madhya pradesh power transmission company limited

74
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in No.07-05/SG-9B-II/30 Jabalpur, dated:06.01.2020 To As per distribution list Sub: Minutes of 72 nd meeting of Operation and Coordination Committee of MP. The Minutes of 72 nd meeting of the Operation and Coordination Committee of MP held on 19 th November 2019 at Conference Hall, SLDC, MPPTCL, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur

Upload: others

Post on 10-Jan-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED

STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected]

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in

No.07-05/SG-9B-II/30 Jabalpur, dated:06.01.2020

To

As per distribution list

Sub: Minutes of 72nd meeting of Operation and Coordination Committee of MP.

The Minutes of 72nd meeting of the Operation and Coordination Committee of MP held on

19th November 2019 at Conference Hall, SLDC, MPPTCL, Jabalpur has been uploaded on the

website of SLDC ‘www.sldcmpindia.com’ and can be downloaded.

(R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur

Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email-

[email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email-

[email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. Email-

[email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura,

Bhopal, email- [email protected]. 6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email-

[email protected] 7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email –

[email protected] 8. The Chief Engineer(EHT:Const.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2661618, E-mail-

[email protected]. 9. The Chief Engineer(EHT:Maint&insp.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2665593, E-mail-

[email protected]. 10. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749,

Email- [email protected], Email- [email protected] 11. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 12. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected] 13. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]. 14. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur,

Fax No- 0761-2668503, Email – [email protected].  15. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited,

Bhopal, Fax No-0755-2580611,Email- [email protected]. 16. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near

Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]. 17. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email –

[email protected]. 18. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email –

[email protected] 19. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046,

[email protected] 20. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal –

462013., Fax No- 0755-4030130,Email – [email protected] [email protected]  21. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical

Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected],    [email protected], M-

9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR). 22. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa

(MP) – 450 119, Fax No- 07323-284080, Email – [email protected] 23. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP)

– 450 554, FaxNo-07280-271703, Email- [email protected] , [email protected] . 24. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551,

Fax No. 07791-243667 / 243669, Email – [email protected] 25. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina-

470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected] [email protected],

26. The Chief Executive Officer, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, Email – [email protected]

27. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :[email protected] 28. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row,

Email- [email protected], Indore – 452010, [email protected]

The 72nd meeting of Operation & Coordination Committee of MP was held on 19th November 2019 at

11:00 AM at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur. The list of participants is enclosed at

Annexure -1.0.

Shri K.K.Parbhakar, C.E.(SLDC) & Chairman OCC welcomed all the guests & participants to 72nd

OCCM of MP. Chairman OCC stated that in the month of October 2019, the demand of all of the states of

India, except J&K and Uttrakhand demand, was less compared to previous year demand. Demand of some of

the states have been reduced by 40% and even the demand of Industrial states like Maharashtra, Gujarat,

Haryana, Punjab etc. has also reduced. The average demand of India for October 2019 is about 30% less

compared to last year demand of October 2018, this feature required to be analyzed.

In MP also the demand has not increased as expected and stated that Discoms can forecast the

expected increase in demand and its pattern in a better way as Discoms can calculate and have the records of

pump connections and expected to be connected in near future. Further he added that the installed capacity

of state is not sufficient to meet the rabi season demand, hence MPPMCL & SLDC will require correct

forcasting from Discoms so that arrangement for required power can be made accordingly by power purchase,

banking etc.

Chairman OCC also shown concern about coal shortage in Generating company and informed the

committee that the available coal stock has to be used optimally so that the grid parameters may be

maintained within limit for safe & secure grid operation. He further requested generators to arrange for coal

and maintain sufficient coal stock. Further he requested all the departments to review the power flow after

commissioning of new elements in the system in prevailing circumstances and emphasized for better

coordination between EHT and T&C for availing shut down on elements. Thereafter he requested Shri.

R.A.Sharma, Addl. CE, SLDC & Member Secretary OCCM to take up the agenda points.

ShriR.A.Sharma, Addl. CE, SLDC has further added that now days the power system is not technical

subject only but it is techno-commercial. The Discoms shall explore possibilities to improve their demand

forecasting method so as to further reduce the deviation charges payable by Discoms. The requisition for

drawl schedule of Discoms must be given by MPPMCL, matching with the actual drawl of Discoms. By

maintaining MP drawl as per schedule, shall reduce the deviation charges payable by Discoms & with the help

in safe grid operation. Thereafter the agenda points were taken up, which are narrated here under:-

ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 71st meeting of Operation & Coordination Committee of MP held on 09th July 2019 at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/2886 Jabalpur dated 31.09.2019. No comments have been received. Committee confirms the minutes.

ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTHS AUGUST 2019 TO SEPTEMBER 2019.

2.1. Frequency Particulars: The committee was apprised that during AUGUST 2019 the system frequency

was below 49.90 Hz for 7.28% of time against 4.57% of time during SEPTEMBER 2019. The system

MINUTES OF 72nd MEETING OF OPERATION & COORDINATION COMMITTEE OF MP HELD ON 19th NOVEMBER 2019 AT 11:00 AM AT Conference Hall, SLDC, MPPTCL,

Nayagaon, Jabalpur.

frequency was above 50.05 Hz for 20.03% of time during AUGUST 2019 against 20.18 % of time during

SEPTEMBER 2019. The system frequency was within the IEGC range of 49.90-50.05 Hz for 72.69 % of the

time during AUGUST 2019 against 75.25 % of time during SEPTEMBER 2019. The average monthly

frequency was 50.00 Hz during month of AUGUST 2019 and 50.01 Hz during month of SEPTEMBER 2019.

The detailed frequency particulars for the month of AUGUST 2019 and SEPTEMBER 2019 are

enclosed at Annexure-2.1. The brief detail of frequency profile is given here under:-

Month Average frequency

Minimum Integrated frequency over an hour

Maximum integrated frequency over an hour

Instantaneous Minimum Frequency

Instantaneous Maximum Frequency

AUGUST 2019

50.00 Hz 49.81 Hz 50.26 Hz 49.55 Hz 50.32 Hz

SEPTEMBER 2019

50.01 Hz 49.80 Hz 50.14 Hz 49.62 Hz 50.27 Hz

2.2 Operational Matters

2.2.1 Operational Discipline : The committee was apprised that System operated in terms of frequency

profile for the months AUGUST 2019 & SEPTEMBER 2019 is as given below for discussion by the committee

:

Month % of time Frequency Below 49.90 Hz

% of time Frequency above 50.05 Hz

% of time frequency within the permissible range of 49.90-50.05 Hz.

Average monthly frequency

AUGUST 2019

7.28% 20.03% 72.69% 50.00 Hz

SEPTEMBER 2019

4.57% 20.18% 75.25% 50.01 Hz

2.2.2 Voltage Profile: During the months AUGUST 2019 & SEPTEMBER 2019 the maximum and minimum

voltage as recorded at following important 400 KV s/s in MP Grid:-

Sr. No.

Name of 400 KV

Substation

AUGUST 2019 SEPTEMBER 2019

Max. Voltage Min. Voltage Max. Voltage Min. Voltage

Observed Observed Observed Observed

Voltage KV Date Voltage

KV Date Voltage

KV Date Voltage

KV Date

1 Bhopal 420.09 15.08.19 400.18 18.08.19 418.89 29.09.19  401.53 30.09.19 

2 Bina 418.99 15.08.19 398.21 18.08.19 417.39 29.09.19  397.42 13.09.19 

3 Gwalior 414.94 15.08.19 388.23 18.08.19 414.33 20.09.19  390.14 02.09.19 

4 Indore 418.75 15.08.19 403.46 19.08.19 417.95 21.09.19  403.28 13.09.19 

5 ISP 420.3 07.08.19 407.1 05.08.19 420.9 13.09.19  408.7 13.09.19 

6 Julwaniya 429.15 10.08.19 412.47 19.08.19 431.7 10.09.19  403.47 13.09.19 

7 Katni 425.25 08.08.19 403.26 18.08.19 426.14 13.09.19  405.63 13.09.19 

8 Nagda 423.04 15.08.19 391.08 02.08.19 421.77 29.09.19  403.28 13.09.19 

9 Pithampur 419.24 15.08.19 403.72 19.08.19 419.99 13.09.19  403.66 13.09.19 

10 Birsinghpur 430.43 15.08.19 413.35 18.08.19 427.38 29.09.19  409.68 13.09.19 

11 Singhaji 422.33 27.08.19 409.5 19.08.19 424.53 22.09.19  405.59 13.09.19 

12 Satpura 426.14 16.08.19 413.84 18.08.19 427.31 12.09.19  410.9 13.09.19 

13 Itarsi 424.97 15.08.19 407.39 18.08.19 424.97 29.09.19  409.73 30.09.19 

14 Ashta 426.42 15.08.19 410.84 18.08.19 427.58 21.09.19  410.55 30.09.19 

15 Chhegaon 424.82 10.08.19 410.74 19.08.19 427.88 12.09.19  412.63 30.09.19 

16 Kirnapur 447.53 08.08.19 419.8 08.08.19 439.67 29.09.19  427.36 27.09.19 

17 Badnawar 425.15 15.08.19 408.15 18.08.19 425.33 21.09.19  410.95 06.09.19  The committee was intimated that at 400kv Kirnapur the high voltage is persisting and measures for controlling the voltage is being taken at EHV level and installation of reactor at Kirnapur & Seoni(PG) end is also being planned at EHV level. Further Discoms shall also check the status of the capacitor banks installed at 33kv and ensure that the voltage is maintained at Discom level by switching off the capacitor banks during high voltage conditions. East Discom was requested to provide the status of capacitor banks installed at in Balaghat & Kirnapur regions during high voltage period. Representative from P&D MPPTCL informed the committee that the reactor at 400 KV S/s Kirnapur is planned and is in the proposal stage. Thereafter, Member Secretary OCC stated that P&D shall expedite the work of reactor installation. Chairman OCC stated that the generators shall also provide their support by absorbing MVAR during High voltages in the system, especially JP Bina and Singhaji TPS which are observed to inject MVAr during high voltages.

2.2.3 Status of Capacitor Banks in sub-transmission system: The committee was apprised that the

updated information of the status of capacitor banks in sub-transmission system as on 31th MAY 2019 as

submitted by DISCOMs is detailed below:

The matter was discussed in the meeting and all the Discoms were requested to ensure healthiness of

the capacitor banks during rabi season for maintaining quality supply to consumers.

   

2.2.4 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The

committee was apprised about the updated information of the status of installed capacitor banks (in MVAR) in

EHV transmission system as on 31.10.2019 as submitted by MPPTCL is given below:-

Voltage

Class

Capacitor bank

installed as on

Capacity Added

after Last OCC

Capacitor banks

already covered

TOTAL

CAPACITY AS

Capacitor Bank

Installed but

DIS

CO

M

Capacitor bank

installed in good

condition (No)

Capacitor

Banks healthy

but not in

service due to

control ckt

problem

Capacitor bank

installed but

defective & are

repairable (No)

Require

ment of

repair

against

each

unit (No)

Requiremen

t against

non-

repairable

capacitor

banks

Capacitor

banks already

covered under

ADB T-V

Balance

capacitor

banks to be

covered in

other

schemes

600

KVAR

1200

KVAR

1500

KVAR

600

KVA

R

1200

KVA

R

1500

KVA

R

600

KVAR

1200

KVAR

1500

KVAR

No of 100

KVAR

Units

required

600

KVAR

1200

KVAR

600

KVAR

1200

KVAR

600

KVAR

1500

KVAR

EZ 449 156 75 3 5 3 5 6 0 25 32 6 0 0 0 0

CZ 1 685 875 - - - 0 0 0 3 0 0 0 0 0 0

WZ 613 550 725 10 3 1 23 12 15 207 08 16 - - - 0

31.08.19(MVAR) Meeting (MVAR) under ADB T-V ON 31.10.19

(MVAR)

defective & are not

repairable (No &

MVAR)

220 KV 100.00 0.00 - 100.00 All in Service

132 KV 1238.00 0.00 - 1238.00

33 KV 5399.50 36.00 - 5435.50

Total 6737.50 0.00 - 6773.50

The matter was discussed in the meeting.

2.2.5 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: The

committee was apprised about the various ongoing Transmission Schemes completed during the financial

year 2019-2020 (up to MAY 2019) and plan for completion of various ongoing Transmission Schemes for the

Year 2019-2020 is enclosed as Annexure 2.2.5(i) and 2.2.5(ii) respectively.

2.2.6 U/F and df/dt Relay Operation

(i) U/F and df/dt Relay Operation: The committee was apprised that the Frequency did not touch 49.20 Hz

during AUGUST 2019 and SEPTEMBER 2019. There was no df/dt operation during the same period. MPPTCL informed that under Frequency Plan for all the stages have been implemented and in operation.

(ii) Defective u/f, df/dt relays: The committee was apprised that MPPTCL has informed that all the df/dt and U/F relays are in operation, where the U/F relays are not available, the numerical relays programmed for under frequency operation.

2.3 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to

33 KV feeders: (i) The committee was apprised about the details of DISCOM wise Power supply given to various domestic

categories during the period AUGUST 2019 and SEPTEMBER 2019 is enclosed at Annexure 2.3(i).

(ii) Group Allocation to Newly Commissioned existing EHV substations:- The committee was apprised

about the region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV

substations for which groups have not been allocated is given in Annexure 2.3 (ii). The DISCOM wise details

of pending group allocation to 33 KV feeders is given below:-

SN DISCOM Region No of 33 KV feeders for which groups

to be allocated

01

EAST

Jabalpur 21

02 Sagar 00

03 Rewa 00

04 Total 21

05

WEST

Indore 05

06 Ujjain 04

07 Total 09

08 CENTRAL

Bhopal 17

09 Gwalior 00

10 Total 17

TOTAL Grand Total 47

The matter was discussed.

ITEM NO. 3 : OPERATIONAL PLANNNING:

3.1 Generating Units under planned outage and proposed maintenance programme: The committee was

apprised about the annual maintenance /outages of thermal generating units of MPPGCL for FY 2019-2020 as

intimated by ED(O&M:Gen.) is NIL for the month OCT-19 to DEC-19.

3.2 Proposed shutdown programme of Transmission lines / Transformers: The committee was apprised

about the proposed shutdown of transmission elements for the period 01.09.2019 to 31.12.2019 as submitted

by T&C, MPPTCL is enclosed as Annexure-3.2.

3.3 Long Outages of transmission elements and protections: The committee was apprised about the

status submitted by MPPGCL /MPPTCL are given below:-

Sr.

No

Line/Transformer/ etc

under long Outage

Outage date Reason Response from Utility

1. 20MVA BHEL make X’mer at 132KV S/S Khachrod.

27.03.2019

X’mer was taken under for pre monsoon maintenance and testing work on

27.03.2019. Shutdown is continue

as the tan-delta values of transformer

windings are measured

considerably high.

The transformer is replaced by 50MVA transformer on 23-09-19.

2 20MVA BBL X’mer at 220 KV S/s Rajgarh(Biora).

30.05.2019 X’mer tripped on

differential indication

Transformer declared failed, and replaced by another 20MVA transformer, spared from 220KV S/S Ganjbasoda on Dt. 01-10-2019.

3 40 MVA BBL, 132/33KV Transformer at 132KV S/S Sagar

07.07.2019 X’mer tripped on

differential trip indication.

Transformer tripped on Differential trip indications and declared failed after testing. Transformer replaced by 50MVA X’mer on Dt. 19-10-19.

4 63 MVA GEC, 132/33KV Transformer at 220KV S/S Mahalgaon, Gwalior

10.07.2019 X’mer tripped on

differential trip indication.

Transformer tripped on Differential trip indications and declared failed after testing. Transformer replaced by 63MVA transformer on Dt. 16-09-19

5 160MVA, 220/132KV BHEL X’mer – 2 at 220KV S/s Satna.

14.08.2019

B-Phase bushing & OLTC selector switch failed due to heavy

lightening.

The 220/132KV, 160MVA BHEL Transformer Sl.No. 6005055 tripped on Differential trip indications due to failure of 132KV R phase bushing, declared failed. Transformer installed on 14.11.2019.

6 160MVA CGL, 220/132KV X’mer at 220KV S/S Shujalpur.

Sl. No. T-8318-3

31.08.2019

Tripped on Differential & PRV trip indication during heavy rains and lightning.

160MVA CGL X’mer declared failed due to fire. MPPTCL informed that the X’mer is expected to be commissioned by Feb-2020.

7

12.5MVA EMCO, 132/33KV X’mer at 132KV S/S Chanderi (Sl.No. 1023-10789)

11.09.2019 X’mer Tripped on Differential Trip indications

12.5MVA EMCO X’mer found defective in testing and is being replaced by 20MVA transformer by Nov-19 end. Latest status may please be intimated by MPPTCL in the meeting.

8 12.5MVA BHEL, 132/33KV at 132KV S/S Bhanegaon (Sl.No. 6000191) 

25.09.2019 X’mer Tripped on Differential Trip indications 

12.5MVA BHEL X’mer found defective in testing and is being replaced by 16MVA transformer by Nov-19 end. Latest status may please be intimated by MPPTCL in the meeting.

9 500 MVA, 400/220 KV X’mer at STPS.

19.04.2018

X’mer tripped at 21:55 Hrs. due to LA Burst. Emergency shutdown taken for 15 days from

21.04.18 to 05.05.18 for CPRI oil filtering and

RLA testing work.

Dismanteling & shifting work of 500 MVA ICT bank has been completed. Presently civil work is under progress. The work is expected to be completed by June 2020. MPPGCL intimated that X’mer winding is under inspection at Company.

10 50 MVAR (Make GE) Line Reactor at 400KV Sarni-Asta Ckt-I.

31.03.2018

Under outage since 31.03.18 due to concentration of

Acetylene gas. DGA test of transformer oil of

reactor was carried out by M/s CPRI, Bhopal.

M/s GE(T&D) India (OEM) deputed their team on dtd-30.10.2019 for internal inspection of reactor. Presently work is under progress. MPPGCL intimated that inspection has been completed and busing need to be replaced.

The matter was discussed.

ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF AUGUST 2019 AND SEPTEMBER 2019: The committee was apprised about the actual generation, Schedule from Central Sector, demand etc. are given in the following Annexures: Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of

MPPGCL & NHDC Hydel Units.

Annex. 4.2 Power Supply Position(Energy Balance Sheet).

POWER SUPPLY POSITION FOR THE MONTH : Aug 19

All Fig in MW

Particulars Max Dem Met on : 12-Aug-19

AT : 07-30

Average 01-10 Aug

Average 11-20 Aug

Average 21-31 Aug

Average

Monthly

STATE PEAK DEMAND MET 8606 7443 6978 7195 7205

BREAKUP :-

STATE THERMAL (Actual Gen) 1807 2315 1283 1228 1596

STATE THERMAL (RSD) Total MW

730 229 1542 1778 1202

STATE HYDEL 1586 386 1657 1823 1306

IPP (STATE) 327 285 326 330 314

CENTRAL SECTOR (Schedule) 3270 3017 2562 2944 2844

CENTRAL SECTOR (Surrender)

96 352 849 574 591

IPP (INTER STATE) 2102 1761 1500 1630 1630

RAILWAY 222 235 228 199 220

RENEWABLE ENERGY 873 777 986 623 790

OTHERS -303 -154 -292 -254 -234

BANKING / PURCHASE / SALE -1520 -901 -1112 -1195 -1073

DEVIATION 242 -62 -160 -133 -119

DEVIATION (AVERAGE) Between (-804 to 782)

Between (-877 to 282)

Between (-828 to 541)

Between(-877 to 782)

ENERGY SUPPLY STATE (LU)

1909.77

POWER SUPPLY POSITION FOR THE MONTH : Sep 19

All Fig in MW

Particulars Max Dem Met on : 06-Sep-19 AT : 19-15

Average 01-10 Sep

Average 11-20 Sep

Average21-31 Sep

AverageMonthly

STATE PEAK DEMAND MET 8685 7544 6939 6060 6822

BREAKUP :-

STATE THERMAL (Actual Gen) 2099 1667 1282 927 1280

STATE THERMAL (RSD) Total MW

1705 1899 2875 3064 2627

STATE HYDEL 1985 1759 1801 1840 1802

IPP (STATE) 341 330 321 274 307

CENTRAL SECTOR (Schedule) 2984 2664 2396 2332 2460

CENTRAL SECTOR (Surrender)

7 525 800 886 737

IPP (INTER STATE) 1851 1684 1790 1694 1722

RAILWAY 229 217 211 198 209

RENEWABLE ENERGY 197 387 737 366 492

OTHERS -10 -230 -277 -262 -256

BANKING / PURCHASE / SALE -879 -811 -1197 -1208 -1077

DEVIATION -113 -124 -126 -100 -116

DEVIATION (AVERAGE) Between (-601 to 509)

Between (-565 to 335)

Between (-741 to 543)

Between (-741 to 543)

ENERGY SUPPLY STATE (LU)

1903.32

Annex. 4.3 Hourly Average of Availability and Demand.

Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs.

ITEM NO. 5 : SYSTEM DISTURBANCE IN MP DURING OF AUGUST 2019 AND SEPTEMBER 2019: The committee was apprised about the Grid Disturbances and Grid Incidents in MP

during these months are given in Annexure 5.

MPPTCL was requested to submit the details/report of tripping at 400KV S/s Ashta on 21.09.2019 at

14:50Hrs. due to PT failure. ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:-

6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF

REACTORS / TRANSMISSION ELEMENTS:- The committee was apprised about the present status

regarding schedule and commissioning of reactors / transmission elements is as below:-

S.No. 400 KV S/s Size MVAR Implementi

ng Agency

Expected Date of Commissioning

as intimated in last OCC

1. Line Reactor on 400 kV Sapura–ISP line at STPS

50 MVAR MPPGCL

In 66th OCC MPPGCL informed that the price bid has to be opened and the reactor will be commissioned by June 2019. MPPGCL informed that previous tender was dropped & new tendering is under process.

2. Bus Reactor at SSTPS 125 MVAR MPPGCL

Work will be carried out under PSDF as intimated by MPPGCL in 62nd OCC in 66th OCC MPPGCL informed the committee that the drawing has been approved and reactor is expected to be commissioned by March 2019. In 68th OCC, MPPGCL informed the committee that reactor will be commissioned by October 2019. MPPGCL was apprised that considering commissioning of unit 3 and 4 at SSTPS stage II, early commissioning of 125 MVA reactor is required to ensure secure operation of grid. MPPGCL informed the committee that the civil work is completed and reactor is expected to be commissioned soon.

6.2 EXCESSTIVE TRIPPING OF 33 KV FEEDERS RADIATING FROM EHV SUB STATIONS:-

The committee was apprised that CE(T&C), MPPTCL vide letter no-1972 dtd-19.09.2019 informed about the

excessive tripping of 33KV Discome feeders emanating from EHV-substation. It was also mentioned that due

to lack of maintenance of these lines, during faults these lines trips along with 33KV incomers of 132/33KV

EHV X’mers, resulting in supply failures in the entire area fed by respective X’mer/EHV Sub-station. MPERC

also monitors these tripping and MD, MPPTCH has showed the concern about such excessive tripping of

33KV feeders. A sub-station wise list of 33KV & 11KV feeders under the control of Discoms on which

excessive tripping (10 & more that 10) is enclosed as Annexure-6.2.

In view of the above it is to mention that proper maintenance of these lines shall be shall be carried

out regularly by Discoms to reduce fault tripping for safe & secure grid operation. Further it is also requested to

issue suitable instruction to field officer to take necessary and corrective action so that the tripping may be

reduced which will improve the performance of company and increase revenue.

Representative from West Discom informed the committee that the reason for excessive tripping was

the bad weather and extended rainy season. Further the maintenance is being carried out regularly and

resulting in reduced trippings. The matter was discussed in the meeting.

6.3 IMPLEMENTATION OF PILOT PROJECT OF RRAS IN THE STATE OF MP:- The

committee was apprised that Hon’ble Central Electricity Regulatory Commission (CERC) vide order dated 13th

Oct 2015 in petition no 11/SM/2015 has given a roadmap for operationalization of generation reserves in the

country. To accelerate the implementation of Ancillary Services at State level a sub-group on “Reserves and

Ancillary Services at State Level” under FOR standing Technical Committee was formed. MP SLDC, MPPTCL,

Jabalpur and MPERC, Bhopal are also members of the sub-group. The task given by the committee to the

state SLDCs was to get hands on experience on Security Constraint Economic Despatching (SCED) through

“Solver” of MS Excel. MP SLDC had demonstrated the use of this model for economic dispatching in the

meetings of the committee.

In the third meeting of the sub-group the committee has opined and suggested MP SLDC to go ahead

in the matter to implement the system of SCED at MP State level on pilot basis. In the demonstrations it was

found that the application of SCED system may reduce the cost of operation considerably. Specially during

low demand period in different seasons of year or at different times of the day. It is, therefore, beneficial to

implement the SCED system at SLDC, MPPTCL, Jabalpur. In fifth meeting of the committee, the

representative of CERC has opined that instead of pilot projects in various states it would be more prudent to

bring a regulation for implementation of SCED. MP SLDC is ready to take up the project, whenever related

regulation is issued by CERC. After issuance of the regulation, It is expected that the implementation of the

SCED system at MP shall take place in the FY 2020-21, as implementation time of the system is approx. 6

months. For information to the members.

Member Secretary OCC stated that to bring the state close to techno-commercial scheduling and

dispatch and hence reduce the financial losses beard by the consumers. Thereafter Chairman OCC briefed

about the process.

6.4 DATA FOR WRPC OCCM OUTAGE APPROVAL:- WEB BASED OCC OUTAGES

SOFTWARE FOR REPLACING THE EXISTING GOOGLE SHEET:- The committee was

apprised that discussed in various MP-OCC, WRLDC has prepared Web Based Application Software for

planned outage coordination that would replace the existing coordination through Google Sheet. The Software

comprising following features and process:-

a) The proposed outages for upcoming OCC uploaded in web based portal before 5th of every month.

b) Compiled OCC outage could be viewed and commented before the OCC meeting.

c) Outage after approval in OCC, will be used for further processing.

d) The readiness of D-3 days will be filled in Web portal by concerned utilities through their login

credentials.

e) Non-OCC outages will be updated and same is presented to WRPC for approval, before being

considered for approval.

f) Anyone could comment and give their feedback before D-3 days.

g) The necessary utility concurrence may be availed before processing any outage.

h) The outage considered for approval could be viewed on D-2 days.

i) The outage approved by WRLDC on D-2 days could be viewed on web portal.

j) The final approved outage after NLDC concurrence is available on D-1 days in individual login

credential.

k) The re-schedule of outages is also done as per the approved guideline.

l) Everyone could view the outage approval status online.

The matter was discussed.

6.5 IMPLEMENTATION OF AUTOMATIC GENERATION CONTROL (AGC) AT SSTPP,

STAGE-I, KHANDWA:- The committee was apprised that Hon’ble Central Electricity Regulatory

Commission (CERC) vide order dated 13th Oct 2015 in petition no 11/SM/2015 has given a roadmap for

operationalization of generation reserves in the country. The objective of the Order was to provide a vision to

introduce Spinning Reserves in the country, which is one of the components for ensuring grid security, quality

and reliability by achieving adequacy of supply and maintaining load-generation balance Essentially, AGC

delivers reserve power to bring back the frequency and the area interchange schedules to their target values

and restores the delivered primary control reserves.

In view of the above MP SLDC has also planned and proposed to implement AGC in Singhaji STPP,

Khandwa Stage-I. The criteria for identification of SSTPP for AGC is similar to approach adopted by NLDC for

NTPC Generating Plants. The SSTPP has comparatively high variable cost, which will enable to keep

Spinning Reserves in the same, due to high chances of surrender of power by the beneficiaries. Further, the

plant has 100% capacity allocation tied up with MPPMCL and is having updated technology because of it’s

latest inception. For information to the members.

The matter was discussed.

6.6 FREQUENT TRIPPING OF 132 KV VSTPS – WAIDHAN CKT – I AND 132 KV

VSTPS – WAIDHAN – MORWA CKT – II:- The committee was apprised that 132 KV VSTPS –

Waidhan Ckt – I & 132 KV VSTPS – Waidhan – Morwa Ckt – II is tripping frequently as detailed below:-

NAME OF ELEMENT OCT 2019

132 KV VSTPS – WAIDHAN CKT – I 12:00/16.10.2019 

10:05/24.10.2019 

132 KV VSTPS – WAIDHAN –

MORWA CKT – II

10:40/13.10.2019 

It is to intimate that the above mentioned circuits are inter-state circuits and frequent tripping of these

circuits causes interruption Waidhan, Morwa &Rajmilan substations. MPPTCL is requested to kindly

investigate the reason for frequent tripping of these circuits and address the issue so that the tripping of these

circuits is not repeated in future.

T&C and EHT-M MPPTCL was requested to kindly investigate the issue of frequent tripping of the

above mentioned elements.

EHT-M MPPTCL informed the committee that tree cutting & chopping has been done after rainy

season and it is expected that the tripping of these circuits will be reduced.

The matter was discussed.

6.7 REVIEW AND UPDATING LOAD DROPPING SCHEME/ SYSTEM PROTECTION

SCHEMS (SPS) AT SUBSTATIONS IN M.P TO HANDLE EMERGENCY CONDITION: -

The committee was apprised that the integration of new transmission elements in the grid it is to bring to the

notice that the existing load drop scheme shall also be reviewed and updated timely as per the updated

network. It is also to bring to the notice that at 132 KV S/s Chambal on dtd- 28.05.2019 at 13:04 Hrs. 132 KV

Chambal – North Zone Ckt – I & II tripped as Y-Phase conductor of ckt – II snapped resulting in overloading &

tripping of 132 KV Indore SZ – Satsai Ckt & 132 Kv Indore SZ – E.Complex ckt even after operation of load

drop scheme. Hence it can be gathered that after up gradation of 132 KV North Zone S/s to 220 KV S/s North

Zone the load drop scheme has not been revise accordingly. It is also to intimate that the load drop scheme

shall also be reviewed according to the increasing 33 KV load.

MPPTCL is requested to review the existing load drop scheme (SPS) and to implement new load drop

scheme as per requirement as per undated network and submit to SLDC.

In view of the above it is requested that the complete details of all SPS commissioned in MP by

MPPTCL along with load shed quantum, may be submitted to SLDC so that the copy of the same could be

placed in Control room of SLDC and concerned substation / power station for reference & record and the

same can also be submitted to WRLDC. The matter was discussed.

6.8 WRLDC TRIPPING PORTAL:- The committee was apprised that as intimated by WRLDC in

529th WR-OCCM, that WRLDC has started a tripping portal from 01.06.2019 for uploading FIR, DR/EL and

other details related to the tripping of all 400KV elements, important grid elements, inter-state/inter-regional

links and lines connected to PGCIL. Further details major Grid Disturbance resulting in significant load

loss/generation loss is also required to be uploaded on the WR-Portal and as per IEGC 54.2(r), utilities need

to submit the data within 24 hours of the event. The link

(https://portal.wrldc.in/Trippingnew/Account/Login.aspx) , common user ID & password for the entities of MP

has been shared with all the entities vide this office letter No.07-05/RPC-51/ 18.06.2019. As advised in 529th WR-OCCM, all Utilities are requested to use and submit the data through the

WRLDC tripping portal. Therefore, entities are requested to use and upload the FIR, DR/EL and other details

related to the tripping of elements mentioned above, in the Tripping Monitoring System of WRLDC within

stipulated time.

It is to inform that despite of continuous reminders the DR/EL files for the tripping incidences is not

being uploaded on the WRLDC tripping portal. The list of incidences for which the submission & uploading of

DR/EL on WRLDC tripping portal is pending for the month of OCTOBER 2019 is as detail below:-

S.NO. NAME OF ELEMENT TIME & DATE OF TRIPPING

1. 220 KV GWALIOR - GWALIOR - I 02:55HRS. ON 02.10.2019

2. 220 KV GWALIOR - GWALIOR - II 02:55HRS. ON 02.10.2019

3. 220 KV GWALIOR - MAHALGAON(MP) - II 02:55HRS. ON 02.10.2019

4. 220 KV HOSHNGABAD-ITARSI CKT-1 04:50HRS. ON 12.10.2019

5. 132KV VSTPS-WAIDHAN-2 10:40HRS. ON 13.10.2019

6. 400 KV INDIRASAGAR - SATPURA - I 20:53HRS. ON 18.10.2019

7. 400 KV INDIRASAGAR - INDORE - II 20:53HRS. ON 18.10.2019

8. INDIRASAGAR - 400KV - BUS 2 20:53HRS. ON 18.10.2019

9. 400KV SEONI - KIRNAPUR 01:57HRS. ON 24.10.2019

10. 400KV SEONI - KIRNAPUR 23:25HRS. ON 24.10.2019

11. 400KV SEONI - KIRNAPUR 13:01HRS. ON 25.10.2019

12. 400KV BHILLAI- KIRNAPUR 12:53HRS. ON 26.10.2019

13. 400KV BHILLAI- KIRNAPUR 14:59HRS. ON 26.10.2019

14. 220 KV BHANUPURA - MODAK – I 21:56HRS. ON 31.10.2019

The matter was discussed.

6.9 PROTECTION COORDINATION DURING INTEGRATION OF NEW INTRA-STATE

ELEMENTS:- The committee was apprised that in compliance to the IEGC & WRLDC operating procedure

the protection coordination of the existing elements & adjacent substations shall be prior to integration of new

intra state elements. All the concerned entities are requested to ensure/review the protection coordination of

adjacent substations/elements and confirm the same along with the firsttime charging documents for intra

state elements also.

6.10 AVAILING SHUT DOWN ON NON-ISTS ELEMENTS (ELEMENTS FOR WHICH

ONLY APPROVAL OF MP-SLDC IS REQUIRED) AND OUTAGE MODULE THEREOF:-

The committee was apprised that parallel run of the ABT, OA & MIS system is in progress and the outage

module has already been initiated (link:- http://223.31.122.117:8080/EltrixPortal/login.jsp). Further it is to

inform that the User ID and Password for all the circles/generating stations/EHT-M/EHT-C along with user

manual of the outage module has already been provided vide this office e-mail dtd-14.01.2019. Also vide this

office letter no. No No.07-05/174-B/Kalki/131 dtd-15.01.2019 all the concerned entities/authorities were

requested to communicate the User ID/Password & issue necessary directives to the respective authorities to

initiate the use of web based outage module.

In view of the reliability and safe & secure grid operation entities were requested to follow the outage

procedure and submit the outage request well in advance i.e., on D-3 basis by 17:00 Hrs. only the emergency

shut down request shall be made on D-1 day or in real time.

In view of the above all the concerned entities were requested to submit/process the outage, tripping,

generator outage, generator start/stop, new element charging request through web based outage module in

addition to the existing practice. It is also to mention that from 01.04.2019 it will be mandatory to process the

outage request through outage module only, hence all the entities shall approach for approval of shut down

through outage module. In case of any queries/addition of element/etc the entities can write to us on e-mail:-

[email protected], [email protected]. It is also to mention that WRLDC has developed a separate

portal for WR-OCCM approval of outage of ISTS elements which shall be discussed separately.

The matter was discussed.

6.11 MAPPING OF FEEDERS:- The committee was apprised it has been requested to initiate the

process of mapping of AUFLS feeders in SCADA system, however no any progress in this regard noticed so

far. In 8th NPC, it has been decided that WRPC would submit the details / progress of feeder mapping to NPC

Secretariat on regular basis (quarterly).

In view of above, it has been requested quarterly details/ progress of mapping of feeders may kindly

be furnished so that same may be communicated to WRPC for onward communication.

6.12 INSPECTION OF RELAYS OF AUTOMATIC UNDER FREQUENCY LOAD

SHEDDING AND CERTIFICATION THEREOF: - The committee was apprised that it is desired that

for safe & secure operation of integrated system, the under frequency relay should be connected in the system

in healthy condition. Accordingly, WRPC is pressing hard to provide the self-certified status of healthiness of

relays of Automatic Under Frequency Load Shedding (AUFLS) and periodic checking of the same. Vide this

office various correspondence. The CE (T&C) and also SE(T&Cs) were requested to provide status of

healthiness of relays of Automatic Under Frequency Load Shedding on priority basis to SLDC, so that same

may be communicated to WRPC. Inspite of repeated request vide various correspondence, moreover the

matter had been raised in OCC meeting of MP in time to time, however the desired information are still

awaited from utilities.

It is therefore desired that the above matter may be treated as urgent and status of healthiness of

Automatic Under Frequency Relays may be provided to SLDC and also the under frequency may be tested

periodically. In this context it is also mentioned that time to time WRPC official as well as SLDC official shall

visit the sub-stations to ascertain the healthiness of under frequency relay.

The matter was discussed.

6.13 PROVISION OF SYNCHRONIZATION FACILITY AT EHV SUB-STATIONS OF MPPTCL

AND AT ALL POWER HOUSE: - The committee was apprised that as per Grid Code, the synchronization

facility should be available at all the Power Stations, 400 KV Sub-stations, 220 KV Sub-stations and 132 KV

sub-stations in the path of black start. In 60TH OCC meeting MPPTCL representative informed the committee

that order for 69 no. synchronization trolleys has been placed and 1 no. synchronization trolley has been

delivered for checking and testing purpose at 220KV S/S Barwaha. In subsequent meetings this issue has

been discussed. However, no any fruitful progress has been observed so far. In the above context it is

indicated that at Manikheda HPS and Rajghat HPS synchronization facility is not available. It is felt that every

Hydel Power station should be equipped with synchronization facilities invariably for system reliability and

Crises Management. Also at Manikheda HPS & Rajghat HPS single bus system exists, hence MPPGCL is

requested to explore the possibility for commissioning of Double Main Transfer Bus system. Thus, MPPGCL is

requested to provide synchronization facility at Manikheda HPS and Rajghat HPS and MPPGCL may kindly

provide status of making synchronization facility in aforesaid HPS.

The MPPTCL may kindly provide the status of installation and commissioning of

synchronization trolleys at different substations. Further, is also requested to indicate, whether

synchronization facility could be provided at Karera & Pichhore substation on priority basis. The

matter has been discussed with officers of T&C wing, it is conveyed that they are making arrangement

for installation of synchronizing trolley at Pichhore S/s at the earliest. T&C may please update the

position.

The matter was discussed in the meeting.

ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS :

Black Start mock drill of Hydel stations of MPPGCL:- During 2019-2020 the proposed / tentative dates for

conducting black start mock drill at various Hydel power station of MP is detailed as mentioned below:-

S.NO. NAME OF HPS PROPOSED/TENTATIVE

DATE OF MOCK DRILL

1 BIRSINGHPUR HPS 28.11.2019

2 PENCH HPS 04.12.2019

3 BARGI HPS 24.12.2019

4 MANIKHEDA HPS 26.12.2019

5 ISP

To be discussed. 6 OSP

7 TONS HPS

All the concerned entities are requested to review the proposed tentative dates for conducting black

start mock drill and confirm the readiness in the meeting. It is also requested that the generators shall intimate

the Unit No. and the Bus No. on which the mock drill is to be conducted.

MPPGCL confirmed the proposed dates for conducting the mock drill.

ITEM NO. 08: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES:

8.1 TESTING &CALIBRATION OF METERS AND NON-RECEIPT OF TIMELY JMR

DATA:

1. SLDC representative requested CE(T&C) office to apprise about the status of testing / calibration of

interface meters as per Regulations 10 and 18 of Central Electricity Authority (Installation and operation of

meter) Regulation 2010 to the committee. CE(T&C) office representative informed that order for testing /

calibration of all interface meters is under process.

2. SLDC representative informed that the complete load survey data of ABT meters installed at the

interface points of Open Access Customers, HT Consumers, Railways TSS end and REGs is not received

through AMR System and site officials are also not furnishing the load survey data timely. CE(T&C) office is

requested to include these meters under AMC contract of M/s Secure Meters Ltd. and issue instructions to

field offices for downloading and furnishing the missing data to SLDC on time. CE(T&C) office representative

informed that letters will be issued to concerned entities for including the ABT meters installed at the interface

points of Open Access Customers, HT Consumers, Railways TSS end and REGs under AMC contract of M/s

Secure Meters Ltd. and also instructions will be issued to field offices for downloading and furnishing the

missing data to SLDC on time.

8.2 NON RECEIPT OF ABT METER DATA OF RAILWAY TSS THROUGH AMR

SYSTEM:- SLDC representative informed that ABT meter data of following TSS of Railways is not being

received through AMR system:

1. Railway TSS Mansakra.

2. Railway TSS Khirkiya

3. Railway TSS Bhitoni.

4. Railway TSS Narsinghpur.

5. Railway TSS Mungaoli.

6. Railway TSS Pandurna.

7. Railway TSS Manjhgawan.

8. Railway TSS Nainpur.

Railway representative informed that in above TSS, SIM’s have been replaced and problem regarding

downloading of meter data shall be resolved shortly. SLDC requested the Railways to include all TSS end

meters under AMC contract of M/s Secure Meters Ltd. in coordination with MPPTCL. SLDC also requested

Railways to coordinate with MPPTCL for resolving the problems related with downloading of meter data of

remaining TSS through AMR installed at SLDC. Railways assured for the same.

8.3 AMR FACILITY FOR THE ABT METERS INSTALLED AT MPPGCL:-SLDC representative

informed that MPPGCL has provided AMR facility on 107 Nos ABT meters installed at the interface points and

all the meters were successfully integrated with AMR server. He also informed that every month data of

around 35-40 Nos. meters do not received through AMR to SLDC. MPPGCL requested to take up the matter

with site officials and M/s Secure Meters Ltd. to resolve the problems related with non readability of meters

which were integrated successfully and provide AMC of AMR facility to M/s Secure Meters Ltd. so that

complete data is received by SLDC. MPPGCL representative intimated that matter is being taken up with M/s

Secure Meters Ltd for providing AMC of AMR system.

SLDC representative informed that 15 minutes blockwise data recorded in the meter no. XD435287

installed at GT of SSTPS PH-II unit-III do not match with midnight data i.e monthly injection data. The issue

was informed to CE, SSTPP and ED(O&M:Gen), Jabalpur vide letter No.07-05/SG-11/SEM/347 dated

14.02.2019. The same problem was also observed in the meter no. XD435284 installed at GT of SSTPS PH-II

unit-IV and in the meter no. XD435283 & XD435282 installed at 400KV SSTPS- Pithampur Ckt-3 &4.

MPPGCL representative intimated that matter has been taken up with M/s Secure Meters Ltd. and with M/s

L&T for resolving the problem.

8.4 TIME DRIFT IN ABT METER INSTALLED AT THE POOLING STATIONS OF WIND

AND SOLAR GENERATING STATIONS AND SLIDING WINDOW PROBLEM:- SLDC

representative stated that as already informed in previous OCCMs, the following ABT meters installed at

Pooling Stations of Solar Power Projects has time drift and thus not recording the correct data. He also

informed that SLDC has already requested to Generators with copy to concerned licensee vide letter no. 2353

dated 31/08/2019 for time synchronization of the ABT meters with GPS so that correct DSM account of these

Wind and Solar Projects is issued by SLDC.

Sr.No. FEEDER NAME LOCATION NAME Location VOLTAGE

LEVEL Meter No

1. 33 KV UJAS -2

ICHHAWAR 132KV S/S ICHHAWARGrid S/s End 33 MPC59975

2. 33KV

BHADRESH_SUSNER 132KV S/S SUSNER Grid S/s End 33 XB593639

3. UJAAS-1 AGAR 132KV S/S AGAR Grid S/s End 33 MPC59595

4. UJAAS-2 AGAR 132KV S/S AGAR Grid S/s End 33 MPC59596

5. 33 KV UJAAS 1 BERCHHA 132KV S/S BERCHHA Grid S/s End 33 XB571652

6. 33 KV UJAAS 1 SUSNER 132KV S/S SUSNER Grid S/s End 33 XB571653

SLDC representative further informed that ABT meters installed at the following Wind and Solar

Generating Stations are recording the 15 minutes block wise data on sliding window principal thus block wise

data do not match with midnight data. These meters need immediate replacement. The ABT meters installed

at the following Wind and Solar Generating Stations are recording the 15 minutes block wise data on slinding

window principal thus blockwise data do not match with midnight data. SLDC has requested to Generators

with copy to concerned licensee vide letter no. 2353 dated31/08/2019 for immediate replacement of these

ABT meters.

Sr.No. Feeder Name Substation ABT Meter No. QCA NAME

1 33KV SUZLON-I SAILANA

132 KV S/S

SAILANA

XE479853

REConnect Energy Solution

Pvt Ltd

2 33KV SUZLON-II SAILANA

132 KV S/S

SAILANA

XE479854

REConnect Energy Solution

Pvt Ltd

3

33KV SUZLON-III SAILANA

132 KV S/S

SAILANA

XE479855

REConnect Energy Solution

Pvt Ltd

4 33KV SUZLON-I RATLAM

132KV S/S

JAORA

XE479856

REConnect Energy Solution

Pvt Ltd

5

33KV SUZLON- IV RATLAM

132KV S/S

JAORA

XE479859

REConnect Energy Solution

Pvt Ltd

6 33KV SUZLON- V RATLAM

132KV S/S

JAORA

XE479860

REConnect Energy Solution

Pvt Ltd

7 33KV SUZLON-IV AGAR

132KV S/S

AGAR

XE479864

REConnect Energy Solution

Pvt Ltd

8 33KV SUZLON-V (SUSNER-

III)

132KV S/S

SUSNER

XE479867

REConnect Energy Solution

Pvt Ltd

9 33KV SUZLON-III (AGAR- I),

132KV S/S

AGAR

XE479863

REConnect Energy Solution

Pvt Ltd

10 33KV SUZLON BEHAPUR

DALODA-I

220 KV S/s

DALODA

XE479862

REConnect Energy Solution

Pvt Ltd

11 33KV SUZLON BEHPUR

DALODA-II

220 KV S/s

DALODA

XE479861

REConnect Energy Solution

Pvt Ltd

12 33KV SUZLON I (SUSNER-

I),

132KV S/S

SUSNER

XE479866

REConnect Energy Solution

Pvt Ltd

13 33KV SUZLON I (SUSNER-

II),

132KV S/S

SUSNER

XE479865

REConnect Energy Solution

Pvt Ltd

14 33KV AVP POWER INFRA

PVT LTD.,

132KV S/S

SONKATCH

XD595991

XD595994

REConnect Energy Solution

Pvt Ltd

15 33KV BADONI POWER PVT.

LTD.

132KV S/S MAXI

XD522128

XD558031

REConnect Energy Solution

Pvt Ltd

16 33 KV M P Wind Farm,

Nagda Hill

220

KVS/SDewas XE525393 Manikaran Analytics Ltd.

17 33 KV Suzlon Gujrat Wind

Park , Barod

220 KV S/S

Barod

XD595984

XD595980 Manikaran Analytics Ltd.

SLDC representative requested to DDCs, Indore & Bhopal to take-up the issue with concerned officials for

time synchronization and replacement of ABT meters. DCCs Bhopal assured to take up the issue with

concerned officials of Discoms. DCCs Indore representative have not attended the meeting.

 

ITEM NO. 9: SCADA and E&T RELATED ISSUES: 9.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & 132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS /TRACTION FEEDERS:-

It was informed during the meeting that integration of telemetry of 132 KV VFJ with SLDC SCADA is

pending. MPPTCL informed that integration work shall be completed within a week time.

SLDC informed that 220 KV Sheopurkalan S/s has been charged but telemetry of this substation is

not yet provided to SLDC despite various pursuances by SLDC. MPPTCL informed that the RTU has been

dispatched and its integration shall be done shortly.

Further, SLDC informed that telemetry of Birsinghpur HPS and Zinna HPS is also not available and

same needs to be provided by MPPGCL. MPPGCL informed that the order for RTU has already been placed

and drawing has been approved & RTU will be delivered within 3 months.

SLDC informed that MPERC regularly monitors & enquires about the reason of RTUs pending for

integration & thus SLDC requested MPPTCL & MPPGCL to take up this matter on topmost priority.

9.2 TELEMETRY OF BUS VOLTAGE IN DFE RTUS:- SLDC informed that in substations having

DFE RTUs, the telemetry of Bus voltage is extended through MFM provided for transformer telemetry. This

results in wrong Bus Voltage in case of outage of transformer.

MPPTCL (T&C) informed that this work shall be done in a phased manner. Firstly, the telemetry

integration of bus voltage through separate MFM shall be done for 400 KV Substations which will be

completed within a month. In second phase, the same shall be done for important 220 KV S/s depending upon

the availability of spare MFM. CE(T&C) office will also work out the requirement of MFM for all 220 KV S/s, for

which providing separate voltage shall be taken up in second phase.

9.3 PROVIDING TELEMETRY OF ISOLATORS OF 400 KV SUBSTATIONS:- SLDC informed

that telemetry of isolators is required for real time grid monitoring as well as for better functioning of EMS

system. NLDC & WRLDC are constantly requesting to provide the telemetry of isolators of 400 KV, 220 KV

substations & Generating Stations; and reason for non-integration of telemetry of isolator status.

MPPTCL informed that auxiliary contacts are not present in isolators of MPPTCL substation & thus it is

not possible to provide the telemetry of isolators. However MPPTCL informed that arrangement of auxiliary

contacts & extension of telemetry of isolators will be ensured for new substations.

MPPGCL informed that telemetry integration of isolators shall be done on top most priority wherever

possible and in places where RTUs are under replacement, provision of isolators shall be made while

procurement of new RTUs.

SLDC also requested ISP to provide telemetry of isolators in response to which ISP informed that

isolator signals are already available in ISP SCADA system from where telemetry to SLDC is proposed to be

provided through IEC gateway. Accordingly, while commissioning of telemetry through ISP SCADA, the

isolators status shall be provided to SLDC.

SLDC pursued the matter with JP Bina to provide the telemetry of isolators in which JP Bina informed

that their SCADA upgradation is being carried out & the telemetry of isolators will be extended to SLDC after

completion of upgradation of their SCADA by end of December 2019.

9.4 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED

VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS:- SLDC informed

that the telemetry discrepancies pertaining to MPPGCL generating stations is detailed below :-

1. Satpura TPS :-

Sr.No. Description Unit Pending

since

MPPGCL

response in

meeting

dtd.30.10.18

MPPGCL response in 72nd OCC

1 400 KV Satpura -

Itarsi

MW 8 months - MPPGCL informed that transducer has

been replaced in 400 KV Satpura-Koradi

and transducers of 400 KV Satpura-Seoni

& 400 KV 400 KV Satpura-Itarsi shall be

replaced soon.

2 400 KV Satpura-

Koradi

MW 8 months -

3 400 KV Satpura- MW 8 months -

Seoni

4. Gen-7 GT MVAR More than 1

year

- MPPGCL informed that the unit is to be

dismantled, so procurement of transducer

is not possible. SLDC requested MPPGCL

to utilize the spare transducers, if any, for

replacement. SLDC informed that

transducers may also be arranged from

MPPTCL wherein some RTU having

same transducres is replaced with

Dongfeng RTUS. However no progress in

the matter has been observed.

5. 400 KV Astha 1 &

2

Line

Reacto

r

Commission

ing

MPPGCL informed

that signals of

reactor are

configured in

database of

Satpura SCADA

system but values

are not being

conveyed to

SLDC. NIT has

been issued for

configuration of

point & it shall be

completed within

one month.

MPPGCL informed that engineer of service

provider will visit the site & it will be

configured at the earliest. However despite

continuous pursuance, the telemetry is still

not available to SLDC.

6. Gen-8,9

Generating

Transformer

MW,M

VAR

One week

2. SGTPS :-

Sr.No. Description Unit Pending

since

MPPGCL response in meeting

dtd.30.10.18

MPPGCL response in

72nd OCC

1. STN TR 1 (220

KV)

CB More than

one year

MPPGCL informed that cabling work of

breaker upto RTU panel is required to

be done & shall be done within one

month.

MPPGCL informed that no

work has been done.

MPPGCL is requested to

provide current progress in

the matter.

2. 220/33 KV

Transformer

MW/MVA

R

More than

one year

MPPGCL informed that it shall be

provided within one month.

MPPGCL informed that all

the discrepancies will be

rectified after procurement

of transducers. MPPGCL

is requested to provide the

current progress in the

matter.

No response from

MPPGCL in the matter

from MPPGCL has been

observed.

3. 400 KV Bus 1

Freq More than

ten months

MPPGCL informed that corrective

action including testing of

transducer/arrangement of new

transducer shall be completed within a

month.

4. 220 KV Bus 2 Voltage More than

ten months

MPPGCL informed that procurement of

transducer is under process & it shall

be commissioned by March-19. SLDC

informed that recently RTU of Rajghat

& Devlond has been replaced, so

transducers can be arranged from

Rajghat & Devlond till procurement of

new transducers.

3. Gandhi Sagar HPS :- SLDC informed that restoration of telemetry of GS HPS is pending due to fault in

RTU. MPPGCL informed that the problem will attended within a month.

4. Rajghat HPS :-

Sr.No. Description Unit Pending

since

MPPGCL response in meeting

dtd.30.10.18

MPPGCL response in

72nd OCC

1. 33 KV

Rajasthan(Kuakh

eda) feeder

MW/MVA

R

Commission

ing

SLDC informed that the telemetry of

this feeder is of utmost importance as it

is an inter-regional feeder. MPPGCL

informed that they will arrange for the

telemetry of this feeder on priority.

MPPGCL informed that

these discrepancies shall

be rectified after

upgradation of RTUs.

2. 132 KV Bus 1 Voltage 2 months Wrong Values No response from

MPPGCL

3. 132 KV Bus 2 Voltage 2 months Wrong Values No response from

MPPGCL

Sr.N

o.

Description Unit Pending

since

MPPGCL response in meeting

dtd.30.10.18

MPPGCL response in 72nd

OCC

1. Gen-3 CB Commission

ing of new

RTU

MPPGCL informed that it shall

be rectified at the earliest.

SLDC informed that all above issues are pending since long time creating problem in grid

management. In response, MPPGCL informed that a separate meeting shall be conducted at SLDC

with officers from Power Stations and SLDC, so that exact problems may be identified. SLDC

requested MPPGCL to arrange the meeting on top most priority.

SLDC informed the list of telemetry discrepancies pertaining to MPPTCL/IPP substations is detailed

below:-

(a) Transmission/ other Generating Substations :-

Sl

No. Name of Substation Name of feeders/transformers

01 400 ISP

1.Telemetry of 125 MVAR Bus Reactor not available.

2.Telemetered values of 400 KV Nagda MW & MVAR

is 10 times of actual value.

3. Telemetered values of 400 KV Indore-1 MW.

4. MVAR values of all generators

5. Non-current data of generators in OFF

condition.

6. Digital telemetry including CB status,

RGMO/FGMO & SOE is not available.

02 220 KV Rajgarh Biaora 1. 220 KV TBC CB status

2. 220/132 KV Xmer 2 MVAR

03 400 KV Chhegaon Wrong CB status of :-

1. 400 KV Transfer Bus Coupler

04 400 KV Julwaniya This problem is persisting since last 8 months. No

action in the matter has been taken.

1. All 132 KV CB status showing open.

2.CB of 220KV Sendhwa feeders 1,2

3. CB of 220/132 KV Xmer-1

05 400 KV Katni Wrong CB status of 400 KV Damoh-1 & 125 MVAR Bus

Reactor

06 400 KV Kirnapur Wrong values of 132 KV Balaghat 1 & 2 (in case of load

above 30 MW)

07 400 KV Pithampur Faulty CB status of 400 KV Singhaji Ckt-4

08 220 KV Nimrani Telemetry of 33 KV Maral is to be provided

09 220 KV Kotar Faulty CB status of 132 KV RTS

10 220 KV Panagar Faulty CB status of 220 KV Sukha

11 220 KV Ujjain 1. Faulty CB status of 132 KV Bus Coupler

2. Faulty CB status of 220/132 KV Xmer-2

12 220 KV Chhatarpur Faulty CB status of 220 KV Bus Coupler

13 220 KV Rajgarh Dhar 1. 220 KV all feeders CB suspected

2. 132 KV all feeders CB suspected

3. 220 KV Bus-1 Voltage

14 220 KV Ratlam 1. 220 KV TBC CB faulty

2. 220 KV Daloda CB faulty

15 220 KV Julwaniya Wrong MW value of 220/132 KV Xmer

16 132 KV Umariya All Analog Values are zero (PT Burst)

ISP informed that case for addition of IEC gateway in ISP SCADA/EMS shall be completed by

Dec-19. MPPTCL informed that telemetry discrepancies pertaining to substations telemetered through

DFE RTUs will be attended within 1 week. The telemetry discrepancies pertaining to substations

telemetered through other RTUs shall be attended within 2 weeks if possible, otherwise the telemetry

of these substations will also be integrated through DFE RTUs.

9.5 EXTENSION OF RGMO/FGMO SIGNAL TO SLDC/WRLDC :- SLDC informed that

extension of RGMO/FGMO signal of following generating units is still pending:-

S.No. Name of Generating

Station

Unit.No. MPPGCL response

1 SGTPS 1,2,3,4 MPPGCL informed that integration of RGMO/FGMO

status shall be done by March-2020.

2 BARGI HPS 1,2 MPPGCL informed that integration will be done by

Jan-20.

Wrong RGMO/FGMO signal status :-

S.No. Name of Generating

Station

Unit.No. Remarks

1 TONS 1,2,3 MPPGCL informed that the shift officials will be

instructed to manually ON/OFF the RGMO status

after taking unit in/out of service.

2 ISP All units ISP informed that it will be available after

commissioning of telemetry through IEC gateway.

3. SSTPS Phase II 3,4 MPPGCL informed that it will be completed within a

month time.

9.6(A) NON AVAILABILITY/ UNRELIABLE TELEMETRY OF HYDEL POWER STATIONS

:- SLDC informed that the telemetry of Hydel Power Stations is very unreliable & frequent long outage with

abnormal delay in restoration of same is observed. The RTU availability of MPPGCL HPS is as detailed here

under :-

RTU AVAILABILITY SEP AVAILABILITY OCT

RAJGHAT HPS 90 95

BARGI HPS 86 85

MADIKHEDA HPS 80 79

GANDHI SAGAR HPS 0 0

PENC HPS 98 99

DEOLOND HPS 84 79

TONS HPS 82 80

SLDC informed that in hydel power stations, skilled manpower is not available for attending the telemetry

issues & considerable time is taken for restoration of telemetry.

SLDC further informed that the matter regarding arrangement of RTU/PLCC spares, measuring

instruments & adequate trained manpower at MPPGCL stations has been discussed in last various OCC

meetings. However MPPGCL has not taken any actions regarding this matter.

MPPGCL was thus again requested to take following measures to ensure round the clock availability of

real time data to SLDC:-

1. Arrangement of essential spares at power stations and one set of all spares at centralized location

with intimation to all power stations

2. Arrangement of training to persons looking after telemetry work.

3. Arrangement of measuring instruments like level meters wherever not available.

4. Ensuring availability of RTU configuration at all power stations.

MPPGCL agreed to look into the matter on highest priority. Further, it was decided to discuss these issues

in separate meeting proposed at SLDC with power station officers.

9.6(B) NON AVAILABILITY/ UNRELIABLE VOICE COMMUNICATION BETWEEN SLDC

TO THERMAL/ HYDEL POWER STATIONS :- SLDC informed that despite constant pursuance

most of the PLCC voice communication of various power stations to SLDC is out since long time. The details

of outage are here as under:-

Sr.No Name of

HPS/TPS

2 wire PLCC

channel

MPPGCL response in meeting

dtd.30.10.18

Remark

1.

Bansagar- IV

PLCC voice

communication is not

established

Mr.Vinay, AE, Tons HPS informed

that he will visit Bansagar-IV for

restoration of voice communication of

Bansagar-IV at the earliest.

Restoration of PLCC

channel is still

pending.NO action in

the matter is initiated

by MPPGCL.

2.

Madikheda

PLCC voice channel

is not working since

last two and half

years.

Restoration of PLCC

channel is still pending.

In last two OCCM,

MPPTCL was

requested to arrange

for extension of voice

channel utilizing

Mahalgaon wideband

node in coordination

with Madikheda HPS.

3

Birsinghpur HPS

/TPS

PLCC voice channel

is not working since

long time due to faulty

PLCC exchange at

Birsinghpur.

AE Birsinghpur informed that

presently voice communication

between SLDC to thermal power

house is proper & the commissioning

of EPAX at site is under progress. AE

Birsinghpur assured that the voice

channel of Birsinghpur HPS shall be

restored within one month.

Restoration of voice

channel is still pending.

SLDC informed that matter regarding Non Availability/ Unreliable voice communication Between SLDC to

Thermal/ Hydel Power Stations was discussed in last various OCC meeting & special meeting on 30.10.18,

however 2 wire voice facility extension of Singhaji 1 & 2 TPS, Madikheda HPS is still pending.

MPPGCL agreed to arrange for the same. Further, it was decided that the matter shall be discussed in

the proposed meeting with MPPGCL filed officers.

9.6(C) REPLACEMENT OF RTUS IN THERMAL POWER STATIONS:- SLDC informed that

large no. of discrepancies pertaining to MPPGCL Thermal Power Station are pending since long time. The

various discrepancies are due to non-availability of desired spares, non renewal of AMC contract of RTUs,

Modems, PLCC equipments. The replacement of RTUS in thermal power stations is required to be arranged

to ensure round the clock availability of telemetry. SLDC informed that it was requested earlier to arrange the

replacement of RTUs. However, no feedback in the matter is provided to SLDC. SLDC has also pursued the

matter vide UO dtd.12.09.19. MPPGCL was thus again requested to arrange for replacement of RTUs in

Thermal Power Stations. MPPGCL informed that matter shall be discussed in proposed separate meeting with

MPPGCL field officers.

9.7 DUAL DATA CHANNEL CONNECTIVITY FOR POWER STATIONS:- SLDC informed that

presently most of the Power Stations to SLDC/Backup SLDC only single channel is established. Looking the

data availability of Power Stations and recently implemented CERC new DSM regulation w.e.f. 1st January,

2019 it is required that each Power Station shall have dual data channel to avoid any outage/discrepancy in

real time data of Generation Station. Therefore to reduce outage due to single data channel failure, MPPGCL

& NHDC were requested to arrange / ensure dual data channel from each Power Stations so that continuity of

real time data to SLDC/Backup SLDC SCADA all the time may be achieved. MPPGCL representative informed

that the matter shall be discussed in proposed separate meeting with MPPGCL field officers.

9.8 NON AVAILABLITY & WRONG TIME STAMPING OF SOE AT SLDC SCADA:-SLDC

informed that on some instances, it has been observed that the SOE was not received or wrong time stamping

of SOE was received in SLDC SCADA system. The matter was taken up with field for verification for proper

configuration /connections of SOE data in RTUs & after long pursuance, the matter was investigated and it

was found that the settings “inf code 2” & “inf code 4” were not correct in Dongfeng make RTUs. These

settings have now verified and changed in some of the RTUs and SOE with correct time stamping from RTUS

where settings were modified is now receipt in SLDC SCADA/EMS system.

Further SLDC informed that the SOE verification of all RTUs is being done & out of 175 RTUs, SOE

verification of 165 RTUs has been done & requested MPPTCL to expedite the SOE verification of balance

RTUs at the earliest. MPPTCL informed that they have instructed all the field offices to coordinate with SLDC

for SOE verification.

9.9 UTILIZATION OF W.B NODE AT BIRSINGHPUR TPS :- SLDC informed that despite

constant pursuance utilization of node at Birsingpur TPS is still pending since last two years due to pending

work of laying of cable form W.B node location to PLCC room, Exchange room and RTU. It was informed by

SLDC that complete scheme to extend wideband facility upto RTU was prepared by SLDC and forwarded to

SGTPS around two years back. The matter is pursued by SLDC constantly. However, required converter and

laying of fiber optic cable is still pending. MPPGCL informed that matter shall be discussed in proposed

separate meeting with MPPGCL field officers.

9.10 MAINTENANCE OF OPGW NETWORK :- SLDC informed that under the MP portion of Master

Telecom project executed by PGCIL,36 No. of wideband nodes has commissioned. As per agreement

between MPPTCL and PGCIL, the subsequent maintenance of these links is to be looked after by MPPTCL.

While execution of the project, it was informed by PGCIL that the AMC of the terminal equipments is covered

under the equipments contract. However, modalities for AMC payment is to be finalised by MPPTCL with

PGCIL. Further, separate arrangement towards maintenance of OPGW cable (upto FODP) involving OPGW

restoration, OPGW LILO work, OTDR testing, OPGW shifting during line diversion etc is to be made by

MPPTCL, the details for which has already been forwarded by SLDC. SLDC further informed that as per order

of CERC, the expenditure towards maintenance under the project shall be done by MPPTCL.

SLDC informed that due to non-availability of maintenance plan, the restoration of any fault is taking

long time. SLDC informed that recently due to fiber cut issue is 220 KV Bina-Shivpuri ckt, the telemetry was

out for more than 15 days.

MPPTCL informed that the matter shall be finalised on top most priority.

9.11 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS &

INTERMITTENT TELEMETRY DUE TO NOISE IN COMMUNICATION CHANNEL :- The

long outage of telemetry & substations having intermittent telemetry due to heavy noise in communication

channel was discussed in detail:-

Sl No. Name of Sub Station Out from /Remark

01 220 KV Chichli

The telemetry was out since last 5 months

due to outage in 220 KV Jabalpur-Narsinghpur

Ckt 1 & 2. However both the circuits has now

been charged but the telemetry of substations

is still not available.

02 132 KV Gadarwara

03 132 KV Pondar

04 BLA TPS

05 GandhiSagar HPS Out since last 3 months

06 132 KV Kannod Out since last 1 month

07 Satpura TPS Very intermittent

MPPTCL & MPPGCL ensured that they will arrange for round the clock availability of telemetry of these

RTUs to SLDC.

9.12 TELEMETRY OF RAILWAY TSS SUB STATIONS: - SLDC informed that the telemetry of

existing 38 Nos railway Traction Sub Stations & upcoming 25 new railway TSS is required to be provided by

railway for monitoring of drawal by each TSS and also monitoring of demand of railway in MP.

SLDC further informed that testing of telemetry for 2 Railway TSS has been done in SLDC SCADA,

however it is currently offline due to non-availability of UPS in Railway Zonal Office. Railways further informed

that currently they have extended the telemetry of 8 TSS upto Railway Zonal Office & telemetry integration of

all Railway TSS with SLDC shall be done within 6 months.

SLDC requested Railways to extend the telemetry of TSS which have been integrated upto Railway

Zonal Office to SLDC and also arrange UPS on highest priority. Railways agreed for the same.

ITEM NO 10 : DATE AND VENUE OF NEXT OCC MEETING :

It is proposed to hold 73rd Operation and Coordination Committee meeting of MP on

17.12.2019. The host and venue of the same shall be decided in the meeting.

[Action :- All the concerned entities]

***********

Annexure-2.1

S. No. Particulars

1

1.1 Maximum Frequency 50.26 HzBetween 10.00 hrs & 11.00 Hrs on 15.08.19

50.14 HzBetween 13.00 hrs & 14.00 Hrs on 29.09.19

1.2 Minimum Frequency 49.81 HzBetween 00.00 hrs & 01.00 Hrs on 18.08.19

49.8 HzBetween 18.00 hrs & 19.00 Hrs on 18.09.19

1.3 Average Frequency 50 Hz 50.01 Hz

2

2.1 Maximum Frequency 50.32 HzAT 09.34.10 HRS ON 15.08.19

50.27 HzAT 08.04:40 HRS ON 05.09.19

2.2 Minimum Frequency 49.55 HzAT 14.04:00 HRS ON 04.08.19

49.62 HzAT 18.50:20. HRS ON 09.09.19

3 Percentage of time when frequency was :-

%age of time when frequency was Aug-18 Sep-19

3.1 Below 48.5 Hz 0.00 0

3.2 Between 48.50 Hz and 48.8 Hz 0.00 0

3.3 Between 48.80 Hz and 49.2 Hz 0.00 0

3.4 Between 49.20 Hz and 49.5 Hz 0.00 0

3.5 Between 49.50 Hz and 49.7 Hz 0.00 0

3.6 Between 49.70 Hz and 49.9 Hz 7.28 4.57

3.7 Between 49.9 Hz and 50.05 Hz 72.69 75.25

3.8 Between 50.05 Hz AND 51.5 Hz 20.03 20.18

3.9 Above 51.5 Hz 0.00 0.00

4 No. of times frquency touched 48.80 Hz 0 0

4.1 No. of times frquency touched 48.60 Hz 0 0

4.2 No. of times frquency touched 51.0 Hz 0 0

FREQUENCY PARTICULARS

INTEGRATED OVER AN-HOUR

INSTANTANEOUS FREQUENCY

Aug-18 Sep-19

Agenda of 72nd OCCM of MP 29

I 1 2 3 4 5 6 7

A. 400 KV TRANSMISSION LINES

1 Nill

B. 220 KV TRANSMISSION LINES

1220kV DCDS line from Betul 220kV S/s - Gudgaon 220kV S/s (2x46.771) (GEC)

DCDS 46.77 93.542 June'2019Test charged on 12.06.2019

22nd Ckt of 220kv Satna - Chhatarpur line (152) (JICA-I)

2nd ckt 160.00 160 Aug'2019charged on 29.08.2019

C. 132 KV TRANSMISSION LINES

1132 KV 2 phase 2 wire DCSS line for PS to 132/25 KV 5 MVA RTS at Sausar from 132 KV S/s Boregaon (RTS)

DCSS 17.413 17.413 May'2019charged on 25.05.2019

2132 KV Shyampur - Pilukhedi DCSS line (1x22.834) (UBI)

DCSS 22.83 22.834 June'2019charged on 28.06.2019

3

2nd ckt of 132 KV Sheopur- Baroda line & LILO of its both ckt at 220 KV S/s Sheopur for 132 KV interconnection of 132 KV S/s Sheopur & 220 KV S/s Sheopur. (2nd ckt- 34 cktkm+2x1+4x5) (UBI)

DCDS 5.13 5.131 June'20195.131 cktkm charged on 29.06.2019

4 132 kv DCSS Karakbel - Belkheda (1x24.93) (ADB-III) DCSS 24.93 24.93 June'2019charged on 30.06.2019

5

LILO of 2ND CIRCUIT OF 132KV Gwalior- Pichhore at 132Kv S/s Dabra (2X0.108) (ADB-III) (balance work) (Note: LILO at Chinour 27.364 cktkm charged on 04.08.2017)(ADB-III)

DCDS 0.11 0.216 June'2019comm on

03.06.2019

6132 KV line 2 phase 2 wire Nainpur - RTS Nainpur line (4.176) (CCW)

DCSS 4.176 4.176 June'2019 12.06.2019

7

LILO of 132kV Betul - Gudgaon at 220kV S/s Gudgaon (2x9.825)(132kV interconnector between Gudgaon 220 kV S/s & Gudgaon 132kV S/s (Note:LILO 1st ckt(2x5.092) charged on 24.01.2019)(2nd ckt 2x4.733) (GEC)

DCDS 4.73 9.466 June'20192nd ckt

charged on 20.06.2019

8LILO of Satna 220kV-Kymore 132kV DCSS line for Uchehara (2x1.8) (JICA-II) DCDS 1.8 3.60 July'2019

comm on 18.07.2019

9132Kv DCSS line from GWSTPP to upcoming Make up Water Pump House river Narmada (Line-II)(1x24.515) (CCW)

DCSS 24.52 24.515 July'2019comm on

11.07.2019

10LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) - Dabra/Karera line at 220 KV S/s Gwalior II) (2x2x5.95+2x1.278) (Transco/UBI)

DCDS 7.26 26.472 Aug'2019charged on 29.08.2019

11

2nd ckt of 132 KV Sheopur- Baroda line & LILO of its both ckt at 220 KV S/s Sheopur for 132 KV interconnection of 132 KV S/s Sheopur & 220 KV S/s Sheopur. (2nd ckt- 33.410 cktkm +1x1.896 +3x3.235) (Note- 5.131 cktkm charged on 29.06.2019) (UBI)

2nd ckt+DCDS

38.54 45.011 Aug'2019charged on 24.08.2019

12132Kv DCSS 2 phase 2wire line from 132Kv s/s Prithvipur to RTS Niwadi for p/s to RTS Niwadi (1x22.712) (RTS)

DCSS 22.71 22.712 Aug'2019charged on 09.08.2019

13LILO of one circuit of 132 kv Neemuch220 - Ratangarh DCDS line at 132 KV S/s Morwan (2x0.56) (UBI)

0.56 1.12 Sept'2019chared on 16.09.2019

14LILO of 132 kv Bhikangaon Khargone line at Biston 132 KV S/s (2x18.997) (ADB-III)

18.997 37.994 Sept'2019charged on 14.09.2019

15132Kv DCSS 2 phase 2wire line from 132Kv s/s Beohari for PS to RTS Beohari (1x20.8) (CCW)

20.80 20.8 Sept'2019

charged on 09.09.2019 (upto dead

end)

16132kv DCSS Gautampur -Depalpur line (1x19.609) (JICA)

19.609 19.609 Oct'19charged on 30.10.2019

17 133 KV Datiya- Bhitarwar DCSS line (1x35.296) (UBI) 16.8 16.8 Oct'19

part line (1x16.8 cktkm)

charged on 31.10.2019

18132 kv DCSS Narsinghpur - Devnagar (1x23) (ADB-III) (Note-1x24.43 + 1x11.33 muiti ckt NSP Karakbel line)

35.76 35.76 Oct'19charged on 26.10.2019

19132kV DCSS line Chichli - Palohabada (1x25.606) (Note: charged Part line 10.776 on 28.03.2019) (ADB-III S)

15.11 15.11 Oct'19

balance 15.110 cktkm

charged on 23.10.2019

ANNEXURE - 2.2.5.i

M.P POWER TRANSMISSION COMPANY LIMITED

TRANSMISSION WORKS COMPLETED DURING 2019-20 (UP TO 31.10.2019)

EHV TRANSMISSION LINES

Agenda of 72nd OCCM of MP 30

1 2 3 4 5 6 7

II.

S. No.

NAME OF SUBSTATION / (DISTRICT) / (FINANCED BY)

VOLTAGE RATIO (KV)

No.OF X-mer &

Cap.(MVA)

EFFECTIVE CAPACITY

MVA

MONTH OF COMPL-ETION

DATE OF COMMI-

SSIONING

A. 400 KV SUBSTATIONS

1 Nill

B. 220 KV SUBSTATIONS

a. 220 KV NEW SUBSTATIONS

1 Nill

C. 132 KV SUBSTATIONS

a. 132KV NEW SUBSTATIONS

1 Bada malehra 132kv s/s 1x40MVA (ADB-III) 132/33 kV 1x40 40 May'2019charged on 30.05.2019

2 Pilukhedi 132kV S/s with 1x50 MVA (UBI) 132/33 kV 1x50 50 June'2019charged on 28.06.2019

3Karakbel 132kv s/s1x40 MVA (Dist. Narsinghpur) (ADB-III)

132/33 kV 1x40 40 July'2019comm on

25.07.2019

4Belkheda 132kv s/s 1x40 MVA (Dist- Jabalpur)(ADB-III)

132/33 kV 1x40 40 July'2019comm on

04.07.2019

5 Biston 132kv s/s1x40 MVA (ADB-III) 132/33 kV 1x40 40 Sept'2019Test charged on 20.09.2019

6 Morwan 132kV S/s with 1x40 MVA (UBI) 132/33 kV 1x40 40 Oct'19charged on 25.10.2019

EHV SUB - STATIONS

Agenda of 72nd OCCM of MP 31

S. No. NAME OF THE TRANSMISSION LINECKT.KMS.

PROGRESS IN %

(Oct'2019)

A. 400 KV TRANSMISSION LINES

1 400 kV DCDS line from Nagda 400 kV S/s to Mandsaur 400 kV S/s 137.32 58.00%

2400 kV DCDS line for LILO of one ckt of Satna(PGCIL) - Bina(PGCIL) 400 kV at Sagar 400 kV S/s

56 85.00%

3 400 kV DCDS line from Ashta 400 kV S/s to Ujjain 400 kV S/s 179.474 42.00%4 400 kV DCDS line from Indore (PGCIL) 765 kV S/s to Ujjain 400 kV S/s 84.528 86.00%

5 400 kV DCDS line from Nagda 400 kV S/s to Ujjain 400 kV S/s 53.2 56.00%

6 LILO of one ckt of 400 KV Khandwa - Rajgarh PGCIL line at Chhegaon 400 kV S/s 3.78 14.00%

B. 220 KV TRANSMISSION LINES

1LILO of one Ckt of 220kv DCDS Ashta - Dewas line at 220kv S/S Chapda (DCDS) (2x32.782)

66 51.00%

2 220Kv DCDS line from Pithampur-Depalpur line (2X31) 62 71.00%

3220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam D/C line at 400Kv S/s Badnawar (2x1.453+4x6.161)

27.55 95.00%

4 220Kv DCDS Julwaniya- Kukshi (2X58) 116 23.00%

5 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) 44 32.00%

6 LILO of one circuit of Bhopal-Hoshangabad DC line at 220kV S/s Adampur 5.84 28.00%

7Part (b).LILO of 220kV Sarni - Pandhurna at 220kV S/s Betul (2x38.864) (Note: Betul220 & Betul400 I/C line 3.76 cktkm. charged on 21.07.2017)

77.728 60.00%

8 220kV DCDS line from Kanwan 220kV S/s - Dhar 220kV S/s 62.78 90.00%

9LILO of both ckt Nagda - Neemuch 220kV line at 400Kv S/s Mandsore(Sitamau) (2x22.787+4x2.229+2x23.323)

101.136 54.00%

10220kV DCDS line from Mandsaure(Sitamau) 400kV S/s - Maruti Shakti Pool 220kV S/s

92.294 51.00%

11 220kV DCDS line from Neemuch 220kV S/s to Ratangarh 400kV S/s 85.016 81.00%

12 2nd circuiting of Ratlam switching - Daloda 220kV DCSS line 72 56.00%

13 LILO of Ratlam - Daloda 220kV line at 220Kv S/s Jaora (2x3.51) 7.02 68.00%

14 LILO of both ckt of Ujjain - Badod 220 kV line at Ujjain 400 Kv S/s (2x6.4+2x5.691) 24.182 78.00%

15 LILO of both ckt of Ujjain - Nagda 220 kV line at Ujjain 400 Kv S/s (2x2x11.766) 47.064 56.00%

16 220kV DCDS line from Ujjain 400kV S/s to Susner (Nalkheda) 220kV S/s 156.00 9.00%17 220kV DCDS line from Badod 220kV S/s to Susner (Nalkheda) 220kV S/s 104.55 28.00%18 220kV DCDS line from Rajgarh(B) 220kV S/s to Susner (Nalkheda) 220kV S/s 124.00 8.00%19 220 kV Sabalgarh - Sheopur line (2x110) 220 67.00%

20 220kV Chhatarpur-Tikamgarh DCSS line 110 9.00%

21 220 KV DCDS UMSP Rewa - Rewa 53.416

22 220 KV DCDS UMSP Rewa - Sidhi 114.998 6.00%

23 220 KV DCDS line from 400 kV Itarsi (PGCIL) to 220 KV S/s Budhni (2x29.942) 59.884 1.00%

220Kv DCDS line from 220kV Pooling S/s RUMS at Goojarkhedi, Suwasara (For interconnection of Solar PV Plant of RUMS) (2X43.426)

86.852

b) Tap point to 400 kV S/s Sitamau (2x34.613) 69.226 93.00%

25220kV DCDS Badwar (220kV Pooling S/s) - 400kV Grid S/s PGCIL line) (2X1.134) (ckt-I charged on 28.03.2019)

2.268

132 KV TRANSMISSION LINES

1 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) 64 61%

2 132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV Itarsi s/s (1x53.209) 53.209 82.00%

3 LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S Seoni (2x20) 40 88.00%

4 132 kv DCSS Guna-Eshagarh line (1x72) 72 41.00%

5 132 kv Sirmour - Katra DCDS line (2x37.67) 75.34 77.00%

6 LILO of 132 kv Jaora - Khachrod line at Bhesola 132 KV S/s (2x0.729) 1.458 100.00%

7 132 kV DCSS line from 132kV Mandla - Bichhiya (1x43.54) 43.54 5.00%

8 132 kV DCSS line from 132kV Dindori - Gorakhpur 132kv S/s (1x49.4) 49.4 8.00%

24

EHV TRANSMISSION WORKS UNDER PROGRESS AS ON 31.10.2019

Annexure-2.2.5.ii

Agenda of 72nd OCCM of MP 32

9 132 KV Gourjhamar - Deori DCSS line (1x27.493) 27.493 66.00%

10132kV DCDS line from 400 kV Ujjain to 132KV Vikram Udyogpuri (Narwar) (2x21.43)

42.86 95.00%

11 133 KV Datiya- Bhitarwar DCSS line (1x35.296) 35.296

91% part line

(1x16.8 cktkm) charged on 31.10.2019

12 132 kv DCSS Khurai- Khimlasa line (1x20.937) 20.937 99.00%

13 132 kv DCSS Panagar - Patan line (1x22.749) 22.749 36.00%

14132 kv DCSS Badnagar - Chhayan Line (1x28.26) ADB-III (Part line 20.969 ckt charged on 05.11.2018 by tapping arrangement)

7.291 Balance

100.00%

15 132 kv DCSS Dhar - Teesgaon line (1x15.35) 15.35 95.00%

16 LILO of 132 kv Ratlam - Meghnagar line at 132Kv S/s Petlawad (2x7.4) 14.8 100.00%

17 132 kv DCDS Narsinghpur - Karakbel line (2x23) 46 98.00%

18LILO of 132 kv Satna-Maihar line at Satna-II S/s (2x11.047)(ADB-III Saving) (Part line 0.50 CktKm charged on 05.12.2018)

22.094 32.00%

19 132kv DCDS line Guna-Bhonra (2x21.394) 21 84.00%

20 132kV DCDS line from Sendhwa 220 kV S/s - Pansemal 132kV line 95.69 70.00%

21 2nd ckt of 132kV Rajgarh(Dhar)220 kV S/s - Jhabua 132kV line 68.8 88.00%

22LILO of both ckt of 132kV Neemuch - Mandsore at Mandsore(Sitamau) 400 kV S/s (2x71.464)

142.928 51.00%

232nd Circuiting of Sidhi 220 Mauganj 132 kV DCSS line (new line 6 km involved)(2x8.285+ 35.922 ckm 2nd ckt) (Note:35.922 charged on 27.03.2019)

52 34.00%

24 LILO of both ckt. of 132kV Neemuch - Ratangarh DCDS line at 220kV S/s Ratangarh (2x3.094)(132kV interconnector between Ratangarh 400 kV S/s & Ratangarh 132kV S/s

6.188 26.00%

25 2nd circuiting of Sabalgarh - Vijaypur 132KV DCSS line (31.39) 31.39 100.00%

26 2nd circuiting of Ashta - Ichhawar 132KV DCSS line (34.64) 34.64 55.00%

27 2nd circuiting of Nalkheda - Moman Badodiya 132KV DCSS line (28.34) 28.34 84.00%

28 LILO of both ckt of Ujjain - Tarana 132KV line at Ujjain 400 KV S/s (4x0.198) 0.792 39.00%

29 LILO of Susner - Jeerapur 132kV line at Susner (Nalkheda) 34.922 18.00%

30 2nd Circuiting of Susner - Jeerapur 132 kV DCSS line (30.256) 30.256 53.00%

31LILO of both ckt of Ujjain 220 KV - Agar 132kV line at Makdon 132KV S/s (2x2x30.052)

120.208 27.00%

32 2nd circuiting of Agar-Susner 132kV DCSS line 31.603 78.00%33 2nd circuiting of Tarana-Makdon 132kV DCSS line 23.05 69.00%34 132kV DCDS Alot-Zarda line 49.92 52.00%

35LILO of one circuit of Susner 132 KV - Agar 132KV line at Susner (Nalkheda) 220kV (2x18)

34 11.00%

36 2nd ckt of 132 KV shahdol 220 - Dindori132 line (2nd ckt-61.71) 61.71 66.00%

37 2nd ckt of 132 KV Gorabazar 220 - Maneri 132 line (2nd ckt-21.175) 21.75

38132kV Julwaniya400 - Shahpura DCSS line (2nd ckt-28 + 1x47.008) (Note:1x47.008 charged on 29.03.2019)

74.866 99.00%

39 132 Kvline from Sailana to Shivgarh (1x25) 25 8.00%

40LILO of one ckt of Chhegaon- Nepanagar 132 Kv DCDS line at Jhirniya (Marugarh) (2x40)

80 1.00%

41 132 Kv DCSS line from 220kV Ganjbasoda to Gyaraspur (1x37.393) 37.393 2.00%

42 132 Kv DCSS line from Mandla to Dindori (1x110) 110 4.00%

432nd ckt of 220 KV Mandideep to 132 KV Mandideep line & LILO for HEG (2nd ckt-6.5 + 2x2.5)

11.5 50.00%

44 2nd ckt of 132 KV Birsingpur - Umariya line (2nd ckt-35.50) 35.5 78.00%

45 Julwania 400kV-Pati(Silawad) 132kV DCSS line 40.69 10.00%46 Panagar 220kV-Dheemarkheda 132kV DCSS line 62.50 40.00%47 132kV Prithvipur-Orchha DCSS line 33.50 32.00%48 132kV Udaipura-Tendukheda DCSS line 36.78 72.00%49 132 kV Gohad - Gormi DCSS line (1x21.187) 21.187 4.00%

50 132kV Narsinghgarh-Suthaliya DCSSline 29.05 49.00%51 Mugaliyachhap 220 kV - Mahawadia 132KV DCDS line(2x7.661) 15.32 1.00%52 132kV Sirmour-Atraila DCDSline 70.50 5.00%53 132kV Sidhi-Sinhawal DCSS line 58.47 7.00%54 132kV Maneri-Mandla DCSS line 77.59 3.00%

Agenda of 72nd OCCM of MP 33

55132Kv DCSS 2 phase 2wire line from 220Kv s/s Kotar for PS to RTS kaima1x26.938)

26.938 63.00%

56 132kV DCSS Sirmore - RTS Dabhaura line (1x56.1) 56.1 96.00%

57132Kv DCSS 2 phase 2wire line from 220Kv s/s Sidhi for PS to RTS Marwasgram(1x51.341)

51.341 81.00%

58132Kv DCSS 2 phase 2wire line from 132Kv s/s Dongrital for PS to RTS Gajra Bahara (1x17.435)

17.435 29.00%

59 132kV 2Phase 2Wire Lalbarra-Samnapur RTS line. (Earlier 132kV 2 Phase 2 wire Kirnapur-RTS Hatta Road line ) 18.643 33.00%

60132Kv DCSS 2 phase 2wire line from 132 Kv s/s Nowgaon for PS to RTS Harpalpur (1x49.851)

49.851 86.00%

61 132 KV line from Seoni 220 KV S/s - Nainpur 132 KV S/s 82.659 97.00%

62 132Kv DCSS 2 phase 2wire line NainpurRTs - Ghansor line (1x34.413) 34.413 26.00%

63 132Kv 2ph 2 wire DCSS Neemuch - RTS Neemuch line 12.188 59.00%

64132 KV 2 phase 2wire DCSS line from 132 KV S/s Malhargarh to RTS Sindpan (earliar 132 KV 2 phase 2wire DCSS Mandsore - RTS Mandsore (Sindpan) line)

14.86 59.00%

65 132Kv 2ph 2 wire line from 220KV S/s - Mandla - RTS Mandla Fort 8.102 39.00%

66 132Kv Rajgarh - Biora RTS line 23.512 12.00%

S.No.

NAME OF THE SUBSTATIONEFFECTIVE CAPACITY

MVA

A. 400 KV SUBSTATIONS

1Badnawar 400 KV sub-station with 2x315MVA 400/220 KV X-mer (1x315MVA charged on 07.03.2019 & 1x125MVAR Bus reactor charged on 11.03.2019)

630 85.00%

2 Mandsore 400 KV sub-station with 2x315MVA 400/220 KV X-mer + 2x160 MVA 630 28.00%

3 Sagar 400 KV sub-station with 2x315MVA 400/220 KV X-mer 630

78%2nd unit 315 MVA charged on 25.08.2019

from 220 kv side

4 Ujjain 400 KV sub-station with 2x315MVA 400/220 KV X-mer+ 2x160 630 55.00%

5 400KV 1x125 MVAR Reactor at 400KV S/s Chhegaon(Torni) 11.00%

B. a 220 KV SUBSTATIONS

1 Gorabazar 220/132kv with 1x160MVA + 40MVA 160 15.00%

2 Chapda 220 Kv S/s (Upgradation) with 1x160MVA 160 56.00%

3 Upgradation of Depalpur 132Kv S/s to 220kv with 1x160MVA 160 60.00%

4 Adampur 220/33kv S/s 2x50MVA 100 57.00%

5 Kukshi 220 Kv S/s Upgradation)with 1x160MVA 160 47.00%

6 Sailana 220/132kV S/s (2x160MVA + 1x63) (Note:63 MVA charged on 12.03.2019)

320 65.00%

7 Jaora 220/132kV S/s (Upgradation) (2x160MVA + 1x40) (Note:40 MVA X-mer charged on 17.02.2019)

320

79%1st 160 MVA charged on 14.08.2019

from 132 KV side

8Gudgaon 220/132kV S/s (1x160MVA + 1x63) (Note:63 MVA charged on 24.01.2019)

160 70.00%

9 Ratangarh 220/132kV S/s (2x160MVA + 1x63) 320 55.00%

10 Nalkheda 220/132kV S/s (2x160MVA + 1x63) 320 6.00%

11North Zone Substation at Indore to 220kV (Upgradation )(Note- 1x160MVA charged on 30.07.2018) 320 77.00%

12 Sheopurkala 220kv S/s with 2x160MVA+ 1x63MVA 320

38%63 Mva

charged on 30.06.2019 & CB charged on

10.07.2019

Agenda of 72nd OCCM of MP 34

13 Upgradation of 220 kV S/s at Udaipura 160 7.00%14 33/220kV Pooling Sub-station at Ramnagar 3x100 (1st & 2nd X-mer charged) 300 100.00%

15 33/220kV Pooling Sub-station at Badwar (3x100) (1st charged) 300

74%1st 100 MVA charged on

29.03.2019 & 2nd on

04.07.2019

C. 132 KV SUBSTATIONS

(a) NEW SUBSTATIONS

1 Khimlasa 132kv s/s 1x40 MVA 40 59.00%

2 Narsinghgarh 132kv s/s with 1x40 MVA 40 39.00%

3 Devnagar 132kv s/s 1x40 MVA (Dist- Narsighpur) (ADB-III) 40

100%charged on 30.03.2019 from 33 KV

4 Bhesola 132kV S/s with 1x50 MVA 50 53.00%

5 Deori 132kV S/s with 1x50 MVA 50 60.00%

6 Vikram Udyogpuri 132kV S/s with 1x63 MVA 63 58.00%

7 Bhitarwar 132kV S/s with 1x50 MVA 50 59.00%

8 Pati 132kV S/s with 1x50 MVA 50 1.00%

9 Orchha 132kV S/s with 1x50 MVA 50 11.00%

10 Madwas 132kV S/s with 1x50 MVA 50 1.00%

11 Unchehera 132kV S/s with 1x50 MVA 50 40.00%

12 Tendukheda 132kV S/s with 1x50 MVA 50 8.00%

13 Suthaliya 132kV S/s with 1x50 MVA 50 1.00%

14 Atraila 132kV S/s with 1x50 MVA 50 2.00%

15 Shivgarh 132kV S/s with 1x50 MVA 50 9.00%

16 Bichhiya 132kV S/s with 1x50 MVA 50 7.00%

17 Gyaraspur 132 Kv S/s, with 1x50 MVA 50 3.00%

Agenda of 72nd OCCM of MP 35

Annexure-2.3(i)

Aug-19 Sep-19 Aug-19 Sep-19

Commissinary HQ 23:54 23:49 23:47 23:42

District HQ 23:52 23:46 23:38 23:40

Tehsil HQ 23:50 23:45 23:45 23:42

Rural -Mixed 23:44 23:39 23:34 23:28

Rural -DLF 23:44 23:40 23:31 23:28

Rural -Irrigation 9:56 9:55 9:53 9:54

Aug-19 Sep-19 Aug-19 Sep-19

Commissinary HQ 23:53 23:52 23:51 23:47

District HQ 23:52 23:47 23:47 23:44

Tehsil HQ 23:47 23:39 23:48 23:42

Rural -3Phase - - 23:40 23:35

Rural -1Phase 23:40 23:29 23:40 23:34

Total Rural 9:48 9:43 9:53 9:51

Discoms wise Average Supply Hours

PARTICULARS

PARTICULARS

West Zone MP

East Zone Central Zone

Agenda of 72nd OCCM of MP 36

Annexure-2.3(ii)

LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR (For which group to be allocated)

JABALPUR REGION

Name of EHV Substation

Name of 33KV feeder

Date of commission-ing of feeder

bay

Date of commission

-ing of feeder

400KV

400 KV Kirnapur 33 KV Hatta 33 KV Kirnapur 33 KV Rajegaon

11.11.2018 12.11.2018 12.112018

11.11.2018 12.11.2018 12.11.2018

220KV

220 KV Seoni 33 KV Karirat 21.08.2007 06.01.2016

132KV

132 KV Ponder 33 KV NSPL 19.01.2018 19.01.2018

132 KV Palohabada

33 KV Bilthari 33 KV Sadumar

01.04.2019 02.04.2019

01.04.2019 02.04.2019

132 KV Narsinghpur

33 KV Nagar Palika 28.02.2018

02.11.2018

132 KV Karapgaon

33 KV Karapgaon 33 KV Bansadehi 33 KV Kareli 33 KV Aamgaon

29.12.2017 29.12.2017 29.12.2017 29.12.2017

24.02.2018 27.01.2018 27.01.2018 28.01.2018

132 KV Waraseoni

33 KV Dongarmali 33 KV Waraseoni 33 KV Kochevahi 33 KV Khairlanji

10.10.2018 06.12.2018 06.12.2018 08.12.2018

10.10.2018 06.12.2018 06.12.2018 08.12.2018

132 KV Nainpur 33 KV Keolari-II 22.01.2018 28.03.2018

132 KV Saori

33 KV Saori 33 KV Lawaghogri 33 KV Mujawar 33 KV Bhutai

05.10.2018 05.10.2018 06.11.2018 06.11.2018

12.11.2018 13.11.2018 12.11.2018 30.01.2019

LIST OF 33KV FEEDERS UNDER MPPKVVCL, INDORE (For which group to be allocated)

INDORE REGION

UJJAIN REGION

Name of EHV Substation

Name of 33KV feeder Date of commissioning of feeder bay

Date of commissioning

of feeder

220KV 220KV Pithampur (Sec-III)

33KV SRF 03.09.2013 03.09.2013

132KV

132KV Chandrawatiganj

33KV Chandrawatiganj

27.04.2015

27.04.2015

132KV Electronic

33KV AKVN (Namkeen Cluster)

31.03.2016

31.03.2016

132KV Raukhedi

33KV DLF-I 33KV DLF-II

03.01.2014 03.01.2014

15.09.2018 15.09.2018

Name of EHV Substation

Name of 33KV feeder Date of commissioning of feeder bay

Date of Charging of feeder

220KV Agenda of 72nd OCCM of MP 37

LIST OF 33KV FEEDERS UNDER MPPKVVCL, BHOPAL (For which group to be allocated)

BHOPAL REGION

Name of EHV Substation

Name of 33KV feeder

Date of charging of feeder bay

Date of charging of feeder

220 KV 220 KV Ganjbasoda

33 KV Simcon-I 33 KV Simcon-II

03.11.2016 31.08.2017

03.11.2016 09.09.2017

220 KV Pipariya 33 KV Food Park (AKVN)

19.06.2017 25.06.2017

132 KV

132 KV Tamot 33 KV Obedullaganj 33 KV AKVN-1 33 KV AKVN-2

05.05.2016 05.10.2016 05.10.2016

02.02.2017 05.10.2016 05.10.2016

132 KV Lateri 33 KV Anantpura

15.06.2017 22.05.2018

132 KV Salamatpur 33 KV Dewanganj 33 KV Aamkheda 33 KV Salamatpur Industrial

04.12.2017 04.12.2014 25.11.2017

04.12.2017 04.12.2017 10.01.2019

132 KV Udaipura 33 KV Thaladigawan 33 KV Boras 33 KV Udaipura

26.04.2018 04.06.2018 04.06.2018

04.06.2018 06.06.2018 07.01.2019

132 KV Ayodhya Nagar 33 KV Maholi 30.10.2018 30.10.2018

132 KV Nasrullaganj 33 KV Kankariya

15.05.2004

15.09.2017

132 KV Khirkiya 33 KV Killod 07.12.2017 10.01.2018

132 KV Bilquisganj 33 KV Uljhawan 07.01.2018 20.07.2018

220KV Barnagar 33KV Bangred 23.10.2017 20.10.2018

132KV

132KV Agar

33KV Agar Town-II

03.12.2012

24.05.2018

132KV Arniyakalan

33KV Designco Manufacture & Exporter (5MW Solar Power Plant)

01.05.2018

01.05.2018

132KV Agrod

33KV Madhopur 30.06.2018 26.07.2018

Agenda of 72nd OCCM of MP 38

ANNEXURE-3.2

Date Time Date Time

1 400 315MVA BHEL Transformer at 400KV S/s Katni 05-Dec-19 9:00 06-Dec-19 17:00 Continue For post monsoon maintenance work

2 400 315MVA TELK Transformer at 400KV S/s Katni 02-Dec-19 9:00 03-Dec-19 17:00 Continue For post monsoon maintenance work

3 400 400KV ICT-II Tie Bay at 400KV S/s Nagda 08-Jan-20 08:00 08-Jan-20 18:00 Daily For Bay maintenance and testing work

4 400 315MVA EMCO Transformer at 400KV S/s Bina 17-Jan-20 08:00 27-Jan-20 17:00 Continue For replacement of 3 Nos Isolators

5 400 315 MVA TransformerI at 400KV S/S Bhopal 04-Dec-19 08:00 04-Dec-19 18:00 Daily For post monsoon maintenance work

1 400 125MVAR BHEL Reactor at 400KV S/s Katni 09-Dec-19 9:00 09-Dec-19 17:00 Daily For post monsoon maintenance work

2 400 50MVAR Bus reactor -I at 400KV S/s Nagda 09-Dec-19 08:00 09-Dec-19 18:00 Daily For post monsoon maintenance work

3 400 125 MVAR Bus- reactor-II at 400KV S/s Nagda 10-Dec-19 08:00 10-Dec-19 18:00 Daily For post monsoon maintenance work

4 400 50MVAR Nagda-ISP Line Reactor 12-Dec-19 08:00 12-Dec-19 18:00 Daily For post monsoon maintenance work

5 400 400KV Nagda-Badnawar-II line Reactor 23-Dec-19 08:00 28-Dec-19 18:00 ContinueFor Circuit breaker replacement work of 400KV line Reactor

6 400 80 MVAR Bus Reactor-I at 400KV S/S Bhopal 09-Dec-19 08:00 16-Dec-19 18:00 Continue PRV Replacement and Testing work

7 400 80 MVAR Bus Reactor-II at 400KV S/S Bhopal 18-Dec-19 08:00 24-Dec-19 18:00 Continue PRV Replacement and Testing work

8 400 80 MVAR Bus Reactor-I at 400KV S/S Bhopal 06-Jan-20 08:00 13-Jan-20 18:00 Continue PRV Replacement and Testing work

1 400 400KV Main Bus No- I at 400KV S/s Katni 10-Dec-19 9:00 10-Dec-19 17:00 Daily For post monsoon maintenance work

2 400 400KV Main Bus No- II at 400KV S/s Katni 12-Dec-19 9:00 12-Dec-19 17:00 Daily For post monsoon maintenance work

3 400 400KV Badanawar-Pithampur-I 09-Dec-19 09:00 09-Dec-19 18:00 Daily For Bay maintenance and testing work

4 400 400KV Badanawar-Pithampur-II 20-Dec-19 09:00 20-Dec-19 18:00 Daily For Bay maintenance and testing work

5 400 400kv Nagda-Badnawar-I with reactor 16-Dec-19 08:00 18-Dec-19 18:00 ContinueFor replacement of Line Gantry Beam (FGB-2)

6 400 400KV ISP Tie Bay at 400KV S/s Nagda 06-Jan-20 08:00 06-Jan-20 18:00 Daily For Bay maintenance and testing work

7 400 400KV Bina-Bhopal-I (Main CB bay only) 02-Dec-19 08:00 11-Dec-19 17:00 ContinueFor CB replacement work (CB erection , commissioning and testing)

8 400 400KV Main bus-II at 400KV S/s Bina 16-Dec-19 08:00 23-Dec-19 17:00 Continue For PG Isolator repalcement work

9 400 400KV Bina-Bhopal-I 01-Jan-20 08:00 08-Jan-20 17:00 Continue For line isolator replacement work

10 400 400KV Bina-Bhopal-I I 09-Jan-20 08:00 16-Jan-20 17:00 Continue For line isolator replacement work

11 400 400KV Indore-ISP-I 02-Dec-19 09:00 02-Dec-19 18:00 DailyFor Bay equipment maintenance and testing work

12 400 400KV Indore-ISP-II 03-Dec-19 09:00 03-Dec-19 18:00 DailyFor Bay equipment maintenance and testing work

13 400 400KV Indore-Nagda 04-Dec-19 09:00 04-Dec-19 18:00 DailyFor Bay equipment maintenance and testing work

14 400 400KV TBC at 400KV S/s Indore 05-Dec-19 09:00 05-Dec-19 18:00 DailyFor Bay equipment maintenance and testing work

15 400 400KV Indore-ISP-I 01-Jan-20 09:00 01-Jan-20 18:00 DailyFor Bay equipment maintenance and testing work

16 400 400KV Indore-ISP-II 02-Jan-20 09:00 02-Jan-20 18:00 DailyFor Bay equipment maintenance and testing work

17 400 400KV TBC at 400KV S/s Indore 03-Jan-20 09:00 03-Jan-20 18:00 DailyFor Bay equipment maintenance and testing work

18 400 400KV Bhopal-Itarsi circuit No.-I 04-Dec-19 08:00 04-Dec-19 18:00 DailyFor Bay equipment maintenance and testing work

19 400 400KV Bhopal-Bina circuit No-II 05-Dec-19 08:00 05-Dec-19 18:00 DailyFor Bay equipment maintenance and testing work

20 400 400KV Bhopal-Itarsi circuit No.-II 06-Dec-19 08:00 06-Dec-19 18:00 DailyFor Bay equipment maintenance and testing work

21 400 400KV Bhopal-Itarsi circuit No.-II 28-Jan-20 08:00 28-Jan-20 18:00 DailyFor Bay equipment maintenance and testing work

1 220 220KV ICT-I at 220KV S/s Sukha 04-Dec-19 9:00 05-Dec-19 17:00 Continue For maintenance and testing work

2 220 220KV ICT-I at 220KV S/s Sukha 03-Jan-20 9:00 04-Jan-20 17:00 Continue For maintenance and testing work

3 220 220KV ICT-II at 220KV S/s Sukha 09-Dec-19 9:00 10-Dec-19 17:00 Continue For maintenance and testing work

B- 400 KV REACTORS

C- 400 KV FEEDER & BAYS OF 400 KV- S/S-

D- 220 KV FEEDER & BAYS-

A- 400 KV TRANSFORMERS

72nd OCCM : PROPOSED SHUTDOWN OF TRANSMISSION ELEMENTS FOR THE PERIOD 01-12-19 TO 31-01-20

Sr- No

KV Line / Transformer / Reactor / Bay

From To Basis(Daily/

Continue)Reason

Agenda of 72nd OCCM of MP 39

Date Time Date Time

Sr- No

KV Line / Transformer / Reactor / Bay

From To Basis(Daily/

Continue)Reason

4 220 220KV ICT-II at 220KV S/s Sukha 07-Jan-20 9:00 08-Jan-20 17:00 Continue For maintenance and testing work

5 220 220KV Pandhurna-Kamleshwar 10-Dec-19 09:00 10-Dec-19 00:00 Daily For Bay equipment maintenance and testing work

6 220 220KV Chhindwara-PGCIL-I 12-Dec-19 09:00 12-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

7 220 220KV Chhindwara-PGCIL-II 13-Dec-19 09:00 13-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

8 220 220KV Pandhurna-Kamleshwar 13-Jan-20 09:00 13-Jan-20 18:00 Daily For Bay equipment maintenance and testing work

9 220 220KV Chhindwara-PGCIL-I 09-Jan-20 09:00 09-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

10 220 220KV Chhindwara-PGCIL-II 10-Jan-20 09:00 10-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

11 220 220KV Seoni-PGCIL-I 10-Dec-19 09:00 10-Dec-19 18:00 Daily For Bay equipment maintenance and testing work

12 220 220KV Seoni-PGCIL-II 12-Dec-19 09:00 12-Dec-19 18:00 Daily For Bay equipment maintenance and testing work

13 220 220KV Seoni-PGCIL-II 08-Jan-20 09:00 08-Jan-20 18:00 Daily For Bay equipment maintenance and testing work

14 220220KV Bus Tie & Main Bus-I at 400KV S/s Badnawar

09-Jan-20 09:00 09-Jan-20 17.:00 Daily For Bay equipment maintenance and testing work

15 220 Bus Tie & Main Bus-II at 400KV S/s Badnawar 14-Jan-20 09:00 14-Jan-20 17.:00 Daily For Bay equipment maintenance and testing work

16 220 220KV Ujjain-Hatuniya PGCIL -I 16-Dec-19 09:00 16-Dec-19 17.:00 Daily For Bay equipment maintenance and testing work

17 220 220KV Ujjain-Hatuniya PGCIL -II 17-Dec-19 09:00 17-Dec-19 17.:00 Daily For Bay equipment maintenance and testing work

18 220 220KV Ujjain-Hatuniya PGCIL -I 14-Jan-20 09:00 14-Jan-20 17.:00 Daily For Bay equipment maintenance and testing work

19 220 220KV Ujjain-Hatuniya PGCIL -II 15-Jan-20 09:00 15-Jan-20 17.:00 Daily For Bay equipment maintenance and testing work

20 220 220KV Shujalpur-PGCIL CKT-I 03-Dec-19 09:00 03-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

21 220 220KV Shujalpur-PGCIL CKT-I I 04-Dec-19 09:00 04-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

22 220 220KV Bhanpura-Modak 12-Dec-19 10:00 12-Dec-19 17:00 Daily For commissioning of 2nd DPR at 220KV S/s Bhanpura

23 220 220KV Bhanpura-Ranpur 13-Dec-19 10:00 13-Dec-19 17:00 Daily For commissioning of 2nd DPR at 220KV S/s Bhanpura

24 220 220KV Sagar-Damoh(PGCIL)-I 19-Dec-19 09:00 19-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

25 220 220KV Sagar-Damoh(PGCIL)-I 04-Jan-20 09:00 04-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

26 220 220KV Sagar-Damoh(PGCIL)-II 23-Dec-19 09:00 23-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

27 220 220KV Sagar-Damoh(PGCIL)-II 13-Jan-20 09:00 13-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

28 220 220KV Sagar-Damoh(PGCIL)-I 26-Dec-19 09:00 26-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

29 220 220KV Sagar-Damoh(PGCIL)-I 18-Jan-20 09:00 18-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

30 220 220KV Sagar-Damoh(PGCIL)-II 30-Dec-19 09:00 30-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

31 220 220KV Sagar-Damoh(PGCIL)-II 20-Jan-20 09:00 20-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

32 220 220KV Sagar-Damoh(PGCIL)-III 25-Jan-20 09:00 25-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

33 220 220KV Damoh-Katni 09-Dec-19 09:00 09-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

34 220 220KV Damoh-Katni 02-Jan-20 09:00 02-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

35 220220KV Barwaha-Indore-I (at 220KV S/s Barwaha)

09-Dec-19 10:00 09-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

36 220220KV Barwaha-Indore-II (at 220KV S/s Barwaha)

10-Dec-19 10:00 10-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

37 220220KV Nimrani-Maheshwar-I (at 220KV S/s Nimrani)

11-Dec-19 10:00 11-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

38 220220KV Nimrani-Julwaniya (at 220KV S/s Nimrani)

15-Dec-19 10:00 15-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

39 220220KV Barwaha-Handiya (at 220KV S/s Barwaha)

06-Jan-20 10:00 06-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

40 220220KV Nimrani-Maheshwar-II (at 220KV S/s Nimrani)

07-Jan-20 10:00 07-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

41 220 220KV Mahalgaon-PGCIL-I 11-Dec-19 10:00 11-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

42 220 220KV Mahalgaon-PGCIL-II 12-Dec-19 10:00 12-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

Agenda of 72nd OCCM of MP 40

Date Time Date Time

Sr- No

KV Line / Transformer / Reactor / Bay

From To Basis(Daily/

Continue)Reason

43 220 220KV Mahalgaon-Bina 18-Dec-19 10:00 18-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

44 220 220KV Mahalgaon-Datia 19-Dec-19 10:00 19-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

45 220 220KV Mehgaon-Adani 03-Dec-19 09:00 03-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

46 220 220KV Mehgaon-Auraiya 07-Dec-19 09:00 07-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

47 220 160MVA transformer-I At 220KV s/s Mehgaon 10-Dec-19 09:00 10-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

48 220 160MVA transformer-II At 220KV s/s Mehgaon 16-Dec-19 09:00 16-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

49 220 220KV Datia- Bina 20-Dec-19 09:00 20-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

50 220 220KV Datia- Gwalior 24-Dec-19 10:00 24-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

51 220 160MVA Transformer-I at 220 KV S/S Datia 27-Dec-19 09:00 27-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

52 220 160MVA Transformer-II at 220 KV S/S Datia 30-Dec-19 09:00 30-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

53 220 220KV Bus Tie at 220 KV S/s Shivpuri 16-Dec-19 10:00 16-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

54 220 220KV Mahalgaon-PGCIL-I 08-Jan-20 10:00 08-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

55 220 220KV Mahalgaon-PGCIL-II 13-Jan-20 10:00 13-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

56 220 220KV Mahalgaon-Bina 18-Jan-20 10:00 18-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

57 220 220KV Mahalgaon-Datia 23-Jan-20 10:00 23-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

58 220 220KV Shivpuri-Sabalgarh-I 20-Jan-20 10:00 20-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

59 220 220KV Shivpuri-Sabalgarh-II 23-Jan-20 10:00 23-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

60 220 220KV Mehgaon-Adani 03-Jan-20 09:00 03-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

61 220 220KV Mehgaon-Auraiya 06-Jan-20 09:00 06-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

62 220 160MVA transformer-I At 220KV s/s Mehgaon 11-Jan-20 09:00 11-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

63 220 160MVA transformer-II At 220KV s/s Mehgaon 14-Jan-20 09:00 14-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

64 220 220KV Datia- Bina 21-Jan-20 09:00 21-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

65 220 220KV Datia- Gwalior 25-Jan-20 10:00 25-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

66 220 160MVA Transformer-I at 220 KV S/S Datia 28-Jan-20 09:00 28-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

67 220 160MVA Transformer-II at 220 KV S/S Datia 31-Jan-20 09:00 31-Jan-20 17:00 Daily For Bay equipment maintenance and testing work

68 220 220KV Ashoknagar-Guna bay 02-Dec-19 09:00 02-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

69 220 220KV Guna-Ashoknagar bay 03-Dec-19 09:00 03-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

70 220 220KV Indore-South Zone-I 09-Dec-19 09:00 09-Dec-19 18:00 Daily For Bay equipment maintenance and testing work

71 220 220KV Indore-South Zone-II 10-Dec-19 09:00 10-Dec-19 18:00 Daily For Bay equipment maintenance and testing work

72 220 220KV Indore-Pithampur 11-Dec-19 09:00 11-Dec-19 18:00 Daily For Bay equipment maintenance and testing work

73 220 220KV Indore-Barnagar 12-Dec-19 09:00 12-Dec-19 18:00 Daily For Bay equipment maintenance and testing work

74 220 220KV Indore-Dewas 13-Dec-19 09:00 13-Dec-19 18:00 Daily For Bay equipment maintenance and testing work

75 220 220KV Indore-Jetpura 16-Dec-19 09:00 16-Dec-19 18:00 Daily For Bay equipment maintenance and testing work

76 220 220KV Indore-Mangliya 17-Dec-19 09:00 17-Dec-19 18:00 Daily For Bay equipment maintenance and testing work

77 220 220KV Indore-Barwaha-I 19-Dec-19 09:00 19-Dec-19 18:00 Daily For Bay equipment maintenance and testing work

78 220 220KV Indore-Barwaha-II 20-Dec-19 09:00 20-Dec-19 18:00 Daily For Bay equipment maintenance and testing work

79 220 220KV Indore-Indore-East 21-Dec-19 09:00 21-Dec-19 18:00 Daily For Bay equipment maintenance and testing work

80 220 220KV Rajgarh(Dhar)-PGCIL –I 19-Dec-19 10:00 19-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

81 220 220KV Rajgarh(Dhar)-PGCIL –II 20-Dec-19 10:00 20-Dec-19 17:00 Daily For Bay equipment maintenance and testing work

Agenda of 72nd OCCM of MP 41

Date Time Date Time

Sr- No

KV Line / Transformer / Reactor / Bay

From To Basis(Daily/

Continue)Reason

82 220 220KV Indore-Pithampur 04-Jan-20 09:00 04-Jan-20 18:00 Daily For Bay equipment maintenance and testing work

83 220 220KV Indore-Barnagar 06-Jan-20 09:00 06-Jan-20 18:00 Daily For Bay equipment maintenance and testing work

84 220 220KV Indore-Dewas 07-Jan-20 09:00 07-Jan-20 18:00 Daily For Bay equipment maintenance and testing work

85 220 220KV Indore-Jetpura 08-Jan-20 09:00 08-Jan-20 18:00 Daily For Bay equipment maintenance and testing work

86 220 220KV Indore-Mangliya 09-Jan-20 09:00 09-Jan-20 18:00 Daily For replacement of Wave trap, Line will be kept OFF

87 220 220KV Indore-Barwaha-I 10-Jan-20 09:00 10-Jan-20 18:00 Daily For Bay equipment maintenance and testing work

88 220 220KV Indore-Barwaha-II 13-Jan-20 09:00 13-Jan-20 18:00 Daily For Bay equipment maintenance and testing work

89 220 220KV Indore-Indore-East 14-Jan-20 09:00 14-Jan-20 18:00 Daily For Bay equipment maintenance and testing work

Agenda of 72nd OCCM of MP 42

Annexure-4.1

A. ThermalStn. Name UNIT No. Capacity

MW Aug-19 Sep-19

5 210 145.80 140.70

PH III 210 145.80 140.70

TOT 210 145.80 140.70

6 200 7.22 0.007 210 34.83 0.00

PH II 410 42.05 0.00

8 210 35.03 0.009 210 32.75 0.00

PH III 420 67.78 0.00

10 250 87.86 82.88

11 250 128.72 95.26

PH IV 500 216.58 178.14

TOT 1330 326.41 178.14

1 210 66.82 85.862 210 68.88 31.63

PH I 420 135.70 117.49

3 210 33.34 25.184 210 123.00 67.11

PH II 420 156.34 92.28

5 500 0.00 244.53

PH III 500 0.00 244.53TOT 1340 292.04 454.31

1 600 311.34 139.02

2 600 0.00 65.07

PH1 1200 311.34 204.09

3 660 140.22 63.54

4 660 88.28 0.00

PH II 1320 228.50 63.54

TOT 1860 539.84 267.63

4740 1304.09 1040.77

B. HydelCapacity

MW Aug-19 Sep-19115.0 9.30 19.21172.0 9.28 45.1499.0 33.45 46.21

386.0 52.02 110.57193.0 26.01 55.28160.0 1.68 81.96107.0 1.12 54.6490.0 55.54 62.58

315.0 122.75 179.3720.0 12.45 13.6760.0 20.48 26.8530.0 0.15 6.0545.0 10.67 19.3522.5 6.37 11.5520.0 0.14 6.8560.0 22.20 42.88

1186.0 298.08 550.14915.0 255.36 458.78917.5 267.21 459.73

CapacityMW Aug-19 Sep-19

Indira Sagar Hydel Project 1000 510.23 702.68Omkareshwar Hydel Project 520 212.73 216.09

Unitwise / Stationwise Genration in MUAnn 4.1

AM

AR

KA

NS

AT

PU

RA

SA

NJ

AY

GA

ND

HI

MPPGCL THERMAL

SS

TP

S

TONSBIRSINGHPUR

Station NameGANDHISAGARR.P.SAGARJ.SAGARCHAMBAL

C. NHDC (Ex-Bus)Station Name

B.SGR(DEOLONDH)B.SGR(SILPARA)RAJGHATM.P.RAJGHATB.SGR(JINHA)MADIKHEDA

Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014. 2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015.

TOTAL HYDELMPPGCL HydelMPSEB HYDEL Share

M.P.CHAMBALPENCHM.P.PENCHBARGI

Agenda of 72nd OCCM of MP 43

S No. Source Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Total30 31 30 31 31 30 0 0 0 0 0 0 183

A.

1 Thermal 2278.56 1929.45 1635.59 1915.93 1213.68 963.02 0.00 0.00 0.00 0.00 0.00 0.00 9936.24

2 Hydel 125.69 135.30 79.20 66.15 263.64 455.97 0.00 0.00 0.00 0.00 0.00 0.00 1125.96

3 Total 2404.26 2064.75 1714.78 1982.08 1477.33 1419.00 0.00 0.00 0.00 0.00 0.00 0.00 11062.20

B.1 Indira Sagar 81.66 94.10 42.03 78.42 507.37 699.26 0.00 0.00 0.00 0.00 0.00 0.00 1502.83

2 Omkareshwar 43.59 43.18 17.74 51.33 212.73 216.09 0.00 0.00 0.00 0.00 0.00 0.00 584.66

3 MPPMCL Schedule from Central Sector of WR 1777.61 1845.11 1849.93 1786.51 1529.83 1172.16 0.00 0.00 0.00 0.00 0.00 0.00 9961.16

4 MPPMCL Schedule from Central Sector ER 31.16 30.60 38.99 34.68 32.01 19.40 0.00 0.00 0.00 0.00 0.00 0.00 186.84

5 Total MPPMCL Schedule from Central Sector (WR+ER) 1808.77 1875.71 1888.92 1821.19 1561.84 1191.56 0.00 0.00 0.00 0.00 0.00 0.00 10148.00

6 Deviation Energy of (WR+ER) -23.86 1.07 -25.22 -21.74 -112.89 -108.38 0.00 0.00 0.00 0.00 0.00 0.00 -291.03

7 NET NR ISGS POWER SCH to MP 26.28 60.97 70.71 81.98 41.50 17.28 0.00 0.00 0.00 0.00 0.00 0.00 298.71

8 RUMS SOLAR REWA (Scheduled Energy) 89.06 83.32 82.07 66.59 78.12 72.78 0.00 0.00 0.00 0.00 0.00 0.00 471.94

9 Schedule From Sugen 0.00 0.24 5.07 13.80 2.08 0.47 0.00 0.00 0.00 0.00 0.00 0.00 21.66

10 LANCO Amk 162.90 174.72 166.39 124.22 131.15 68.30 0.00 0.00 0.00 0.00 0.00 0.00 827.68

11 SASAN 962.78 1016.20 944.63 880.82 794.41 932.61 0.00 0.00 0.00 0.00 0.00 0.00 5531.46

12 ESSAR (STOA against LTA) 0.00 6.16 5.47 4.46 3.62 2.92 0.00 0.00 0.00 0.00 0.00 0.00 22.64

13 J P Nigri 315.28 324.01 311.95 162.24 145.83 266.78 0.00 0.00 0.00 0.00 0.00 0.00 1526.09

14 MB Power 215.07 230.68 202.23 179.76 142.30 44.13 0.00 0.00 0.00 0.00 0.00 0.00 1014.18

15 JHABUA Power 70.02 86.00 80.24 77.37 32.78 3.63 0.00 0.00 0.00 0.00 0.00 0.00 350.04

16 Other Open Access Schedule other than MPPMCL Incl. Seci -188.35 -93.64 -71.91 -76.23 -165.01 -178.04 0.00 0.00 0.00 0.00 0.00 0.00 -773.16

17 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

18 BARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

19 Schedule from Sardar Sarovar 14.26 11.94 13.14 26.13 398.75 555.46 0.00 0.00 0.00 0.00 0.00 0.00 1019.68

20 SCH to Railway from RGPPL_ebid 176.29 183.11 173.39 180.41 168.71 160.33 0.00 0.00 0.00 0.00 0.00 0.00 1042.23

21 Schedule from SEZ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

22 Schedule from Rihand+Matatila 3.86 2.81 2.58 6.00 3.25 5.17 0.00 0.00 0.00 0.00 0.00 0.00 23.67

23 MTOA / STOA FROM RAJASTHAN 0.00 41.28 41.54 43.06 44.55 43.08 0.00 0.00 0.00 0.00 0.00 0.00 213.51

24 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA CSPDCCL dtd. 18.09.2012 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

25 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 18.09.2012 Including Short term purchase against MTOA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

26 Additional Power Purchase 0.00 0.00 0.00 32.40 0.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.4427 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0028 Banking of Energy -393.14 -468.76 -393.51 -593.40 -564.04 -584.15 0.00 0.00 0.00 0.00 0.00 0.00 -2997.00

29 Sale of Power -469.81 -61.02 -40.63 -215.50 -239.14 -221.85 0.00 0.00 0.00 0.00 0.00 0.00 -1247.96

30 Total MP Schedule (Including Railway) 2793.28 3473.75 3482.28 2815.30 2580.76 2380.45 0.00 0.00 0.00 0.00 0.00 0.00 17525.82

31 Total MP Drawal (Including Railway) 2769.41 3474.82 3457.06 2793.56 2467.87 2272.07 0.00 0.00 0.00 0.00 0.00 0.00 17234.79

32 Wheeled Energy of Tawa HEG 0.00 0.00 0.00 0.00 6.48 11.87 0.00 0.00 0.00 0.00 0.00 0.00 18.34

33 Wheeled Energy of Wind Farm 10.15 11.63 9.91 13.63 6.94 3.61 0.00 0.00 0.00 0.00 0.00 0.00 55.87

34 Wheeled Energy of Solar Plant 67.16 64.39 55.62 28.72 35.74 31.24 0.00 0.00 0.00 0.00 0.00 0.00 282.87

35 Wheeled Energy of Bio-Mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

36 Wheeled Energy of Ascent Hydro +SAS Hydel Hatta 1.34 1.27 1.02 2.49 2.49 5.70 0.00 0.00 0.00 0.00 0.00 0.00 14.32

37 Export to MSEB (Nepa-Dharni) Wheeling -7.23 -6.99 -5.77 -4.96 -4.48 -4.70 0.00 0.00 0.00 0.00 0.00 0.00 -34.13

38 Deviation Energy of MPPGCL Thermal + Infirm Energy of Singajil -30.89 -38.40 -35.05 -25.15 -29.92 -29.28 0.00 0.00 0.00 0.00 0.00 0.00 -188.69

39 Energy Purchased by MP from Wind Farm 403.98 579.40 555.30 644.20 490.23 257.89 0.00 0.00 0.00 0.00 0.00 0.00 2931.00

40 Energy Purchased by MP from Solar Plant 163.30 166.07 135.61 109.56 85.64 78.75 0.00 0.00 0.00 0.00 0.00 0.00 738.92

41 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. purchase by MP +Wheeled enrgy of CPP / IPP 187.15 101.90 86.30 87.04 176.83 192.05 0.00 0.00 0.00 0.00 0.00 0.00 831.27

42

Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW

2.66 2.98 3.06 1.59 0.90 1.64 0.00 0.00 0.00 0.00 0.00 0.00 12.83

43 Deviation Energy of ISP 1.41 1.64 1.70 1.83 2.85 3.41 0.00 0.00 0.00 0.00 0.00 0.00 12.85

44 Schedule Energy of BLA Power against LTOA 0.66 4.45 2.27 4.30 1.14 0.44 0.00 0.00 0.00 0.00 0.00 0.00 13.26

45 Schedule Energy of JP BINA Power against LTOA 34.61 150.56 147.57 54.21 54.84 35.95 0.00 0.00 0.00 0.00 0.00 0.00 477.74

46 Import from bargi Left Bank Canal Power House + ISP NVDA 0.59 -0.01 0.00 0.00 1.36 1.47 0.00 0.00 0.00 0.00 0.00 0.00 3.40

47 Chambal Complex Excess / less Overshare by MP -1.17 -1.09 1.27 -1.96 -16.60 -17.90 0.00 0.00 0.00 0.00 0.00 0.00 -37.44

48 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.03 0.00 -0.02 -0.02 2.14 2.96 0.00 0.00 0.00 0.00 0.00 0.00 5.03

49 State Supply (Ex-Power stn. Bus) 6132.61 6714.64 6190.39 5820.86 5481.89 5181.52 0.00 0.00 0.00 0.00 0.00 0.00 35521.92

50 AVERAGE DAILY (Ex-Bus) 204.42 216.60 206.35 187.77 176.84 172.72 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 194.1151 MINIMUM DAILY (MP Periphery) 147.90 194.22 166.40 149.59 136.89 150.30 0.00 0.00 0.00 0.00 0.00 0.00 136.8952 MAXIMUM DAILY (MP Periphery) 214.82 221.89 221.88 223.94 190.98 190.33 0.00 0.00 0.00 0.00 0.00 0.00 223.9453 State Supply (Ex-Power st. Bus):- YEAR : 2018-19 6180.81 7257.46 5559.67 5521.99 6028.06 6017.96 9509.89 10724.63 10506.69 10038.55 7907.95 7319.25 36565.95

54 Year ((19-20)-(18-19))*100/Year (18-19) -0.78 -7.48 11.34 5.41 -9.06 -13.90 -100.00 -100.00 -100.00 -100.00 -100.00 -100.00 -2.86

55 Unshedule L/S : Year-2019-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

56 Frequency Correction 2.76 3.66 3.72 2.48 2.44 1.66 0.00 0.00 0.00 0.00 0.00 0.00 16.72

57 Restricted Requirement : Year-2019-20 6135.38 6718.30 6194.11 5823.34 5484.33 5183.19 0.00 0.00 0.00 0.00 0.00 0.00 35538.64

58 Shedule L/S : Year-2019-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

59 Un-Restricted Requirement : Year-2019-20 6135.38 6718.30 6194.11 5823.34 5484.33 5183.19 0.00 0.00 0.00 0.00 0.00 0.00 35538.64

ENERGY BALANCE SHEETYear : 2019 - 20

All figures in Million Unit

M.P. Availability

Exchange with other States / Systems

29

Agenda of 72nd OCCM of MP 44

S.NO. Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Yr 19-20C.1 DEMAND MET 9738 9880 9955 9845 8606 8545 0 0 0 0 0 0 99552 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0D.1 DEMAND MET 9235 9475 9480 9746 8526 8685 0 0 0 0 0 0 97462 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0F. REGISTERED MAXIMUM 9738 9880 9955 9845 8606 8685 0 0 0 0 0 0 9955G. COMPUTED MAXIMUM DEMAND 9738 9891 9961 9845 8606 8887 0 0 0 0 0 0 9961H. UNRESTRICTED MAXIMUM DEMAND 9738 9891 9955 9845 8606 8887 0 0 0 0 0 0 9955I.1. Div. Head Quarters 23:52 23:54 23:48 23:48 23:51 23:47 0:00 0:00 0:00 0:00 0:00 0:00 23:502. District Head Quarters 23:54 23:55 23:48 23:48 23:47 23:44 0:00 0:00 0:00 0:00 0:00 0:00 23:493. Tahsil Head Quarters 23:50 23:53 23:43 23:44 23:48 23:42 0:00 0:00 0:00 0:00 0:00 0:00 23:474. Rural -Mixed 23:36 23:46 23:34 23:29 23:40 23:35 0:00 0:00 0:00 0:00 0:00 0:00 23:375. Rural -DLF 23:40 23:48 23:35 23:34 23:40 23:34 0:00 0:00 0:00 0:00 0:00 0:00 23:386. Rural -Irrigation 9:54 9:57 9:53 9:53 9:53 9:51 0:00 0:00 0:00 0:00 0:00 0:00 9:54J LOAD FACTOR % 100.29 111.80 107.44 92.07 100.54 65.85 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 96.33

S.N PARTICULARS Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Yr 19-20A. INTGRATED FREQUENCY

1 MAXIMUM 50.21 50.16 50.23 50.16 50.26 50.14 0.00 0.00 0.00 0.00 0.00 0.00 50.262 MINIMUM 49.81 49.81 49.80 49.83 49.81 49.80 0.00 0.00 0.00 0.00 0.00 0.00 49.80

B. INSTANTANEOUS FREQUENCY1 MAXIMUM 50.29 50.33 50.31 50.32 50.32 50.27 0.00 0.00 0.00 0.00 0.00 0.00 50.332 MINIMUM 49.65 49.65 49.63 49.64 49.55 49.62 0.00 0.00 0.00 0.00 0.00 0.00 49.55

C. AVG FREQUENCY 50.00 50.00 50.00 50.01 50.00 50.01 0.00 0.00 0.00 0.00 0.00 0.00 50.00D. % TIME WHEN FREQUENCY WAS

1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.002 50.05 TO 51.5 Hz 20.14 19.14 19.79 24.64 20.03 20.18 0.00 0.00 0.00 0.00 0.00 0.00 20.663 49.9 TO 50.05 Hz 72.76 72.60 70.34 68.27 72.69 75.25 0.00 0.00 0.00 0.00 0.00 0.00 71.974 49.7 TO 49.9 Hz 7.10 8.26 9.87 7.09 7.28 4.57 0.00 0.00 0.00 0.00 0.00 0.00 7.365 49.5 TO 49.7 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.006 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.007 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.008 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.009 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Year : 2019 - 20

MORNING PEAK (MAX)

EVENING PEAK (MAX)

Average Power Supply per day to

FREQUENCY ANALYSIS YEAR 2019-20

ENERGY BALANCE SHEET : Demand & Sypply Hours

29

Agenda of 72nd OCCM of MP 45

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs

Injection

Total CPPs

Injection

Total CSSNet

NR to MP

Sugen

Lanco SasanEssa

rJP

Nigri

RUMS (SOLA

R) REWA

TO MPPM

CL

MB Power

Jhabua

PowerSSP

SCH to

Railway

SEZ Banking Sale Pur STOA

Rihand+Matatila-Rajgh

at

MTOA / STOA FROM

RAJASTHAN

Total SCH UN SCH

TOTALDEMAND

MET Check

1:00 50.02 1749 1593 328 671 281 307 755 3934 2231 54 5 178 1075 6 182 0 216 57 521 229 0 -1089 -188 1 -194 1 58 3344 7278 3291 -53 -6 7218 0 0 0 7219 7219 7218 0

2:00 50.02 1747 1591 323 661 275 309 770 3930 2213 66 2 180 1070 6 178 0 195 54 519 220 0 -1089 -159 0 -198 1 58 3316 7246 3228 -88 -6 7151 0 0 0 7153 7153 7151 0

3:00 50.02 1742 1586 311 649 275 308 767 3895 2143 48 0 161 1062 5 185 0 152 47 516 212 0 -1089 -73 0 -213 1 58 3215 7110 3223 8 -6 7112 0 0 0 7114 7114 7112 0

4:00 50.02 1748 1592 312 657 276 305 760 3901 2131 55 0 161 1052 5 188 0 142 47 514 217 0 -1032 -60 0 -213 1 58 3268 7169 3161 -107 -6 7057 0 0 0 7058 7058 7057 0

5:00 50.00 1760 1603 322 653 277 304 755 3913 2006 45 0 154 1030 5 189 0 168 35 515 218 0 -842 -77 0 -214 1 58 3291 7203 3163 -128 -6 7069 0 0 0 7072 7072 7069 0

6:00 50.00 1766 1609 323 652 283 306 720 3892 2030 43 0 165 1042 4 185 8 173 35 515 229 0 -547 -217 0 -204 1 58 3521 7413 3482 -39 -6 7369 0 0 0 7372 7372 7369 0

7:00 49.98 1799 1639 353 680 287 311 738 4008 2239 59 0 187 1077 5 184 24 222 58 515 221 0 -547 -278 0 -209 1 58 3817 7825 3709 -107 -6 7711 0 0 0 7719 7719 7711 0

8:00 50.05 1769 1611 357 667 292 306 811 4045 2113 86 0 169 1069 3 183 101 194 47 516 213 0 -547 -208 0 -240 1 58 3759 7804 3538 -220 -6 7577 0 0 0 7578 7578 7577 0

9:00 50.03 1716 1563 335 653 291 302 920 4064 1930 79 0 157 1055 1 183 202 141 38 519 220 0 -532 -155 0 -271 1 58 3628 7692 3505 -123 -6 7563 0 0 0 7564 7564 7563 0

10:00 50.04 1671 1522 343 652 293 304 1005 4118 1931 75 0 160 1000 0 183 278 132 18 519 220 0 -531 -374 0 -302 1 58 3368 7486 3229 -139 -5 7342 0 0 0 7343 7343 7341 0

11:00 50.04 1657 1509 326 660 291 305 1037 4128 1819 69 0 152 953 0 183 340 137 11 520 226 0 -531 -425 0 -312 1 58 3200 7328 2965 -235 -5 7089 0 0 0 7089 7089 7089 0

12:00 50.01 1614 1469 315 658 288 302 1071 4102 1715 49 0 150 920 0 183 384 101 11 516 218 0 -530 -512 0 -318 1 58 2946 7049 2765 -181 -5 6863 0 0 0 6866 6866 6863 0

13:00 50.03 1589 1447 323 652 287 297 1059 4066 1605 25 0 143 924 0 184 376 99 8 517 213 0 -592 -431 0 -322 1 58 2809 6874 2715 -93 -5 6777 0 0 0 6778 6778 6777 0

14:00 50.01 1603 1459 317 661 286 300 1039 4062 1620 25 0 151 940 0 184 321 93 12 517 218 0 -593 -377 0 -321 1 58 2850 6912 2602 -248 -4 6660 0 0 0 6663 6663 6660 0

15:00 50.01 1644 1497 305 663 287 301 972 4026 1735 22 0 158 947 1 185 258 126 13 518 219 0 -595 -654 0 -306 1 58 2685 6711 2662 -22 -5 6684 0 0 0 6686 6686 6684 0

16:00 50.00 1685 1535 291 667 286 300 864 3942 1817 21 0 167 977 1 185 161 134 21 521 229 0 -595 -549 0 -285 1 58 2862 6805 2766 -96 -5 6703 0 0 0 6707 6707 6703 0

17:00 49.98 1696 1544 299 667 288 300 726 3825 1912 21 0 157 1005 0 185 63 157 30 523 219 0 -611 -386 0 -280 1 58 3054 6879 3034 -20 -5 6855 0 0 0 6861 6861 6855 0

18:00 49.99 1729 1575 324 678 287 304 605 3773 2010 23 0 162 1025 0 191 15 162 32 521 213 0 -538 -239 0 -266 1 58 3369 7142 3257 -112 -6 7024 0 0 0 7031 7031 7024 0

19:00 49.97 1891 1724 365 707 287 347 544 3974 2222 96 5 199 1067 12 201 0 270 62 518 220 0 -550 -490 0 -160 1 58 3731 7704 3566 -165 -7 7533 0 0 0 7543 7543 7533 0

20:00 50.00 1942 1771 461 762 302 372 549 4218 2341 53 24 204 1091 15 207 0 319 85 528 221 0 -1027 -373 0 -114 1 58 3631 7849 3587 -44 -7 7798 0 0 0 7804 7804 7798 0

21:00 49.98 1944 1773 410 738 299 359 569 4148 2285 57 12 202 1096 15 209 0 304 82 536 230 0 -1011 -406 0 -114 1 58 3555 7703 3419 -136 -7 7560 0 0 0 7568 7568 7560 0

22:00 50.04 1909 1740 384 724 297 346 594 4085 2275 59 7 200 1110 15 209 0 278 75 542 219 0 -1064 -440 0 -118 1 58 3428 7513 3328 -99 -7 7406 0 0 0 7408 7408 7406 0

23:00 50.02 1893 1726 377 723 300 330 639 4096 2265 85 7 197 1113 14 208 0 283 78 546 212 0 -1059 -378 0 -100 1 58 3532 7628 3391 -142 -7 7479 0 0 0 7481 7481 7479 0

24:00 50.03 1794 1635 354 717 295 317 683 4000 2215 78 5 188 1098 8 196 0 262 74 551 221 0 -869 -307 0 -193 1 58 3586 7586 3323 -263 -7 7316 0 0 0 7318 7318 7316 0

Avg. 50.01 1752 1596 340 678 288 314 790 4006 2033 54 3 171 1033 5 190 105 186 43 523 220 0 -750 -323 0 -228 1 58 3324 7330 3205 -119 -6 7205 0 0 0 7208 7208 a a

00 TO 06 HRS.

50.01 1752 1596 320 657 278 306 754 3911 2126 52 1 167 1055 5 184 1 174 46 517 221 0 -948 -129 0 -206 1 58 3326 7237 3258 -68 -6 7163 0 0 0 7165 7165

06 TO 12 HRS.

50.02 1704 1552 338 662 290 305 930 4078 1958 69 0 163 1012 2 183 222 154 30 518 220 0 -537 -325 0 -275 1 58 3453 7531 3285 -168 -5 7357 0 0 0 7360 7360

12 TO 18 HRS.

50.00 1658 1510 310 665 287 300 878 3949 1783 23 0 156 970 0 186 199 129 19 520 218 0 -587 -439 0 -297 1 58 2938 6887 2840 -99 -5 6784 0 0 0 6788 6788

06TO 18 HRS.

50.01 1681 1531 324 663 289 303 904 4013 1870 46 0 159 991 1 185 210 141 25 519 219 0 -562 -382 0 -286 1 58 3196 7209 3062 -133 -5 7071 0 0 0 7074 7074

18 TO 24 HRS.

50.01 1896 1728 392 729 297 345 597 4087 2267 71 10 198 1096 13 205 0 286 76 537 221 0 -930 -399 0 -133 1 58 3577 7664 3436 -141 -7 7515 0 0 0 7520 7520

DEMAND MET

Load Shedding

REST. DEMAN

D

UNREST. DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- August 2019

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

TotAvl.

Act.Drl

Devia -tion

Export to MS

Agenda of 72nd OCCM of MP 46

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs

Injection

Total CPPs Injectio

n

Total CSSNet

NR to MP

Sugen

Lanco Sasan Essar

JP Nigri

RUMS (SOLA

R) REWA

TO MPPM

CL

MB Power

Jhabua

PowerSSP

SCH to

Railway

SEZ Banking Sale Pur STOA

Rihand+Matatila-Rajgh

at

MTOA / STOA FROM RAJASTHAN

Total SCH UN SCH

TOTAL

1:00 50.01 1546 1418 592 967 301 320 452 4049 1863 20 0 93 1308 4 358 0 102 0 786 216 0 -1336 -106 0 -240 0 58 3126 7175 3002 -124 -7 7044 0 0 0 7045 7045

2:00 50.02 1526 1399 588 964 296 317 466 4029 1805 19 0 79 1307 4 358 0 55 0 786 217 0 -1345 -68 0 -240 0 58 3037 7067 2944 -93 -7 6967 0 0 0 6968 6968

3:00 50.03 1479 1355 586 957 296 317 456 3968 1751 19 0 75 1306 3 358 0 49 0 804 216 0 -1345 -55 0 -254 0 58 2987 6955 2953 -34 -7 6914 0 0 0 6915 6915

4:00 50.04 1473 1349 588 965 296 317 447 3962 1719 19 0 75 1310 2 358 0 52 0 811 216 0 -1316 -44 0 -259 0 58 3001 6964 2934 -67 -7 6890 0 0 0 6890 6890

5:00 50.00 1476 1352 589 964 298 316 419 3939 1539 20 0 75 1283 2 359 0 43 0 794 215 0 -1000 -37 0 -264 0 58 3087 7026 2989 -98 -6 6922 0 0 0 6926 6926

6:00 50.01 1459 1337 590 965 298 318 389 3896 1497 22 0 80 1311 1 354 4 33 0 764 216 0 -547 -101 0 -264 0 58 3429 7325 3323 -106 -7 7212 0 0 0 7216 7216

7:00 50.02 1498 1373 624 959 298 318 383 3954 1821 24 0 83 1323 1 354 16 60 0 763 215 0 -547 -130 0 -268 0 58 3773 7727 3680 -93 -7 7626 0 0 0 7628 7628

8:00 50.05 1447 1326 620 953 298 313 478 3988 1688 18 0 83 1311 1 353 100 36 0 784 214 0 -547 -120 0 -289 0 58 3691 7679 3459 -233 -7 7439 0 0 0 7439 7439

9:00 50.02 1387 1271 611 965 295 312 570 4026 1425 21 0 80 1296 1 353 207 3 0 778 215 0 -544 -147 0 -308 0 58 3438 7464 3348 -90 -6 7368 0 0 0 7369 7369

10:00 50.04 1362 1248 608 959 297 312 680 4103 1388 19 0 80 1279 0 354 297 0 0 718 215 0 -544 -323 0 -332 0 58 3211 7315 3036 -176 -6 7133 0 0 0 7134 7134

11:00 50.03 1324 1214 595 965 297 312 732 4114 1235 18 0 80 1222 0 354 363 0 0 721 217 0 -543 -463 0 -343 0 58 2921 7036 2727 -195 -5 6836 0 0 0 6836 6836

12:00 50.03 1302 1193 590 965 297 312 776 4133 1120 18 0 80 1120 0 354 378 0 0 723 218 0 -543 -556 0 -348 0 58 2624 6757 2517 -107 -5 6645 0 0 0 6645 6645

13:00 50.02 1267 1161 582 966 292 312 793 4106 1021 18 0 80 1066 0 354 357 0 0 740 217 0 -604 -445 0 -348 0 58 2515 6621 2427 -88 -5 6528 0 0 0 6530 6530

14:00 50.02 1246 1142 566 968 302 312 746 4036 1041 18 0 80 1066 0 354 311 0 0 730 217 0 -603 -406 0 -345 0 58 2522 6558 2400 -122 -5 6431 0 0 0 6433 6433

15:00 50.00 1264 1158 565 961 308 313 688 3992 1202 19 0 80 1094 0 354 218 0 0 720 217 0 -602 -524 0 -335 0 58 2502 6494 2442 -60 -5 6429 0 0 0 6432 6432

16:00 50.02 1306 1197 565 964 317 313 569 3925 1377 19 0 83 1195 0 354 128 5 0 721 217 0 -602 -583 0 -320 0 58 2653 6578 2542 -111 -5 6462 0 0 0 6464 6464

17:00 49.99 1363 1249 585 967 316 313 438 3869 1476 19 0 92 1244 0 355 35 14 0 721 216 0 -613 -436 0 -308 0 58 2874 6743 2802 -72 -6 6665 0 0 0 6669 6669

18:00 49.98 1453 1332 593 972 310 314 351 3871 1744 20 0 102 1279 1 360 3 28 12 722 216 0 -547 -454 0 -284 0 58 3260 7131 3187 -73 -7 7051 0 0 0 7058 7058

19:00 49.94 1607 1473 614 969 313 342 342 4053 2072 46 0 132 1305 22 371 0 182 34 721 215 0 -547 -619 0 -89 0 58 3903 7956 3798 -104 -8 7844 0 0 0 7859 7859

20:00 50.05 1615 1481 626 961 306 337 385 4096 2077 36 5 136 1306 23 375 0 241 26 753 214 0 -1008 -412 0 -37 0 58 3793 7888 3557 -236 -8 7644 0 0 0 7644 7644

21:00 50.01 1588 1456 615 972 306 328 388 4065 1963 25 0 127 1311 21 376 0 177 17 762 214 0 -992 -417 0 -86 0 58 3556 7621 3374 -182 -8 7431 0 0 0 7434 7434

22:00 50.05 1576 1445 609 954 306 318 396 4027 1970 25 0 126 1316 9 375 0 127 12 719 214 0 -1037 -405 0 -182 0 58 3328 7356 3270 -59 -8 7289 0 0 0 7289 7289

23:00 50.04 1564 1434 602 967 303 319 431 4056 1949 34 2 122 1327 8 373 0 129 12 720 215 0 -1039 -310 0 -203 0 58 3399 7456 3249 -151 -7 7298 0 0 0 7298 7298

24:00 50.04 1510 1385 595 966 301 317 435 3999 1889 29 0 89 1323 4 370 0 72 3 739 214 0 -907 -281 0 -258 0 58 3345 7344 3132 -213 -7 7124 0 0 0 7124 7124

Avg. 50.02 1443 1323 596 964 302 318 509 4011 1610 23 0 92 1259 4 360 101 59 5 750 216 0 -802 -310 0 -258 0 58 3166 7176 3046 -120 -7 7050 0 0 0 7052 7052

00 TO 06 HRS.

50.02 1493 1368 589 964 297 318 438 3974 1696 20 0 80 1304 3 357 1 56 0 791 216 0 -1148 -69 0 -253 0 58 3111 7085 3024 -87 -7 6992 0 0 0 6993 6993

06 TO 12 HRS.

50.03 1387 1271 608 961 297 313 603 4053 1446 20 0 81 1259 1 354 227 16 0 748 216 0 -545 -290 0 -315 0 58 3276 7330 3128 -149 -6 7174 0 0 0 7175 7175

12 TO 18 HRS.

50.01 1316 1206 576 966 307 313 597 3966 1310 19 0 86 1157 0 355 175 8 2 726 217 0 -595 -475 0 -323 0 58 2721 6687 2634 -88 -5 6594 0 0 0 6598 6598

06TO 18 HRS.

50.02 1352 1239 592 964 302 313 600 4010 1378 19 0 84 1208 0 355 201 12 1 737 216 0 -570 -382 0 -319 0 58 2999 7008 2881 -118 -6 6884 0 0 0 6886 6886

18 TO 24 HRS.

50.02 1577 1446 610 965 306 327 396 4049 1987 33 1 122 1315 14 373 0 155 18 736 214 0 -922 -407 0 -142 0 58 3554 7603 3397 -157 -8 7438 0 0 0 7442 7442

DEMAND MET

Load Shedding

REST. DEMAN

D

UNREST. DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- September 2019

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

TotAvl.

Act.Drl

Devia -tion

Export to MS

Agenda of 72nd OCCM of MP 47

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 50.02 2551 2474 -77 0 0 2475 2475 2715 2637 -78 0 0 2637 2637 1842 1870 29 0 0 1871 1871 229 237

2:00 50.02 2514 2440 -74 0 0 2440 2440 2672 2607 -64 0 0 2608 2608 1831 1864 33 0 0 1865 1865 220 240

3:00 50.02 2494 2439 -55 0 0 2440 2440 2610 2568 -42 0 0 2568 2568 1822 1874 52 0 0 1875 1875 212 231

4:00 50.02 2470 2427 -43 0 0 2428 2428 2576 2533 -43 0 0 2533 2533 1855 1870 15 0 0 1870 1870 217 227

5:00 50.00 2507 2414 -93 0 0 2415 2415 2597 2520 -77 0 0 2521 2521 1897 1910 14 0 0 1911 1911 218 225

6:00 50.00 2459 2360 -98 0 0 2361 2361 2657 2642 -16 0 0 2643 2643 2086 2129 43 0 0 2130 2130 229 238

7:00 49.98 2443 2365 -78 0 0 2367 2367 2841 2773 -68 0 0 2776 2776 2328 2328 0 0 0 2330 2330 221 246

8:00 50.05 2434 2273 -161 0 0 2273 2273 2858 2699 -159 0 0 2699 2699 2322 2361 39 0 0 2361 2361 213 244

9:00 50.03 2396 2310 -86 0 0 2310 2310 2813 2714 -99 0 0 2714 2714 2319 2302 -16 0 0 2303 2303 220 237

10:00 50.04 2345 2254 -92 0 0 2254 2254 2753 2662 -91 0 0 2663 2663 2187 2190 3 0 0 2190 2190 220 236

11:00 50.04 2307 2207 -100 0 0 2207 2207 2692 2570 -122 0 0 2570 2570 2140 2081 -59 0 0 2081 2081 226 231

12:00 50.01 2303 2154 -149 0 0 2155 2155 2600 2489 -111 0 0 2490 2490 2010 1989 -21 0 0 1990 1990 218 230

13:00 50.03 2231 2149 -82 0 0 2150 2150 2512 2445 -66 0 0 2446 2446 1948 1967 19 0 0 1967 1967 213 215

14:00 50.01 2181 2072 -109 0 0 2073 2073 2505 2411 -94 0 0 2412 2412 1967 1952 -15 0 0 1953 1953 218 226

15:00 50.01 2121 2077 -44 0 0 2078 2078 2445 2398 -47 0 0 2399 2399 1957 1979 22 0 0 1980 1980 219 230

16:00 50.00 2156 2085 -71 0 0 2087 2087 2472 2404 -69 0 0 2405 2405 1973 1986 12 0 0 1987 1987 229 229

17:00 49.98 2131 2098 -33 0 0 2100 2100 2485 2468 -17 0 0 2470 2470 2025 2054 30 0 0 2056 2056 219 234

18:00 49.99 2191 2119 -72 0 0 2121 2121 2595 2505 -90 0 0 2508 2508 2153 2160 8 0 0 2162 2162 213 240

19:00 49.97 2537 2471 -65 0 0 2475 2475 2619 2558 -61 0 0 2561 2561 2326 2269 -57 0 0 2272 2272 220 235

20:00 50.00 2732 2627 -104 0 0 2629 2629 2737 2702 -35 0 0 2704 2704 2211 2214 4 0 0 2216 2216 221 254

21:00 49.98 2727 2605 -122 0 0 2608 2608 2705 2626 -79 0 0 2629 2629 2084 2096 12 0 0 2098 2098 230 233

22:00 50.04 2680 2536 -145 0 0 2536 2536 2677 2618 -59 0 0 2618 2618 1972 2022 50 0 0 2022 2022 219 231

23:00 50.02 2662 2537 -125 0 0 2538 2538 2817 2747 -70 0 0 2748 2748 1957 1971 14 0 0 1972 1972 212 224

24:00 50.03 2648 2500 -149 0 0 2500 2500 2799 2665 -134 0 0 2665 2665 1914 1891 -23 0 0 1891 1891 221 261

Avg. 50.01 2426 2333 -93 0 0 2334 2334 2656 2582 -75 0 0 2583 2583 2047 2055 9 0 0 2056 2056 220 235

00 TO 06 HRS.

50.01 2499 2426 -73 0 0 2426 2426 2638 2584 -53 0 0 2585 2585 1889 1920 31 0 0 1920 1920 221 233

06 TO 12 HRS.

50.02 2371 2260 -111 0 0 2261 2261 2759 2651 -108 0 0 2652 2652 2218 2209 -9 0 0 2209 2209 220 237

12 TO 18 HRS.

50.00 2168 2100 -68 0 0 2101 2101 2502 2438 -64 0 0 2440 2440 2004 2016 13 0 0 2018 2018 218 229

06TO 18 HRS.

50.01 2270 2180 -90 0 0 2181 2181 2631 2545 -86 0 0 2546 2546 2111 2112 2 0 0 2113 2113 219 233

18 TO 24 HRS.

50.01 2664 2546 -118 0 0 2548 2548 2726 2652 -73 0 0 2654 2654 2077 2077 0 0 0 2079 2079 221 240

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- August 2019

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Agenda of 72nd OCCM of MP 48

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 50.01 2405 2337 -69 0 0 2337 2337 2658 2534 -125 0 0 2534 2534 1941 1947 6 0 0 1947 1947 216 227

2:00 50.02 2356 2306 -51 0 0 2306 2306 2586 2499 -86 0 0 2500 2500 1933 1942 8 0 0 1942 1942 217 220

3:00 50.03 2330 2289 -41 0 0 2290 2290 2554 2465 -89 0 0 2465 2465 1916 1942 27 0 0 1943 1943 216 218

4:00 50.04 2319 2282 -37 0 0 2282 2282 2532 2439 -92 0 0 2439 2439 1933 1956 23 0 0 1956 1956 216 212

5:00 50.00 2296 2263 -33 0 0 2264 2264 2525 2440 -85 0 0 2442 2442 1948 2001 52 0 0 2002 2002 215 218

6:00 50.01 2292 2220 -72 0 0 2221 2221 2573 2562 -11 0 0 2563 2563 2170 2216 45 0 0 2217 2217 216 214

7:00 50.02 2285 2237 -47 0 0 2238 2238 2766 2713 -53 0 0 2714 2714 2423 2447 24 0 0 2447 2447 215 229

8:00 50.05 2225 2127 -97 0 0 2127 2127 2754 2635 -119 0 0 2635 2635 2433 2451 18 0 0 2451 2451 214 226

9:00 50.02 2182 2130 -51 0 0 2131 2131 2678 2615 -63 0 0 2615 2615 2353 2389 36 0 0 2390 2390 215 233

10:00 50.04 2165 2069 -96 0 0 2070 2070 2654 2562 -93 0 0 2562 2562 2257 2282 25 0 0 2282 2282 215 220

11:00 50.03 2104 2009 -94 0 0 2010 2010 2560 2447 -114 0 0 2447 2447 2108 2161 53 0 0 2161 2161 217 218

12:00 50.03 2046 1979 -68 0 0 1979 1979 2450 2363 -87 0 0 2363 2363 1994 2089 95 0 0 2089 2089 218 215

13:00 50.02 2020 1960 -60 0 0 1960 1960 2377 2319 -58 0 0 2320 2320 1935 2042 108 0 0 2043 2043 217 207

14:00 50.02 1988 1893 -95 0 0 1894 1894 2388 2288 -100 0 0 2289 2289 1983 2037 53 0 0 2037 2037 217 213

15:00 50.00 1923 1881 -42 0 0 1882 1882 2314 2270 -44 0 0 2271 2271 2001 2049 48 0 0 2050 2050 217 229

16:00 50.02 1945 1891 -55 0 0 1891 1891 2321 2280 -41 0 0 2281 2281 2025 2077 52 0 0 2077 2077 217 214

17:00 49.99 1966 1917 -50 0 0 1918 1918 2385 2356 -29 0 0 2357 2357 2125 2165 41 0 0 2167 2167 216 227

18:00 49.98 2046 2046 0 0 0 2048 2048 2506 2476 -31 0 0 2478 2478 2270 2303 33 0 0 2306 2306 216 226

19:00 49.94 2436 2466 30 0 0 2471 2471 2759 2694 -65 0 0 2699 2699 2527 2470 -57 0 0 2474 2474 215 214

20:00 50.05 2571 2457 -113 0 0 2457 2457 2847 2666 -181 0 0 2666 2666 2279 2295 16 0 0 2295 2295 214 226

21:00 50.01 2569 2459 -110 0 0 2460 2460 2719 2584 -135 0 0 2585 2585 2126 2184 58 0 0 2184 2184 214 204

22:00 50.05 2511 2403 -107 0 0 2403 2403 2611 2560 -51 0 0 2560 2560 2022 2116 94 0 0 2116 2116 214 211

23:00 50.04 2489 2404 -84 0 0 2405 2405 2768 2631 -138 0 0 2631 2631 2023 2059 36 0 0 2059 2059 215 203

24:00 50.04 2454 2362 -92 0 0 2362 2362 2712 2527 -184 0 0 2528 2528 1951 1981 30 0 0 1981 1981 214 253

Avg. 50.02 2247 2183 -64 0 0 2184 2184 2583 2497 -86 0 0 2498 2498 2111 2150 39 0 0 2151 2151 216 220

00 TO 06 HRS.

50.02 2333 2283 -50 0 0 2283 2283 2571 2490 -82 0 0 2491 2491 1974 2001 27 0 0 2001 2001 216 218

06 TO 12 HRS.

50.03 2168 2092 -76 0 0 2092 2092 2644 2556 -88 0 0 2556 2556 2261 2303 42 0 0 2303 2303 216 224

12 TO 18 HRS.

50.01 1981 1931 -50 0 0 1932 1932 2382 2332 -50 0 0 2333 2333 2056 2112 56 0 0 2113 2113 217 219

06TO 18 HRS.

50.02 2075 2012 -63 0 0 2012 2012 2513 2444 -69 0 0 2444 2444 2159 2208 49 0 0 2208 2208 216 221

18 TO 24 HRS.

50.02 2505 2425 -80 0 0 2426 2426 2736 2610 -126 0 0 2612 2612 2154 2184 30 0 0 2185 2185 214 219

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- September 2019

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Agenda of 72nd OCCM of MP 49

ANNEXURE-5 System Disturbance / System Incidence

1. System Disturbance on 04.09.2019 at 400kv s/s Bhopal: On dated 04.09.19 at 16.00 hrs.

there was heavy rains and lightening in central MP and frequency of National Grid was 50.08 Hz, at 16.06 hrs, 220 Kv Bhopal-Bairagarh 1 tripped and auto reclosed but did not trip from Bhopal end causing LBB protection to operate which tripped following feeders and X-mers of 220kv Main Bus-1:- 220kv Bhopal-Bhopal-I 220kv Bhopal-Shujalpur-I 220kv Bhopal-Mungalia Chhap ckt 220kv Bhopal-Ganj Basoda ckt 220kv Bhopal-Bairagarh 1 220kv Bus-tie 400/220kv 315 MVA Xmer 1 and 3 There was very heavy rains and lightening at the time of tripping. R Phase string at location No. 8 and R phase wavetrap at 400 Kv s/s for 220 Kv Bairagarh 1 found failed.The tripped elements has been normalized in due course of time. No any system and areas affected as load managed by elements on 220kv Main Bus-2 and nearby network. There was no load loss and no generation loss.

2. System Disturbance on 07.09.2019 at 220kv s/s Sukha, Jabalpur: On dated 07.09.19 at 16.00 hrs. weather in East MP was normal and frequency of National Grid was 50.08 Hz, at 16.15 hrs, LBB protection of 220 Main bus 2 operated which was initiated from ICT-2 ,which tripped following feeders and X-mers of 220kv Main Bus-2:- 220kv Sukha-Jabalpur-2 220kv Sukha -Narsinghpur-2 220kv Sukha -Panagar-2 220kv Bus-tie 400/220kv 315 MVA Xmer 2 It was reported that LBB protection of 220 Main bus 2 operated due to false signal from ICT 2 cable fault. Bus 2 Successfully separated The tripped elements has been normalized in due course of time. No any system and areas affected as load managed by elements on 220kv Main Bus-1 and nearby network. There was no load loss and no generation loss.

Agenda of 72nd OCCM of MP 50

3. System Disturbance on 21.09.2019 at 400kv s/s Ashta: On dated 21.09.19 at 14.50 hrs. weather in MP was normal and frequency of National Grid was 49.96 Hz, at 14.58 hrs 220 KV Main Bus 1 R Phase PT failed with operation of 220 KV Bus Bar Protection . This caused both 220 KV Bus dead ,which tripped following feeders and X-mers of 220kv Main Bus-2:-

220 KV Ashta-Bhopal, 220 KV Ashta-Mughaliyachhap 220 KV Ashta-Jetpura Ckt No.1 & 2 220 KV Ashta-Shajapur Ckt No. 1 & 2

220 KV Ashta-Dewas Ckt No. 1 & 2 160 MVA Xmer No. 1 & 2 100 MVA 220/33 KV Xmer 220KV BUS Tie

220 KV Incoming of 315 MVA Xmer 1 & 2

It was reported that R Phase pole of 220 KV Incoming of 315 MVA Xmer 2 was found stuck and it’s both tripping coils were found burnt. Then 315MVA Xmer 2 (CGL) H/T at 15:22Hrs. After isolating defective PT, Restoration of supply was done. After replacement of both trip coils 315 MVA Xmer 2 Charged at 17:05hrs There was a load loss of 13 MW and no generation loss.

*********

Agenda of 72nd OCCM of MP 51

O/C trip E/F trip O/C+E/F

trip 1 2 3 4 5

33KV JABALPUR NO 4 3 0 20 2333KV JABALPUR NO 5 5 0 11 1633KV JABALPUR NO 6 1 1 10 1233KV JABALPUR NO 7 0 1 11 1233KV NTPC NO.1. 1 0 15 1633KV NTPC NO.2 3 0 23 2633KV RAMNAGARA NO 2 0 0 25 25

2 PANAGAR 220 33KV INDUSTRIAL SIHORA 8 0 23 313 PATAN 132 33KV KATRA-BELK 0 6 9 15

33KV RICHHAI 2 5 6 1333KV ADHARTAL 6 2 2 1033KV SAE 1 7 2 1033KV GOKALPUR 2 7 2 1133KV BELK-1 3 0 17 2033KV BELK-NO.2 0 2 15 1733KV SHAHPURA 6 0 13 1933KV MARHOTAL 1 0 18 1933KV J P NAGAR 1 0 21 2233KV SEVER PLANT 5 0 21 2633KV GUNDRAI 0 1 15 1633KV PARAMHANSI 8 12 8 2833KV GOTEGAON NO.II NEW 1 16 1 1833KV BAGASPUR 1 6 18 2533KV KYMORI 0 7 3 1033KV BORIYA 0 7 5 1233KV POLA 0 3 8 1133KV KATNI -2 3 1 6 1033KV PURENA 0 0 16 1633KV DEVGAON 1 2 23 26

10 KYMORE 132 33KV BAMANGAON 1 1 17 1933KV KATNI IC 3 2 16 2133KV PAHARAUA 5 5 0 1033KV BILHARI 0 0 15 1533KV BADWARA 0 0 28 2833KV SLEEMNABAD 8 0 19 2733KV KATAIGHAT 9 0 1 1033KV NKJ 5 0 16 2133KV DABAR 1 0 19 2033KV BAHORIBAND I 3 7 14 2433KV BAHORIBAND II 1 1 17 1933KV PANUMARIA-1 2 6 21 2933KV PANUMARIA-2 3 0 23 2633KV SLEEMNABAD 5 5 7 1733KV INDUSTRIAL 4 2 35 4133KV SLEEMNABAD 0 0 45 4533KV SIHORA-1 0 0 18 1833KV MAJHOLI-2 0 0 23 2333KV INDUSTRIAL(UROBOND) 0 0 17 1733KV FANWAANI 0 0 31 3133KV DEONAGAR. 5 5 0 1033KV GOTEGAON 4 6 4 1433KV BACHAI 0 13 0 1333KV JOBA 0 13 7 2033KV BASANPANI 0 16 0 1633KV CHHICHLI 0 0 14 14

33KV RUCHI SOYA (TENDUKHEDA) 0 7 6 13

33KV NTPC I (RAIPUR) 7 8 0 1533KV IMALIYA 0 10 0 1033KV UMARIYA 9 4 9 2233KV GOTEGAON 1 3 29 3333KV THEMI 4 0 6 1011KV 5MVA TRANSFORMER NO.I 0 15 0 1511KV TOWN-I 0 10 0 1011KV TOWN-II 0 11 0 1133KV SALICHOUKA 10 5 2 1733KV GADERWARA 0 25 0 2533KV SAIKHEDA 12 8 0 2033KV ATTHAISA 0 11 0 1133KV RUCHY SOYA 0 7 14 2133KV BANSKHEDA 0 15 19 3433KV BLA 0 21 20 4133KV SIHORA 0 11 0 1133KV DOBHI NO.-I 0 11 6 1733KV DOBHI NO.-II 0 19 0 1933KV BEETALI-I 0 10 8 1833KV BEETALI-II 0 7 8 15

EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

SL.NO

NAME OF TESTING

DIVISIONNAME OF SUB SATAION NAME OF FEEDER

TOTAL FAULT TRIPPINGS TOTAL TRIPPI

NGS

Annexure-6.2

6 MARHOTAL 132

7 SHRINAGAR 132

8 KATANGI 132

JABALPUR REGIONSE(T&C) JABALPUR

1

JABALPUR-I

JABALPUR 220

4 VFJ 132

5 SHAHPURA 132

9

KATNI

KATNI 400

11 KATNI 132

12 SLEEMNABAD 132

13 MANSAKRA 132

BARMAN 132

14

JABALPUR-II

NARSINGPUR 220

15 CHHICHLI 220

16 NARSINGPUR 132

17 GADARWARA 132

18

Agenda of 72nd OCCM of MP 52

O/C trip E/F trip O/C+E/F

trip 1 2 3 4 5

EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

SL.NO

NAME OF TESTING

DIVISIONNAME OF SUB SATAION NAME OF FEEDER

TOTAL FAULT TRIPPINGS TOTAL TRIPPI

NGS

33KV BARELA-I 0 39 19 5833KV BARELA(2) 0 10 6 1611KV INDUSTRIAL 0 23 1 2411KV MANERI GRAMIN 0 10 0 1033KV BICHHIYA 0 17 0 1733KV POUNDI 1 24 0 2533KV PHOOLSAGER 0 25 0 2533KV KARELI 0 10 4 1433KV KARAPGAON 0 11 0 11

85 1651

33KV CHHAPARA 3 0 22 2533KV GOPALGANJ 5 5 10 2033KV AKVN 0 1 9 1033KV KARIRAT 0 1 23 2433KV KALARBAKI 5 1 4 1033KV BARGHAT 2 1 14 1733KV KEOLARI 4 0 21 2533KV P.H.E. 2 0 13 1533KV KURAI 8 4 11 2311KV TOWN - I 1 1 15 1711KV TOWN - II 0 12 6 1811KV MUNGWANI 1 4 44 4933KV LALBRRA 0 11 0 1133KV KHAIRLANGI 0 10 7 1711KV BHARVELLY 0 11 13 2411KV LINGA 0 19 5 2433KV TIRODI 0 0 20 2033KV MOIL 1 0 10 1133KV WARASEONI 3 0 13 16

5 BHANEGAON 132 33KV KARANJA 0 11 0 1133KV PARASWADA 2 1 19 2233KV MOHAGAON 0 0 19 1933KV UKWA 1 0 13 1433KV KEOLARI 2 4 14 2033KV KEOLARI-II 6 10 19 3533KV BHEEMGARH 20 22 4 4633KV GHANSOUR-I 2 8 8 1833KV GHANSOUR-II 0 15 0 1533KV JHABUA 0 33 0 3333KV DHANORA 1 10 5 16

9 LALBRRA 132 33KV LAMTA 4 0 13 1733KV KHAIRLANGI 0 1 11 1233KV KOCHEWAHI 0 0 10 1033KV DONGARMALI 2 0 10 12

11 KIRNAPUR 400 33KV KIRNAPUR 1 0 13 1433KV ROHNA KALA 5 4 2 1133KV CHAND-I 0 0 12 1233KV CHAND-II 3 3 10 1633KV BANGAON 0 0 11 1133KV LINGA 0 0 10 1033KV JUNEWANI 0 0 10 1033KV NANDANWADI 0 2 8 1033KV SAORI-I 0 0 12 1233KV SAUSAR 1 2 22 2533KV THISGORA 0 0 23 2333KV UMRANALA-II 0 2 26 2833KV CHANDAMETA 0 2 32 3433KV NAVEGAON 5 0 6 1133KV RAMAKONA 0 13 1 1433KV BORGAON 0 0 10 1033KV PIPLA 2 2 9 1333KV SINGODI 0 0 13 1333KV CHHUEE 0 0 11 11

18 BICHHUA 132 33KV KHAMARPANI 0 0 13 1319 SAORI 132 33KV LAWAGHOGRI 0 11 7 18

55 995140 2646

19

JABALPUR-II

MANERI 132

20 MANDLA 132

21 KARAPGAON 132

KATANGI 132

6 BAIHER 132

7 NAINPUR 132

8 LAKHNADON 132

Abstract of TrippingsJABALPUR REGION

SE(T&C) SEONI

1

SEONI

SEONI 220

2 SEONI 132

3 BALAGHAT 132

4

KHAPASWAMI 132

16 BORGAON 132

17 AMARWARA 132

Abstract of Trippings

10 WARASEONI 132

12

CHHINDWARA

CHHINDWARA 220

13 PANDHURNA 220

14 CHHINDWARA 132

15

Abstract of Trippings (Jabalpur Region)

Agenda of 72nd OCCM of MP 53

O/C trip E/F trip O/C+E/F

trip 1 2 3 4 5

EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

SL.NO

NAME OF TESTING

DIVISIONNAME OF SUB SATAION NAME OF FEEDER

TOTAL FAULT TRIPPINGS TOTAL TRIPPI

NGS

33KV MEDICAL COLLAGE 2 8 0 1033KV MAINPANI 1 9 0 1033KV JAISINAGAR 1 32 0 3333KV NARIOLI 0 1 14 1533KV MOTHI 2 3 21 2633KV SEHORA 1 0 9 1033KV DHARAMSHREE 0 1 9 1033KV KAREELA 3 0 9 1233KV BANDA 0 1 13 1433KV HOUSHING BOARD ( DD NAGAR )

5 0 5 10

33KV CIVIL LINE 0 3 7 1033KV CHANAUWA 0 16 12 2833KV KEOLARI 0 15 13 2833KV BARKOTI 7 17 4 2833KV DEORI 6 28 10 4433KV MAHARAJPUR 2 19 3 2433KV KESLI -I 0 18 0 1833KV KESLI-II 1 19 2 2233KV BANDA 5 1 12 1833KV BHADRANA 8 0 2 1033KV DALPATPUR 3 5 10 1833KV JABERA - I 6 0 4 1033KV BANSA 3 4 7 1433KV PATERA 2 5 7 1433KV PGCIL 5 6 4 1533KV NARSINGARH 4 4 15 2333KV PHUTERA 4 0 14 1833KV IMLAI 7 0 8 1533KV HINOTA 19 0 43 6233KV MARIYADEO 3 0 83 8633KV PHATEPUR 3 0 38 4133KV BANGAON 41 0 9 5033KV BAXWAHA 6 7 47 6033KV MAGRON 5 0 8 1333KV TEJGARH/ HARRAI 1 0 9 1033KV TENDUKHEDA 3 7 12 2233KV JABERA 13 3 7 23

11 RAHATGARH 132 33KV SEHORA 7 5 0 1233KV PATERA 11 0 24 3533KV KUNDALPUR 2 13 5 2033KV CHHIRARI 5 0 6 1133KV PATNA BUJURG 13 8 9 3033KV MOHANGARH 6 2 17 2533KV DIGODA - I 0 2 11 1333KV AHAR 19 0 25 4433KV BADAGAON 26 0 23 4933KV MAWAI 10 3 11 2433KV DHONGA 7 2 11 2033KV NIWARI -2 7 4 15 2633KV NIWARI -1 14 11 16 4133KV MADIYA 5 7 40 5233KV PRATAPPURA 3 1 27 3133KV ZERON 1 5 31 3733KV ORCHHA 9 3 18 3033KV TEHARKA 18 3 4 2533KV HRIDAY NAGAR 3 9 2 1433KV BAMORI 2 21 4 2733KV VEERPURA 11 8 3 2233KV PALERA 16 36 1 5333KV DIGODA 0 12 1 1333KV MOHANGARH 4 8 8 2033KV LIDHORA 3 2 5 1033KV BALDEVGARH 3 8 53 6433KV KHARGAPUR 2 0 9 1133KV GHUWARA 1 11 38 5033KV BUDHERA 11 1 11 2333KV DHARARI 9 2 9 2033KV GARHI MALEHARA 4 8 24 3633KV SATAI 2 8 1 1133KV CHHATARPUR 21 14 2 3733KV BHAGWA 4 11 8 2333KV MATGAWAN 14 8 3 2533KV KISHANGARH 3 9 2 1433KV GULGANJ 3 8 3 1433KV BADAMALAHARA 3 18 8 2933KV BASARI 1 19 22 4233KV PANNA/KHAJURAHO 0 4 11 1533KV BAMITHA 0 2 9 1133KV RAJNAGAR + BASARI 2 4 14 2033KV MES 7 2 2 1133KV HARPALPUR 6 5 11 2233KV LUGASI 6 3 20 2933KV LAUNDI 3 0 41 4433KV DUMRA 9 18 21 4833KV BASANTPURA 5 0 49 5433KV CHANDLA 1 2 33 36

86 2247

33KV KOHA (KHURAI II) 11 0 16 2733KV MANDIBAMORA 3 6 6 1533KV KHIMLASA 9 0 12 2133KV BORL 1 0 16 1733KV KOHA 1 0 12 1333KV BERI DHANORA 1 0 22 2333KV BAHADURPUR 5 3 9 1733KV PIPRAI 2 8 3 1333KV MUNGAOLI 2 0 10 1233KV SEHRAI 0 20 12 32

10 19096 2437

SAGAR REGIONSE(T&C) SAGAR

1

SAGAR

SAGAR 220

2 SAGAR 132

3 GARHAKOTA 132

4

8 HATTA 132

9 BATIYAGARH 132

10 TEJGARH 132

GOURJHAMER 132

5 BANDA 132

6 DAMOH 220

7 DAMOH 132

PRITHIVIPUR 132

17 JATARA 132

18 DIGODA 132

19 BUDERA 132

12 PATERA 132

13 RAHLI 132

14

TIKAMGARH

TIKAMGARH 220

15 TIKAMGARH 132

16

20 CHHATARPUR 220

21 BIJAWAR 132

22

TIKAMGARH

KHAJURAHO 132

23 NOWGAON 132

24 LAVKUSH NAGAR 132

Abstract of TrippingsSAGAR REGION

SE(T&C) 400KV BINA

1

BINA 400

BINA 220

2 KHURAI 132

3 MUNGAWALI 132

Abstract of TrippingsAbstract of Trippings (Sagar Region)

Agenda of 72nd OCCM of MP 54

O/C trip E/F trip O/C+E/F

trip 1 2 3 4 5

EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

SL.NO

NAME OF TESTING

DIVISIONNAME OF SUB SATAION NAME OF FEEDER

TOTAL FAULT TRIPPINGS TOTAL TRIPPI

NGS

33KV PAWAI 2 15 0 1733KV MOHANDRA 1 27 3 3133KV AMANGANJ 4 31 0 3533KV GUNOR 2 35 0 3733KV RAMNAGAR 31 28 0 5933KV TALA 2 16 0 1833KV SATNA 2 15 0 1733KV NADAN 22 11 0 3333KV KATHAHA 7 13 0 2033KV MUKUNDPUR 14 25 0 3933KV AMARPATAN 8 40 0 4833KV AMDARA 0 26 0 2633KV BADERA 11 27 0 3833KV UNCHEHRA 8 36 0 4433KV JASO 0 11 4 1533KV SINGHPUR 0 11 4 1533KV NAGOD 5 10 0 1533KV RAHIKWARA 6 4 1 1133KV BASUDHA 20 9 4 3333KV TIKURI 3 8 5 1633KV KOTAR 10 18 12 4033KV DAGDIHA LI 7 9 10 2633KV BIRSINGHPUR 6 8 10 2433KV SUKWAH 9 10 16 3533KV BELA 1 2 12 1533KV MADAHWGARH 2 0 24 2633KV GORAIYA 4 7 9 2033KV KRISHNAGARH 0 4 58 6233KV CHIBOURA 5 13 12 3033KV SILPARI 9 1 10 2033KV PAWAI 5 36 0 4133KV AJAYGARH 32 17 0 4933KV DEVENDRA NAGER 2 22 0 2433KV BRIJPUR 7 19 0 2633KV BARAUNDHA 0 2 11 1333KV CHITRAKOOT 3 3 23 2933KV MAJHGAWAN 3 2 10 1533KV KOTHI 0 6 8 1433KV JAITWARA 2 0 32 3433KV UNCHEHARA 18 8 4 3033KV KOLGAWAN 8 5 0 1333KV KS-1 2 14 0 1633KV TIKURIYA TOLA 11 0 10 2133KV ANIKET MATEHNA 1 0 9 1033KV RATAHRA 1 2 10 1333KV SGMH 1 1 23 2533KV TEEKAR 14 0 11 2533KV MANIKWAR 1 1 11 1333KV GURH 1 0 18 1933KV MADWAS 1 55 2 5833KV SEMARIYA 6 7 14 2733KV SIHAWAL( SIDHI) 10 14 2 2633KV JP-I 5 9 8 2233KV JP-II 5 4 4 1333KV SIRMOUR 11 10 0 2133KV PATEHRA 1 15 0 1633KV BANKUIYA ( AKVN) 0 23 0 2333KV SEMARIYA 0 31 0 3133KV MARTAND SCHOOL 0 11 0 1133KV MOHRA 0 20 0 2033KV SIRMOUR 0 10 0 1033KV AIR 0 18 0 1833KV AMIRTI 0 11 0 1133KV CITY II 10 1 0 1133KV REWA 1 19 0 2033KV PATPARA 5 47 0 5233KV SIDHI 0 2 14 1633KV BHIKHAJHIRIA 0 6 54 6033KV NIGAHI 7 0 6 1333KV WAIDHAN 3 0 30 3333KV SASAN POWER 4 20 48 7233KV NAVJEEVAN VIHAR 9 0 28 3733KV NTPC 0 0 11 1133KV JAYANT 2 0 9 1133KV GANGEO 4 18 4 2633KV MAUGANJ 2 11 1 14

REWA REGIONSE(T&C) SATNA

1

SATNA

PAWAI 132

2 AMARPATAN 132

3 MAIHAR 220

7 PANNA 132

8 MAJHGAWAN 132

9 SATNA 220

4 NAGOD 132

5 KOTAR 220

6 RAMPUR BAGHELAN 132

SIRMOUR 220

15 REWA 132

16 SIDHI 132

17 MORWA 132

10 SATNA 132

11 SATNA-II 132

12

REWA

REWA 220

13 SIDHI 220

14

18 WAIDHAN 132

19 MANGAWAN 132

Agenda of 72nd OCCM of MP 55

O/C trip E/F trip O/C+E/F

trip 1 2 3 4 5

EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

SL.NO

NAME OF TESTING

DIVISIONNAME OF SUB SATAION NAME OF FEEDER

TOTAL FAULT TRIPPINGS TOTAL TRIPPI

NGS

33KV KATRA 1 4 11 1633KV CHAKGHAT 1 10 15 2633KV NAIGARHI 4 5 3 1233KV TEOTHAR 2 9 11 2233KV JAWA 12 2 4 1833KV BANSAGAR 9 8 2 1933KV HANUMANA 0 21 0 2133KV MAUGANJ 0 14 0 1433KV KHATKHARI 0 16 0 1633KV KHUTAR 14 8 19 4133KV RAJMILAN 3 4 13 2033KV PGCIL 6 1 18 2533KV RAIPURE 3 18 0 2133KV SIRMOUR 3 11 0 1433KV MOHRA 4 14 0 1833KV DEOSAR 2 10 0 1233KV BEHRI 7 47 0 5433KV CHITRANGI 8 47 0 55

25 RAMPUR NAIKEN 132 33KV KOTHIYA 0 17 0 1726 DONGRITAL 132 33KV KHANUA KHAS 8 8 8 24

96 2443

33KV MANPUR-I 0 19 0 1933KV CHANDIYA-I 4 17 0 2133KV CHANDIYA-II 2 31 0 3333KV UMARIYA 10 2 0 1233KV BANSAGAR 13 14 0 2733KV JAISINGHNAGAR 1 25 0 2633KV PAPOUNDH 7 13 0 2033KV MADVAS 0 10 0 1033KV SHAHPURA 7 12 0 1933KV GADASARAI 4 9 0 1333KV SAMNAPUR 5 23 0 2833KV DINDORI 8 24 0 3233KV SECL-I 5 29 0 3433KV SECL-II 1 11 0 1233KV ASCENT HYDRO 1 18 0 1933KV JAITHARI 6 33 0 3933KV D-OCM 0 25 0 2533KV KESHWAHI 3 41 0 4433KV NEW DOCM 4 17 0 2133KV JAISINGHNAGAR 12 7 0 1933KV UMARIYA-I 8 10 0 1833KV DCL 0 24 0 2433KVPANDAV NAGAR (SINGHPUR) 5 24 0 2933KV RAJNAGAR 15 0 0 1533KV KOTMA OLD 16 0 0 16

25 575

RAJMILAN 132

23 REWA-II 132

24 DEOSAR 132

Abstract of Trippings (Rewa Region)

20

REWA

KATRA 132

21 MAUGANJ 132

22

5 ANOOPPUR 220

6 SHAHDOL 220

7 KOTMA 132

SHAHDOL REGIONSE(T&C) SATNA

1

SHAHDOL

UMARIYA 132

2 BEOHARI 132

3 DINDORI 132

4 BIRSINGHPUR 220

Abstract of Trippings (Shahdol Region)

Agenda of 72nd OCCM of MP 56

O/C trip E/F trip O/C+E/F

trip 1 2 3 4 5

EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

SL.NO

NAME OF TESTING

DIVISIONNAME OF SUB SATAION NAME OF FEEDER

TOTAL FAULT TRIPPINGS TOTAL TRIPPI

NGS

33KV SHIVPUR 0 0 30 3033KV DHARAM KUNDI 6 2 14 2233KV SURAJPUR 0 15 1 1633KV BABRI 7 1 2 1033KV HANDIYA 4 8 25 3733KV KANKARIYA 0 2 14 1633KV RAHAT GAON 7 4 15 2633KV TIMARNI 0 8 10 1833KV SONTALAI 4 0 37 4133KV KARTANA 2 3 8 1333KV GWAL NAGAR 5 3 3 1133KV SOHAGPUR 6 4 7 1733KV SANDIYA 0 26 0 2633KV KANWAR 7 2 3 1233KV SHOBHAPUR 1 16 3 2033KV SHANKHANI 0 10 0 1033KV HOSHANGABAD 6 1 3 1033KV DOLARIYA 6 2 2 1033KV SANGAKHEDA 4 1 11 1633KV MILK DAIRY 15 0 3 1833KV TUGARIY 8 0 15 2333KV BUDHNI 11 0 10 2133KV PIPARIYA SOUTH 3 4 7 1433KV PIPARPANI 0 1 13 1433KV AKVN 4 1 20 2533KV CHANDON 5 1 7 1333KV MACHHIRA 4 3 7 1433KV UMARDHA 7 5 13 2533KV MAGARDAH 2 9 19 3033KV REHTA KALA 10 0 3 1333KV MOHAL KALA 1 0 21 2233KV BABAI 7 0 10 1733KV SEMRI HARCHAND 7 2 20 2933KV KAMTHI 5 18 13 3633KV MOHASA 1 5 4 18 2733KV BHATWARI 5 2 32 39

9 KHIRKIYA 132 33KV KILLOD 1 4 9 1433KV BIAORA 0 2 10 1233KV SUTHALIYA 0 7 11 1833KV KACHRI 0 13 24 3733KV DHOODI 0 9 10 1933KV SILAPTI 0 6 8 1433KV BHOORA 0 31 12 4333KV PAGARI BANGLA 0 10 7 1733KV BODA 0 9 1 1033KV KARANWAS 0 10 1 1133KV MANGLAJ 0 8 5 1333KV P.MATA-II 0 9 4 1333KV JETPURA 0 14 3 1733KV CHHAPIHEDA 0 14 3 1733KV MACHALPUR 0 6 19 2533KV LAKHONI 0 11 12 2333KV BHOJPUR 0 11 10 2133KV KHAJLA 0 15 11 2633KV KALYAKHEDI 0 17 4 2133KV PALYAKHEDI 0 11 1 1233KV PIPLODI 0 4 27 3133KV WATER WORKS 0 20 4 2433KV ITARSI -2 0 0 11 1133KV SPM 0 0 17 1733KV JAMANI 0 0 13 1333KV PROPLENT - 1 0 0 10 1033KV NCDC 0 10 0 1033KV GHORADONGRI 1 13 0 1433KV AMLA TOWN 0 2 12 1433KV PARSODI 0 5 5 1033KV PADHAR 2 7 1 1033KV HIWARKHEDI 0 1 9 1033KV HAMLAPUR 0 4 6 10

21 CHICHOLI 132 33KV SHAHPUR 2 0 15 1733KV PRABHAT PATTAN 0 8 3 1133KV INDUSTRIAL 0 17 0 1733KV DUNAWA 1 10 0 11

23 GUDGAON 132 33KV GUDGAON 1 0 14 1533KV 3 EME 0 0 13 1333KV NTRO 1 0 36 3733KV ITKHEDI 0 0 11 1133KV BHAUKHEDI 2 5 3 1033KV THUNA 4 2 4 1033KV DODI 0 0 13 1333KV KHACHROD 3 0 15 1833KV LASUDIA VIJAY SINGH 0 8 5 1333KV JHADLA 3 3 4 1033KV ACHHAROHI 2 3 6 1133KV JAMUNIYA GOP CHOUHAN 2 1 10 1333KV LASUDIYA BHAMA 0 0 11 1133KV KOTARA 0 0 18 1833KV KHAIKHEDA 1 1 9 1133KV AHMADPUR 2 2 10 1433KV KHAJURI KALA 1 0 11 1233KV MUGAWALI 0 0 12 1233KV SEWDA 0 10 0 1033KV JAWAR 0 12 0 1233KV AMLA MAJJU 0 10 0 1033KV AMLAHA 0 18 0 1833KV KAJLAS 0 18 0 18

30 BILKISHGANJ 132 33KV NIBUKHEDA 1 2 9 1297 1696

HOSHANGABAD 220

5 PIPARIYA 220

6 BANKHEDI 132

7 SULTANPUR 132

BHOPAL REGIONSE(T&C) BHOPAL

1

HOSHANGABAD

SEONI MALWA 132

2 HARDA 132

3 PIPARIYA 132

4

ZEERAPUR 132

14 KHILCHIPUR 132

15 KHUJNER 132

16 RAJGARH 220

8 SEMRI HARCHAND 132

10

BIAORA

BIAORA 132

11 PACHORE 132

12 SARANGPUR 132

13

17

ITARSI

ITARSI 220

18 SARNI 220

19 AMLA 132

20 BETUL 132

22

28 SHYAMPUR 132

29 ASHTA 400

Abstract of Trippings

MULTAI 132

24

BHOPAL-I

BAIRAGARH 220

25 SEHORE 132

26 ASHTA 132

27 KURAWAR 132

Agenda of 72nd OCCM of MP 57

O/C trip E/F trip O/C+E/F

trip 1 2 3 4 5

EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

SL.NO

NAME OF TESTING

DIVISIONNAME OF SUB SATAION NAME OF FEEDER

TOTAL FAULT TRIPPINGS TOTAL TRIPPI

NGS

33KV ANAND NAGAR 0 0 15 1533KV KILANDEV 0 0 16 1633KV DAMKHEDA-II 2 1 14 1733KV NARMADA 0 4 8 1233KV TIRUPATI ABHINAV 0 0 10 1033KV VALLABHNAGAR 1 1 3 10 1433KV VALLABHNAGAR 2 0 3 10 1333KV AMRAWAD NO 1 0 3 12 1533KV KATARA II 0 1 11 12

4 BHOPAL 220 33KV BHOPAL-III 8 0 4 1233KV ENTKHEDI NO. 2 0 1 29 3033KV SUKHI SEWANIA 6 0 8 1433KV RATUA 4 2 17 2333KV GAIRATGANJ 1 11 0 1233KV BARLA 3 8 0 1133KV NAKTARA 2 14 0 1633KV NEEMKHEDA 0 15 0 1533KV SULTANPUR 0 12 0 1233KV BHOPAL-I 0 1 18 1933KV BHOPAL-II 1 0 10 1133KV KOLAR 4 1 17 2233KV RAMAKHEDI 0 0 11 1133KV NJA 1 11 3 1533KV KOLAR 0 12 0 1233KV BADJHIRI 0 14 3 1733KV KUNDALI 1 9 5 1533KV HARSLI 6 19 0 2533KV KHARGONE 3 30 0 3333KV GURADIYA 4 17 0 2133KV BAGPIPARIYA 5 25 0 3033KV BARNA 3 25 0 2833KV CHAKALDI 3 41 4 4833KV REHTI 2 16 2 2033KV LADUKI 0 9 3 1233KV NEELKANTH 2 14 2 1833KV SEMALPANI 0 11 1 1233KV KANKARIYA 0 16 6 2233KV BEGUMGANJ 5 50 8 6333KV SILWANI 2 7 5 1433KV DEHGAON 1 4 5 1033KV DHANDIYA 4 9 11 24

12 MANDIDEEP 220 33KV RELIANCE 0 7 4 1133KV NANDER 2 1 14 1733KV DIGWAD 3 0 20 23

14 TAMOT 132 33KV GOHAR GANJ 0 1 13 1433KV AKVN - I 2 6 4 1233KV DURGA STEEL 1 2 12 1533KV BORAS 2 44 0 4633KV THALADIGWAN 5 45 0 5033KV VIKALPUR 14 61 0 7533KV SAI KHEDA 2 0 10 1233KV BAKSHI 0 0 13 1333KV LASHKARPUR 0 0 57 5733KV HANSUA 0 6 5 1133KV BAN 3 1 43 4733KV KARARIA 1 0 25 26

19 BERASIA 132 33KV SAPAUA 2 0 22 2433KV MURWAS 0 1 13 1433KV SHAHPUR 1 0 18 1933KV CHHAPU 1 13 0 1433KV UHAR 0 1 9 1033KV SOMWARA 0 8 21 2933KV MASOODPUR 0 24 8 3233KV UDAIPUR 0 9 2 1133KV TINSHIYAI 1 8 16 2533KV GHOLANA 0 13 2 1533KV RUNAHA 0 0 12 1233KV NAZIRABAD 0 0 29 2933KV RAMGARHA 2 0 9 1133KV NAYASAMAND 0 0 16 1633KV SAHARWASA 8 2 2 1233KV KURWAI 1 3 14 1833KV PATHARI 0 3 12 1533KV UDAIPUR 1 5 15 2133KV ANNATPUR 1 0 10 1133KV MADAN KHEDI 3 0 16 1933KV DEWANGANJ 0 0 10 1033KV INDUSTRIAL 0 1 17 1833KV BARKHEDI 0 4 32 36

79 1621176 3317

BHOPAL REGIONSE(T&C) 400KV BHOPAL

1

BHOPAL 400

CHAMBAL BHOPAL 132

2 AYODHYA NAGAR 132

3 AMRAWADKHURD 132

5 ENTKHEDI 132

NASRULLAGANJ 132

11 GAIRATGANJ 132

13 SHAHGANJ 132

15 BAGRODA 132

6

BHOPAL-II

RAISEN 132

7 MANDIDEEP 132

8 MACT BHOPAL 132

9 BARELI 132

10

16 UDAIPURA 132

17 SILWANI 132

18

VIDISHA

VIDISHA 220

20 SIRONJ 132

21

25

VIDISHA

LATERI 132

26 SALAMATPUR 132

Abstract of Trippings

GANJBASODA 220

22 SHAMSABAD 132

23 RUNAHA 132

24 SAHARWASA 132

Abstract of Trippings (Bhopal Region)

Agenda of 72nd OCCM of MP 58

O/C trip E/F trip O/C+E/F

trip 1 2 3 4 5

EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

SL.NO

NAME OF TESTING

DIVISIONNAME OF SUB SATAION NAME OF FEEDER

TOTAL FAULT TRIPPINGS TOTAL TRIPPI

NGS

33KV SAF (POLYTECNIC) 1 0 9 1033KV DABKA 1 0 14 1533KV MELA 0 1 13 1433KV AIR FORCE 6 0 38 4433KV M.E.S. 0 0 20 2033KV BANDHOLI 0 2 23 2533KV FEEDER NO. 2 0 0 12 1233KV FEEDER NO. 4 9 0 16 2533KV FEEDER NO.8 0 0 10 1033KV BILAUA 11 23 9 4333KV INDUSTRIAL CRUSHER MARKET

19 72 6 97

33KV CITY-I 4 5 10 1933KV DIG NAYAGOAN 0 6 6 1233KV CARMEL CONVENT 0 0 15 1533KV STONE PARK 0 0 14 1433KV BARAI 8 0 53 6133KV GOL PAHIDIYA 2 0 9 1133KV DWARIKAPURI 4 0 13 1733KV P.T.S. TIGHRA 1 0 15 1633KV D.D. NAGAR 3 0 10 1333KV KALPI BRIDGE 3 0 7 1033KV MAHARAJPURA 3 0 21 2433KV BHADROLI 0 0 28 2833KV GHATIGAON 1 14 1 1633KV SEHASRAM 2 14 5 2133KV SHUBHASPURA 2 19 0 2133KV SUKHLIHARI 20 7 8 3533KV HASTINAPUR 4 0 6 1033KV GORMI 1 0 32 3333KV GATA 1 0 47 4833KV PIDORA 0 0 12 1233KV MOW 3 0 27 3033KV MEHGAON 8 10 0 1833KV SITAPUR 9 8 10 2733KV DABRA 8 17 17 4233KV BADONI 27 17 7 5133KV UMARI (LAHAR) 8 0 12 2033KV PHOOP 4 1 32 3733KV ROOR 8 1 34 4333KV MASOORI 1 0 9 1033KV ITI RURAL 0 16 0 1633KV SEONDHA 8 2 0 1033KV INDERGARH MAGROL 2 9 0 1133KV ALAMPUR 16 14 0 3033KV THARET(LANCH) 54 17 0 7133KV BHAGUAPURA (NEW BAY) 27 24 0 5133KV DAGRAI 0 8 4 1233KV RAJGHAT 0 0 10 1033KV CHHEMAK 19 0 18 3733KV BHITARWAR(KARAYAWATI) 10 0 33 4333KV LOHGARH 1 0 14 1533KV TEKANPUR 7 0 13 2033KV CHINORE 0 0 17 1733KV NEW PICHHORE 0 0 19 1933KV MASHUDPUR 0 0 15 1533KV MAGRORA 1 0 9 1033KV MADORI 1 7 3 1133KV DABOH 3 7 4 1433KV SHYAMPURA 1 7 10 1833KV RON 10 0 2 1233KV MACHHAND 5 0 10 1533KV NAYAGAON 7 0 21 2833KV GORAE 1 0 12 1333KV GOHAD FEEDER 1 15 3 1933KV ANDORI 4 25 27 5633KV CHITORA 1 19 8 2833KV PRTAPPURA 1 0 9 1033KV CHOAMO 5 0 22 2733KV SURPURA 21 0 7 28

MOTIJHEEL 132

5 TIGHRA 132

6 MORAR 132

7 MOHNA 132

GWALIOR REGIONSE(T&C) GWALIOR

1

GWALIOR-I

MAHALGAON 220

2 MALANPUR 220

3 GWALIOR-II 220

4

8 HASTINAPUR 132

9

GWALIOR-II

MEHGAON 220

10 DATIA 220

11 BHIND 132

12

16 RON 132

17 GOHAD 132

18 PRATAPPURA 132

SEONDHA 132

13 DATIA 132

14 DABRA 132

15 LAHAR 132

Agenda of 72nd OCCM of MP 59

O/C trip E/F trip O/C+E/F

trip 1 2 3 4 5

EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

SL.NO

NAME OF TESTING

DIVISIONNAME OF SUB SATAION NAME OF FEEDER

TOTAL FAULT TRIPPINGS TOTAL TRIPPI

NGS

33KV MELA GROUND 8 0 4 1233KV T.V TOWER 6 0 26 3233KV SARSAI 1 0 27 2833KV PANDOKHAR 0 0 34 34

20 CHINNOR 132 33KV GHARSONDI 0 10 1 1133KV LANCH 9 0 28 3733KV RARUA RAI 19 0 69 8833KV RAMPUR 3 0 8 1133KV JHUNDPURA 4 0 26 3033KV BADDHPURA 3 0 11 1433KV VIJAYPUR 2 3 7 1233KV AGARA 2 35 5 4233KV BEERPUR 6 67 17 9033KV GOTH 0 0 16 1633KV ESHAH 1 0 29 3033KV GUNJBADA 11 0 14 2533KV THARA 2 23 0 2533KV RACHHED 10 7 3 2033KV KHERLY 2 0 9 1133KV MANPUR 0 0 26 26

26 MORENA 220 33KV BICHOULA 10 0 9 1933KV INDUSTRIAL 0 0 14 1433KV DEORI 6 1 21 2833KV MANDI 2 0 8 1033KV BEERAMPUR ( BAGHCHINI) 0 0 18 1833KV BADAGAON 14 0 15 2933KV KHADIYAHAR 13 0 4 1733KV SUMAWALI 6 1 10 1733KV CHINNONI 3 0 14 1733KV NAVODAY 1 0 12 1333KV BAGCHINI 0 0 31 3133KV SATANWARA 0 1 23 2433KV BHESANA 0 2 9 1133KV BANGANGA 0 2 16 1833KV GURUNAVADA 14 18 10 4233KV TILLIPUR 5 4 2 1133KV SOTHWA 8 5 5 1833KV DHIROLI 4 6 2 1233KV AASHIDA 0 10 14 2433KV BHATNAWAR 14 0 8 2233KV PADORA 6 3 8 1733KV SHARDA SOLVENT 2 0 8 1033KV NAYA CHAURAHA 3 1 35 3933KV MAYAPUR 13 9 2 2433KV KHOD 10 8 12 3033KV KARARKHEDA 5 5 2 1233KV PADRA 2 19 3 2433KV BARODA 1 8 1 1033KV GORUS 12 8 15 3533KV BAGDUA 2 6 3 1133KV DHONTI 3 16 3 2233KV PANDOLA 2 3 5 1033KV KALARNA 6 2 2 1033KV BHOGIKA (MAYAPUR) 2 8 0 1033KV RAMBADE 5 20 3 2833KV KARERA 2 7 9 1833KV BHAGEMA 1 2 16 1933KV DINARA 6 2 48 5633KV NARAUA 24 12 3 3933KV SIRSAUD 2 0 12 1433KV MADIKHEDA 10 10 5 2533KV BADARWAS 3 13 12 2833KV RAI 10 5 3 1833KV SALMANIYA 5 3 5 1333KV LALITPUR 3 0 14 1733KV BHURWADA 7 9 5 2133KV ALLAPURA 11 0 4 15

38 BAIRAD 132 33KV GOVRDHAN 3 4 12 1933KV KHARE 3 0 7 1033KV INDAR 0 0 10 1033KV KHATORA 1 0 14 15

140 3313

24 AMBAH 132

25 PORSA 132

27 MORENA 132

19

GWALIOR-II

BHANDER 132

21 INDERGARH 132

22

MORENA

SABALGARH 220

23 VIJAYPUR 132

28 BADAGAON 132

29 JOURA 132

30

SHIVPURI

SHIVPURI 220

31 SHEOPURKALAN 220

32

36 KOLARAS 132

37 BARODA 132

39 MADA 132

SHIVPURI 132

33 PICHHORE 132

34 SHEOPUR 132

35 KARERA 132

Abstract of Trippings

Agenda of 72nd OCCM of MP 60

O/C trip E/F trip O/C+E/F

trip 1 2 3 4 5

EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

SL.NO

NAME OF TESTING

DIVISIONNAME OF SUB SATAION NAME OF FEEDER

TOTAL FAULT TRIPPINGS TOTAL TRIPPI

NGS

33KV W/W 0 4 12 1633KV BEHTAGHAT 17 0 31 4833KV SINGWASA 3 1 15 1933KV BHADORA 0 0 39 3933KV MURADPUR 5 3 17 2533KV UMRI 0 6 35 4133KV GARHA 0 0 18 1833KV HARIPUR 0 0 16 1633KV NOVODAY 0 0 12 1233KV AIR 0 4 11 1533KV NANAKHADI 1 4 21 2633KV K.S.OIL MILL 0 0 15 1533KV MAHIDPUR 0 1 12 1333KV KHAJUIRY KALA 0 1 24 2533KV SEJI 0 0 15 1533KV SEMRAHAT 0 3 23 2633KV KAPASI 10 3 15 2833KV FATHIYGARH 2 4 4 10

4 CHANDERI 132 33KV BANMORE 0 8 12 2033KV NAISARAI 18 10 1 2933KV DHAKHONI 5 3 2 1033KV ESAGARH 2 20 1 2333KV PARSOL 0 14 1 1533KV MAKSUDANGARH 4 5 12 2133KV TALIGOAN 1 3 6 1033KV RAMPUR 8 8 7 2333KV PANWARI HAT 0 1 10 1133KV BAROD 0 2 8 1033KV BHADORE 0 0 10 1033KV SEJI 2 6 6 1433KV MAGRANA 3 0 11 1433KV CHAKCHOROLI 2 1 7 1033KV GADLA 14 0 0 1433KV NEW GADLA 13 2 0 1533KV PARANT 14 0 0 1433KV PATHI 11 1 0 1233KV JAMNER 0 0 23 2333KV DHARNAWDA 0 0 10 1033KV KUMBHARAJ-II 0 0 20 20

39 735179 4048

GWALIOR REGIONSE(T&C) 400KV BINA

1

GUNA

GUNA 220

2 ASHOKNAGAR 220

3 KAPASI 132

5

9 BHONRA 132

10 RAGHOGARH 132

Abstract of TrippingsAbstract of Trippings (Gwalior Region)

ESHAGARH 132

6 MAKSUDANGARH 132

7 ARON 132

8 KOTHIYA 132

Agenda of 72nd OCCM of MP 61

O/C trip E/F trip O/C+E/F

trip 1 2 3 4 5

EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

SL.NO

NAME OF TESTING

DIVISIONNAME OF SUB SATAION NAME OF FEEDER

TOTAL FAULT TRIPPINGS TOTAL TRIPPI

NGS

1 RAJGARH (DHAR) 220 33KV HATOD 8 0 6 1433KV AMJHERA (DHAR) 4 1 6 1133KV DATIGAON (JHABUA) 0 1 13 1433KV ZHAKNAWAD (PETLAWAD) 2 5 3 1033KV BHARAT OMAN 1 8 6 1533KV PHE 0 0 16 1633KV BAGH 1 1 14 1633KV DHOLIYA 5 0 5 1033KV DEHRI 7 5 3 1533KV BHAVARIYA 8 0 14 2233KV DAHI 0 0 11 1133KV PHE 2 0 20 2233KV WATERWORK 0 0 20 2033KV FLOROSIS 0 6 8 1433KV AMBUA 0 11 10 2133KV NANPUR (DABADI) 0 8 8 1633KV FULMAL ( NEW SONDWA ) 0 3 8 1133KV KALAYANPURA 0 0 17 1733KV THANDLA 0 1 20 2133KV JHABUA 0 0 22 2233KV INDUSTRIAL 0 1 30 3133KV JHABUA 1 0 13 1433KV KALIDEVI 0 11 6 1733KV BAMANIYA 3 0 16 19

33KV MAHI PHE(CHARAN KOTHRA) 1 11 9 2133KV BUS COUPLAR 9 0 10 1933KV JOBAT 4 0 10 1433KV KALIKHETIYAR 6 0 15 2133KV PAGNIS PAGA. 6 0 4 1033KV PITHAM PUR. 1 0 16 1733KV DAILY COOEGE.NO. I. 7 0 7 1433KV DAILY COOEGE.NO. II. 4 0 7 1133KV RAU. 4 0 12 1633KV TILLOR. 5 0 5 1033KV DATTODA. 1 0 10 1133KV INDIRA COMPLEX NO. II. 3 0 12 1533KV PALDA INDUSTRIAL. 3 0 20 2333KV COMPEL. 1 1 12 1433KV KANADIYA 7 0 3 1033KV MANPUR 1 0 25 2633KV MHOW 5 0 7 1233KV MES (KARBALA) 3 0 9 1233KV AMBEDKAR 5 0 13 1833KV MHOW 5 0 6 1133KV HARSOLA 7 0 5 1233KV PANTHER-1 3 3 5 1133KV SILICON CITY 11 0 3 14

12 SIMROL 132 33KV DATODA 0 4 16 20

13 PITHAMPUR (SECT-I) 220 33KV MANPUR 0 3 9 1233KV NAGIN NAGAR-I 1 0 13 1433KV NAGIN NAGAR-II 1 0 10 1133KV INDUSTRIAL 2 1 10 1333KV PLETHICO 0 0 10 1033KV AIRPORT 7 0 6 13

15 BETMA 132 33KV INDUSTRIAL 3 1 15 1933KV DHAR 9 0 2 1133KV TEES GAON 4 0 10 1433KV INDUSTRIAL 1 0 9 10

17 GHATABILLOD 132 33KV INDUSTRIAL 1 0 11 1218 CHHAYAN 132 33KV NANDLAI 8 0 4 1219 DEPALPUR 132 33KV BETMA 0 1 14 15

33KV DCL 0 0 10 1033KV KAROLI 1 6 8 1533KV AJANDA 1 0 10 1133KV SINGHANA 6 18 2 2633KV LOHARI 3 11 3 17

INDORE REGIONSE(T&C) INDORE

RAJGARH (DHAR)

2 RAJGARH (DHAR) 132

3 KUKSHI 132

4 ALIRAJPUR 132

5 MEGHNAGAR 132

9

INDORE 400

S/Z INDORE 220

10 JAMLI 132

11 RAU 132

6 JHABUA 132

7 PETLAWAD 132

8 JOBAT 132

INDORE-II

14 INDORE WEST 132

16 DHAR 220

20 MANAWAR 132

21 SINGHANA 132

Agenda of 72nd OCCM of MP 62

O/C trip E/F trip O/C+E/F

trip 1 2 3 4 5

EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

SL.NO

NAME OF TESTING

DIVISIONNAME OF SUB SATAION NAME OF FEEDER

TOTAL FAULT TRIPPINGS TOTAL TRIPPI

NGS

33KV RAMA PHSPT. 0 6 5 1133KV INDUSTRIAL 0 16 9 2533KV VANDANA NAGAR-II 4 5 10 1933KV SANCHAR NAGER-II 4 5 7 1633KV DUDHIYA 5 3 6 1433KV KANNOD- II 4 3 6 1333KV H.T.INDUSTRIAL 0 7 16 2333KV GAMBHIR 10 1 3 1433KV MANORAMAGANG -I 1 2 12 1533KV SECTOR 'C' 1 0 14 1533KV HATOD 7 2 8 1733KV MANGLIA 5 0 7 12

26 SATYA SAI INDORE 132 33KV TULSI NAGAR 0 0 12 1227 ELECTONIC COMPLEX 132 33KV E.S.I. -I 0 0 10 1028 RAUKHEDI 132 33KV BHONDWAS 0 0 14 1429 SIVANI 132 33KV KHUDEL 0 0 21 21

82 1257

33KV CHIRAGPURA 1 4 11 1633KV BHOJAKHEDI 0 10 0 1033KV NEPANAGAR 13 1 1 1533KV DABIYA 1 5 4 1033KV KHAR 3 3 20 2633KV GUDI 0 0 11 1133KV SIHADA 2 12 11 2533KV RANGAON 1 0 11 1233KV CHANDEL-I 3 5 10 1833KV INDORE ROAD 0 2 15 1733KV KHANDWA-II 1 0 17 1833KV DULHAR 0 0 11 1133KV JAINABAD 6 0 13 1933KV SHAHPUR-I 4 0 10 1433KV INDUSTRIAL 9 0 13 2233KV CHAPORA 9 0 3 1233KV BADGAON 10 2 1 1333KV MANJROD 5 17 23 45

7 MOONDI 132 33KV NARMADA NAGAR 4 1 9 1433KV ROSHANI 7 17 15 3933KV KHIRKIYA 1 5 4 1033KV DHULKOT-I 4 2 5 1133KV INDUSTRIAL 0 0 10 1033KV INDUSTRIAL 0 14 0 1433KV BHIKANGAON 8 4 1 1333KV BAMNALA 1 20 6 27

11 SINGOT 132 33KV POKHAR 0 24 0 2412 PIPALPANI 132 33KV NIMANDHAD 0 0 16 16

33KV KHARGONE 4 0 9 1333KV AHIRKHEDA 3 0 11 1433KV NANDGAON 1 0 28 2933KV GOGAWA 3 0 7 1033KV MONGARGAON 1 2 11 1433KV BHAGWANPURA 11 0 18 2933KV NAGZIREE 9 2 3 1433KV P.F.C 6 0 4 1033KV KASRAWAD 1 2 13 1633KV SAWDA 2 19 11 3233KV MAKADKHEDA 1 10 0 1133KV NTPC-II 0 1 9 1033KV MULTHAN 0 6 5 1133KV DEWLA 0 10 7 1733KV BALSMOOD 3 2 6 1133KV DAWANA 1 10 6 1733KV DHAMNOD 0 17 19 3633KV INDUSTRIAL 1 4 12 1733KV BAGOD 4 1 11 1633KV SANAWAD-II 3 0 16 1933KV JAIMALPURA 3 0 17 2033KV KARAHI 1 1 12 1433KV SUNDREL 0 0 14 1433KV PIPALGAON 4 0 11 1533KV BEDIYA 4 10 9 2333KV RODIYA 9 4 0 1333KV NHDC 15 2 1733KV DHAKALGAON 0 5 5 1033KV BALWADA 0 1 11 1233KV CHOURAL 3 4 16 23

22 SENDHWA 132 33KV PALSOOD 1 4 5 1033KV PANSEMAL 7 3 0 1033KV KHETIYA 5 5 1 1133KV BADGON 0 12 0 1233KV SURANA 1 9 10 2033KV SHIVAI 0 11 4 1533KV BARWANI 0 12 0 1233KV PATI 3 6 3 1233KV SONDUL 0 13 0 1333KV REHGUN 1 9 2 12

26SHAHPURA (BARWANI) 132

33KV BALWADI 5 0 5 10

69 1136151 2393

22

INDORE-I

INDORE-II (JAITPURA) 220

23 BICHOLI (INDORE EAST ) 2

24 CHAMBAL INDORE 132

25 N/Z INDORE 220

CHHEGAON 132

5 BAHADARPUR 132

6 BADGAON 132

8 CHHANERA 220

Abstract of Trippings (Gwalior Region)INDORE REGION

SE(T&C) 400kv KHANDWA

1

KHANDWA

CHHEGAON (TORNI) 400

2 NEPANAGAR 220

3 KHANDWA 132

4

ANDAD 132

16 NIMARNI 220

17 DHAMNOD 132

18 BARWAHA 220

9 PANDHANA 132

10 BHIKANGAON 132

13

BARWAHA

KHARGONE 132

14 KASRAWAD 132

15

JULWANIA 400

23 PANSEMAL 132

24 ANJAD 132

25 BARWANI 132

19 CHHOTI KHARGONE 132

20 SANAWAD 132

21 BALWADA 132

Abstract of TrippingsAbstract of Trippings (Indore Region)

Agenda of 72nd OCCM of MP 63

O/C trip E/F trip O/C+E/F

trip 1 2 3 4 5

EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

SL.NO

NAME OF TESTING

DIVISIONNAME OF SUB SATAION NAME OF FEEDER

TOTAL FAULT TRIPPINGS TOTAL TRIPPI

NGS

1 BARNAGAR 220 33KV MULTHAN 0 8 2 1033KV KHEDA KHAJURIYA 0 12 0 1233KV BICHHROD 0 11 0 1133KV BANJARI 0 14 0 1433KV KHUNDI KHEDA 0 10 0 1033KV MAHIDPUR ROAD 0 14 0 14

4 BHERUGARH 132 33KV GARH KALIKA 2 5 6 135 MAKDONE 132 33KV RUPAKHEDI 10 0 0 10

33KV CHANDUKHEDI 0 15 0 1533KV D/A -2 0 11 0 1133KV CHINTAMAN 0 13 0 1333KV KANAD 29 4 0 3333KV MADKOTA 56 1 0 5733KV MOYA KHEDA 9 6 0 1533KV AGAR 12 0 0 1233KV SUZLON-1 0 15 0 1533KV ENORCON-1 8 3 0 1133KV ENORCON-3 7 5 0 1233KV NALKHEDA 0 0 22 2233KV SOYAT-1 2 15 0 1733KV AMLA 11 0 6 1733KV SUZLON-3 0 2 11 1333KV ENERCON 1 2 8 1133KV SOYAT-2 4 2 14 2033KV KACHNARIYA 1 5 4 1033KV DHAROLA 1 7 4 12

10 UJJAIN 132 33KV WATER WORKS 6 9 0 1533KV BHOURANSA 1 11 9 2133KV BALGARH 2 8 4 14

12 SHAJAPUR 220 33KV BERCHHA ROAD 9 11 7 2713 BNP DEWAS 132 33KV SIYA 6 0 8 14

33KV INDUSTRIAL IV 4 0 17 2133KV STEEL INGOT 1 0 9 1033KV INDUSTRIAL VI 0 0 11 1133KV BAIRAGARH 2 4 4 1033KV ENERCONE I 1 0 11 1233KV KAMLAPUR 0 0 10 1033KV HAT PIPLIYA 17 1 0 1833KV KANNOD 18 0 3 2133KV OLAMBA (KHATEGAON) 6 0 5 1133KV MSK (KHATEGAON II) 14 0 1 1533KV DEHRIYA (SATWAS) 1 0 18 1933KV BIJWAD (CHAPDA ) 6 0 8 1433KV VIKRAMPUR 3 0 9 1233KV EKLERA MATAJI 4 0 12 1633KV TALOD 6 0 13 1933KV KHERIA JAGEER 0 0 11 1133KV MURADPURA 15 0 11 2633KV SHANKAR PURA 14 0 3 1733KV KANASIYA 3 0 9 12

19 MAKSI 132 33KV MAKSI 2 0 8 1033KV NEMAWAR 5 0 21 2633KV MSK 0 7 7 1433KV SANDALPUR 2 0 15 1733KV AJNAS 2 0 11 1333KV PALASI 1 1 15 1733KV BAI JAGWADA 7 0 11 1833KV BAROTHA 10 0 0 1033KV NEORY 0 0 19 1933KV JETHDA 2 8 2 1233KV RAIPUR 11 0 9 2033KV AKODIYA 1 0 9 1033KV JAMNER 1 0 11 1233KV ARANDIYA 4 0 7 1133KV POCHANER 6 4 25 3533KV BERCHHA DATAR 4 0 11 1533KV ARNIYAKALA 7 0 20 2733KV SUNDARSI 0 13 0 1333KV LAHORI 0 10 0 10

27 POLAIKALAN 132 33KV AVANTIPUR BARODIYA 1 3 6 1033KV PANWADI 1 0 13 1433KV SARANGPUR 5 0 9 1433KV NAGZIRI 14 1 1 1633KV MOHNA 5 4 10 1933KV MANDODA 15 2 3 2033KV KALAPIPAL 2 3 7 1233KV NANDANI 1 1 14 16

77 1216

7 AGAR 132

8 SUSNER 132

9 NALKHEDA 132

UJJAIN REGIONSE(T&C) UJJAIN

UJJAIN

2 GHONSALA 132

3 MAHIDPUR 132

6 RATADIYA 132

SONKATCHH 132

18 SHAJAPUR 132

20 KHATEGAON 132

21 SATWAS 132

11

DEWAS

DEWAS 220

14 MSP DEWAS 132

15 CHAPDA 132

16 KANNOD 132

17

BERCHHA 132

28 PANWADI 132

29 MOMIN BARODIYA 132

30 KALAPIPAL 132

22 BAROTHA 132

23

SHUJALPUR

SHUJALPUR 220

24 SHUJALPUR 132

25 ARNIYAKALAN 132

26

Abstract of Trippings

Agenda of 72nd OCCM of MP 64

O/C trip E/F trip O/C+E/F

trip 1 2 3 4 5

EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

SL.NO

NAME OF TESTING

DIVISIONNAME OF SUB SATAION NAME OF FEEDER

TOTAL FAULT TRIPPINGS TOTAL TRIPPI

NGS

33KV MHW ROAD 8 9 0 1733KV SIMLAWADA 4 23 0 2733KV SHIVPUR 5 8 0 1333KV BILPANK 3 7 0 1033KV I.O.C.L. 10 9 0 1933KV GANGA SAGAR 2 11 0 1333KV DHOLAWAD 2 8 0 1033KV MILK CHILING 6 4 0 1033KV DHONSWAS (OLD NAME NAMLI)

11 3 0 14

33KV SHIVGARH 6 7 0 1333KV DHODHAR 5 0 6 1133KV KALUKHEDA 0 4 11 1533KV PIPLODA 5 0 11 1633KV KHARWAKALA 2 9 0 1133KV HANUMANTIYA 1 0 12 1333KV PATAN 7 0 20 2733KV CLEAN SOLAR POWER-I 1 1 8 1033KV CLEAN SOLAR POWER-II 1 1 9 1133KV NVR CKT-I 0 0 13 1333KV NVR CKT-II 0 0 13 1333KV RAVATI ( OLD NAME SHIVGARH)

8 3 0 11

33KV DHAMNOD 7 9 0 1633KV BAJANA 6 6 0 1233KV BIRMAWAL 5 5 0 1033KV RANISINGH 3 11 0 1433KV BOTALGANJ 13 2 0 1533KV SONY BOI CAM 10 5 0 1533KV GUJARBARDIYA 8 2 0 1033KV AMLAWAD 10 6 0 1633KV DHALPAT 33 15 0 4833KV KAYAMPUR 14 10 0 2433KV KACHNARA 5 6 0 1133KV KARJOO 0 13 0 1333KV SUZLON -I 3 7 0 1033KV BOLIA 5 15 0 2033KV BARKHEDAGANGASA 2 15 0 1733KV BHESODA MANDI 6 8 0 1433KV BARDIYA AMARA 5 11 0 1633KV SATHAKHEDA 2 15 0 1733KV BABULDA 3 7 0 10

11 SUWASARA 220 33KV KANTIYA 0 17 0 1733KV DHANERIYA 8 0 4 1233KV NAYAGAON 2 8 0 1033KV MORVAN 6 2 3 1133KV HARKIYA KHAL 10 2 6 1833KV SAVAN 8 1 10 1933KV RAMPURA 0 8 11 1933KV KANJARA 0 4 9 1333KV AANTRI 10 10 9 2933KV KUKDESHWER 8 5 4 17

15 RATANGARH 132 33KV SINGOLI 0 10 2 1216 BHANPURA 220 33KV NEEMTHUR 20 1 20 41

33KV BUDHA 0 8 3 1133KV NARAYANGARH 2 3 7 1233KV NATARAM 2 8 9 1933KV MANPURA 2 4 7 1333KV TAL 11 0 2 1333KV MAHU MATRA 20 1 23 4433KV UNHEL 0 0 12 1233KV MHETWAS 4 0 11 1533KV HATAI PALKI 14 1 2 1733KV MAHIDPUR ROAD 6 0 6 1233KV MOHANA 1 3 10 14

20 KHACHROD 132 33KV BURANABAD I 0 0 11 1133KV LOD 3 2 10 1533KV TAL TOWN 11 0 1 12

66 1043143 2259

UJJAIN REGIONSE(T&C) NAGDA

1

RATLAM

RATLAM 220

2 RATLAM 132

3 JAORA 132

4

8 SUWASARA 132

9 DALODA 220

10 GAROTH 132

A LOT 132

5 SAILANA 132

6 BILPANK 132

7 MANDSAUR 132

Abstract of TrippingsAbstract of Trippings (Ujjain Region)

SITAMAU 132

19

NAGDA

NAGDA 220

21 TAL 132

12

NEEMUCH

NEEMUCH 220

13 NEEMUCH 132

14 MANASA 132

17 MALHARGARH 132

18

Agenda of 72nd OCCM of MP 65

ANNEXURE-9.4

1 220 KV SATNA PGCIL CB FAULTY CLOSE

1 220 KV KOTAR CB FAULTY CLOSE2 132KV KYMORE CB FAULTY CLOSE

1 132/33 KV XMER (PRI) CB FAULTY CLOSE

1

1 132 KV RTS MW/MVAR 0/0 4/1

1 125 MVAR BUS REACTOR CB N/A Process connection required2 400 KV DAMOH CB OPEN CLOSE

1 220 KV SUKHA 1 CB FAULTY CLOSE

1 132 RTS MW /MVAR 0 7/1

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

SrDESCRIPTION Status Telemetry value at SLD Actual value at site1 132 KV BUS BALAGHAT 1 & 2 MW/MVAR 26/16 ;-40/20

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

SrDESCRIPTION Status Telemetry value at SLD Actual value at site1 220 KV BUS COUPLER CB FAULTY OPEN

SrParameter Field value Scada value /status1 ISP –INDORE 400 KV Feeder 1 91 9082 ISP –NAGDA 400 KV Feeder (M 94 9383 GENERATOR 5 & 6 MAVR 5 N /A4 GENERATOR (OFF CONDITION) N/C5

Name at SLDC end at site end

1 400 KV AASTHA 1 & 2 LINE REACTOR N/A2 400 KV SEONI MW 99 85

1 GEN NO 3 & 4 RGMO N/A

1 220 /33 KV TR MW/MVAR NA2 400 KV BUS 1 FREQ 49.79 49.983 GEN NO.1,2,3,4 RGMO N/A

ISP

SATPURA T P S

SINGHA JI phase 2 S T P S

S G T P S

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETERKATNI 400 KV S/S

PANAGAR 220 KV S/S

SHAHPURA 132 KV S/S

KIRNAPUR 132 KV S/S

CHHATARPUR 220 KV S/S

MANJAGAWAN 132 KV S/S

UMARIYA 132ALL ANALOG SHOWING 0 PROBLEM IN PT SUPPLY

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

SATNA CIRCLE

KOTAR 220 KV S/S

SATNA 220

KOTMA 132

Agenda of 72nd OCCM of MP 66

1 GEN NO 1 ,2 RGMO N/A

1 220 KV SIDHI CB TRANSMIT CLOSE

srName of Element sldc side Field

2 220 Kv Dewas CB Faulty Close

2 400kv Singhaji malwa Ckt -4 CB Faulty Close

1 132 Kv PRASRAM PURIYA CB open close

1 220 kv all breakers suspected2 220kv bus voltag-1 wrong3 132kv all brekers suspected

1 220/132Xmer HV and LV Side MW 16 24

1 220/132 TR1 CB NOT COMING CLOSED2 220 Sendhwa-I CB NOT COMING CLOSED3 220 Sendhwa-II CB NOT COMING CLOSEDNO

NO

1 220 Kv TBC CB Not Coming open2 22kV Daloda I CB Open Close3 22kV Daloda II CB FOULTY OPEN

1 132KV BUS COUPLER CB FOULTY OPEN

1 132kV Buscoupler CB Faulty Close

2 132/33KV 40MVA-XMER-2 MW/MVAR NON-CURRENT

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 400 KV BUS-COUPLER CB FAULTY2 132 KV BUS-COUPLER CB FAULTY

04-11-2019

ASTHA 400 KV S/S

RAJGARH 220 KV S/S

04-11-2019KHATEGAON 132 KV S/S

132 kV S/s Khachrod

220 KV S/S RATLAM

UJJAIN 220 KV S/S

132 KV S/S AGAR

Kannod 132 KV S/S All 132 Kv side BC and 33 kv side BC not coming

All 132 Kv Side brekaer is open Actually closed

RAJGRAH (DHAR) 220 KV S/S

220KV S/s Julwaniya

JULWANIA 400 KV S/S

All 132 Kv Side brekaer is open Actually closed

INDORE 400 KV S/S

PITAMPUR 400 KV S/S

PITAMPUR 220 KV S/S Sector-III

GANDHI SAGAR H P STELEMETRY OUT

ATPS

BARGI

ALL CB SUSPECTED

Agenda of 72nd OCCM of MP 67

1 220 KV MAIN BUS VOLTAGE/FREQUENCY NON CURRENT

1 160 MVA XMER(LV SIDE) CB FAULTY CLOSE

1 132 KV KHIRKIYA CB NON CURRENT CLOSE2V CHANNERA(TAP KHIRKIYA RLY TR CB FAULTY CLOSE3 132 KV KHIRKIYA RLY TRCN-1 CB FAULTY

1 132/33 KV 40 MVA XMER-2 CB FAULTY CLOSE

1 132 KV BUS VOLTAGE/FREQUENCY NON CURRENT2 132 KV BUS-COUPLER MW/MVAR NON CURRENT

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER 05-11-2019

1 132 KV BUS COUPLER CB FAULTY

1 132 KV BUS COUPLER CB FAULTY2 132 KV BUS COUPLER MW/MVAR NON-CURRENT

ASHOKNAGAR 220 KV S/S

ESAGARH 132 KV S/S

ZEERAPUR 132 KV S/S

SARNI 220 KV S/S

HARDA 132 KV S/S

BIORA 132 KV S/S

Agenda of 72nd OCCM of MP 68

ANNEXURE-9.8

220 KV Mugaliyachhap400 KV Astha132 KV Astha132 KV Icchwar132 KV Harda132 KV Picchore132 KV Sehore132 KV Kurawar

SOE VERIFICATION PENDING

Agenda of 72nd OCCM of MP 69