for the same.
ITEM NO 10 : DATE AND VENUE OF NEXT OCC MEETING :
It is proposed to hold 73rd Operation and Coordination Committee meeting of MP on
17.12.2019. The host and venue of the same shall be decided in the meeting.
[Action :- All the concerned entities]
***********
Annexure-2.1
S. No. Particulars
1
1.1 Maximum Frequency 50.26 HzBetween 10.00 hrs & 11.00 Hrs on 15.08.19
50.14 HzBetween 13.00 hrs & 14.00 Hrs on 29.09.19
1.2 Minimum Frequency 49.81 HzBetween 00.00 hrs & 01.00 Hrs on 18.08.19
49.8 HzBetween 18.00 hrs & 19.00 Hrs on 18.09.19
1.3 Average Frequency 50 Hz 50.01 Hz
2
2.1 Maximum Frequency 50.32 HzAT 09.34.10 HRS ON 15.08.19
50.27 HzAT 08.04:40 HRS ON 05.09.19
2.2 Minimum Frequency 49.55 HzAT 14.04:00 HRS ON 04.08.19
49.62 HzAT 18.50:20. HRS ON 09.09.19
3 Percentage of time when frequency was :-
%age of time when frequency was Aug-18 Sep-19
3.1 Below 48.5 Hz 0.00 0
3.2 Between 48.50 Hz and 48.8 Hz 0.00 0
3.3 Between 48.80 Hz and 49.2 Hz 0.00 0
3.4 Between 49.20 Hz and 49.5 Hz 0.00 0
3.5 Between 49.50 Hz and 49.7 Hz 0.00 0
3.6 Between 49.70 Hz and 49.9 Hz 7.28 4.57
3.7 Between 49.9 Hz and 50.05 Hz 72.69 75.25
3.8 Between 50.05 Hz AND 51.5 Hz 20.03 20.18
3.9 Above 51.5 Hz 0.00 0.00
4 No. of times frquency touched 48.80 Hz 0 0
4.1 No. of times frquency touched 48.60 Hz 0 0
4.2 No. of times frquency touched 51.0 Hz 0 0
FREQUENCY PARTICULARS
INTEGRATED OVER AN-HOUR
INSTANTANEOUS FREQUENCY
Aug-18 Sep-19
Agenda of 72nd OCCM of MP 29
I 1 2 3 4 5 6 7
A. 400 KV TRANSMISSION LINES
1 Nill
B. 220 KV TRANSMISSION LINES
1220kV DCDS line from Betul 220kV S/s - Gudgaon 220kV S/s (2x46.771) (GEC)
DCDS 46.77 93.542 June'2019Test charged on 12.06.2019
22nd Ckt of 220kv Satna - Chhatarpur line (152) (JICA-I)
2nd ckt 160.00 160 Aug'2019charged on 29.08.2019
C. 132 KV TRANSMISSION LINES
1132 KV 2 phase 2 wire DCSS line for PS to 132/25 KV 5 MVA RTS at Sausar from 132 KV S/s Boregaon (RTS)
DCSS 17.413 17.413 May'2019charged on 25.05.2019
2132 KV Shyampur - Pilukhedi DCSS line (1x22.834) (UBI)
DCSS 22.83 22.834 June'2019charged on 28.06.2019
3
2nd ckt of 132 KV Sheopur- Baroda line & LILO of its both ckt at 220 KV S/s Sheopur for 132 KV interconnection of 132 KV S/s Sheopur & 220 KV S/s Sheopur. (2nd ckt- 34 cktkm+2x1+4x5) (UBI)
DCDS 5.13 5.131 June'20195.131 cktkm charged on 29.06.2019
4 132 kv DCSS Karakbel - Belkheda (1x24.93) (ADB-III) DCSS 24.93 24.93 June'2019charged on 30.06.2019
5
LILO of 2ND CIRCUIT OF 132KV Gwalior- Pichhore at 132Kv S/s Dabra (2X0.108) (ADB-III) (balance work) (Note: LILO at Chinour 27.364 cktkm charged on 04.08.2017)(ADB-III)
DCDS 0.11 0.216 June'2019comm on
03.06.2019
6132 KV line 2 phase 2 wire Nainpur - RTS Nainpur line (4.176) (CCW)
DCSS 4.176 4.176 June'2019 12.06.2019
7
LILO of 132kV Betul - Gudgaon at 220kV S/s Gudgaon (2x9.825)(132kV interconnector between Gudgaon 220 kV S/s & Gudgaon 132kV S/s (Note:LILO 1st ckt(2x5.092) charged on 24.01.2019)(2nd ckt 2x4.733) (GEC)
DCDS 4.73 9.466 June'20192nd ckt
charged on 20.06.2019
8LILO of Satna 220kV-Kymore 132kV DCSS line for Uchehara (2x1.8) (JICA-II) DCDS 1.8 3.60 July'2019
comm on 18.07.2019
9132Kv DCSS line from GWSTPP to upcoming Make up Water Pump House river Narmada (Line-II)(1x24.515) (CCW)
DCSS 24.52 24.515 July'2019comm on
11.07.2019
10LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) - Dabra/Karera line at 220 KV S/s Gwalior II) (2x2x5.95+2x1.278) (Transco/UBI)
DCDS 7.26 26.472 Aug'2019charged on 29.08.2019
11
2nd ckt of 132 KV Sheopur- Baroda line & LILO of its both ckt at 220 KV S/s Sheopur for 132 KV interconnection of 132 KV S/s Sheopur & 220 KV S/s Sheopur. (2nd ckt- 33.410 cktkm +1x1.896 +3x3.235) (Note- 5.131 cktkm charged on 29.06.2019) (UBI)
2nd ckt+DCDS
38.54 45.011 Aug'2019charged on 24.08.2019
12132Kv DCSS 2 phase 2wire line from 132Kv s/s Prithvipur to RTS Niwadi for p/s to RTS Niwadi (1x22.712) (RTS)
DCSS 22.71 22.712 Aug'2019charged on 09.08.2019
13LILO of one circuit of 132 kv Neemuch220 - Ratangarh DCDS line at 132 KV S/s Morwan (2x0.56) (UBI)
0.56 1.12 Sept'2019chared on 16.09.2019
14LILO of 132 kv Bhikangaon Khargone line at Biston 132 KV S/s (2x18.997) (ADB-III)
18.997 37.994 Sept'2019charged on 14.09.2019
15132Kv DCSS 2 phase 2wire line from 132Kv s/s Beohari for PS to RTS Beohari (1x20.8) (CCW)
20.80 20.8 Sept'2019
charged on 09.09.2019 (upto dead
end)
16132kv DCSS Gautampur -Depalpur line (1x19.609) (JICA)
19.609 19.609 Oct'19charged on 30.10.2019
17 133 KV Datiya- Bhitarwar DCSS line (1x35.296) (UBI) 16.8 16.8 Oct'19
part line (1x16.8 cktkm)
charged on 31.10.2019
18132 kv DCSS Narsinghpur - Devnagar (1x23) (ADB-III) (Note-1x24.43 + 1x11.33 muiti ckt NSP Karakbel line)
35.76 35.76 Oct'19charged on 26.10.2019
19132kV DCSS line Chichli - Palohabada (1x25.606) (Note: charged Part line 10.776 on 28.03.2019) (ADB-III S)
15.11 15.11 Oct'19
balance 15.110 cktkm
charged on 23.10.2019
ANNEXURE - 2.2.5.i
M.P POWER TRANSMISSION COMPANY LIMITED
TRANSMISSION WORKS COMPLETED DURING 2019-20 (UP TO 31.10.2019)
EHV TRANSMISSION LINES
Agenda of 72nd OCCM of MP 30
1 2 3 4 5 6 7
II.
S. No.
NAME OF SUBSTATION / (DISTRICT) / (FINANCED BY)
VOLTAGE RATIO (KV)
No.OF X-mer &
Cap.(MVA)
EFFECTIVE CAPACITY
MVA
MONTH OF COMPL-ETION
DATE OF COMMI-
SSIONING
A. 400 KV SUBSTATIONS
1 Nill
B. 220 KV SUBSTATIONS
a. 220 KV NEW SUBSTATIONS
1 Nill
C. 132 KV SUBSTATIONS
a. 132KV NEW SUBSTATIONS
1 Bada malehra 132kv s/s 1x40MVA (ADB-III) 132/33 kV 1x40 40 May'2019charged on 30.05.2019
2 Pilukhedi 132kV S/s with 1x50 MVA (UBI) 132/33 kV 1x50 50 June'2019charged on 28.06.2019
3Karakbel 132kv s/s1x40 MVA (Dist. Narsinghpur) (ADB-III)
132/33 kV 1x40 40 July'2019comm on
25.07.2019
4Belkheda 132kv s/s 1x40 MVA (Dist- Jabalpur)(ADB-III)
132/33 kV 1x40 40 July'2019comm on
04.07.2019
5 Biston 132kv s/s1x40 MVA (ADB-III) 132/33 kV 1x40 40 Sept'2019Test charged on 20.09.2019
6 Morwan 132kV S/s with 1x40 MVA (UBI) 132/33 kV 1x40 40 Oct'19charged on 25.10.2019
EHV SUB - STATIONS
Agenda of 72nd OCCM of MP 31
S. No. NAME OF THE TRANSMISSION LINECKT.KMS.
PROGRESS IN %
(Oct'2019)
A. 400 KV TRANSMISSION LINES
1 400 kV DCDS line from Nagda 400 kV S/s to Mandsaur 400 kV S/s 137.32 58.00%
2400 kV DCDS line for LILO of one ckt of Satna(PGCIL) - Bina(PGCIL) 400 kV at Sagar 400 kV S/s
56 85.00%
3 400 kV DCDS line from Ashta 400 kV S/s to Ujjain 400 kV S/s 179.474 42.00%4 400 kV DCDS line from Indore (PGCIL) 765 kV S/s to Ujjain 400 kV S/s 84.528 86.00%
5 400 kV DCDS line from Nagda 400 kV S/s to Ujjain 400 kV S/s 53.2 56.00%
6 LILO of one ckt of 400 KV Khandwa - Rajgarh PGCIL line at Chhegaon 400 kV S/s 3.78 14.00%
B. 220 KV TRANSMISSION LINES
1LILO of one Ckt of 220kv DCDS Ashta - Dewas line at 220kv S/S Chapda (DCDS) (2x32.782)
66 51.00%
2 220Kv DCDS line from Pithampur-Depalpur line (2X31) 62 71.00%
3220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam D/C line at 400Kv S/s Badnawar (2x1.453+4x6.161)
27.55 95.00%
4 220Kv DCDS Julwaniya- Kukshi (2X58) 116 23.00%
5 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) 44 32.00%
6 LILO of one circuit of Bhopal-Hoshangabad DC line at 220kV S/s Adampur 5.84 28.00%
7Part (b).LILO of 220kV Sarni - Pandhurna at 220kV S/s Betul (2x38.864) (Note: Betul220 & Betul400 I/C line 3.76 cktkm. charged on 21.07.2017)
77.728 60.00%
8 220kV DCDS line from Kanwan 220kV S/s - Dhar 220kV S/s 62.78 90.00%
9LILO of both ckt Nagda - Neemuch 220kV line at 400Kv S/s Mandsore(Sitamau) (2x22.787+4x2.229+2x23.323)
101.136 54.00%
10220kV DCDS line from Mandsaure(Sitamau) 400kV S/s - Maruti Shakti Pool 220kV S/s
92.294 51.00%
11 220kV DCDS line from Neemuch 220kV S/s to Ratangarh 400kV S/s 85.016 81.00%
12 2nd circuiting of Ratlam switching - Daloda 220kV DCSS line 72 56.00%
13 LILO of Ratlam - Daloda 220kV line at 220Kv S/s Jaora (2x3.51) 7.02 68.00%
14 LILO of both ckt of Ujjain - Badod 220 kV line at Ujjain 400 Kv S/s (2x6.4+2x5.691) 24.182 78.00%
15 LILO of both ckt of Ujjain - Nagda 220 kV line at Ujjain 400 Kv S/s (2x2x11.766) 47.064 56.00%
16 220kV DCDS line from Ujjain 400kV S/s to Susner (Nalkheda) 220kV S/s 156.00 9.00%17 220kV DCDS line from Badod 220kV S/s to Susner (Nalkheda) 220kV S/s 104.55 28.00%18 220kV DCDS line from Rajgarh(B) 220kV S/s to Susner (Nalkheda) 220kV S/s 124.00 8.00%19 220 kV Sabalgarh - Sheopur line (2x110) 220 67.00%
20 220kV Chhatarpur-Tikamgarh DCSS line 110 9.00%
21 220 KV DCDS UMSP Rewa - Rewa 53.416
22 220 KV DCDS UMSP Rewa - Sidhi 114.998 6.00%
23 220 KV DCDS line from 400 kV Itarsi (PGCIL) to 220 KV S/s Budhni (2x29.942) 59.884 1.00%
220Kv DCDS line from 220kV Pooling S/s RUMS at Goojarkhedi, Suwasara (For interconnection of Solar PV Plant of RUMS) (2X43.426)
86.852
b) Tap point to 400 kV S/s Sitamau (2x34.613) 69.226 93.00%
25220kV DCDS Badwar (220kV Pooling S/s) - 400kV Grid S/s PGCIL line) (2X1.134) (ckt-I charged on 28.03.2019)
2.268
132 KV TRANSMISSION LINES
1 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) 64 61%
2 132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV Itarsi s/s (1x53.209) 53.209 82.00%
3 LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S Seoni (2x20) 40 88.00%
4 132 kv DCSS Guna-Eshagarh line (1x72) 72 41.00%
5 132 kv Sirmour - Katra DCDS line (2x37.67) 75.34 77.00%
6 LILO of 132 kv Jaora - Khachrod line at Bhesola 132 KV S/s (2x0.729) 1.458 100.00%
7 132 kV DCSS line from 132kV Mandla - Bichhiya (1x43.54) 43.54 5.00%
8 132 kV DCSS line from 132kV Dindori - Gorakhpur 132kv S/s (1x49.4) 49.4 8.00%
24
EHV TRANSMISSION WORKS UNDER PROGRESS AS ON 31.10.2019
Annexure-2.2.5.ii
Agenda of 72nd OCCM of MP 32
9 132 KV Gourjhamar - Deori DCSS line (1x27.493) 27.493 66.00%
10132kV DCDS line from 400 kV Ujjain to 132KV Vikram Udyogpuri (Narwar) (2x21.43)
42.86 95.00%
11 133 KV Datiya- Bhitarwar DCSS line (1x35.296) 35.296
91% part line
(1x16.8 cktkm) charged on 31.10.2019
12 132 kv DCSS Khurai- Khimlasa line (1x20.937) 20.937 99.00%
13 132 kv DCSS Panagar - Patan line (1x22.749) 22.749 36.00%
14132 kv DCSS Badnagar - Chhayan Line (1x28.26) ADB-III (Part line 20.969 ckt charged on 05.11.2018 by tapping arrangement)
7.291 Balance
100.00%
15 132 kv DCSS Dhar - Teesgaon line (1x15.35) 15.35 95.00%
16 LILO of 132 kv Ratlam - Meghnagar line at 132Kv S/s Petlawad (2x7.4) 14.8 100.00%
17 132 kv DCDS Narsinghpur - Karakbel line (2x23) 46 98.00%
18LILO of 132 kv Satna-Maihar line at Satna-II S/s (2x11.047)(ADB-III Saving) (Part line 0.50 CktKm charged on 05.12.2018)
22.094 32.00%
19 132kv DCDS line Guna-Bhonra (2x21.394) 21 84.00%
20 132kV DCDS line from Sendhwa 220 kV S/s - Pansemal 132kV line 95.69 70.00%
21 2nd ckt of 132kV Rajgarh(Dhar)220 kV S/s - Jhabua 132kV line 68.8 88.00%
22LILO of both ckt of 132kV Neemuch - Mandsore at Mandsore(Sitamau) 400 kV S/s (2x71.464)
142.928 51.00%
232nd Circuiting of Sidhi 220 Mauganj 132 kV DCSS line (new line 6 km involved)(2x8.285+ 35.922 ckm 2nd ckt) (Note:35.922 charged on 27.03.2019)
52 34.00%
24 LILO of both ckt. of 132kV Neemuch - Ratangarh DCDS line at 220kV S/s Ratangarh (2x3.094)(132kV interconnector between Ratangarh 400 kV S/s & Ratangarh 132kV S/s
6.188 26.00%
25 2nd circuiting of Sabalgarh - Vijaypur 132KV DCSS line (31.39) 31.39 100.00%
26 2nd circuiting of Ashta - Ichhawar 132KV DCSS line (34.64) 34.64 55.00%
27 2nd circuiting of Nalkheda - Moman Badodiya 132KV DCSS line (28.34) 28.34 84.00%
28 LILO of both ckt of Ujjain - Tarana 132KV line at Ujjain 400 KV S/s (4x0.198) 0.792 39.00%
29 LILO of Susner - Jeerapur 132kV line at Susner (Nalkheda) 34.922 18.00%
30 2nd Circuiting of Susner - Jeerapur 132 kV DCSS line (30.256) 30.256 53.00%
31LILO of both ckt of Ujjain 220 KV - Agar 132kV line at Makdon 132KV S/s (2x2x30.052)
120.208 27.00%
32 2nd circuiting of Agar-Susner 132kV DCSS line 31.603 78.00%33 2nd circuiting of Tarana-Makdon 132kV DCSS line 23.05 69.00%34 132kV DCDS Alot-Zarda line 49.92 52.00%
35LILO of one circuit of Susner 132 KV - Agar 132KV line at Susner (Nalkheda) 220kV (2x18)
34 11.00%
36 2nd ckt of 132 KV shahdol 220 - Dindori132 line (2nd ckt-61.71) 61.71 66.00%
37 2nd ckt of 132 KV Gorabazar 220 - Maneri 132 line (2nd ckt-21.175) 21.75
38132kV Julwaniya400 - Shahpura DCSS line (2nd ckt-28 + 1x47.008) (Note:1x47.008 charged on 29.03.2019)
74.866 99.00%
39 132 Kvline from Sailana to Shivgarh (1x25) 25 8.00%
40LILO of one ckt of Chhegaon- Nepanagar 132 Kv DCDS line at Jhirniya (Marugarh) (2x40)
80 1.00%
41 132 Kv DCSS line from 220kV Ganjbasoda to Gyaraspur (1x37.393) 37.393 2.00%
42 132 Kv DCSS line from Mandla to Dindori (1x110) 110 4.00%
432nd ckt of 220 KV Mandideep to 132 KV Mandideep line & LILO for HEG (2nd ckt-6.5 + 2x2.5)
11.5 50.00%
44 2nd ckt of 132 KV Birsingpur - Umariya line (2nd ckt-35.50) 35.5 78.00%
45 Julwania 400kV-Pati(Silawad) 132kV DCSS line 40.69 10.00%46 Panagar 220kV-Dheemarkheda 132kV DCSS line 62.50 40.00%47 132kV Prithvipur-Orchha DCSS line 33.50 32.00%48 132kV Udaipura-Tendukheda DCSS line 36.78 72.00%49 132 kV Gohad - Gormi DCSS line (1x21.187) 21.187 4.00%
50 132kV Narsinghgarh-Suthaliya DCSSline 29.05 49.00%51 Mugaliyachhap 220 kV - Mahawadia 132KV DCDS line(2x7.661) 15.32 1.00%52 132kV Sirmour-Atraila DCDSline 70.50 5.00%53 132kV Sidhi-Sinhawal DCSS line 58.47 7.00%54 132kV Maneri-Mandla DCSS line 77.59 3.00%
Agenda of 72nd OCCM of MP 33
55132Kv DCSS 2 phase 2wire line from 220Kv s/s Kotar for PS to RTS kaima1x26.938)
26.938 63.00%
56 132kV DCSS Sirmore - RTS Dabhaura line (1x56.1) 56.1 96.00%
57132Kv DCSS 2 phase 2wire line from 220Kv s/s Sidhi for PS to RTS Marwasgram(1x51.341)
51.341 81.00%
58132Kv DCSS 2 phase 2wire line from 132Kv s/s Dongrital for PS to RTS Gajra Bahara (1x17.435)
17.435 29.00%
59 132kV 2Phase 2Wire Lalbarra-Samnapur RTS line. (Earlier 132kV 2 Phase 2 wire Kirnapur-RTS Hatta Road line ) 18.643 33.00%
60132Kv DCSS 2 phase 2wire line from 132 Kv s/s Nowgaon for PS to RTS Harpalpur (1x49.851)
49.851 86.00%
61 132 KV line from Seoni 220 KV S/s - Nainpur 132 KV S/s 82.659 97.00%
62 132Kv DCSS 2 phase 2wire line NainpurRTs - Ghansor line (1x34.413) 34.413 26.00%
63 132Kv 2ph 2 wire DCSS Neemuch - RTS Neemuch line 12.188 59.00%
64132 KV 2 phase 2wire DCSS line from 132 KV S/s Malhargarh to RTS Sindpan (earliar 132 KV 2 phase 2wire DCSS Mandsore - RTS Mandsore (Sindpan) line)
14.86 59.00%
65 132Kv 2ph 2 wire line from 220KV S/s - Mandla - RTS Mandla Fort 8.102 39.00%
66 132Kv Rajgarh - Biora RTS line 23.512 12.00%
S.No.
NAME OF THE SUBSTATIONEFFECTIVE CAPACITY
MVA
A. 400 KV SUBSTATIONS
1Badnawar 400 KV sub-station with 2x315MVA 400/220 KV X-mer (1x315MVA charged on 07.03.2019 & 1x125MVAR Bus reactor charged on 11.03.2019)
630 85.00%
2 Mandsore 400 KV sub-station with 2x315MVA 400/220 KV X-mer + 2x160 MVA 630 28.00%
3 Sagar 400 KV sub-station with 2x315MVA 400/220 KV X-mer 630
78%2nd unit 315 MVA charged on 25.08.2019
from 220 kv side
4 Ujjain 400 KV sub-station with 2x315MVA 400/220 KV X-mer+ 2x160 630 55.00%
5 400KV 1x125 MVAR Reactor at 400KV S/s Chhegaon(Torni) 11.00%
B. a 220 KV SUBSTATIONS
1 Gorabazar 220/132kv with 1x160MVA + 40MVA 160 15.00%
2 Chapda 220 Kv S/s (Upgradation) with 1x160MVA 160 56.00%
3 Upgradation of Depalpur 132Kv S/s to 220kv with 1x160MVA 160 60.00%
4 Adampur 220/33kv S/s 2x50MVA 100 57.00%
5 Kukshi 220 Kv S/s Upgradation)with 1x160MVA 160 47.00%
6 Sailana 220/132kV S/s (2x160MVA + 1x63) (Note:63 MVA charged on 12.03.2019)
320 65.00%
7 Jaora 220/132kV S/s (Upgradation) (2x160MVA + 1x40) (Note:40 MVA X-mer charged on 17.02.2019)
320
79%1st 160 MVA charged on 14.08.2019
from 132 KV side
8Gudgaon 220/132kV S/s (1x160MVA + 1x63) (Note:63 MVA charged on 24.01.2019)
160 70.00%
9 Ratangarh 220/132kV S/s (2x160MVA + 1x63) 320 55.00%
10 Nalkheda 220/132kV S/s (2x160MVA + 1x63) 320 6.00%
11North Zone Substation at Indore to 220kV (Upgradation )(Note- 1x160MVA charged on 30.07.2018) 320 77.00%
12 Sheopurkala 220kv S/s with 2x160MVA+ 1x63MVA 320
38%63 Mva
charged on 30.06.2019 & CB charged on
10.07.2019
Agenda of 72nd OCCM of MP 34
13 Upgradation of 220 kV S/s at Udaipura 160 7.00%14 33/220kV Pooling Sub-station at Ramnagar 3x100 (1st & 2nd X-mer charged) 300 100.00%
15 33/220kV Pooling Sub-station at Badwar (3x100) (1st charged) 300
74%1st 100 MVA charged on
29.03.2019 & 2nd on
04.07.2019
C. 132 KV SUBSTATIONS
(a) NEW SUBSTATIONS
1 Khimlasa 132kv s/s 1x40 MVA 40 59.00%
2 Narsinghgarh 132kv s/s with 1x40 MVA 40 39.00%
3 Devnagar 132kv s/s 1x40 MVA (Dist- Narsighpur) (ADB-III) 40
100%charged on 30.03.2019 from 33 KV
4 Bhesola 132kV S/s with 1x50 MVA 50 53.00%
5 Deori 132kV S/s with 1x50 MVA 50 60.00%
6 Vikram Udyogpuri 132kV S/s with 1x63 MVA 63 58.00%
7 Bhitarwar 132kV S/s with 1x50 MVA 50 59.00%
8 Pati 132kV S/s with 1x50 MVA 50 1.00%
9 Orchha 132kV S/s with 1x50 MVA 50 11.00%
10 Madwas 132kV S/s with 1x50 MVA 50 1.00%
11 Unchehera 132kV S/s with 1x50 MVA 50 40.00%
12 Tendukheda 132kV S/s with 1x50 MVA 50 8.00%
13 Suthaliya 132kV S/s with 1x50 MVA 50 1.00%
14 Atraila 132kV S/s with 1x50 MVA 50 2.00%
15 Shivgarh 132kV S/s with 1x50 MVA 50 9.00%
16 Bichhiya 132kV S/s with 1x50 MVA 50 7.00%
17 Gyaraspur 132 Kv S/s, with 1x50 MVA 50 3.00%
Agenda of 72nd OCCM of MP 35
Annexure-2.3(i)
Aug-19 Sep-19 Aug-19 Sep-19
Commissinary HQ 23:54 23:49 23:47 23:42
District HQ 23:52 23:46 23:38 23:40
Tehsil HQ 23:50 23:45 23:45 23:42
Rural -Mixed 23:44 23:39 23:34 23:28
Rural -DLF 23:44 23:40 23:31 23:28
Rural -Irrigation 9:56 9:55 9:53 9:54
Aug-19 Sep-19 Aug-19 Sep-19
Commissinary HQ 23:53 23:52 23:51 23:47
District HQ 23:52 23:47 23:47 23:44
Tehsil HQ 23:47 23:39 23:48 23:42
Rural -3Phase - - 23:40 23:35
Rural -1Phase 23:40 23:29 23:40 23:34
Total Rural 9:48 9:43 9:53 9:51
Discoms wise Average Supply Hours
PARTICULARS
PARTICULARS
West Zone MP
East Zone Central Zone
Agenda of 72nd OCCM of MP 36
Annexure-2.3(ii)
LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR (For which group to be allocated)
JABALPUR REGION
Name of EHV Substation
Name of 33KV feeder
Date of commission-ing of feeder
bay
Date of commission
-ing of feeder
400KV
400 KV Kirnapur 33 KV Hatta 33 KV Kirnapur 33 KV Rajegaon
11.11.2018 12.11.2018 12.112018
11.11.2018 12.11.2018 12.11.2018
220KV
220 KV Seoni 33 KV Karirat 21.08.2007 06.01.2016
132KV
132 KV Ponder 33 KV NSPL 19.01.2018 19.01.2018
132 KV Palohabada
33 KV Bilthari 33 KV Sadumar
01.04.2019 02.04.2019
01.04.2019 02.04.2019
132 KV Narsinghpur
33 KV Nagar Palika 28.02.2018
02.11.2018
132 KV Karapgaon
33 KV Karapgaon 33 KV Bansadehi 33 KV Kareli 33 KV Aamgaon
29.12.2017 29.12.2017 29.12.2017 29.12.2017
24.02.2018 27.01.2018 27.01.2018 28.01.2018
132 KV Waraseoni
33 KV Dongarmali 33 KV Waraseoni 33 KV Kochevahi 33 KV Khairlanji
10.10.2018 06.12.2018 06.12.2018 08.12.2018
10.10.2018 06.12.2018 06.12.2018 08.12.2018
132 KV Nainpur 33 KV Keolari-II 22.01.2018 28.03.2018
132 KV Saori
33 KV Saori 33 KV Lawaghogri 33 KV Mujawar 33 KV Bhutai
05.10.2018 05.10.2018 06.11.2018 06.11.2018
12.11.2018 13.11.2018 12.11.2018 30.01.2019
LIST OF 33KV FEEDERS UNDER MPPKVVCL, INDORE (For which group to be allocated)
INDORE REGION
UJJAIN REGION
Name of EHV Substation
Name of 33KV feeder Date of commissioning of feeder bay
Date of commissioning
of feeder
220KV 220KV Pithampur (Sec-III)
33KV SRF 03.09.2013 03.09.2013
132KV
132KV Chandrawatiganj
33KV Chandrawatiganj
27.04.2015
27.04.2015
132KV Electronic
33KV AKVN (Namkeen Cluster)
31.03.2016
31.03.2016
132KV Raukhedi
33KV DLF-I 33KV DLF-II
03.01.2014 03.01.2014
15.09.2018 15.09.2018
Name of EHV Substation
Name of 33KV feeder Date of commissioning of feeder bay
Date of Charging of feeder
220KV Agenda of 72nd OCCM of MP 37
LIST OF 33KV FEEDERS UNDER MPPKVVCL, BHOPAL (For which group to be allocated)
BHOPAL REGION
Name of EHV Substation
Name of 33KV feeder
Date of charging of feeder bay
Date of charging of feeder
220 KV 220 KV Ganjbasoda
33 KV Simcon-I 33 KV Simcon-II
03.11.2016 31.08.2017
03.11.2016 09.09.2017
220 KV Pipariya 33 KV Food Park (AKVN)
19.06.2017 25.06.2017
132 KV
132 KV Tamot 33 KV Obedullaganj 33 KV AKVN-1 33 KV AKVN-2
05.05.2016 05.10.2016 05.10.2016
02.02.2017 05.10.2016 05.10.2016
132 KV Lateri 33 KV Anantpura
15.06.2017 22.05.2018
132 KV Salamatpur 33 KV Dewanganj 33 KV Aamkheda 33 KV Salamatpur Industrial
04.12.2017 04.12.2014 25.11.2017
04.12.2017 04.12.2017 10.01.2019
132 KV Udaipura 33 KV Thaladigawan 33 KV Boras 33 KV Udaipura
26.04.2018 04.06.2018 04.06.2018
04.06.2018 06.06.2018 07.01.2019
132 KV Ayodhya Nagar 33 KV Maholi 30.10.2018 30.10.2018
132 KV Nasrullaganj 33 KV Kankariya
15.05.2004
15.09.2017
132 KV Khirkiya 33 KV Killod 07.12.2017 10.01.2018
132 KV Bilquisganj 33 KV Uljhawan 07.01.2018 20.07.2018
220KV Barnagar 33KV Bangred 23.10.2017 20.10.2018
132KV
132KV Agar
33KV Agar Town-II
03.12.2012
24.05.2018
132KV Arniyakalan
33KV Designco Manufacture & Exporter (5MW Solar Power Plant)
01.05.2018
01.05.2018
132KV Agrod
33KV Madhopur 30.06.2018 26.07.2018
Agenda of 72nd OCCM of MP 38
ANNEXURE-3.2
Date Time Date Time
1 400 315MVA BHEL Transformer at 400KV S/s Katni 05-Dec-19 9:00 06-Dec-19 17:00 Continue For post monsoon maintenance work
2 400 315MVA TELK Transformer at 400KV S/s Katni 02-Dec-19 9:00 03-Dec-19 17:00 Continue For post monsoon maintenance work
3 400 400KV ICT-II Tie Bay at 400KV S/s Nagda 08-Jan-20 08:00 08-Jan-20 18:00 Daily For Bay maintenance and testing work
4 400 315MVA EMCO Transformer at 400KV S/s Bina 17-Jan-20 08:00 27-Jan-20 17:00 Continue For replacement of 3 Nos Isolators
5 400 315 MVA TransformerI at 400KV S/S Bhopal 04-Dec-19 08:00 04-Dec-19 18:00 Daily For post monsoon maintenance work
1 400 125MVAR BHEL Reactor at 400KV S/s Katni 09-Dec-19 9:00 09-Dec-19 17:00 Daily For post monsoon maintenance work
2 400 50MVAR Bus reactor -I at 400KV S/s Nagda 09-Dec-19 08:00 09-Dec-19 18:00 Daily For post monsoon maintenance work
3 400 125 MVAR Bus- reactor-II at 400KV S/s Nagda 10-Dec-19 08:00 10-Dec-19 18:00 Daily For post monsoon maintenance work
4 400 50MVAR Nagda-ISP Line Reactor 12-Dec-19 08:00 12-Dec-19 18:00 Daily For post monsoon maintenance work
5 400 400KV Nagda-Badnawar-II line Reactor 23-Dec-19 08:00 28-Dec-19 18:00 ContinueFor Circuit breaker replacement work of 400KV line Reactor
6 400 80 MVAR Bus Reactor-I at 400KV S/S Bhopal 09-Dec-19 08:00 16-Dec-19 18:00 Continue PRV Replacement and Testing work
7 400 80 MVAR Bus Reactor-II at 400KV S/S Bhopal 18-Dec-19 08:00 24-Dec-19 18:00 Continue PRV Replacement and Testing work
8 400 80 MVAR Bus Reactor-I at 400KV S/S Bhopal 06-Jan-20 08:00 13-Jan-20 18:00 Continue PRV Replacement and Testing work
1 400 400KV Main Bus No- I at 400KV S/s Katni 10-Dec-19 9:00 10-Dec-19 17:00 Daily For post monsoon maintenance work
2 400 400KV Main Bus No- II at 400KV S/s Katni 12-Dec-19 9:00 12-Dec-19 17:00 Daily For post monsoon maintenance work
3 400 400KV Badanawar-Pithampur-I 09-Dec-19 09:00 09-Dec-19 18:00 Daily For Bay maintenance and testing work
4 400 400KV Badanawar-Pithampur-II 20-Dec-19 09:00 20-Dec-19 18:00 Daily For Bay maintenance and testing work
5 400 400kv Nagda-Badnawar-I with reactor 16-Dec-19 08:00 18-Dec-19 18:00 ContinueFor replacement of Line Gantry Beam (FGB-2)
6 400 400KV ISP Tie Bay at 400KV S/s Nagda 06-Jan-20 08:00 06-Jan-20 18:00 Daily For Bay maintenance and testing work
7 400 400KV Bina-Bhopal-I (Main CB bay only) 02-Dec-19 08:00 11-Dec-19 17:00 ContinueFor CB replacement work (CB erection , commissioning and testing)
8 400 400KV Main bus-II at 400KV S/s Bina 16-Dec-19 08:00 23-Dec-19 17:00 Continue For PG Isolator repalcement work
9 400 400KV Bina-Bhopal-I 01-Jan-20 08:00 08-Jan-20 17:00 Continue For line isolator replacement work
10 400 400KV Bina-Bhopal-I I 09-Jan-20 08:00 16-Jan-20 17:00 Continue For line isolator replacement work
11 400 400KV Indore-ISP-I 02-Dec-19 09:00 02-Dec-19 18:00 DailyFor Bay equipment maintenance and testing work
12 400 400KV Indore-ISP-II 03-Dec-19 09:00 03-Dec-19 18:00 DailyFor Bay equipment maintenance and testing work
13 400 400KV Indore-Nagda 04-Dec-19 09:00 04-Dec-19 18:00 DailyFor Bay equipment maintenance and testing work
14 400 400KV TBC at 400KV S/s Indore 05-Dec-19 09:00 05-Dec-19 18:00 DailyFor Bay equipment maintenance and testing work
15 400 400KV Indore-ISP-I 01-Jan-20 09:00 01-Jan-20 18:00 DailyFor Bay equipment maintenance and testing work
16 400 400KV Indore-ISP-II 02-Jan-20 09:00 02-Jan-20 18:00 DailyFor Bay equipment maintenance and testing work
17 400 400KV TBC at 400KV S/s Indore 03-Jan-20 09:00 03-Jan-20 18:00 DailyFor Bay equipment maintenance and testing work
18 400 400KV Bhopal-Itarsi circuit No.-I 04-Dec-19 08:00 04-Dec-19 18:00 DailyFor Bay equipment maintenance and testing work
19 400 400KV Bhopal-Bina circuit No-II 05-Dec-19 08:00 05-Dec-19 18:00 DailyFor Bay equipment maintenance and testing work
20 400 400KV Bhopal-Itarsi circuit No.-II 06-Dec-19 08:00 06-Dec-19 18:00 DailyFor Bay equipment maintenance and testing work
21 400 400KV Bhopal-Itarsi circuit No.-II 28-Jan-20 08:00 28-Jan-20 18:00 DailyFor Bay equipment maintenance and testing work
1 220 220KV ICT-I at 220KV S/s Sukha 04-Dec-19 9:00 05-Dec-19 17:00 Continue For maintenance and testing work
2 220 220KV ICT-I at 220KV S/s Sukha 03-Jan-20 9:00 04-Jan-20 17:00 Continue For maintenance and testing work
3 220 220KV ICT-II at 220KV S/s Sukha 09-Dec-19 9:00 10-Dec-19 17:00 Continue For maintenance and testing work
B- 400 KV REACTORS
C- 400 KV FEEDER & BAYS OF 400 KV- S/S-
D- 220 KV FEEDER & BAYS-
A- 400 KV TRANSFORMERS
72nd OCCM : PROPOSED SHUTDOWN OF TRANSMISSION ELEMENTS FOR THE PERIOD 01-12-19 TO 31-01-20
Sr- No
KV Line / Transformer / Reactor / Bay
From To Basis(Daily/
Continue)Reason
Agenda of 72nd OCCM of MP 39
Date Time Date Time
Sr- No
KV Line / Transformer / Reactor / Bay
From To Basis(Daily/
Continue)Reason
4 220 220KV ICT-II at 220KV S/s Sukha 07-Jan-20 9:00 08-Jan-20 17:00 Continue For maintenance and testing work
5 220 220KV Pandhurna-Kamleshwar 10-Dec-19 09:00 10-Dec-19 00:00 Daily For Bay equipment maintenance and testing work
6 220 220KV Chhindwara-PGCIL-I 12-Dec-19 09:00 12-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
7 220 220KV Chhindwara-PGCIL-II 13-Dec-19 09:00 13-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
8 220 220KV Pandhurna-Kamleshwar 13-Jan-20 09:00 13-Jan-20 18:00 Daily For Bay equipment maintenance and testing work
9 220 220KV Chhindwara-PGCIL-I 09-Jan-20 09:00 09-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
10 220 220KV Chhindwara-PGCIL-II 10-Jan-20 09:00 10-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
11 220 220KV Seoni-PGCIL-I 10-Dec-19 09:00 10-Dec-19 18:00 Daily For Bay equipment maintenance and testing work
12 220 220KV Seoni-PGCIL-II 12-Dec-19 09:00 12-Dec-19 18:00 Daily For Bay equipment maintenance and testing work
13 220 220KV Seoni-PGCIL-II 08-Jan-20 09:00 08-Jan-20 18:00 Daily For Bay equipment maintenance and testing work
14 220220KV Bus Tie & Main Bus-I at 400KV S/s Badnawar
09-Jan-20 09:00 09-Jan-20 17.:00 Daily For Bay equipment maintenance and testing work
15 220 Bus Tie & Main Bus-II at 400KV S/s Badnawar 14-Jan-20 09:00 14-Jan-20 17.:00 Daily For Bay equipment maintenance and testing work
16 220 220KV Ujjain-Hatuniya PGCIL -I 16-Dec-19 09:00 16-Dec-19 17.:00 Daily For Bay equipment maintenance and testing work
17 220 220KV Ujjain-Hatuniya PGCIL -II 17-Dec-19 09:00 17-Dec-19 17.:00 Daily For Bay equipment maintenance and testing work
18 220 220KV Ujjain-Hatuniya PGCIL -I 14-Jan-20 09:00 14-Jan-20 17.:00 Daily For Bay equipment maintenance and testing work
19 220 220KV Ujjain-Hatuniya PGCIL -II 15-Jan-20 09:00 15-Jan-20 17.:00 Daily For Bay equipment maintenance and testing work
20 220 220KV Shujalpur-PGCIL CKT-I 03-Dec-19 09:00 03-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
21 220 220KV Shujalpur-PGCIL CKT-I I 04-Dec-19 09:00 04-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
22 220 220KV Bhanpura-Modak 12-Dec-19 10:00 12-Dec-19 17:00 Daily For commissioning of 2nd DPR at 220KV S/s Bhanpura
23 220 220KV Bhanpura-Ranpur 13-Dec-19 10:00 13-Dec-19 17:00 Daily For commissioning of 2nd DPR at 220KV S/s Bhanpura
24 220 220KV Sagar-Damoh(PGCIL)-I 19-Dec-19 09:00 19-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
25 220 220KV Sagar-Damoh(PGCIL)-I 04-Jan-20 09:00 04-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
26 220 220KV Sagar-Damoh(PGCIL)-II 23-Dec-19 09:00 23-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
27 220 220KV Sagar-Damoh(PGCIL)-II 13-Jan-20 09:00 13-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
28 220 220KV Sagar-Damoh(PGCIL)-I 26-Dec-19 09:00 26-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
29 220 220KV Sagar-Damoh(PGCIL)-I 18-Jan-20 09:00 18-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
30 220 220KV Sagar-Damoh(PGCIL)-II 30-Dec-19 09:00 30-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
31 220 220KV Sagar-Damoh(PGCIL)-II 20-Jan-20 09:00 20-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
32 220 220KV Sagar-Damoh(PGCIL)-III 25-Jan-20 09:00 25-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
33 220 220KV Damoh-Katni 09-Dec-19 09:00 09-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
34 220 220KV Damoh-Katni 02-Jan-20 09:00 02-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
35 220220KV Barwaha-Indore-I (at 220KV S/s Barwaha)
09-Dec-19 10:00 09-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
36 220220KV Barwaha-Indore-II (at 220KV S/s Barwaha)
10-Dec-19 10:00 10-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
37 220220KV Nimrani-Maheshwar-I (at 220KV S/s Nimrani)
11-Dec-19 10:00 11-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
38 220220KV Nimrani-Julwaniya (at 220KV S/s Nimrani)
15-Dec-19 10:00 15-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
39 220220KV Barwaha-Handiya (at 220KV S/s Barwaha)
06-Jan-20 10:00 06-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
40 220220KV Nimrani-Maheshwar-II (at 220KV S/s Nimrani)
07-Jan-20 10:00 07-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
41 220 220KV Mahalgaon-PGCIL-I 11-Dec-19 10:00 11-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
42 220 220KV Mahalgaon-PGCIL-II 12-Dec-19 10:00 12-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
Agenda of 72nd OCCM of MP 40
Date Time Date Time
Sr- No
KV Line / Transformer / Reactor / Bay
From To Basis(Daily/
Continue)Reason
43 220 220KV Mahalgaon-Bina 18-Dec-19 10:00 18-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
44 220 220KV Mahalgaon-Datia 19-Dec-19 10:00 19-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
45 220 220KV Mehgaon-Adani 03-Dec-19 09:00 03-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
46 220 220KV Mehgaon-Auraiya 07-Dec-19 09:00 07-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
47 220 160MVA transformer-I At 220KV s/s Mehgaon 10-Dec-19 09:00 10-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
48 220 160MVA transformer-II At 220KV s/s Mehgaon 16-Dec-19 09:00 16-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
49 220 220KV Datia- Bina 20-Dec-19 09:00 20-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
50 220 220KV Datia- Gwalior 24-Dec-19 10:00 24-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
51 220 160MVA Transformer-I at 220 KV S/S Datia 27-Dec-19 09:00 27-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
52 220 160MVA Transformer-II at 220 KV S/S Datia 30-Dec-19 09:00 30-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
53 220 220KV Bus Tie at 220 KV S/s Shivpuri 16-Dec-19 10:00 16-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
54 220 220KV Mahalgaon-PGCIL-I 08-Jan-20 10:00 08-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
55 220 220KV Mahalgaon-PGCIL-II 13-Jan-20 10:00 13-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
56 220 220KV Mahalgaon-Bina 18-Jan-20 10:00 18-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
57 220 220KV Mahalgaon-Datia 23-Jan-20 10:00 23-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
58 220 220KV Shivpuri-Sabalgarh-I 20-Jan-20 10:00 20-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
59 220 220KV Shivpuri-Sabalgarh-II 23-Jan-20 10:00 23-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
60 220 220KV Mehgaon-Adani 03-Jan-20 09:00 03-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
61 220 220KV Mehgaon-Auraiya 06-Jan-20 09:00 06-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
62 220 160MVA transformer-I At 220KV s/s Mehgaon 11-Jan-20 09:00 11-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
63 220 160MVA transformer-II At 220KV s/s Mehgaon 14-Jan-20 09:00 14-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
64 220 220KV Datia- Bina 21-Jan-20 09:00 21-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
65 220 220KV Datia- Gwalior 25-Jan-20 10:00 25-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
66 220 160MVA Transformer-I at 220 KV S/S Datia 28-Jan-20 09:00 28-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
67 220 160MVA Transformer-II at 220 KV S/S Datia 31-Jan-20 09:00 31-Jan-20 17:00 Daily For Bay equipment maintenance and testing work
68 220 220KV Ashoknagar-Guna bay 02-Dec-19 09:00 02-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
69 220 220KV Guna-Ashoknagar bay 03-Dec-19 09:00 03-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
70 220 220KV Indore-South Zone-I 09-Dec-19 09:00 09-Dec-19 18:00 Daily For Bay equipment maintenance and testing work
71 220 220KV Indore-South Zone-II 10-Dec-19 09:00 10-Dec-19 18:00 Daily For Bay equipment maintenance and testing work
72 220 220KV Indore-Pithampur 11-Dec-19 09:00 11-Dec-19 18:00 Daily For Bay equipment maintenance and testing work
73 220 220KV Indore-Barnagar 12-Dec-19 09:00 12-Dec-19 18:00 Daily For Bay equipment maintenance and testing work
74 220 220KV Indore-Dewas 13-Dec-19 09:00 13-Dec-19 18:00 Daily For Bay equipment maintenance and testing work
75 220 220KV Indore-Jetpura 16-Dec-19 09:00 16-Dec-19 18:00 Daily For Bay equipment maintenance and testing work
76 220 220KV Indore-Mangliya 17-Dec-19 09:00 17-Dec-19 18:00 Daily For Bay equipment maintenance and testing work
77 220 220KV Indore-Barwaha-I 19-Dec-19 09:00 19-Dec-19 18:00 Daily For Bay equipment maintenance and testing work
78 220 220KV Indore-Barwaha-II 20-Dec-19 09:00 20-Dec-19 18:00 Daily For Bay equipment maintenance and testing work
79 220 220KV Indore-Indore-East 21-Dec-19 09:00 21-Dec-19 18:00 Daily For Bay equipment maintenance and testing work
80 220 220KV Rajgarh(Dhar)-PGCIL –I 19-Dec-19 10:00 19-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
81 220 220KV Rajgarh(Dhar)-PGCIL –II 20-Dec-19 10:00 20-Dec-19 17:00 Daily For Bay equipment maintenance and testing work
Agenda of 72nd OCCM of MP 41
Date Time Date Time
Sr- No
KV Line / Transformer / Reactor / Bay
From To Basis(Daily/
Continue)Reason
82 220 220KV Indore-Pithampur 04-Jan-20 09:00 04-Jan-20 18:00 Daily For Bay equipment maintenance and testing work
83 220 220KV Indore-Barnagar 06-Jan-20 09:00 06-Jan-20 18:00 Daily For Bay equipment maintenance and testing work
84 220 220KV Indore-Dewas 07-Jan-20 09:00 07-Jan-20 18:00 Daily For Bay equipment maintenance and testing work
85 220 220KV Indore-Jetpura 08-Jan-20 09:00 08-Jan-20 18:00 Daily For Bay equipment maintenance and testing work
86 220 220KV Indore-Mangliya 09-Jan-20 09:00 09-Jan-20 18:00 Daily For replacement of Wave trap, Line will be kept OFF
87 220 220KV Indore-Barwaha-I 10-Jan-20 09:00 10-Jan-20 18:00 Daily For Bay equipment maintenance and testing work
88 220 220KV Indore-Barwaha-II 13-Jan-20 09:00 13-Jan-20 18:00 Daily For Bay equipment maintenance and testing work
89 220 220KV Indore-Indore-East 14-Jan-20 09:00 14-Jan-20 18:00 Daily For Bay equipment maintenance and testing work
Agenda of 72nd OCCM of MP 42
Annexure-4.1
A. ThermalStn. Name UNIT No. Capacity
MW Aug-19 Sep-19
5 210 145.80 140.70
PH III 210 145.80 140.70
TOT 210 145.80 140.70
6 200 7.22 0.007 210 34.83 0.00
PH II 410 42.05 0.00
8 210 35.03 0.009 210 32.75 0.00
PH III 420 67.78 0.00
10 250 87.86 82.88
11 250 128.72 95.26
PH IV 500 216.58 178.14
TOT 1330 326.41 178.14
1 210 66.82 85.862 210 68.88 31.63
PH I 420 135.70 117.49
3 210 33.34 25.184 210 123.00 67.11
PH II 420 156.34 92.28
5 500 0.00 244.53
PH III 500 0.00 244.53TOT 1340 292.04 454.31
1 600 311.34 139.02
2 600 0.00 65.07
PH1 1200 311.34 204.09
3 660 140.22 63.54
4 660 88.28 0.00
PH II 1320 228.50 63.54
TOT 1860 539.84 267.63
4740 1304.09 1040.77
B. HydelCapacity
MW Aug-19 Sep-19115.0 9.30 19.21172.0 9.28 45.1499.0 33.45 46.21
386.0 52.02 110.57193.0 26.01 55.28160.0 1.68 81.96107.0 1.12 54.6490.0 55.54 62.58
315.0 122.75 179.3720.0 12.45 13.6760.0 20.48 26.8530.0 0.15 6.0545.0 10.67 19.3522.5 6.37 11.5520.0 0.14 6.8560.0 22.20 42.88
1186.0 298.08 550.14915.0 255.36 458.78917.5 267.21 459.73
CapacityMW Aug-19 Sep-19
Indira Sagar Hydel Project 1000 510.23 702.68Omkareshwar Hydel Project 520 212.73 216.09
Unitwise / Stationwise Genration in MUAnn 4.1
AM
AR
KA
NS
AT
PU
RA
SA
NJ
AY
GA
ND
HI
MPPGCL THERMAL
SS
TP
S
TONSBIRSINGHPUR
Station NameGANDHISAGARR.P.SAGARJ.SAGARCHAMBAL
C. NHDC (Ex-Bus)Station Name
B.SGR(DEOLONDH)B.SGR(SILPARA)RAJGHATM.P.RAJGHATB.SGR(JINHA)MADIKHEDA
Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014. 2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015.
TOTAL HYDELMPPGCL HydelMPSEB HYDEL Share
M.P.CHAMBALPENCHM.P.PENCHBARGI
Agenda of 72nd OCCM of MP 43
S No. Source Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Total30 31 30 31 31 30 0 0 0 0 0 0 183
A.
1 Thermal 2278.56 1929.45 1635.59 1915.93 1213.68 963.02 0.00 0.00 0.00 0.00 0.00 0.00 9936.24
2 Hydel 125.69 135.30 79.20 66.15 263.64 455.97 0.00 0.00 0.00 0.00 0.00 0.00 1125.96
3 Total 2404.26 2064.75 1714.78 1982.08 1477.33 1419.00 0.00 0.00 0.00 0.00 0.00 0.00 11062.20
B.1 Indira Sagar 81.66 94.10 42.03 78.42 507.37 699.26 0.00 0.00 0.00 0.00 0.00 0.00 1502.83
2 Omkareshwar 43.59 43.18 17.74 51.33 212.73 216.09 0.00 0.00 0.00 0.00 0.00 0.00 584.66
3 MPPMCL Schedule from Central Sector of WR 1777.61 1845.11 1849.93 1786.51 1529.83 1172.16 0.00 0.00 0.00 0.00 0.00 0.00 9961.16
4 MPPMCL Schedule from Central Sector ER 31.16 30.60 38.99 34.68 32.01 19.40 0.00 0.00 0.00 0.00 0.00 0.00 186.84
5 Total MPPMCL Schedule from Central Sector (WR+ER) 1808.77 1875.71 1888.92 1821.19 1561.84 1191.56 0.00 0.00 0.00 0.00 0.00 0.00 10148.00
6 Deviation Energy of (WR+ER) -23.86 1.07 -25.22 -21.74 -112.89 -108.38 0.00 0.00 0.00 0.00 0.00 0.00 -291.03
7 NET NR ISGS POWER SCH to MP 26.28 60.97 70.71 81.98 41.50 17.28 0.00 0.00 0.00 0.00 0.00 0.00 298.71
8 RUMS SOLAR REWA (Scheduled Energy) 89.06 83.32 82.07 66.59 78.12 72.78 0.00 0.00 0.00 0.00 0.00 0.00 471.94
9 Schedule From Sugen 0.00 0.24 5.07 13.80 2.08 0.47 0.00 0.00 0.00 0.00 0.00 0.00 21.66
10 LANCO Amk 162.90 174.72 166.39 124.22 131.15 68.30 0.00 0.00 0.00 0.00 0.00 0.00 827.68
11 SASAN 962.78 1016.20 944.63 880.82 794.41 932.61 0.00 0.00 0.00 0.00 0.00 0.00 5531.46
12 ESSAR (STOA against LTA) 0.00 6.16 5.47 4.46 3.62 2.92 0.00 0.00 0.00 0.00 0.00 0.00 22.64
13 J P Nigri 315.28 324.01 311.95 162.24 145.83 266.78 0.00 0.00 0.00 0.00 0.00 0.00 1526.09
14 MB Power 215.07 230.68 202.23 179.76 142.30 44.13 0.00 0.00 0.00 0.00 0.00 0.00 1014.18
15 JHABUA Power 70.02 86.00 80.24 77.37 32.78 3.63 0.00 0.00 0.00 0.00 0.00 0.00 350.04
16 Other Open Access Schedule other than MPPMCL Incl. Seci -188.35 -93.64 -71.91 -76.23 -165.01 -178.04 0.00 0.00 0.00 0.00 0.00 0.00 -773.16
17 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18 BARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
19 Schedule from Sardar Sarovar 14.26 11.94 13.14 26.13 398.75 555.46 0.00 0.00 0.00 0.00 0.00 0.00 1019.68
20 SCH to Railway from RGPPL_ebid 176.29 183.11 173.39 180.41 168.71 160.33 0.00 0.00 0.00 0.00 0.00 0.00 1042.23
21 Schedule from SEZ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22 Schedule from Rihand+Matatila 3.86 2.81 2.58 6.00 3.25 5.17 0.00 0.00 0.00 0.00 0.00 0.00 23.67
23 MTOA / STOA FROM RAJASTHAN 0.00 41.28 41.54 43.06 44.55 43.08 0.00 0.00 0.00 0.00 0.00 0.00 213.51
24 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA CSPDCCL dtd. 18.09.2012 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
25 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 18.09.2012 Including Short term purchase against MTOA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
26 Additional Power Purchase 0.00 0.00 0.00 32.40 0.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.4427 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0028 Banking of Energy -393.14 -468.76 -393.51 -593.40 -564.04 -584.15 0.00 0.00 0.00 0.00 0.00 0.00 -2997.00
29 Sale of Power -469.81 -61.02 -40.63 -215.50 -239.14 -221.85 0.00 0.00 0.00 0.00 0.00 0.00 -1247.96
30 Total MP Schedule (Including Railway) 2793.28 3473.75 3482.28 2815.30 2580.76 2380.45 0.00 0.00 0.00 0.00 0.00 0.00 17525.82
31 Total MP Drawal (Including Railway) 2769.41 3474.82 3457.06 2793.56 2467.87 2272.07 0.00 0.00 0.00 0.00 0.00 0.00 17234.79
32 Wheeled Energy of Tawa HEG 0.00 0.00 0.00 0.00 6.48 11.87 0.00 0.00 0.00 0.00 0.00 0.00 18.34
33 Wheeled Energy of Wind Farm 10.15 11.63 9.91 13.63 6.94 3.61 0.00 0.00 0.00 0.00 0.00 0.00 55.87
34 Wheeled Energy of Solar Plant 67.16 64.39 55.62 28.72 35.74 31.24 0.00 0.00 0.00 0.00 0.00 0.00 282.87
35 Wheeled Energy of Bio-Mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
36 Wheeled Energy of Ascent Hydro +SAS Hydel Hatta 1.34 1.27 1.02 2.49 2.49 5.70 0.00 0.00 0.00 0.00 0.00 0.00 14.32
37 Export to MSEB (Nepa-Dharni) Wheeling -7.23 -6.99 -5.77 -4.96 -4.48 -4.70 0.00 0.00 0.00 0.00 0.00 0.00 -34.13
38 Deviation Energy of MPPGCL Thermal + Infirm Energy of Singajil -30.89 -38.40 -35.05 -25.15 -29.92 -29.28 0.00 0.00 0.00 0.00 0.00 0.00 -188.69
39 Energy Purchased by MP from Wind Farm 403.98 579.40 555.30 644.20 490.23 257.89 0.00 0.00 0.00 0.00 0.00 0.00 2931.00
40 Energy Purchased by MP from Solar Plant 163.30 166.07 135.61 109.56 85.64 78.75 0.00 0.00 0.00 0.00 0.00 0.00 738.92
41 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. purchase by MP +Wheeled enrgy of CPP / IPP 187.15 101.90 86.30 87.04 176.83 192.05 0.00 0.00 0.00 0.00 0.00 0.00 831.27
42
Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW
2.66 2.98 3.06 1.59 0.90 1.64 0.00 0.00 0.00 0.00 0.00 0.00 12.83
43 Deviation Energy of ISP 1.41 1.64 1.70 1.83 2.85 3.41 0.00 0.00 0.00 0.00 0.00 0.00 12.85
44 Schedule Energy of BLA Power against LTOA 0.66 4.45 2.27 4.30 1.14 0.44 0.00 0.00 0.00 0.00 0.00 0.00 13.26
45 Schedule Energy of JP BINA Power against LTOA 34.61 150.56 147.57 54.21 54.84 35.95 0.00 0.00 0.00 0.00 0.00 0.00 477.74
46 Import from bargi Left Bank Canal Power House + ISP NVDA 0.59 -0.01 0.00 0.00 1.36 1.47 0.00 0.00 0.00 0.00 0.00 0.00 3.40
47 Chambal Complex Excess / less Overshare by MP -1.17 -1.09 1.27 -1.96 -16.60 -17.90 0.00 0.00 0.00 0.00 0.00 0.00 -37.44
48 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.03 0.00 -0.02 -0.02 2.14 2.96 0.00 0.00 0.00 0.00 0.00 0.00 5.03
49 State Supply (Ex-Power stn. Bus) 6132.61 6714.64 6190.39 5820.86 5481.89 5181.52 0.00 0.00 0.00 0.00 0.00 0.00 35521.92
50 AVERAGE DAILY (Ex-Bus) 204.42 216.60 206.35 187.77 176.84 172.72 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 194.1151 MINIMUM DAILY (MP Periphery) 147.90 194.22 166.40 149.59 136.89 150.30 0.00 0.00 0.00 0.00 0.00 0.00 136.8952 MAXIMUM DAILY (MP Periphery) 214.82 221.89 221.88 223.94 190.98 190.33 0.00 0.00 0.00 0.00 0.00 0.00 223.9453 State Supply (Ex-Power st. Bus):- YEAR : 2018-19 6180.81 7257.46 5559.67 5521.99 6028.06 6017.96 9509.89 10724.63 10506.69 10038.55 7907.95 7319.25 36565.95
54 Year ((19-20)-(18-19))*100/Year (18-19) -0.78 -7.48 11.34 5.41 -9.06 -13.90 -100.00 -100.00 -100.00 -100.00 -100.00 -100.00 -2.86
55 Unshedule L/S : Year-2019-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
56 Frequency Correction 2.76 3.66 3.72 2.48 2.44 1.66 0.00 0.00 0.00 0.00 0.00 0.00 16.72
57 Restricted Requirement : Year-2019-20 6135.38 6718.30 6194.11 5823.34 5484.33 5183.19 0.00 0.00 0.00 0.00 0.00 0.00 35538.64
58 Shedule L/S : Year-2019-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
59 Un-Restricted Requirement : Year-2019-20 6135.38 6718.30 6194.11 5823.34 5484.33 5183.19 0.00 0.00 0.00 0.00 0.00 0.00 35538.64
ENERGY BALANCE SHEETYear : 2019 - 20
All figures in Million Unit
M.P. Availability
Exchange with other States / Systems
29
Agenda of 72nd OCCM of MP 44
S.NO. Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Yr 19-20C.1 DEMAND MET 9738 9880 9955 9845 8606 8545 0 0 0 0 0 0 99552 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0D.1 DEMAND MET 9235 9475 9480 9746 8526 8685 0 0 0 0 0 0 97462 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0F. REGISTERED MAXIMUM 9738 9880 9955 9845 8606 8685 0 0 0 0 0 0 9955G. COMPUTED MAXIMUM DEMAND 9738 9891 9961 9845 8606 8887 0 0 0 0 0 0 9961H. UNRESTRICTED MAXIMUM DEMAND 9738 9891 9955 9845 8606 8887 0 0 0 0 0 0 9955I.1. Div. Head Quarters 23:52 23:54 23:48 23:48 23:51 23:47 0:00 0:00 0:00 0:00 0:00 0:00 23:502. District Head Quarters 23:54 23:55 23:48 23:48 23:47 23:44 0:00 0:00 0:00 0:00 0:00 0:00 23:493. Tahsil Head Quarters 23:50 23:53 23:43 23:44 23:48 23:42 0:00 0:00 0:00 0:00 0:00 0:00 23:474. Rural -Mixed 23:36 23:46 23:34 23:29 23:40 23:35 0:00 0:00 0:00 0:00 0:00 0:00 23:375. Rural -DLF 23:40 23:48 23:35 23:34 23:40 23:34 0:00 0:00 0:00 0:00 0:00 0:00 23:386. Rural -Irrigation 9:54 9:57 9:53 9:53 9:53 9:51 0:00 0:00 0:00 0:00 0:00 0:00 9:54J LOAD FACTOR % 100.29 111.80 107.44 92.07 100.54 65.85 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 96.33
S.N PARTICULARS Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Yr 19-20A. INTGRATED FREQUENCY
1 MAXIMUM 50.21 50.16 50.23 50.16 50.26 50.14 0.00 0.00 0.00 0.00 0.00 0.00 50.262 MINIMUM 49.81 49.81 49.80 49.83 49.81 49.80 0.00 0.00 0.00 0.00 0.00 0.00 49.80
B. INSTANTANEOUS FREQUENCY1 MAXIMUM 50.29 50.33 50.31 50.32 50.32 50.27 0.00 0.00 0.00 0.00 0.00 0.00 50.332 MINIMUM 49.65 49.65 49.63 49.64 49.55 49.62 0.00 0.00 0.00 0.00 0.00 0.00 49.55
C. AVG FREQUENCY 50.00 50.00 50.00 50.01 50.00 50.01 0.00 0.00 0.00 0.00 0.00 0.00 50.00D. % TIME WHEN FREQUENCY WAS
1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.002 50.05 TO 51.5 Hz 20.14 19.14 19.79 24.64 20.03 20.18 0.00 0.00 0.00 0.00 0.00 0.00 20.663 49.9 TO 50.05 Hz 72.76 72.60 70.34 68.27 72.69 75.25 0.00 0.00 0.00 0.00 0.00 0.00 71.974 49.7 TO 49.9 Hz 7.10 8.26 9.87 7.09 7.28 4.57 0.00 0.00 0.00 0.00 0.00 0.00 7.365 49.5 TO 49.7 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.006 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.007 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.008 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.009 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Year : 2019 - 20
MORNING PEAK (MAX)
EVENING PEAK (MAX)
Average Power Supply per day to
FREQUENCY ANALYSIS YEAR 2019-20
ENERGY BALANCE SHEET : Demand & Sypply Hours
29
Agenda of 72nd OCCM of MP 45
THER.Incl Aux
THER. Excl Aux
HYD. ISP OSP
Total IPPs
Injection
Total CPPs
Injection
Total CSSNet
NR to MP
Sugen
Lanco SasanEssa
rJP
Nigri
RUMS (SOLA
R) REWA
TO MPPM
CL
MB Power
Jhabua
PowerSSP
SCH to
Railway
SEZ Banking Sale Pur STOA
Rihand+Matatila-Rajgh
at
MTOA / STOA FROM
RAJASTHAN
Total SCH UN SCH
TOTALDEMAND
MET Check
1:00 50.02 1749 1593 328 671 281 307 755 3934 2231 54 5 178 1075 6 182 0 216 57 521 229 0 -1089 -188 1 -194 1 58 3344 7278 3291 -53 -6 7218 0 0 0 7219 7219 7218 0
2:00 50.02 1747 1591 323 661 275 309 770 3930 2213 66 2 180 1070 6 178 0 195 54 519 220 0 -1089 -159 0 -198 1 58 3316 7246 3228 -88 -6 7151 0 0 0 7153 7153 7151 0
3:00 50.02 1742 1586 311 649 275 308 767 3895 2143 48 0 161 1062 5 185 0 152 47 516 212 0 -1089 -73 0 -213 1 58 3215 7110 3223 8 -6 7112 0 0 0 7114 7114 7112 0
4:00 50.02 1748 1592 312 657 276 305 760 3901 2131 55 0 161 1052 5 188 0 142 47 514 217 0 -1032 -60 0 -213 1 58 3268 7169 3161 -107 -6 7057 0 0 0 7058 7058 7057 0
5:00 50.00 1760 1603 322 653 277 304 755 3913 2006 45 0 154 1030 5 189 0 168 35 515 218 0 -842 -77 0 -214 1 58 3291 7203 3163 -128 -6 7069 0 0 0 7072 7072 7069 0
6:00 50.00 1766 1609 323 652 283 306 720 3892 2030 43 0 165 1042 4 185 8 173 35 515 229 0 -547 -217 0 -204 1 58 3521 7413 3482 -39 -6 7369 0 0 0 7372 7372 7369 0
7:00 49.98 1799 1639 353 680 287 311 738 4008 2239 59 0 187 1077 5 184 24 222 58 515 221 0 -547 -278 0 -209 1 58 3817 7825 3709 -107 -6 7711 0 0 0 7719 7719 7711 0
8:00 50.05 1769 1611 357 667 292 306 811 4045 2113 86 0 169 1069 3 183 101 194 47 516 213 0 -547 -208 0 -240 1 58 3759 7804 3538 -220 -6 7577 0 0 0 7578 7578 7577 0
9:00 50.03 1716 1563 335 653 291 302 920 4064 1930 79 0 157 1055 1 183 202 141 38 519 220 0 -532 -155 0 -271 1 58 3628 7692 3505 -123 -6 7563 0 0 0 7564 7564 7563 0
10:00 50.04 1671 1522 343 652 293 304 1005 4118 1931 75 0 160 1000 0 183 278 132 18 519 220 0 -531 -374 0 -302 1 58 3368 7486 3229 -139 -5 7342 0 0 0 7343 7343 7341 0
11:00 50.04 1657 1509 326 660 291 305 1037 4128 1819 69 0 152 953 0 183 340 137 11 520 226 0 -531 -425 0 -312 1 58 3200 7328 2965 -235 -5 7089 0 0 0 7089 7089 7089 0
12:00 50.01 1614 1469 315 658 288 302 1071 4102 1715 49 0 150 920 0 183 384 101 11 516 218 0 -530 -512 0 -318 1 58 2946 7049 2765 -181 -5 6863 0 0 0 6866 6866 6863 0
13:00 50.03 1589 1447 323 652 287 297 1059 4066 1605 25 0 143 924 0 184 376 99 8 517 213 0 -592 -431 0 -322 1 58 2809 6874 2715 -93 -5 6777 0 0 0 6778 6778 6777 0
14:00 50.01 1603 1459 317 661 286 300 1039 4062 1620 25 0 151 940 0 184 321 93 12 517 218 0 -593 -377 0 -321 1 58 2850 6912 2602 -248 -4 6660 0 0 0 6663 6663 6660 0
15:00 50.01 1644 1497 305 663 287 301 972 4026 1735 22 0 158 947 1 185 258 126 13 518 219 0 -595 -654 0 -306 1 58 2685 6711 2662 -22 -5 6684 0 0 0 6686 6686 6684 0
16:00 50.00 1685 1535 291 667 286 300 864 3942 1817 21 0 167 977 1 185 161 134 21 521 229 0 -595 -549 0 -285 1 58 2862 6805 2766 -96 -5 6703 0 0 0 6707 6707 6703 0
17:00 49.98 1696 1544 299 667 288 300 726 3825 1912 21 0 157 1005 0 185 63 157 30 523 219 0 -611 -386 0 -280 1 58 3054 6879 3034 -20 -5 6855 0 0 0 6861 6861 6855 0
18:00 49.99 1729 1575 324 678 287 304 605 3773 2010 23 0 162 1025 0 191 15 162 32 521 213 0 -538 -239 0 -266 1 58 3369 7142 3257 -112 -6 7024 0 0 0 7031 7031 7024 0
19:00 49.97 1891 1724 365 707 287 347 544 3974 2222 96 5 199 1067 12 201 0 270 62 518 220 0 -550 -490 0 -160 1 58 3731 7704 3566 -165 -7 7533 0 0 0 7543 7543 7533 0
20:00 50.00 1942 1771 461 762 302 372 549 4218 2341 53 24 204 1091 15 207 0 319 85 528 221 0 -1027 -373 0 -114 1 58 3631 7849 3587 -44 -7 7798 0 0 0 7804 7804 7798 0
21:00 49.98 1944 1773 410 738 299 359 569 4148 2285 57 12 202 1096 15 209 0 304 82 536 230 0 -1011 -406 0 -114 1 58 3555 7703 3419 -136 -7 7560 0 0 0 7568 7568 7560 0
22:00 50.04 1909 1740 384 724 297 346 594 4085 2275 59 7 200 1110 15 209 0 278 75 542 219 0 -1064 -440 0 -118 1 58 3428 7513 3328 -99 -7 7406 0 0 0 7408 7408 7406 0
23:00 50.02 1893 1726 377 723 300 330 639 4096 2265 85 7 197 1113 14 208 0 283 78 546 212 0 -1059 -378 0 -100 1 58 3532 7628 3391 -142 -7 7479 0 0 0 7481 7481 7479 0
24:00 50.03 1794 1635 354 717 295 317 683 4000 2215 78 5 188 1098 8 196 0 262 74 551 221 0 -869 -307 0 -193 1 58 3586 7586 3323 -263 -7 7316 0 0 0 7318 7318 7316 0
Avg. 50.01 1752 1596 340 678 288 314 790 4006 2033 54 3 171 1033 5 190 105 186 43 523 220 0 -750 -323 0 -228 1 58 3324 7330 3205 -119 -6 7205 0 0 0 7208 7208 a a
00 TO 06 HRS.
50.01 1752 1596 320 657 278 306 754 3911 2126 52 1 167 1055 5 184 1 174 46 517 221 0 -948 -129 0 -206 1 58 3326 7237 3258 -68 -6 7163 0 0 0 7165 7165
06 TO 12 HRS.
50.02 1704 1552 338 662 290 305 930 4078 1958 69 0 163 1012 2 183 222 154 30 518 220 0 -537 -325 0 -275 1 58 3453 7531 3285 -168 -5 7357 0 0 0 7360 7360
12 TO 18 HRS.
50.00 1658 1510 310 665 287 300 878 3949 1783 23 0 156 970 0 186 199 129 19 520 218 0 -587 -439 0 -297 1 58 2938 6887 2840 -99 -5 6784 0 0 0 6788 6788
06TO 18 HRS.
50.01 1681 1531 324 663 289 303 904 4013 1870 46 0 159 991 1 185 210 141 25 519 219 0 -562 -382 0 -286 1 58 3196 7209 3062 -133 -5 7071 0 0 0 7074 7074
18 TO 24 HRS.
50.01 1896 1728 392 729 297 345 597 4087 2267 71 10 198 1096 13 205 0 286 76 537 221 0 -930 -399 0 -133 1 58 3577 7664 3436 -141 -7 7515 0 0 0 7520 7520
DEMAND MET
Load Shedding
REST. DEMAN
D
UNREST. DEMAND
Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- August 2019
FIGURES IN MW
Hrs. FREQ.
Own Generation Schedule from
TotAvl.
Act.Drl
Devia -tion
Export to MS
Agenda of 72nd OCCM of MP 46
THER.Incl Aux
THER. Excl Aux
HYD. ISP OSP
Total IPPs
Injection
Total CPPs Injectio
n
Total CSSNet
NR to MP
Sugen
Lanco Sasan Essar
JP Nigri
RUMS (SOLA
R) REWA
TO MPPM
CL
MB Power
Jhabua
PowerSSP
SCH to
Railway
SEZ Banking Sale Pur STOA
Rihand+Matatila-Rajgh
at
MTOA / STOA FROM RAJASTHAN
Total SCH UN SCH
TOTAL
1:00 50.01 1546 1418 592 967 301 320 452 4049 1863 20 0 93 1308 4 358 0 102 0 786 216 0 -1336 -106 0 -240 0 58 3126 7175 3002 -124 -7 7044 0 0 0 7045 7045
2:00 50.02 1526 1399 588 964 296 317 466 4029 1805 19 0 79 1307 4 358 0 55 0 786 217 0 -1345 -68 0 -240 0 58 3037 7067 2944 -93 -7 6967 0 0 0 6968 6968
3:00 50.03 1479 1355 586 957 296 317 456 3968 1751 19 0 75 1306 3 358 0 49 0 804 216 0 -1345 -55 0 -254 0 58 2987 6955 2953 -34 -7 6914 0 0 0 6915 6915
4:00 50.04 1473 1349 588 965 296 317 447 3962 1719 19 0 75 1310 2 358 0 52 0 811 216 0 -1316 -44 0 -259 0 58 3001 6964 2934 -67 -7 6890 0 0 0 6890 6890
5:00 50.00 1476 1352 589 964 298 316 419 3939 1539 20 0 75 1283 2 359 0 43 0 794 215 0 -1000 -37 0 -264 0 58 3087 7026 2989 -98 -6 6922 0 0 0 6926 6926
6:00 50.01 1459 1337 590 965 298 318 389 3896 1497 22 0 80 1311 1 354 4 33 0 764 216 0 -547 -101 0 -264 0 58 3429 7325 3323 -106 -7 7212 0 0 0 7216 7216
7:00 50.02 1498 1373 624 959 298 318 383 3954 1821 24 0 83 1323 1 354 16 60 0 763 215 0 -547 -130 0 -268 0 58 3773 7727 3680 -93 -7 7626 0 0 0 7628 7628
8:00 50.05 1447 1326 620 953 298 313 478 3988 1688 18 0 83 1311 1 353 100 36 0 784 214 0 -547 -120 0 -289 0 58 3691 7679 3459 -233 -7 7439 0 0 0 7439 7439
9:00 50.02 1387 1271 611 965 295 312 570 4026 1425 21 0 80 1296 1 353 207 3 0 778 215 0 -544 -147 0 -308 0 58 3438 7464 3348 -90 -6 7368 0 0 0 7369 7369
10:00 50.04 1362 1248 608 959 297 312 680 4103 1388 19 0 80 1279 0 354 297 0 0 718 215 0 -544 -323 0 -332 0 58 3211 7315 3036 -176 -6 7133 0 0 0 7134 7134
11:00 50.03 1324 1214 595 965 297 312 732 4114 1235 18 0 80 1222 0 354 363 0 0 721 217 0 -543 -463 0 -343 0 58 2921 7036 2727 -195 -5 6836 0 0 0 6836 6836
12:00 50.03 1302 1193 590 965 297 312 776 4133 1120 18 0 80 1120 0 354 378 0 0 723 218 0 -543 -556 0 -348 0 58 2624 6757 2517 -107 -5 6645 0 0 0 6645 6645
13:00 50.02 1267 1161 582 966 292 312 793 4106 1021 18 0 80 1066 0 354 357 0 0 740 217 0 -604 -445 0 -348 0 58 2515 6621 2427 -88 -5 6528 0 0 0 6530 6530
14:00 50.02 1246 1142 566 968 302 312 746 4036 1041 18 0 80 1066 0 354 311 0 0 730 217 0 -603 -406 0 -345 0 58 2522 6558 2400 -122 -5 6431 0 0 0 6433 6433
15:00 50.00 1264 1158 565 961 308 313 688 3992 1202 19 0 80 1094 0 354 218 0 0 720 217 0 -602 -524 0 -335 0 58 2502 6494 2442 -60 -5 6429 0 0 0 6432 6432
16:00 50.02 1306 1197 565 964 317 313 569 3925 1377 19 0 83 1195 0 354 128 5 0 721 217 0 -602 -583 0 -320 0 58 2653 6578 2542 -111 -5 6462 0 0 0 6464 6464
17:00 49.99 1363 1249 585 967 316 313 438 3869 1476 19 0 92 1244 0 355 35 14 0 721 216 0 -613 -436 0 -308 0 58 2874 6743 2802 -72 -6 6665 0 0 0 6669 6669
18:00 49.98 1453 1332 593 972 310 314 351 3871 1744 20 0 102 1279 1 360 3 28 12 722 216 0 -547 -454 0 -284 0 58 3260 7131 3187 -73 -7 7051 0 0 0 7058 7058
19:00 49.94 1607 1473 614 969 313 342 342 4053 2072 46 0 132 1305 22 371 0 182 34 721 215 0 -547 -619 0 -89 0 58 3903 7956 3798 -104 -8 7844 0 0 0 7859 7859
20:00 50.05 1615 1481 626 961 306 337 385 4096 2077 36 5 136 1306 23 375 0 241 26 753 214 0 -1008 -412 0 -37 0 58 3793 7888 3557 -236 -8 7644 0 0 0 7644 7644
21:00 50.01 1588 1456 615 972 306 328 388 4065 1963 25 0 127 1311 21 376 0 177 17 762 214 0 -992 -417 0 -86 0 58 3556 7621 3374 -182 -8 7431 0 0 0 7434 7434
22:00 50.05 1576 1445 609 954 306 318 396 4027 1970 25 0 126 1316 9 375 0 127 12 719 214 0 -1037 -405 0 -182 0 58 3328 7356 3270 -59 -8 7289 0 0 0 7289 7289
23:00 50.04 1564 1434 602 967 303 319 431 4056 1949 34 2 122 1327 8 373 0 129 12 720 215 0 -1039 -310 0 -203 0 58 3399 7456 3249 -151 -7 7298 0 0 0 7298 7298
24:00 50.04 1510 1385 595 966 301 317 435 3999 1889 29 0 89 1323 4 370 0 72 3 739 214 0 -907 -281 0 -258 0 58 3345 7344 3132 -213 -7 7124 0 0 0 7124 7124
Avg. 50.02 1443 1323 596 964 302 318 509 4011 1610 23 0 92 1259 4 360 101 59 5 750 216 0 -802 -310 0 -258 0 58 3166 7176 3046 -120 -7 7050 0 0 0 7052 7052
00 TO 06 HRS.
50.02 1493 1368 589 964 297 318 438 3974 1696 20 0 80 1304 3 357 1 56 0 791 216 0 -1148 -69 0 -253 0 58 3111 7085 3024 -87 -7 6992 0 0 0 6993 6993
06 TO 12 HRS.
50.03 1387 1271 608 961 297 313 603 4053 1446 20 0 81 1259 1 354 227 16 0 748 216 0 -545 -290 0 -315 0 58 3276 7330 3128 -149 -6 7174 0 0 0 7175 7175
12 TO 18 HRS.
50.01 1316 1206 576 966 307 313 597 3966 1310 19 0 86 1157 0 355 175 8 2 726 217 0 -595 -475 0 -323 0 58 2721 6687 2634 -88 -5 6594 0 0 0 6598 6598
06TO 18 HRS.
50.02 1352 1239 592 964 302 313 600 4010 1378 19 0 84 1208 0 355 201 12 1 737 216 0 -570 -382 0 -319 0 58 2999 7008 2881 -118 -6 6884 0 0 0 6886 6886
18 TO 24 HRS.
50.02 1577 1446 610 965 306 327 396 4049 1987 33 1 122 1315 14 373 0 155 18 736 214 0 -922 -407 0 -142 0 58 3554 7603 3397 -157 -8 7438 0 0 0 7442 7442
DEMAND MET
Load Shedding
REST. DEMAN
D
UNREST. DEMAND
Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- September 2019
FIGURES IN MW
Hrs. FREQ.
Own Generation Schedule from
TotAvl.
Act.Drl
Devia -tion
Export to MS
Agenda of 72nd OCCM of MP 47
SCH Demand Met
O/U DRL
SCH LS
Unsch LS
Restricted
Demand
Unrestricted
DemandSCH Demand
MetO/U DRL
SCH LS
Unsch LS
Restricted
Demand
Unrestricted
DemandSCH Demand
MetO/U DRL
SCH LS
Unsch LS
Restricted
Demand
Unrestricted
DemandTotal Sch Total
Drawal
1:00 50.02 2551 2474 -77 0 0 2475 2475 2715 2637 -78 0 0 2637 2637 1842 1870 29 0 0 1871 1871 229 237
2:00 50.02 2514 2440 -74 0 0 2440 2440 2672 2607 -64 0 0 2608 2608 1831 1864 33 0 0 1865 1865 220 240
3:00 50.02 2494 2439 -55 0 0 2440 2440 2610 2568 -42 0 0 2568 2568 1822 1874 52 0 0 1875 1875 212 231
4:00 50.02 2470 2427 -43 0 0 2428 2428 2576 2533 -43 0 0 2533 2533 1855 1870 15 0 0 1870 1870 217 227
5:00 50.00 2507 2414 -93 0 0 2415 2415 2597 2520 -77 0 0 2521 2521 1897 1910 14 0 0 1911 1911 218 225
6:00 50.00 2459 2360 -98 0 0 2361 2361 2657 2642 -16 0 0 2643 2643 2086 2129 43 0 0 2130 2130 229 238
7:00 49.98 2443 2365 -78 0 0 2367 2367 2841 2773 -68 0 0 2776 2776 2328 2328 0 0 0 2330 2330 221 246
8:00 50.05 2434 2273 -161 0 0 2273 2273 2858 2699 -159 0 0 2699 2699 2322 2361 39 0 0 2361 2361 213 244
9:00 50.03 2396 2310 -86 0 0 2310 2310 2813 2714 -99 0 0 2714 2714 2319 2302 -16 0 0 2303 2303 220 237
10:00 50.04 2345 2254 -92 0 0 2254 2254 2753 2662 -91 0 0 2663 2663 2187 2190 3 0 0 2190 2190 220 236
11:00 50.04 2307 2207 -100 0 0 2207 2207 2692 2570 -122 0 0 2570 2570 2140 2081 -59 0 0 2081 2081 226 231
12:00 50.01 2303 2154 -149 0 0 2155 2155 2600 2489 -111 0 0 2490 2490 2010 1989 -21 0 0 1990 1990 218 230
13:00 50.03 2231 2149 -82 0 0 2150 2150 2512 2445 -66 0 0 2446 2446 1948 1967 19 0 0 1967 1967 213 215
14:00 50.01 2181 2072 -109 0 0 2073 2073 2505 2411 -94 0 0 2412 2412 1967 1952 -15 0 0 1953 1953 218 226
15:00 50.01 2121 2077 -44 0 0 2078 2078 2445 2398 -47 0 0 2399 2399 1957 1979 22 0 0 1980 1980 219 230
16:00 50.00 2156 2085 -71 0 0 2087 2087 2472 2404 -69 0 0 2405 2405 1973 1986 12 0 0 1987 1987 229 229
17:00 49.98 2131 2098 -33 0 0 2100 2100 2485 2468 -17 0 0 2470 2470 2025 2054 30 0 0 2056 2056 219 234
18:00 49.99 2191 2119 -72 0 0 2121 2121 2595 2505 -90 0 0 2508 2508 2153 2160 8 0 0 2162 2162 213 240
19:00 49.97 2537 2471 -65 0 0 2475 2475 2619 2558 -61 0 0 2561 2561 2326 2269 -57 0 0 2272 2272 220 235
20:00 50.00 2732 2627 -104 0 0 2629 2629 2737 2702 -35 0 0 2704 2704 2211 2214 4 0 0 2216 2216 221 254
21:00 49.98 2727 2605 -122 0 0 2608 2608 2705 2626 -79 0 0 2629 2629 2084 2096 12 0 0 2098 2098 230 233
22:00 50.04 2680 2536 -145 0 0 2536 2536 2677 2618 -59 0 0 2618 2618 1972 2022 50 0 0 2022 2022 219 231
23:00 50.02 2662 2537 -125 0 0 2538 2538 2817 2747 -70 0 0 2748 2748 1957 1971 14 0 0 1972 1972 212 224
24:00 50.03 2648 2500 -149 0 0 2500 2500 2799 2665 -134 0 0 2665 2665 1914 1891 -23 0 0 1891 1891 221 261
Avg. 50.01 2426 2333 -93 0 0 2334 2334 2656 2582 -75 0 0 2583 2583 2047 2055 9 0 0 2056 2056 220 235
00 TO 06 HRS.
50.01 2499 2426 -73 0 0 2426 2426 2638 2584 -53 0 0 2585 2585 1889 1920 31 0 0 1920 1920 221 233
06 TO 12 HRS.
50.02 2371 2260 -111 0 0 2261 2261 2759 2651 -108 0 0 2652 2652 2218 2209 -9 0 0 2209 2209 220 237
12 TO 18 HRS.
50.00 2168 2100 -68 0 0 2101 2101 2502 2438 -64 0 0 2440 2440 2004 2016 13 0 0 2018 2018 218 229
06TO 18 HRS.
50.01 2270 2180 -90 0 0 2181 2181 2631 2545 -86 0 0 2546 2546 2111 2112 2 0 0 2113 2113 219 233
18 TO 24 HRS.
50.01 2664 2546 -118 0 0 2548 2548 2726 2652 -73 0 0 2654 2654 2077 2077 0 0 0 2079 2079 221 240
Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- August 2019
FIGURES IN MW
Hrs. FREQ.
EZONE CZONE WZONE Railway
Agenda of 72nd OCCM of MP 48
SCH Demand Met
O/U DRL
SCH LS
Unsch LS
Restricted
Demand
Unrestricted
DemandSCH Demand
MetO/U DRL
SCH LS
Unsch LS
Restricted
Demand
Unrestricted
DemandSCH Demand
MetO/U DRL
SCH LS
Unsch LS
Restricted
Demand
Unrestricted
DemandTotal Sch Total
Drawal
1:00 50.01 2405 2337 -69 0 0 2337 2337 2658 2534 -125 0 0 2534 2534 1941 1947 6 0 0 1947 1947 216 227
2:00 50.02 2356 2306 -51 0 0 2306 2306 2586 2499 -86 0 0 2500 2500 1933 1942 8 0 0 1942 1942 217 220
3:00 50.03 2330 2289 -41 0 0 2290 2290 2554 2465 -89 0 0 2465 2465 1916 1942 27 0 0 1943 1943 216 218
4:00 50.04 2319 2282 -37 0 0 2282 2282 2532 2439 -92 0 0 2439 2439 1933 1956 23 0 0 1956 1956 216 212
5:00 50.00 2296 2263 -33 0 0 2264 2264 2525 2440 -85 0 0 2442 2442 1948 2001 52 0 0 2002 2002 215 218
6:00 50.01 2292 2220 -72 0 0 2221 2221 2573 2562 -11 0 0 2563 2563 2170 2216 45 0 0 2217 2217 216 214
7:00 50.02 2285 2237 -47 0 0 2238 2238 2766 2713 -53 0 0 2714 2714 2423 2447 24 0 0 2447 2447 215 229
8:00 50.05 2225 2127 -97 0 0 2127 2127 2754 2635 -119 0 0 2635 2635 2433 2451 18 0 0 2451 2451 214 226
9:00 50.02 2182 2130 -51 0 0 2131 2131 2678 2615 -63 0 0 2615 2615 2353 2389 36 0 0 2390 2390 215 233
10:00 50.04 2165 2069 -96 0 0 2070 2070 2654 2562 -93 0 0 2562 2562 2257 2282 25 0 0 2282 2282 215 220
11:00 50.03 2104 2009 -94 0 0 2010 2010 2560 2447 -114 0 0 2447 2447 2108 2161 53 0 0 2161 2161 217 218
12:00 50.03 2046 1979 -68 0 0 1979 1979 2450 2363 -87 0 0 2363 2363 1994 2089 95 0 0 2089 2089 218 215
13:00 50.02 2020 1960 -60 0 0 1960 1960 2377 2319 -58 0 0 2320 2320 1935 2042 108 0 0 2043 2043 217 207
14:00 50.02 1988 1893 -95 0 0 1894 1894 2388 2288 -100 0 0 2289 2289 1983 2037 53 0 0 2037 2037 217 213
15:00 50.00 1923 1881 -42 0 0 1882 1882 2314 2270 -44 0 0 2271 2271 2001 2049 48 0 0 2050 2050 217 229
16:00 50.02 1945 1891 -55 0 0 1891 1891 2321 2280 -41 0 0 2281 2281 2025 2077 52 0 0 2077 2077 217 214
17:00 49.99 1966 1917 -50 0 0 1918 1918 2385 2356 -29 0 0 2357 2357 2125 2165 41 0 0 2167 2167 216 227
18:00 49.98 2046 2046 0 0 0 2048 2048 2506 2476 -31 0 0 2478 2478 2270 2303 33 0 0 2306 2306 216 226
19:00 49.94 2436 2466 30 0 0 2471 2471 2759 2694 -65 0 0 2699 2699 2527 2470 -57 0 0 2474 2474 215 214
20:00 50.05 2571 2457 -113 0 0 2457 2457 2847 2666 -181 0 0 2666 2666 2279 2295 16 0 0 2295 2295 214 226
21:00 50.01 2569 2459 -110 0 0 2460 2460 2719 2584 -135 0 0 2585 2585 2126 2184 58 0 0 2184 2184 214 204
22:00 50.05 2511 2403 -107 0 0 2403 2403 2611 2560 -51 0 0 2560 2560 2022 2116 94 0 0 2116 2116 214 211
23:00 50.04 2489 2404 -84 0 0 2405 2405 2768 2631 -138 0 0 2631 2631 2023 2059 36 0 0 2059 2059 215 203
24:00 50.04 2454 2362 -92 0 0 2362 2362 2712 2527 -184 0 0 2528 2528 1951 1981 30 0 0 1981 1981 214 253
Avg. 50.02 2247 2183 -64 0 0 2184 2184 2583 2497 -86 0 0 2498 2498 2111 2150 39 0 0 2151 2151 216 220
00 TO 06 HRS.
50.02 2333 2283 -50 0 0 2283 2283 2571 2490 -82 0 0 2491 2491 1974 2001 27 0 0 2001 2001 216 218
06 TO 12 HRS.
50.03 2168 2092 -76 0 0 2092 2092 2644 2556 -88 0 0 2556 2556 2261 2303 42 0 0 2303 2303 216 224
12 TO 18 HRS.
50.01 1981 1931 -50 0 0 1932 1932 2382 2332 -50 0 0 2333 2333 2056 2112 56 0 0 2113 2113 217 219
06TO 18 HRS.
50.02 2075 2012 -63 0 0 2012 2012 2513 2444 -69 0 0 2444 2444 2159 2208 49 0 0 2208 2208 216 221
18 TO 24 HRS.
50.02 2505 2425 -80 0 0 2426 2426 2736 2610 -126 0 0 2612 2612 2154 2184 30 0 0 2185 2185 214 219
Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- September 2019
FIGURES IN MW
Hrs. FREQ.
EZONE CZONE WZONE Railway
Agenda of 72nd OCCM of MP 49
ANNEXURE-5 System Disturbance / System Incidence
1. System Disturbance on 04.09.2019 at 400kv s/s Bhopal: On dated 04.09.19 at 16.00 hrs.
there was heavy rains and lightening in central MP and frequency of National Grid was 50.08 Hz, at 16.06 hrs, 220 Kv Bhopal-Bairagarh 1 tripped and auto reclosed but did not trip from Bhopal end causing LBB protection to operate which tripped following feeders and X-mers of 220kv Main Bus-1:- 220kv Bhopal-Bhopal-I 220kv Bhopal-Shujalpur-I 220kv Bhopal-Mungalia Chhap ckt 220kv Bhopal-Ganj Basoda ckt 220kv Bhopal-Bairagarh 1 220kv Bus-tie 400/220kv 315 MVA Xmer 1 and 3 There was very heavy rains and lightening at the time of tripping. R Phase string at location No. 8 and R phase wavetrap at 400 Kv s/s for 220 Kv Bairagarh 1 found failed.The tripped elements has been normalized in due course of time. No any system and areas affected as load managed by elements on 220kv Main Bus-2 and nearby network. There was no load loss and no generation loss.
2. System Disturbance on 07.09.2019 at 220kv s/s Sukha, Jabalpur: On dated 07.09.19 at 16.00 hrs. weather in East MP was normal and frequency of National Grid was 50.08 Hz, at 16.15 hrs, LBB protection of 220 Main bus 2 operated which was initiated from ICT-2 ,which tripped following feeders and X-mers of 220kv Main Bus-2:- 220kv Sukha-Jabalpur-2 220kv Sukha -Narsinghpur-2 220kv Sukha -Panagar-2 220kv Bus-tie 400/220kv 315 MVA Xmer 2 It was reported that LBB protection of 220 Main bus 2 operated due to false signal from ICT 2 cable fault. Bus 2 Successfully separated The tripped elements has been normalized in due course of time. No any system and areas affected as load managed by elements on 220kv Main Bus-1 and nearby network. There was no load loss and no generation loss.
Agenda of 72nd OCCM of MP 50
3. System Disturbance on 21.09.2019 at 400kv s/s Ashta: On dated 21.09.19 at 14.50 hrs. weather in MP was normal and frequency of National Grid was 49.96 Hz, at 14.58 hrs 220 KV Main Bus 1 R Phase PT failed with operation of 220 KV Bus Bar Protection . This caused both 220 KV Bus dead ,which tripped following feeders and X-mers of 220kv Main Bus-2:-
220 KV Ashta-Bhopal, 220 KV Ashta-Mughaliyachhap 220 KV Ashta-Jetpura Ckt No.1 & 2 220 KV Ashta-Shajapur Ckt No. 1 & 2
220 KV Ashta-Dewas Ckt No. 1 & 2 160 MVA Xmer No. 1 & 2 100 MVA 220/33 KV Xmer 220KV BUS Tie
220 KV Incoming of 315 MVA Xmer 1 & 2
It was reported that R Phase pole of 220 KV Incoming of 315 MVA Xmer 2 was found stuck and it’s both tripping coils were found burnt. Then 315MVA Xmer 2 (CGL) H/T at 15:22Hrs. After isolating defective PT, Restoration of supply was done. After replacement of both trip coils 315 MVA Xmer 2 Charged at 17:05hrs There was a load loss of 13 MW and no generation loss.
*********
Agenda of 72nd OCCM of MP 51
O/C trip E/F trip O/C+E/F
trip 1 2 3 4 5
33KV JABALPUR NO 4 3 0 20 2333KV JABALPUR NO 5 5 0 11 1633KV JABALPUR NO 6 1 1 10 1233KV JABALPUR NO 7 0 1 11 1233KV NTPC NO.1. 1 0 15 1633KV NTPC NO.2 3 0 23 2633KV RAMNAGARA NO 2 0 0 25 25
2 PANAGAR 220 33KV INDUSTRIAL SIHORA 8 0 23 313 PATAN 132 33KV KATRA-BELK 0 6 9 15
33KV RICHHAI 2 5 6 1333KV ADHARTAL 6 2 2 1033KV SAE 1 7 2 1033KV GOKALPUR 2 7 2 1133KV BELK-1 3 0 17 2033KV BELK-NO.2 0 2 15 1733KV SHAHPURA 6 0 13 1933KV MARHOTAL 1 0 18 1933KV J P NAGAR 1 0 21 2233KV SEVER PLANT 5 0 21 2633KV GUNDRAI 0 1 15 1633KV PARAMHANSI 8 12 8 2833KV GOTEGAON NO.II NEW 1 16 1 1833KV BAGASPUR 1 6 18 2533KV KYMORI 0 7 3 1033KV BORIYA 0 7 5 1233KV POLA 0 3 8 1133KV KATNI -2 3 1 6 1033KV PURENA 0 0 16 1633KV DEVGAON 1 2 23 26
10 KYMORE 132 33KV BAMANGAON 1 1 17 1933KV KATNI IC 3 2 16 2133KV PAHARAUA 5 5 0 1033KV BILHARI 0 0 15 1533KV BADWARA 0 0 28 2833KV SLEEMNABAD 8 0 19 2733KV KATAIGHAT 9 0 1 1033KV NKJ 5 0 16 2133KV DABAR 1 0 19 2033KV BAHORIBAND I 3 7 14 2433KV BAHORIBAND II 1 1 17 1933KV PANUMARIA-1 2 6 21 2933KV PANUMARIA-2 3 0 23 2633KV SLEEMNABAD 5 5 7 1733KV INDUSTRIAL 4 2 35 4133KV SLEEMNABAD 0 0 45 4533KV SIHORA-1 0 0 18 1833KV MAJHOLI-2 0 0 23 2333KV INDUSTRIAL(UROBOND) 0 0 17 1733KV FANWAANI 0 0 31 3133KV DEONAGAR. 5 5 0 1033KV GOTEGAON 4 6 4 1433KV BACHAI 0 13 0 1333KV JOBA 0 13 7 2033KV BASANPANI 0 16 0 1633KV CHHICHLI 0 0 14 14
33KV RUCHI SOYA (TENDUKHEDA) 0 7 6 13
33KV NTPC I (RAIPUR) 7 8 0 1533KV IMALIYA 0 10 0 1033KV UMARIYA 9 4 9 2233KV GOTEGAON 1 3 29 3333KV THEMI 4 0 6 1011KV 5MVA TRANSFORMER NO.I 0 15 0 1511KV TOWN-I 0 10 0 1011KV TOWN-II 0 11 0 1133KV SALICHOUKA 10 5 2 1733KV GADERWARA 0 25 0 2533KV SAIKHEDA 12 8 0 2033KV ATTHAISA 0 11 0 1133KV RUCHY SOYA 0 7 14 2133KV BANSKHEDA 0 15 19 3433KV BLA 0 21 20 4133KV SIHORA 0 11 0 1133KV DOBHI NO.-I 0 11 6 1733KV DOBHI NO.-II 0 19 0 1933KV BEETALI-I 0 10 8 1833KV BEETALI-II 0 7 8 15
EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19
SL.NO
NAME OF TESTING
DIVISIONNAME OF SUB SATAION NAME OF FEEDER
TOTAL FAULT TRIPPINGS TOTAL TRIPPI
NGS
Annexure-6.2
6 MARHOTAL 132
7 SHRINAGAR 132
8 KATANGI 132
JABALPUR REGIONSE(T&C) JABALPUR
1
JABALPUR-I
JABALPUR 220
4 VFJ 132
5 SHAHPURA 132
9
KATNI
KATNI 400
11 KATNI 132
12 SLEEMNABAD 132
13 MANSAKRA 132
BARMAN 132
14
JABALPUR-II
NARSINGPUR 220
15 CHHICHLI 220
16 NARSINGPUR 132
17 GADARWARA 132
18
Agenda of 72nd OCCM of MP 52
O/C trip E/F trip O/C+E/F
trip 1 2 3 4 5
EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19
SL.NO
NAME OF TESTING
DIVISIONNAME OF SUB SATAION NAME OF FEEDER
TOTAL FAULT TRIPPINGS TOTAL TRIPPI
NGS
33KV BARELA-I 0 39 19 5833KV BARELA(2) 0 10 6 1611KV INDUSTRIAL 0 23 1 2411KV MANERI GRAMIN 0 10 0 1033KV BICHHIYA 0 17 0 1733KV POUNDI 1 24 0 2533KV PHOOLSAGER 0 25 0 2533KV KARELI 0 10 4 1433KV KARAPGAON 0 11 0 11
85 1651
33KV CHHAPARA 3 0 22 2533KV GOPALGANJ 5 5 10 2033KV AKVN 0 1 9 1033KV KARIRAT 0 1 23 2433KV KALARBAKI 5 1 4 1033KV BARGHAT 2 1 14 1733KV KEOLARI 4 0 21 2533KV P.H.E. 2 0 13 1533KV KURAI 8 4 11 2311KV TOWN - I 1 1 15 1711KV TOWN - II 0 12 6 1811KV MUNGWANI 1 4 44 4933KV LALBRRA 0 11 0 1133KV KHAIRLANGI 0 10 7 1711KV BHARVELLY 0 11 13 2411KV LINGA 0 19 5 2433KV TIRODI 0 0 20 2033KV MOIL 1 0 10 1133KV WARASEONI 3 0 13 16
5 BHANEGAON 132 33KV KARANJA 0 11 0 1133KV PARASWADA 2 1 19 2233KV MOHAGAON 0 0 19 1933KV UKWA 1 0 13 1433KV KEOLARI 2 4 14 2033KV KEOLARI-II 6 10 19 3533KV BHEEMGARH 20 22 4 4633KV GHANSOUR-I 2 8 8 1833KV GHANSOUR-II 0 15 0 1533KV JHABUA 0 33 0 3333KV DHANORA 1 10 5 16
9 LALBRRA 132 33KV LAMTA 4 0 13 1733KV KHAIRLANGI 0 1 11 1233KV KOCHEWAHI 0 0 10 1033KV DONGARMALI 2 0 10 12
11 KIRNAPUR 400 33KV KIRNAPUR 1 0 13 1433KV ROHNA KALA 5 4 2 1133KV CHAND-I 0 0 12 1233KV CHAND-II 3 3 10 1633KV BANGAON 0 0 11 1133KV LINGA 0 0 10 1033KV JUNEWANI 0 0 10 1033KV NANDANWADI 0 2 8 1033KV SAORI-I 0 0 12 1233KV SAUSAR 1 2 22 2533KV THISGORA 0 0 23 2333KV UMRANALA-II 0 2 26 2833KV CHANDAMETA 0 2 32 3433KV NAVEGAON 5 0 6 1133KV RAMAKONA 0 13 1 1433KV BORGAON 0 0 10 1033KV PIPLA 2 2 9 1333KV SINGODI 0 0 13 1333KV CHHUEE 0 0 11 11
18 BICHHUA 132 33KV KHAMARPANI 0 0 13 1319 SAORI 132 33KV LAWAGHOGRI 0 11 7 18
55 995140 2646
19
JABALPUR-II
MANERI 132
20 MANDLA 132
21 KARAPGAON 132
KATANGI 132
6 BAIHER 132
7 NAINPUR 132
8 LAKHNADON 132
Abstract of TrippingsJABALPUR REGION
SE(T&C) SEONI
1
SEONI
SEONI 220
2 SEONI 132
3 BALAGHAT 132
4
KHAPASWAMI 132
16 BORGAON 132
17 AMARWARA 132
Abstract of Trippings
10 WARASEONI 132
12
CHHINDWARA
CHHINDWARA 220
13 PANDHURNA 220
14 CHHINDWARA 132
15
Abstract of Trippings (Jabalpur Region)
Agenda of 72nd OCCM of MP 53
O/C trip E/F trip O/C+E/F
trip 1 2 3 4 5
EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19
SL.NO
NAME OF TESTING
DIVISIONNAME OF SUB SATAION NAME OF FEEDER
TOTAL FAULT TRIPPINGS TOTAL TRIPPI
NGS
33KV MEDICAL COLLAGE 2 8 0 1033KV MAINPANI 1 9 0 1033KV JAISINAGAR 1 32 0 3333KV NARIOLI 0 1 14 1533KV MOTHI 2 3 21 2633KV SEHORA 1 0 9 1033KV DHARAMSHREE 0 1 9 1033KV KAREELA 3 0 9 1233KV BANDA 0 1 13 1433KV HOUSHING BOARD ( DD NAGAR )
5 0 5 10
33KV CIVIL LINE 0 3 7 1033KV CHANAUWA 0 16 12 2833KV KEOLARI 0 15 13 2833KV BARKOTI 7 17 4 2833KV DEORI 6 28 10 4433KV MAHARAJPUR 2 19 3 2433KV KESLI -I 0 18 0 1833KV KESLI-II 1 19 2 2233KV BANDA 5 1 12 1833KV BHADRANA 8 0 2 1033KV DALPATPUR 3 5 10 1833KV JABERA - I 6 0 4 1033KV BANSA 3 4 7 1433KV PATERA 2 5 7 1433KV PGCIL 5 6 4 1533KV NARSINGARH 4 4 15 2333KV PHUTERA 4 0 14 1833KV IMLAI 7 0 8 1533KV HINOTA 19 0 43 6233KV MARIYADEO 3 0 83 8633KV PHATEPUR 3 0 38 4133KV BANGAON 41 0 9 5033KV BAXWAHA 6 7 47 6033KV MAGRON 5 0 8 1333KV TEJGARH/ HARRAI 1 0 9 1033KV TENDUKHEDA 3 7 12 2233KV JABERA 13 3 7 23
11 RAHATGARH 132 33KV SEHORA 7 5 0 1233KV PATERA 11 0 24 3533KV KUNDALPUR 2 13 5 2033KV CHHIRARI 5 0 6 1133KV PATNA BUJURG 13 8 9 3033KV MOHANGARH 6 2 17 2533KV DIGODA - I 0 2 11 1333KV AHAR 19 0 25 4433KV BADAGAON 26 0 23 4933KV MAWAI 10 3 11 2433KV DHONGA 7 2 11 2033KV NIWARI -2 7 4 15 2633KV NIWARI -1 14 11 16 4133KV MADIYA 5 7 40 5233KV PRATAPPURA 3 1 27 3133KV ZERON 1 5 31 3733KV ORCHHA 9 3 18 3033KV TEHARKA 18 3 4 2533KV HRIDAY NAGAR 3 9 2 1433KV BAMORI 2 21 4 2733KV VEERPURA 11 8 3 2233KV PALERA 16 36 1 5333KV DIGODA 0 12 1 1333KV MOHANGARH 4 8 8 2033KV LIDHORA 3 2 5 1033KV BALDEVGARH 3 8 53 6433KV KHARGAPUR 2 0 9 1133KV GHUWARA 1 11 38 5033KV BUDHERA 11 1 11 2333KV DHARARI 9 2 9 2033KV GARHI MALEHARA 4 8 24 3633KV SATAI 2 8 1 1133KV CHHATARPUR 21 14 2 3733KV BHAGWA 4 11 8 2333KV MATGAWAN 14 8 3 2533KV KISHANGARH 3 9 2 1433KV GULGANJ 3 8 3 1433KV BADAMALAHARA 3 18 8 2933KV BASARI 1 19 22 4233KV PANNA/KHAJURAHO 0 4 11 1533KV BAMITHA 0 2 9 1133KV RAJNAGAR + BASARI 2 4 14 2033KV MES 7 2 2 1133KV HARPALPUR 6 5 11 2233KV LUGASI 6 3 20 2933KV LAUNDI 3 0 41 4433KV DUMRA 9 18 21 4833KV BASANTPURA 5 0 49 5433KV CHANDLA 1 2 33 36
86 2247
33KV KOHA (KHURAI II) 11 0 16 2733KV MANDIBAMORA 3 6 6 1533KV KHIMLASA 9 0 12 2133KV BORL 1 0 16 1733KV KOHA 1 0 12 1333KV BERI DHANORA 1 0 22 2333KV BAHADURPUR 5 3 9 1733KV PIPRAI 2 8 3 1333KV MUNGAOLI 2 0 10 1233KV SEHRAI 0 20 12 32
10 19096 2437
SAGAR REGIONSE(T&C) SAGAR
1
SAGAR
SAGAR 220
2 SAGAR 132
3 GARHAKOTA 132
4
8 HATTA 132
9 BATIYAGARH 132
10 TEJGARH 132
GOURJHAMER 132
5 BANDA 132
6 DAMOH 220
7 DAMOH 132
PRITHIVIPUR 132
17 JATARA 132
18 DIGODA 132
19 BUDERA 132
12 PATERA 132
13 RAHLI 132
14
TIKAMGARH
TIKAMGARH 220
15 TIKAMGARH 132
16
20 CHHATARPUR 220
21 BIJAWAR 132
22
TIKAMGARH
KHAJURAHO 132
23 NOWGAON 132
24 LAVKUSH NAGAR 132
Abstract of TrippingsSAGAR REGION
SE(T&C) 400KV BINA
1
BINA 400
BINA 220
2 KHURAI 132
3 MUNGAWALI 132
Abstract of TrippingsAbstract of Trippings (Sagar Region)
Agenda of 72nd OCCM of MP 54
O/C trip E/F trip O/C+E/F
trip 1 2 3 4 5
EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19
SL.NO
NAME OF TESTING
DIVISIONNAME OF SUB SATAION NAME OF FEEDER
TOTAL FAULT TRIPPINGS TOTAL TRIPPI
NGS
33KV PAWAI 2 15 0 1733KV MOHANDRA 1 27 3 3133KV AMANGANJ 4 31 0 3533KV GUNOR 2 35 0 3733KV RAMNAGAR 31 28 0 5933KV TALA 2 16 0 1833KV SATNA 2 15 0 1733KV NADAN 22 11 0 3333KV KATHAHA 7 13 0 2033KV MUKUNDPUR 14 25 0 3933KV AMARPATAN 8 40 0 4833KV AMDARA 0 26 0 2633KV BADERA 11 27 0 3833KV UNCHEHRA 8 36 0 4433KV JASO 0 11 4 1533KV SINGHPUR 0 11 4 1533KV NAGOD 5 10 0 1533KV RAHIKWARA 6 4 1 1133KV BASUDHA 20 9 4 3333KV TIKURI 3 8 5 1633KV KOTAR 10 18 12 4033KV DAGDIHA LI 7 9 10 2633KV BIRSINGHPUR 6 8 10 2433KV SUKWAH 9 10 16 3533KV BELA 1 2 12 1533KV MADAHWGARH 2 0 24 2633KV GORAIYA 4 7 9 2033KV KRISHNAGARH 0 4 58 6233KV CHIBOURA 5 13 12 3033KV SILPARI 9 1 10 2033KV PAWAI 5 36 0 4133KV AJAYGARH 32 17 0 4933KV DEVENDRA NAGER 2 22 0 2433KV BRIJPUR 7 19 0 2633KV BARAUNDHA 0 2 11 1333KV CHITRAKOOT 3 3 23 2933KV MAJHGAWAN 3 2 10 1533KV KOTHI 0 6 8 1433KV JAITWARA 2 0 32 3433KV UNCHEHARA 18 8 4 3033KV KOLGAWAN 8 5 0 1333KV KS-1 2 14 0 1633KV TIKURIYA TOLA 11 0 10 2133KV ANIKET MATEHNA 1 0 9 1033KV RATAHRA 1 2 10 1333KV SGMH 1 1 23 2533KV TEEKAR 14 0 11 2533KV MANIKWAR 1 1 11 1333KV GURH 1 0 18 1933KV MADWAS 1 55 2 5833KV SEMARIYA 6 7 14 2733KV SIHAWAL( SIDHI) 10 14 2 2633KV JP-I 5 9 8 2233KV JP-II 5 4 4 1333KV SIRMOUR 11 10 0 2133KV PATEHRA 1 15 0 1633KV BANKUIYA ( AKVN) 0 23 0 2333KV SEMARIYA 0 31 0 3133KV MARTAND SCHOOL 0 11 0 1133KV MOHRA 0 20 0 2033KV SIRMOUR 0 10 0 1033KV AIR 0 18 0 1833KV AMIRTI 0 11 0 1133KV CITY II 10 1 0 1133KV REWA 1 19 0 2033KV PATPARA 5 47 0 5233KV SIDHI 0 2 14 1633KV BHIKHAJHIRIA 0 6 54 6033KV NIGAHI 7 0 6 1333KV WAIDHAN 3 0 30 3333KV SASAN POWER 4 20 48 7233KV NAVJEEVAN VIHAR 9 0 28 3733KV NTPC 0 0 11 1133KV JAYANT 2 0 9 1133KV GANGEO 4 18 4 2633KV MAUGANJ 2 11 1 14
REWA REGIONSE(T&C) SATNA
1
SATNA
PAWAI 132
2 AMARPATAN 132
3 MAIHAR 220
7 PANNA 132
8 MAJHGAWAN 132
9 SATNA 220
4 NAGOD 132
5 KOTAR 220
6 RAMPUR BAGHELAN 132
SIRMOUR 220
15 REWA 132
16 SIDHI 132
17 MORWA 132
10 SATNA 132
11 SATNA-II 132
12
REWA
REWA 220
13 SIDHI 220
14
18 WAIDHAN 132
19 MANGAWAN 132
Agenda of 72nd OCCM of MP 55
O/C trip E/F trip O/C+E/F
trip 1 2 3 4 5
EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19
SL.NO
NAME OF TESTING
DIVISIONNAME OF SUB SATAION NAME OF FEEDER
TOTAL FAULT TRIPPINGS TOTAL TRIPPI
NGS
33KV KATRA 1 4 11 1633KV CHAKGHAT 1 10 15 2633KV NAIGARHI 4 5 3 1233KV TEOTHAR 2 9 11 2233KV JAWA 12 2 4 1833KV BANSAGAR 9 8 2 1933KV HANUMANA 0 21 0 2133KV MAUGANJ 0 14 0 1433KV KHATKHARI 0 16 0 1633KV KHUTAR 14 8 19 4133KV RAJMILAN 3 4 13 2033KV PGCIL 6 1 18 2533KV RAIPURE 3 18 0 2133KV SIRMOUR 3 11 0 1433KV MOHRA 4 14 0 1833KV DEOSAR 2 10 0 1233KV BEHRI 7 47 0 5433KV CHITRANGI 8 47 0 55
25 RAMPUR NAIKEN 132 33KV KOTHIYA 0 17 0 1726 DONGRITAL 132 33KV KHANUA KHAS 8 8 8 24
96 2443
33KV MANPUR-I 0 19 0 1933KV CHANDIYA-I 4 17 0 2133KV CHANDIYA-II 2 31 0 3333KV UMARIYA 10 2 0 1233KV BANSAGAR 13 14 0 2733KV JAISINGHNAGAR 1 25 0 2633KV PAPOUNDH 7 13 0 2033KV MADVAS 0 10 0 1033KV SHAHPURA 7 12 0 1933KV GADASARAI 4 9 0 1333KV SAMNAPUR 5 23 0 2833KV DINDORI 8 24 0 3233KV SECL-I 5 29 0 3433KV SECL-II 1 11 0 1233KV ASCENT HYDRO 1 18 0 1933KV JAITHARI 6 33 0 3933KV D-OCM 0 25 0 2533KV KESHWAHI 3 41 0 4433KV NEW DOCM 4 17 0 2133KV JAISINGHNAGAR 12 7 0 1933KV UMARIYA-I 8 10 0 1833KV DCL 0 24 0 2433KVPANDAV NAGAR (SINGHPUR) 5 24 0 2933KV RAJNAGAR 15 0 0 1533KV KOTMA OLD 16 0 0 16
25 575
RAJMILAN 132
23 REWA-II 132
24 DEOSAR 132
Abstract of Trippings (Rewa Region)
20
REWA
KATRA 132
21 MAUGANJ 132
22
5 ANOOPPUR 220
6 SHAHDOL 220
7 KOTMA 132
SHAHDOL REGIONSE(T&C) SATNA
1
SHAHDOL
UMARIYA 132
2 BEOHARI 132
3 DINDORI 132
4 BIRSINGHPUR 220
Abstract of Trippings (Shahdol Region)
Agenda of 72nd OCCM of MP 56
O/C trip E/F trip O/C+E/F
trip 1 2 3 4 5
EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19
SL.NO
NAME OF TESTING
DIVISIONNAME OF SUB SATAION NAME OF FEEDER
TOTAL FAULT TRIPPINGS TOTAL TRIPPI
NGS
33KV SHIVPUR 0 0 30 3033KV DHARAM KUNDI 6 2 14 2233KV SURAJPUR 0 15 1 1633KV BABRI 7 1 2 1033KV HANDIYA 4 8 25 3733KV KANKARIYA 0 2 14 1633KV RAHAT GAON 7 4 15 2633KV TIMARNI 0 8 10 1833KV SONTALAI 4 0 37 4133KV KARTANA 2 3 8 1333KV GWAL NAGAR 5 3 3 1133KV SOHAGPUR 6 4 7 1733KV SANDIYA 0 26 0 2633KV KANWAR 7 2 3 1233KV SHOBHAPUR 1 16 3 2033KV SHANKHANI 0 10 0 1033KV HOSHANGABAD 6 1 3 1033KV DOLARIYA 6 2 2 1033KV SANGAKHEDA 4 1 11 1633KV MILK DAIRY 15 0 3 1833KV TUGARIY 8 0 15 2333KV BUDHNI 11 0 10 2133KV PIPARIYA SOUTH 3 4 7 1433KV PIPARPANI 0 1 13 1433KV AKVN 4 1 20 2533KV CHANDON 5 1 7 1333KV MACHHIRA 4 3 7 1433KV UMARDHA 7 5 13 2533KV MAGARDAH 2 9 19 3033KV REHTA KALA 10 0 3 1333KV MOHAL KALA 1 0 21 2233KV BABAI 7 0 10 1733KV SEMRI HARCHAND 7 2 20 2933KV KAMTHI 5 18 13 3633KV MOHASA 1 5 4 18 2733KV BHATWARI 5 2 32 39
9 KHIRKIYA 132 33KV KILLOD 1 4 9 1433KV BIAORA 0 2 10 1233KV SUTHALIYA 0 7 11 1833KV KACHRI 0 13 24 3733KV DHOODI 0 9 10 1933KV SILAPTI 0 6 8 1433KV BHOORA 0 31 12 4333KV PAGARI BANGLA 0 10 7 1733KV BODA 0 9 1 1033KV KARANWAS 0 10 1 1133KV MANGLAJ 0 8 5 1333KV P.MATA-II 0 9 4 1333KV JETPURA 0 14 3 1733KV CHHAPIHEDA 0 14 3 1733KV MACHALPUR 0 6 19 2533KV LAKHONI 0 11 12 2333KV BHOJPUR 0 11 10 2133KV KHAJLA 0 15 11 2633KV KALYAKHEDI 0 17 4 2133KV PALYAKHEDI 0 11 1 1233KV PIPLODI 0 4 27 3133KV WATER WORKS 0 20 4 2433KV ITARSI -2 0 0 11 1133KV SPM 0 0 17 1733KV JAMANI 0 0 13 1333KV PROPLENT - 1 0 0 10 1033KV NCDC 0 10 0 1033KV GHORADONGRI 1 13 0 1433KV AMLA TOWN 0 2 12 1433KV PARSODI 0 5 5 1033KV PADHAR 2 7 1 1033KV HIWARKHEDI 0 1 9 1033KV HAMLAPUR 0 4 6 10
21 CHICHOLI 132 33KV SHAHPUR 2 0 15 1733KV PRABHAT PATTAN 0 8 3 1133KV INDUSTRIAL 0 17 0 1733KV DUNAWA 1 10 0 11
23 GUDGAON 132 33KV GUDGAON 1 0 14 1533KV 3 EME 0 0 13 1333KV NTRO 1 0 36 3733KV ITKHEDI 0 0 11 1133KV BHAUKHEDI 2 5 3 1033KV THUNA 4 2 4 1033KV DODI 0 0 13 1333KV KHACHROD 3 0 15 1833KV LASUDIA VIJAY SINGH 0 8 5 1333KV JHADLA 3 3 4 1033KV ACHHAROHI 2 3 6 1133KV JAMUNIYA GOP CHOUHAN 2 1 10 1333KV LASUDIYA BHAMA 0 0 11 1133KV KOTARA 0 0 18 1833KV KHAIKHEDA 1 1 9 1133KV AHMADPUR 2 2 10 1433KV KHAJURI KALA 1 0 11 1233KV MUGAWALI 0 0 12 1233KV SEWDA 0 10 0 1033KV JAWAR 0 12 0 1233KV AMLA MAJJU 0 10 0 1033KV AMLAHA 0 18 0 1833KV KAJLAS 0 18 0 18
30 BILKISHGANJ 132 33KV NIBUKHEDA 1 2 9 1297 1696
HOSHANGABAD 220
5 PIPARIYA 220
6 BANKHEDI 132
7 SULTANPUR 132
BHOPAL REGIONSE(T&C) BHOPAL
1
HOSHANGABAD
SEONI MALWA 132
2 HARDA 132
3 PIPARIYA 132
4
ZEERAPUR 132
14 KHILCHIPUR 132
15 KHUJNER 132
16 RAJGARH 220
8 SEMRI HARCHAND 132
10
BIAORA
BIAORA 132
11 PACHORE 132
12 SARANGPUR 132
13
17
ITARSI
ITARSI 220
18 SARNI 220
19 AMLA 132
20 BETUL 132
22
28 SHYAMPUR 132
29 ASHTA 400
Abstract of Trippings
MULTAI 132
24
BHOPAL-I
BAIRAGARH 220
25 SEHORE 132
26 ASHTA 132
27 KURAWAR 132
Agenda of 72nd OCCM of MP 57
O/C trip E/F trip O/C+E/F
trip 1 2 3 4 5
EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19
SL.NO
NAME OF TESTING
DIVISIONNAME OF SUB SATAION NAME OF FEEDER
TOTAL FAULT TRIPPINGS TOTAL TRIPPI
NGS
33KV ANAND NAGAR 0 0 15 1533KV KILANDEV 0 0 16 1633KV DAMKHEDA-II 2 1 14 1733KV NARMADA 0 4 8 1233KV TIRUPATI ABHINAV 0 0 10 1033KV VALLABHNAGAR 1 1 3 10 1433KV VALLABHNAGAR 2 0 3 10 1333KV AMRAWAD NO 1 0 3 12 1533KV KATARA II 0 1 11 12
4 BHOPAL 220 33KV BHOPAL-III 8 0 4 1233KV ENTKHEDI NO. 2 0 1 29 3033KV SUKHI SEWANIA 6 0 8 1433KV RATUA 4 2 17 2333KV GAIRATGANJ 1 11 0 1233KV BARLA 3 8 0 1133KV NAKTARA 2 14 0 1633KV NEEMKHEDA 0 15 0 1533KV SULTANPUR 0 12 0 1233KV BHOPAL-I 0 1 18 1933KV BHOPAL-II 1 0 10 1133KV KOLAR 4 1 17 2233KV RAMAKHEDI 0 0 11 1133KV NJA 1 11 3 1533KV KOLAR 0 12 0 1233KV BADJHIRI 0 14 3 1733KV KUNDALI 1 9 5 1533KV HARSLI 6 19 0 2533KV KHARGONE 3 30 0 3333KV GURADIYA 4 17 0 2133KV BAGPIPARIYA 5 25 0 3033KV BARNA 3 25 0 2833KV CHAKALDI 3 41 4 4833KV REHTI 2 16 2 2033KV LADUKI 0 9 3 1233KV NEELKANTH 2 14 2 1833KV SEMALPANI 0 11 1 1233KV KANKARIYA 0 16 6 2233KV BEGUMGANJ 5 50 8 6333KV SILWANI 2 7 5 1433KV DEHGAON 1 4 5 1033KV DHANDIYA 4 9 11 24
12 MANDIDEEP 220 33KV RELIANCE 0 7 4 1133KV NANDER 2 1 14 1733KV DIGWAD 3 0 20 23
14 TAMOT 132 33KV GOHAR GANJ 0 1 13 1433KV AKVN - I 2 6 4 1233KV DURGA STEEL 1 2 12 1533KV BORAS 2 44 0 4633KV THALADIGWAN 5 45 0 5033KV VIKALPUR 14 61 0 7533KV SAI KHEDA 2 0 10 1233KV BAKSHI 0 0 13 1333KV LASHKARPUR 0 0 57 5733KV HANSUA 0 6 5 1133KV BAN 3 1 43 4733KV KARARIA 1 0 25 26
19 BERASIA 132 33KV SAPAUA 2 0 22 2433KV MURWAS 0 1 13 1433KV SHAHPUR 1 0 18 1933KV CHHAPU 1 13 0 1433KV UHAR 0 1 9 1033KV SOMWARA 0 8 21 2933KV MASOODPUR 0 24 8 3233KV UDAIPUR 0 9 2 1133KV TINSHIYAI 1 8 16 2533KV GHOLANA 0 13 2 1533KV RUNAHA 0 0 12 1233KV NAZIRABAD 0 0 29 2933KV RAMGARHA 2 0 9 1133KV NAYASAMAND 0 0 16 1633KV SAHARWASA 8 2 2 1233KV KURWAI 1 3 14 1833KV PATHARI 0 3 12 1533KV UDAIPUR 1 5 15 2133KV ANNATPUR 1 0 10 1133KV MADAN KHEDI 3 0 16 1933KV DEWANGANJ 0 0 10 1033KV INDUSTRIAL 0 1 17 1833KV BARKHEDI 0 4 32 36
79 1621176 3317
BHOPAL REGIONSE(T&C) 400KV BHOPAL
1
BHOPAL 400
CHAMBAL BHOPAL 132
2 AYODHYA NAGAR 132
3 AMRAWADKHURD 132
5 ENTKHEDI 132
NASRULLAGANJ 132
11 GAIRATGANJ 132
13 SHAHGANJ 132
15 BAGRODA 132
6
BHOPAL-II
RAISEN 132
7 MANDIDEEP 132
8 MACT BHOPAL 132
9 BARELI 132
10
16 UDAIPURA 132
17 SILWANI 132
18
VIDISHA
VIDISHA 220
20 SIRONJ 132
21
25
VIDISHA
LATERI 132
26 SALAMATPUR 132
Abstract of Trippings
GANJBASODA 220
22 SHAMSABAD 132
23 RUNAHA 132
24 SAHARWASA 132
Abstract of Trippings (Bhopal Region)
Agenda of 72nd OCCM of MP 58
O/C trip E/F trip O/C+E/F
trip 1 2 3 4 5
EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19
SL.NO
NAME OF TESTING
DIVISIONNAME OF SUB SATAION NAME OF FEEDER
TOTAL FAULT TRIPPINGS TOTAL TRIPPI
NGS
33KV SAF (POLYTECNIC) 1 0 9 1033KV DABKA 1 0 14 1533KV MELA 0 1 13 1433KV AIR FORCE 6 0 38 4433KV M.E.S. 0 0 20 2033KV BANDHOLI 0 2 23 2533KV FEEDER NO. 2 0 0 12 1233KV FEEDER NO. 4 9 0 16 2533KV FEEDER NO.8 0 0 10 1033KV BILAUA 11 23 9 4333KV INDUSTRIAL CRUSHER MARKET
19 72 6 97
33KV CITY-I 4 5 10 1933KV DIG NAYAGOAN 0 6 6 1233KV CARMEL CONVENT 0 0 15 1533KV STONE PARK 0 0 14 1433KV BARAI 8 0 53 6133KV GOL PAHIDIYA 2 0 9 1133KV DWARIKAPURI 4 0 13 1733KV P.T.S. TIGHRA 1 0 15 1633KV D.D. NAGAR 3 0 10 1333KV KALPI BRIDGE 3 0 7 1033KV MAHARAJPURA 3 0 21 2433KV BHADROLI 0 0 28 2833KV GHATIGAON 1 14 1 1633KV SEHASRAM 2 14 5 2133KV SHUBHASPURA 2 19 0 2133KV SUKHLIHARI 20 7 8 3533KV HASTINAPUR 4 0 6 1033KV GORMI 1 0 32 3333KV GATA 1 0 47 4833KV PIDORA 0 0 12 1233KV MOW 3 0 27 3033KV MEHGAON 8 10 0 1833KV SITAPUR 9 8 10 2733KV DABRA 8 17 17 4233KV BADONI 27 17 7 5133KV UMARI (LAHAR) 8 0 12 2033KV PHOOP 4 1 32 3733KV ROOR 8 1 34 4333KV MASOORI 1 0 9 1033KV ITI RURAL 0 16 0 1633KV SEONDHA 8 2 0 1033KV INDERGARH MAGROL 2 9 0 1133KV ALAMPUR 16 14 0 3033KV THARET(LANCH) 54 17 0 7133KV BHAGUAPURA (NEW BAY) 27 24 0 5133KV DAGRAI 0 8 4 1233KV RAJGHAT 0 0 10 1033KV CHHEMAK 19 0 18 3733KV BHITARWAR(KARAYAWATI) 10 0 33 4333KV LOHGARH 1 0 14 1533KV TEKANPUR 7 0 13 2033KV CHINORE 0 0 17 1733KV NEW PICHHORE 0 0 19 1933KV MASHUDPUR 0 0 15 1533KV MAGRORA 1 0 9 1033KV MADORI 1 7 3 1133KV DABOH 3 7 4 1433KV SHYAMPURA 1 7 10 1833KV RON 10 0 2 1233KV MACHHAND 5 0 10 1533KV NAYAGAON 7 0 21 2833KV GORAE 1 0 12 1333KV GOHAD FEEDER 1 15 3 1933KV ANDORI 4 25 27 5633KV CHITORA 1 19 8 2833KV PRTAPPURA 1 0 9 1033KV CHOAMO 5 0 22 2733KV SURPURA 21 0 7 28
MOTIJHEEL 132
5 TIGHRA 132
6 MORAR 132
7 MOHNA 132
GWALIOR REGIONSE(T&C) GWALIOR
1
GWALIOR-I
MAHALGAON 220
2 MALANPUR 220
3 GWALIOR-II 220
4
8 HASTINAPUR 132
9
GWALIOR-II
MEHGAON 220
10 DATIA 220
11 BHIND 132
12
16 RON 132
17 GOHAD 132
18 PRATAPPURA 132
SEONDHA 132
13 DATIA 132
14 DABRA 132
15 LAHAR 132
Agenda of 72nd OCCM of MP 59
O/C trip E/F trip O/C+E/F
trip 1 2 3 4 5
EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19
SL.NO
NAME OF TESTING
DIVISIONNAME OF SUB SATAION NAME OF FEEDER
TOTAL FAULT TRIPPINGS TOTAL TRIPPI
NGS
33KV MELA GROUND 8 0 4 1233KV T.V TOWER 6 0 26 3233KV SARSAI 1 0 27 2833KV PANDOKHAR 0 0 34 34
20 CHINNOR 132 33KV GHARSONDI 0 10 1 1133KV LANCH 9 0 28 3733KV RARUA RAI 19 0 69 8833KV RAMPUR 3 0 8 1133KV JHUNDPURA 4 0 26 3033KV BADDHPURA 3 0 11 1433KV VIJAYPUR 2 3 7 1233KV AGARA 2 35 5 4233KV BEERPUR 6 67 17 9033KV GOTH 0 0 16 1633KV ESHAH 1 0 29 3033KV GUNJBADA 11 0 14 2533KV THARA 2 23 0 2533KV RACHHED 10 7 3 2033KV KHERLY 2 0 9 1133KV MANPUR 0 0 26 26
26 MORENA 220 33KV BICHOULA 10 0 9 1933KV INDUSTRIAL 0 0 14 1433KV DEORI 6 1 21 2833KV MANDI 2 0 8 1033KV BEERAMPUR ( BAGHCHINI) 0 0 18 1833KV BADAGAON 14 0 15 2933KV KHADIYAHAR 13 0 4 1733KV SUMAWALI 6 1 10 1733KV CHINNONI 3 0 14 1733KV NAVODAY 1 0 12 1333KV BAGCHINI 0 0 31 3133KV SATANWARA 0 1 23 2433KV BHESANA 0 2 9 1133KV BANGANGA 0 2 16 1833KV GURUNAVADA 14 18 10 4233KV TILLIPUR 5 4 2 1133KV SOTHWA 8 5 5 1833KV DHIROLI 4 6 2 1233KV AASHIDA 0 10 14 2433KV BHATNAWAR 14 0 8 2233KV PADORA 6 3 8 1733KV SHARDA SOLVENT 2 0 8 1033KV NAYA CHAURAHA 3 1 35 3933KV MAYAPUR 13 9 2 2433KV KHOD 10 8 12 3033KV KARARKHEDA 5 5 2 1233KV PADRA 2 19 3 2433KV BARODA 1 8 1 1033KV GORUS 12 8 15 3533KV BAGDUA 2 6 3 1133KV DHONTI 3 16 3 2233KV PANDOLA 2 3 5 1033KV KALARNA 6 2 2 1033KV BHOGIKA (MAYAPUR) 2 8 0 1033KV RAMBADE 5 20 3 2833KV KARERA 2 7 9 1833KV BHAGEMA 1 2 16 1933KV DINARA 6 2 48 5633KV NARAUA 24 12 3 3933KV SIRSAUD 2 0 12 1433KV MADIKHEDA 10 10 5 2533KV BADARWAS 3 13 12 2833KV RAI 10 5 3 1833KV SALMANIYA 5 3 5 1333KV LALITPUR 3 0 14 1733KV BHURWADA 7 9 5 2133KV ALLAPURA 11 0 4 15
38 BAIRAD 132 33KV GOVRDHAN 3 4 12 1933KV KHARE 3 0 7 1033KV INDAR 0 0 10 1033KV KHATORA 1 0 14 15
140 3313
24 AMBAH 132
25 PORSA 132
27 MORENA 132
19
GWALIOR-II
BHANDER 132
21 INDERGARH 132
22
MORENA
SABALGARH 220
23 VIJAYPUR 132
28 BADAGAON 132
29 JOURA 132
30
SHIVPURI
SHIVPURI 220
31 SHEOPURKALAN 220
32
36 KOLARAS 132
37 BARODA 132
39 MADA 132
SHIVPURI 132
33 PICHHORE 132
34 SHEOPUR 132
35 KARERA 132
Abstract of Trippings
Agenda of 72nd OCCM of MP 60
O/C trip E/F trip O/C+E/F
trip 1 2 3 4 5
EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19
SL.NO
NAME OF TESTING
DIVISIONNAME OF SUB SATAION NAME OF FEEDER
TOTAL FAULT TRIPPINGS TOTAL TRIPPI
NGS
33KV W/W 0 4 12 1633KV BEHTAGHAT 17 0 31 4833KV SINGWASA 3 1 15 1933KV BHADORA 0 0 39 3933KV MURADPUR 5 3 17 2533KV UMRI 0 6 35 4133KV GARHA 0 0 18 1833KV HARIPUR 0 0 16 1633KV NOVODAY 0 0 12 1233KV AIR 0 4 11 1533KV NANAKHADI 1 4 21 2633KV K.S.OIL MILL 0 0 15 1533KV MAHIDPUR 0 1 12 1333KV KHAJUIRY KALA 0 1 24 2533KV SEJI 0 0 15 1533KV SEMRAHAT 0 3 23 2633KV KAPASI 10 3 15 2833KV FATHIYGARH 2 4 4 10
4 CHANDERI 132 33KV BANMORE 0 8 12 2033KV NAISARAI 18 10 1 2933KV DHAKHONI 5 3 2 1033KV ESAGARH 2 20 1 2333KV PARSOL 0 14 1 1533KV MAKSUDANGARH 4 5 12 2133KV TALIGOAN 1 3 6 1033KV RAMPUR 8 8 7 2333KV PANWARI HAT 0 1 10 1133KV BAROD 0 2 8 1033KV BHADORE 0 0 10 1033KV SEJI 2 6 6 1433KV MAGRANA 3 0 11 1433KV CHAKCHOROLI 2 1 7 1033KV GADLA 14 0 0 1433KV NEW GADLA 13 2 0 1533KV PARANT 14 0 0 1433KV PATHI 11 1 0 1233KV JAMNER 0 0 23 2333KV DHARNAWDA 0 0 10 1033KV KUMBHARAJ-II 0 0 20 20
39 735179 4048
GWALIOR REGIONSE(T&C) 400KV BINA
1
GUNA
GUNA 220
2 ASHOKNAGAR 220
3 KAPASI 132
5
9 BHONRA 132
10 RAGHOGARH 132
Abstract of TrippingsAbstract of Trippings (Gwalior Region)
ESHAGARH 132
6 MAKSUDANGARH 132
7 ARON 132
8 KOTHIYA 132
Agenda of 72nd OCCM of MP 61
O/C trip E/F trip O/C+E/F
trip 1 2 3 4 5
EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19
SL.NO
NAME OF TESTING
DIVISIONNAME OF SUB SATAION NAME OF FEEDER
TOTAL FAULT TRIPPINGS TOTAL TRIPPI
NGS
1 RAJGARH (DHAR) 220 33KV HATOD 8 0 6 1433KV AMJHERA (DHAR) 4 1 6 1133KV DATIGAON (JHABUA) 0 1 13 1433KV ZHAKNAWAD (PETLAWAD) 2 5 3 1033KV BHARAT OMAN 1 8 6 1533KV PHE 0 0 16 1633KV BAGH 1 1 14 1633KV DHOLIYA 5 0 5 1033KV DEHRI 7 5 3 1533KV BHAVARIYA 8 0 14 2233KV DAHI 0 0 11 1133KV PHE 2 0 20 2233KV WATERWORK 0 0 20 2033KV FLOROSIS 0 6 8 1433KV AMBUA 0 11 10 2133KV NANPUR (DABADI) 0 8 8 1633KV FULMAL ( NEW SONDWA ) 0 3 8 1133KV KALAYANPURA 0 0 17 1733KV THANDLA 0 1 20 2133KV JHABUA 0 0 22 2233KV INDUSTRIAL 0 1 30 3133KV JHABUA 1 0 13 1433KV KALIDEVI 0 11 6 1733KV BAMANIYA 3 0 16 19
33KV MAHI PHE(CHARAN KOTHRA) 1 11 9 2133KV BUS COUPLAR 9 0 10 1933KV JOBAT 4 0 10 1433KV KALIKHETIYAR 6 0 15 2133KV PAGNIS PAGA. 6 0 4 1033KV PITHAM PUR. 1 0 16 1733KV DAILY COOEGE.NO. I. 7 0 7 1433KV DAILY COOEGE.NO. II. 4 0 7 1133KV RAU. 4 0 12 1633KV TILLOR. 5 0 5 1033KV DATTODA. 1 0 10 1133KV INDIRA COMPLEX NO. II. 3 0 12 1533KV PALDA INDUSTRIAL. 3 0 20 2333KV COMPEL. 1 1 12 1433KV KANADIYA 7 0 3 1033KV MANPUR 1 0 25 2633KV MHOW 5 0 7 1233KV MES (KARBALA) 3 0 9 1233KV AMBEDKAR 5 0 13 1833KV MHOW 5 0 6 1133KV HARSOLA 7 0 5 1233KV PANTHER-1 3 3 5 1133KV SILICON CITY 11 0 3 14
12 SIMROL 132 33KV DATODA 0 4 16 20
13 PITHAMPUR (SECT-I) 220 33KV MANPUR 0 3 9 1233KV NAGIN NAGAR-I 1 0 13 1433KV NAGIN NAGAR-II 1 0 10 1133KV INDUSTRIAL 2 1 10 1333KV PLETHICO 0 0 10 1033KV AIRPORT 7 0 6 13
15 BETMA 132 33KV INDUSTRIAL 3 1 15 1933KV DHAR 9 0 2 1133KV TEES GAON 4 0 10 1433KV INDUSTRIAL 1 0 9 10
17 GHATABILLOD 132 33KV INDUSTRIAL 1 0 11 1218 CHHAYAN 132 33KV NANDLAI 8 0 4 1219 DEPALPUR 132 33KV BETMA 0 1 14 15
33KV DCL 0 0 10 1033KV KAROLI 1 6 8 1533KV AJANDA 1 0 10 1133KV SINGHANA 6 18 2 2633KV LOHARI 3 11 3 17
INDORE REGIONSE(T&C) INDORE
RAJGARH (DHAR)
2 RAJGARH (DHAR) 132
3 KUKSHI 132
4 ALIRAJPUR 132
5 MEGHNAGAR 132
9
INDORE 400
S/Z INDORE 220
10 JAMLI 132
11 RAU 132
6 JHABUA 132
7 PETLAWAD 132
8 JOBAT 132
INDORE-II
14 INDORE WEST 132
16 DHAR 220
20 MANAWAR 132
21 SINGHANA 132
Agenda of 72nd OCCM of MP 62
O/C trip E/F trip O/C+E/F
trip 1 2 3 4 5
EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19
SL.NO
NAME OF TESTING
DIVISIONNAME OF SUB SATAION NAME OF FEEDER
TOTAL FAULT TRIPPINGS TOTAL TRIPPI
NGS
33KV RAMA PHSPT. 0 6 5 1133KV INDUSTRIAL 0 16 9 2533KV VANDANA NAGAR-II 4 5 10 1933KV SANCHAR NAGER-II 4 5 7 1633KV DUDHIYA 5 3 6 1433KV KANNOD- II 4 3 6 1333KV H.T.INDUSTRIAL 0 7 16 2333KV GAMBHIR 10 1 3 1433KV MANORAMAGANG -I 1 2 12 1533KV SECTOR 'C' 1 0 14 1533KV HATOD 7 2 8 1733KV MANGLIA 5 0 7 12
26 SATYA SAI INDORE 132 33KV TULSI NAGAR 0 0 12 1227 ELECTONIC COMPLEX 132 33KV E.S.I. -I 0 0 10 1028 RAUKHEDI 132 33KV BHONDWAS 0 0 14 1429 SIVANI 132 33KV KHUDEL 0 0 21 21
82 1257
33KV CHIRAGPURA 1 4 11 1633KV BHOJAKHEDI 0 10 0 1033KV NEPANAGAR 13 1 1 1533KV DABIYA 1 5 4 1033KV KHAR 3 3 20 2633KV GUDI 0 0 11 1133KV SIHADA 2 12 11 2533KV RANGAON 1 0 11 1233KV CHANDEL-I 3 5 10 1833KV INDORE ROAD 0 2 15 1733KV KHANDWA-II 1 0 17 1833KV DULHAR 0 0 11 1133KV JAINABAD 6 0 13 1933KV SHAHPUR-I 4 0 10 1433KV INDUSTRIAL 9 0 13 2233KV CHAPORA 9 0 3 1233KV BADGAON 10 2 1 1333KV MANJROD 5 17 23 45
7 MOONDI 132 33KV NARMADA NAGAR 4 1 9 1433KV ROSHANI 7 17 15 3933KV KHIRKIYA 1 5 4 1033KV DHULKOT-I 4 2 5 1133KV INDUSTRIAL 0 0 10 1033KV INDUSTRIAL 0 14 0 1433KV BHIKANGAON 8 4 1 1333KV BAMNALA 1 20 6 27
11 SINGOT 132 33KV POKHAR 0 24 0 2412 PIPALPANI 132 33KV NIMANDHAD 0 0 16 16
33KV KHARGONE 4 0 9 1333KV AHIRKHEDA 3 0 11 1433KV NANDGAON 1 0 28 2933KV GOGAWA 3 0 7 1033KV MONGARGAON 1 2 11 1433KV BHAGWANPURA 11 0 18 2933KV NAGZIREE 9 2 3 1433KV P.F.C 6 0 4 1033KV KASRAWAD 1 2 13 1633KV SAWDA 2 19 11 3233KV MAKADKHEDA 1 10 0 1133KV NTPC-II 0 1 9 1033KV MULTHAN 0 6 5 1133KV DEWLA 0 10 7 1733KV BALSMOOD 3 2 6 1133KV DAWANA 1 10 6 1733KV DHAMNOD 0 17 19 3633KV INDUSTRIAL 1 4 12 1733KV BAGOD 4 1 11 1633KV SANAWAD-II 3 0 16 1933KV JAIMALPURA 3 0 17 2033KV KARAHI 1 1 12 1433KV SUNDREL 0 0 14 1433KV PIPALGAON 4 0 11 1533KV BEDIYA 4 10 9 2333KV RODIYA 9 4 0 1333KV NHDC 15 2 1733KV DHAKALGAON 0 5 5 1033KV BALWADA 0 1 11 1233KV CHOURAL 3 4 16 23
22 SENDHWA 132 33KV PALSOOD 1 4 5 1033KV PANSEMAL 7 3 0 1033KV KHETIYA 5 5 1 1133KV BADGON 0 12 0 1233KV SURANA 1 9 10 2033KV SHIVAI 0 11 4 1533KV BARWANI 0 12 0 1233KV PATI 3 6 3 1233KV SONDUL 0 13 0 1333KV REHGUN 1 9 2 12
26SHAHPURA (BARWANI) 132
33KV BALWADI 5 0 5 10
69 1136151 2393
22
INDORE-I
INDORE-II (JAITPURA) 220
23 BICHOLI (INDORE EAST ) 2
24 CHAMBAL INDORE 132
25 N/Z INDORE 220
CHHEGAON 132
5 BAHADARPUR 132
6 BADGAON 132
8 CHHANERA 220
Abstract of Trippings (Gwalior Region)INDORE REGION
SE(T&C) 400kv KHANDWA
1
KHANDWA
CHHEGAON (TORNI) 400
2 NEPANAGAR 220
3 KHANDWA 132
4
ANDAD 132
16 NIMARNI 220
17 DHAMNOD 132
18 BARWAHA 220
9 PANDHANA 132
10 BHIKANGAON 132
13
BARWAHA
KHARGONE 132
14 KASRAWAD 132
15
JULWANIA 400
23 PANSEMAL 132
24 ANJAD 132
25 BARWANI 132
19 CHHOTI KHARGONE 132
20 SANAWAD 132
21 BALWADA 132
Abstract of TrippingsAbstract of Trippings (Indore Region)
Agenda of 72nd OCCM of MP 63
O/C trip E/F trip O/C+E/F
trip 1 2 3 4 5
EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19
SL.NO
NAME OF TESTING
DIVISIONNAME OF SUB SATAION NAME OF FEEDER
TOTAL FAULT TRIPPINGS TOTAL TRIPPI
NGS
1 BARNAGAR 220 33KV MULTHAN 0 8 2 1033KV KHEDA KHAJURIYA 0 12 0 1233KV BICHHROD 0 11 0 1133KV BANJARI 0 14 0 1433KV KHUNDI KHEDA 0 10 0 1033KV MAHIDPUR ROAD 0 14 0 14
4 BHERUGARH 132 33KV GARH KALIKA 2 5 6 135 MAKDONE 132 33KV RUPAKHEDI 10 0 0 10
33KV CHANDUKHEDI 0 15 0 1533KV D/A -2 0 11 0 1133KV CHINTAMAN 0 13 0 1333KV KANAD 29 4 0 3333KV MADKOTA 56 1 0 5733KV MOYA KHEDA 9 6 0 1533KV AGAR 12 0 0 1233KV SUZLON-1 0 15 0 1533KV ENORCON-1 8 3 0 1133KV ENORCON-3 7 5 0 1233KV NALKHEDA 0 0 22 2233KV SOYAT-1 2 15 0 1733KV AMLA 11 0 6 1733KV SUZLON-3 0 2 11 1333KV ENERCON 1 2 8 1133KV SOYAT-2 4 2 14 2033KV KACHNARIYA 1 5 4 1033KV DHAROLA 1 7 4 12
10 UJJAIN 132 33KV WATER WORKS 6 9 0 1533KV BHOURANSA 1 11 9 2133KV BALGARH 2 8 4 14
12 SHAJAPUR 220 33KV BERCHHA ROAD 9 11 7 2713 BNP DEWAS 132 33KV SIYA 6 0 8 14
33KV INDUSTRIAL IV 4 0 17 2133KV STEEL INGOT 1 0 9 1033KV INDUSTRIAL VI 0 0 11 1133KV BAIRAGARH 2 4 4 1033KV ENERCONE I 1 0 11 1233KV KAMLAPUR 0 0 10 1033KV HAT PIPLIYA 17 1 0 1833KV KANNOD 18 0 3 2133KV OLAMBA (KHATEGAON) 6 0 5 1133KV MSK (KHATEGAON II) 14 0 1 1533KV DEHRIYA (SATWAS) 1 0 18 1933KV BIJWAD (CHAPDA ) 6 0 8 1433KV VIKRAMPUR 3 0 9 1233KV EKLERA MATAJI 4 0 12 1633KV TALOD 6 0 13 1933KV KHERIA JAGEER 0 0 11 1133KV MURADPURA 15 0 11 2633KV SHANKAR PURA 14 0 3 1733KV KANASIYA 3 0 9 12
19 MAKSI 132 33KV MAKSI 2 0 8 1033KV NEMAWAR 5 0 21 2633KV MSK 0 7 7 1433KV SANDALPUR 2 0 15 1733KV AJNAS 2 0 11 1333KV PALASI 1 1 15 1733KV BAI JAGWADA 7 0 11 1833KV BAROTHA 10 0 0 1033KV NEORY 0 0 19 1933KV JETHDA 2 8 2 1233KV RAIPUR 11 0 9 2033KV AKODIYA 1 0 9 1033KV JAMNER 1 0 11 1233KV ARANDIYA 4 0 7 1133KV POCHANER 6 4 25 3533KV BERCHHA DATAR 4 0 11 1533KV ARNIYAKALA 7 0 20 2733KV SUNDARSI 0 13 0 1333KV LAHORI 0 10 0 10
27 POLAIKALAN 132 33KV AVANTIPUR BARODIYA 1 3 6 1033KV PANWADI 1 0 13 1433KV SARANGPUR 5 0 9 1433KV NAGZIRI 14 1 1 1633KV MOHNA 5 4 10 1933KV MANDODA 15 2 3 2033KV KALAPIPAL 2 3 7 1233KV NANDANI 1 1 14 16
77 1216
7 AGAR 132
8 SUSNER 132
9 NALKHEDA 132
UJJAIN REGIONSE(T&C) UJJAIN
UJJAIN
2 GHONSALA 132
3 MAHIDPUR 132
6 RATADIYA 132
SONKATCHH 132
18 SHAJAPUR 132
20 KHATEGAON 132
21 SATWAS 132
11
DEWAS
DEWAS 220
14 MSP DEWAS 132
15 CHAPDA 132
16 KANNOD 132
17
BERCHHA 132
28 PANWADI 132
29 MOMIN BARODIYA 132
30 KALAPIPAL 132
22 BAROTHA 132
23
SHUJALPUR
SHUJALPUR 220
24 SHUJALPUR 132
25 ARNIYAKALAN 132
26
Abstract of Trippings
Agenda of 72nd OCCM of MP 64
O/C trip E/F trip O/C+E/F
trip 1 2 3 4 5
EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19
SL.NO
NAME OF TESTING
DIVISIONNAME OF SUB SATAION NAME OF FEEDER
TOTAL FAULT TRIPPINGS TOTAL TRIPPI
NGS
33KV MHW ROAD 8 9 0 1733KV SIMLAWADA 4 23 0 2733KV SHIVPUR 5 8 0 1333KV BILPANK 3 7 0 1033KV I.O.C.L. 10 9 0 1933KV GANGA SAGAR 2 11 0 1333KV DHOLAWAD 2 8 0 1033KV MILK CHILING 6 4 0 1033KV DHONSWAS (OLD NAME NAMLI)
11 3 0 14
33KV SHIVGARH 6 7 0 1333KV DHODHAR 5 0 6 1133KV KALUKHEDA 0 4 11 1533KV PIPLODA 5 0 11 1633KV KHARWAKALA 2 9 0 1133KV HANUMANTIYA 1 0 12 1333KV PATAN 7 0 20 2733KV CLEAN SOLAR POWER-I 1 1 8 1033KV CLEAN SOLAR POWER-II 1 1 9 1133KV NVR CKT-I 0 0 13 1333KV NVR CKT-II 0 0 13 1333KV RAVATI ( OLD NAME SHIVGARH)
8 3 0 11
33KV DHAMNOD 7 9 0 1633KV BAJANA 6 6 0 1233KV BIRMAWAL 5 5 0 1033KV RANISINGH 3 11 0 1433KV BOTALGANJ 13 2 0 1533KV SONY BOI CAM 10 5 0 1533KV GUJARBARDIYA 8 2 0 1033KV AMLAWAD 10 6 0 1633KV DHALPAT 33 15 0 4833KV KAYAMPUR 14 10 0 2433KV KACHNARA 5 6 0 1133KV KARJOO 0 13 0 1333KV SUZLON -I 3 7 0 1033KV BOLIA 5 15 0 2033KV BARKHEDAGANGASA 2 15 0 1733KV BHESODA MANDI 6 8 0 1433KV BARDIYA AMARA 5 11 0 1633KV SATHAKHEDA 2 15 0 1733KV BABULDA 3 7 0 10
11 SUWASARA 220 33KV KANTIYA 0 17 0 1733KV DHANERIYA 8 0 4 1233KV NAYAGAON 2 8 0 1033KV MORVAN 6 2 3 1133KV HARKIYA KHAL 10 2 6 1833KV SAVAN 8 1 10 1933KV RAMPURA 0 8 11 1933KV KANJARA 0 4 9 1333KV AANTRI 10 10 9 2933KV KUKDESHWER 8 5 4 17
15 RATANGARH 132 33KV SINGOLI 0 10 2 1216 BHANPURA 220 33KV NEEMTHUR 20 1 20 41
33KV BUDHA 0 8 3 1133KV NARAYANGARH 2 3 7 1233KV NATARAM 2 8 9 1933KV MANPURA 2 4 7 1333KV TAL 11 0 2 1333KV MAHU MATRA 20 1 23 4433KV UNHEL 0 0 12 1233KV MHETWAS 4 0 11 1533KV HATAI PALKI 14 1 2 1733KV MAHIDPUR ROAD 6 0 6 1233KV MOHANA 1 3 10 14
20 KHACHROD 132 33KV BURANABAD I 0 0 11 1133KV LOD 3 2 10 1533KV TAL TOWN 11 0 1 12
66 1043143 2259
UJJAIN REGIONSE(T&C) NAGDA
1
RATLAM
RATLAM 220
2 RATLAM 132
3 JAORA 132
4
8 SUWASARA 132
9 DALODA 220
10 GAROTH 132
A LOT 132
5 SAILANA 132
6 BILPANK 132
7 MANDSAUR 132
Abstract of TrippingsAbstract of Trippings (Ujjain Region)
SITAMAU 132
19
NAGDA
NAGDA 220
21 TAL 132
12
NEEMUCH
NEEMUCH 220
13 NEEMUCH 132
14 MANASA 132
17 MALHARGARH 132
18
Agenda of 72nd OCCM of MP 65
ANNEXURE-9.4
1 220 KV SATNA PGCIL CB FAULTY CLOSE
1 220 KV KOTAR CB FAULTY CLOSE2 132KV KYMORE CB FAULTY CLOSE
1 132/33 KV XMER (PRI) CB FAULTY CLOSE
1
1 132 KV RTS MW/MVAR 0/0 4/1
1 125 MVAR BUS REACTOR CB N/A Process connection required2 400 KV DAMOH CB OPEN CLOSE
1 220 KV SUKHA 1 CB FAULTY CLOSE
1 132 RTS MW /MVAR 0 7/1
LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER
SrDESCRIPTION Status Telemetry value at SLD Actual value at site1 132 KV BUS BALAGHAT 1 & 2 MW/MVAR 26/16 ;-40/20
LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER
SrDESCRIPTION Status Telemetry value at SLD Actual value at site1 220 KV BUS COUPLER CB FAULTY OPEN
SrParameter Field value Scada value /status1 ISP –INDORE 400 KV Feeder 1 91 9082 ISP –NAGDA 400 KV Feeder (M 94 9383 GENERATOR 5 & 6 MAVR 5 N /A4 GENERATOR (OFF CONDITION) N/C5
Name at SLDC end at site end
1 400 KV AASTHA 1 & 2 LINE REACTOR N/A2 400 KV SEONI MW 99 85
1 GEN NO 3 & 4 RGMO N/A
1 220 /33 KV TR MW/MVAR NA2 400 KV BUS 1 FREQ 49.79 49.983 GEN NO.1,2,3,4 RGMO N/A
ISP
SATPURA T P S
SINGHA JI phase 2 S T P S
S G T P S
LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETERKATNI 400 KV S/S
PANAGAR 220 KV S/S
SHAHPURA 132 KV S/S
KIRNAPUR 132 KV S/S
CHHATARPUR 220 KV S/S
MANJAGAWAN 132 KV S/S
UMARIYA 132ALL ANALOG SHOWING 0 PROBLEM IN PT SUPPLY
LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER
SATNA CIRCLE
KOTAR 220 KV S/S
SATNA 220
KOTMA 132
Agenda of 72nd OCCM of MP 66
1 GEN NO 1 ,2 RGMO N/A
1 220 KV SIDHI CB TRANSMIT CLOSE
srName of Element sldc side Field
2 220 Kv Dewas CB Faulty Close
2 400kv Singhaji malwa Ckt -4 CB Faulty Close
1 132 Kv PRASRAM PURIYA CB open close
1 220 kv all breakers suspected2 220kv bus voltag-1 wrong3 132kv all brekers suspected
1 220/132Xmer HV and LV Side MW 16 24
1 220/132 TR1 CB NOT COMING CLOSED2 220 Sendhwa-I CB NOT COMING CLOSED3 220 Sendhwa-II CB NOT COMING CLOSEDNO
NO
1 220 Kv TBC CB Not Coming open2 22kV Daloda I CB Open Close3 22kV Daloda II CB FOULTY OPEN
1 132KV BUS COUPLER CB FOULTY OPEN
1 132kV Buscoupler CB Faulty Close
2 132/33KV 40MVA-XMER-2 MW/MVAR NON-CURRENT
LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER
1 400 KV BUS-COUPLER CB FAULTY2 132 KV BUS-COUPLER CB FAULTY
04-11-2019
ASTHA 400 KV S/S
RAJGARH 220 KV S/S
04-11-2019KHATEGAON 132 KV S/S
132 kV S/s Khachrod
220 KV S/S RATLAM
UJJAIN 220 KV S/S
132 KV S/S AGAR
Kannod 132 KV S/S All 132 Kv side BC and 33 kv side BC not coming
All 132 Kv Side brekaer is open Actually closed
RAJGRAH (DHAR) 220 KV S/S
220KV S/s Julwaniya
JULWANIA 400 KV S/S
All 132 Kv Side brekaer is open Actually closed
INDORE 400 KV S/S
PITAMPUR 400 KV S/S
PITAMPUR 220 KV S/S Sector-III
GANDHI SAGAR H P STELEMETRY OUT
ATPS
BARGI
ALL CB SUSPECTED
Agenda of 72nd OCCM of MP 67
1 220 KV MAIN BUS VOLTAGE/FREQUENCY NON CURRENT
1 160 MVA XMER(LV SIDE) CB FAULTY CLOSE
1 132 KV KHIRKIYA CB NON CURRENT CLOSE2V CHANNERA(TAP KHIRKIYA RLY TR CB FAULTY CLOSE3 132 KV KHIRKIYA RLY TRCN-1 CB FAULTY
1 132/33 KV 40 MVA XMER-2 CB FAULTY CLOSE
1 132 KV BUS VOLTAGE/FREQUENCY NON CURRENT2 132 KV BUS-COUPLER MW/MVAR NON CURRENT
LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER 05-11-2019
1 132 KV BUS COUPLER CB FAULTY
1 132 KV BUS COUPLER CB FAULTY2 132 KV BUS COUPLER MW/MVAR NON-CURRENT
ASHOKNAGAR 220 KV S/S
ESAGARH 132 KV S/S
ZEERAPUR 132 KV S/S
SARNI 220 KV S/S
HARDA 132 KV S/S
BIORA 132 KV S/S
Agenda of 72nd OCCM of MP 68