MAGUDHDHUVAA ISLAND RESORT PROJECT PROGRESS REPORT Report No……….: MGDH0907 Report Period….: July2009 Date ……………….: 01.08.2009 Report Contents: 1. Method of Development a. Material Supply 2. Administration & Human Resources / Labor 3. Machines, Vehicles & Equipment 4. Site Works a. Temporary Structures b. Permanent Structures 5. Difficulties Faced 6. Target Completion Date 7. Other Issues 8. Pictures of Site 1. Method of Development In this month we supplied most of the materials from abroad and rest like food and tools from Maldives. The materials that we supplied from Maldives had transferred with our two dhonies. The items that we imported had discharged directly to the island. Because of the noncompetitive high prices and limited opportunities in the market all investors choose abroad markets rather than Maldives Market, like us. The distribution of material supply, taking zones into consideration, is mentioned below: 60% from abroad 25% from Male 4% from Thinadhoo 1% from Vaadhoo 8% from Gadhdhoo 1% from Foammulah 1% from Addhoo

Upload: hakhue

Post on 14-Mar-2018

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: MAGUDHDHUVAA ISLAND RESORT PROJECT PROGRESS REPORT ... 2009 Progress Report for M… · magudhdhuvaa island resort project progress report ... ‐ 2 tractors with trolleys (tafe)

MAGUDHDHUVAA ISLAND RESORT PROJECT  PROGRESS REPORT   Report No……….: MGDH0907 Report Period….: July2009  Date ……………….: 01.08.2009   Report Contents:   1. Method of Development  a. Material Supply  2. Administration & Human Resources / Labor  3. Machines, Vehicles & Equipment  4. Site Works  a. Temporary Structures  b. Permanent Structures  5. Difficulties Faced  6. Target Completion Date  7. Other Issues  8. Pictures of Site   1. Method of Development  In this month we supplied most of the materials from abroad and rest like food and tools from Maldives. The materials that we supplied from Maldives had transferred with our two dhonies. The items that we imported had discharged directly to the island. Because of the noncompetitive high prices and limited opportunities in the market all investors choose abroad markets rather than Maldives Market, like us. The distribution of material supply, taking zones into consideration, is mentioned below:   60% from abroad   25% from Male    4% from Thinadhoo    1% from Vaadhoo   8% from Gadhdhoo  1% from Foammulah  1% from Addhoo     

Page 2: MAGUDHDHUVAA ISLAND RESORT PROJECT PROGRESS REPORT ... 2009 Progress Report for M… · magudhdhuvaa island resort project progress report ... ‐ 2 tractors with trolleys (tafe)

2. Administration & Human Resources / Labor   Since we reached the peak numbers as employee we stopped recruitment. This month we hold up the employee number that constituted as senior staff team from Turks and Maldivian, masters from Maldivians and Indians and labors from Bangladeshis. Especially we hired skilled labors from Foummulah. Day by day we get accustomed to Maldivian working style and also they learn our company principles and system. At the end of the month the distribution of staff was as below.  In short:  7 prs Turkish  63 prs Maldivian  59 prs Indian  228 prs Bangladeshi  12 prs Burma 45 prs Subcontractor  3. Machines, Vehicles & Equipment  While the quantity of construction equipments and tools was getting longer day by day, we added one truck with crane to the list of heavy construction machines on the island. We covered the construction machines that we lost last month in an sea accident from Maldives.   Now on the island we have:  ‐ 2 Excavators (Kobelco SK200‐8)  ‐ 1 Excavator (Kobelco SK350)  ‐ 1 Loader (JCB 3DX)  ‐ 1 Crane ( Tadano 35ton)  ‐ 2 Tractors with trolleys (Tafe)  ‐ 1 Truck with crane(4ton) ‐ 1 Speed Boat (36 feet)  ‐ 1 Small Dhonni (36 feet)  ‐ 2 Cargo Dhonni (95 feet)  ‐ 1 Barge (81 feet x 27 feet)  ‐ 12 Concrete Mixers  ‐ 5 Generators  ‐ 2 Tough Riders (Tough Rider ‐2 ton)  ‐ 1 RO Plant (140m3/day)    

Page 3: MAGUDHDHUVAA ISLAND RESORT PROJECT PROGRESS REPORT ... 2009 Progress Report for M… · magudhdhuvaa island resort project progress report ... ‐ 2 tractors with trolleys (tafe)

4. Site Works  a. Temporary Structures  According to the needs we made some arrangements on temporary structures as guest house and a new temporary mosque, bigger one. As the previous month we work hard on the channels which are located on east and west sides of the island.   b. Permanent Structures  According to the construction program the developments in 8 sections are as the following: 

1. Land Bungalows Section We started permanent structures from this section which includes 24ea Beach Bungalows and 10ea Executive Staff Bungalows. Till the end of this month we finished all masonry walls, other plastering up to roof level both in 24ea (all in the 1st phase) Beach bungalows and 10ea Executive Staff Bungalows. We already finished construction of 20ea. pool structures and started landscaping. 

2. Land Suites Section In this section we have 14ea. Beach Suites and 11ea. Lagoon Suites.  We already finished all masonry wall and exterior plastering up to roof level works on all Beach Suites. We finished construction of 8 ea. pool structures on Beach Suites. We planned to finish footings, foundations and masonry walls on Lagoon Suites but because of the sank ship we could not get our target. We just started the foundations of Lagoon Suites and finished 3ea. Slabs of 11. Also we finished the footings of 8 suites in this period.  

3. Water Bungalows Section In this section there are 33ea Water Bungalows, 16ea Water Suites, 1ea Presidential Suite and Jetty walkways. This section is the one which affected from the sea accident a lot. However we finished all prefabricated foundations and columns of 20ea Water Bungalows, 16ea Water Suites, Arrival and Service Jetties, we could just get PVC shuttering materials for columns at the last week of this month. As a result of this we could not started works on time but for all that we finished 200ea column casting and 2ea. bungalows’ footing placement in the sea. 

4. Utility Section To eliminate the lack of time occurred from the graveyard problem we increased the staff quantity in this section. In this section there are Staff Accomodation and utility areas, Powerhouse, Desalination Plant and WWTP with Fuel and Water tanks. In this month we finished all concrete and masonry works on the 3 of 8 staff accommodation buildings as an addition to first 3rd group in the previous month. All exterior plastering was finished in this 3 buildings also. We finished concrete and masonry works on Powerhouse. On the third group of staff accommodations that we could not start previous months because of the graves, we finalized the concrete works of foundations and slab works still continues.  

5. Restaurants In this section there are 5ea restaurants and 1ea café and shop unit. We started Mediterranean Restaurant and Bar & Main Pool Buildings. We finished the foundations and masonry walls of both. 

Page 4: MAGUDHDHUVAA ISLAND RESORT PROJECT PROGRESS REPORT ... 2009 Progress Report for M… · magudhdhuvaa island resort project progress report ... ‐ 2 tractors with trolleys (tafe)

6. Administrative Buildings In this section there are Reception and administrative buildings, Housekeeping and Offices. We finished the concrete and masonry works on the Reception and administrative Building and the pond works also was finished.  

7. Other Social Buildings This section includes Spa, Kids’ Club, Recreation Center, Dive center and Mosque. We finished the concrete and masonry works on Dive center, SPA and Water Sports Buildings. Additionally we started the foundations of SPA treatment rooms and finished 6 of 9 rooms. We just started the Kid’s Club foundation on the last days of month. 

8. Infrastructure We started the plumbing and electrical works of buildings. We plan to start infrastructural site works on September. 

 5. Difficulties Faced  Fortunately we passed a month with settled conditions when compare with the previous months.    6. Target Completion Date  As our construction program, we started permanent structures on 1st of March. We are planning to finalize the resort construction in fifteen months starting from this day provided that the problem of graveyard is solved on time. However we got a full solution after three months delay in this issue and this already create three months delay in our program. Now we work hard to cover this non‐productive time.   7. Other Issues  Rather than graveyard issue we have not faced with big problems and we created good relations with habitant islands which are close to our islands, such as Gadhdhoo, Vaadhoo, Foammulah with the help of the Atoll Council and Gadhdhoo Island Council. As a foreign company we give great importance to this issue. 

Page 5: MAGUDHDHUVAA ISLAND RESORT PROJECT PROGRESS REPORT ... 2009 Progress Report for M… · magudhdhuvaa island resort project progress report ... ‐ 2 tractors with trolleys (tafe)

  8. Pictures of Site  CONSTRUCTION REPORT for JULY 2009

200 BED RESORT HOTEL PROJECT MAGUHDHUVAA ISLAND, MALDIVES

PHOTO1 BEACH SUITE ENTRANCE PHOTO2 BEACH SUITE BUNGALOW

PHOTO3 BEACH SUITE COUPLE PHOTO4 BEACH SUITE COUPLE

PHOTO5 WATER SPORTS CENTER PHOTO6 BEACH BUNGALOW POOL

Page 6: MAGUDHDHUVAA ISLAND RESORT PROJECT PROGRESS REPORT ... 2009 Progress Report for M… · magudhdhuvaa island resort project progress report ... ‐ 2 tractors with trolleys (tafe)

PHOTO6 BEACH BUNGALOW VISTA PHOTO7 BEACH BUNGALOW ENTRANCE

PHOTO8 EXECUTIVE STAFF BUNGALOW PHOTO9 SERVICE CENTER

PHOTO10 JUNIOR STAFF BUILDING 01 PHOTO11 JUNIOR STAFF BUILDING 01

Page 7: MAGUDHDHUVAA ISLAND RESORT PROJECT PROGRESS REPORT ... 2009 Progress Report for M… · magudhdhuvaa island resort project progress report ... ‐ 2 tractors with trolleys (tafe)

PHOTO12 JUNIOR STAFF BUILDING 01 PHOTO13 JUNIOR STAFF BUILDING 01

PHOTO14 JUNIOR STAFF BUILDING 02 PHOTO14 JUNIOR STAFF BUILDING 02

PHOTO15 SENIOR STAFF QUARTERS PHOTO16 SENIOR STAFF QUARTERS

Page 8: MAGUDHDHUVAA ISLAND RESORT PROJECT PROGRESS REPORT ... 2009 Progress Report for M… · magudhdhuvaa island resort project progress report ... ‐ 2 tractors with trolleys (tafe)

PHOTO17 SENIOR STAFF QUARTERS PHOTO18 SENIOR STAFF QUARTERS

PHOTO19 MANAGEMENT STAFF QUARTERS PHOTO20 MANAGEMENT STAFF QUARTERS

PHOTO21 MANAGEMENT STAFF QUARTERS PHOTO22 STAFF AREA GENERAL VIEW

Page 9: MAGUDHDHUVAA ISLAND RESORT PROJECT PROGRESS REPORT ... 2009 Progress Report for M… · magudhdhuvaa island resort project progress report ... ‐ 2 tractors with trolleys (tafe)

PHOTO23 MOSQUE PHOTO24 MOSQUE

PHOTO25 MOSQUE PHOTO26 MOSQUE

PHOTO27 GENERAL MANAGER BUNGALOW PHOTO28 GENERAL MANAGER BUNGALOW

Page 10: MAGUDHDHUVAA ISLAND RESORT PROJECT PROGRESS REPORT ... 2009 Progress Report for M… · magudhdhuvaa island resort project progress report ... ‐ 2 tractors with trolleys (tafe)

PHOTO29 BAR & MAIN POOL PHOTO30 BAR & MAIN POOL

PHOTO31 BAR & MAIN POOL PHOTO32 BAR & MAIN POOL

PHOTO33 MEDITERRANEAN RESTAURANT PHOTO34 MEDITERRANEAN RESTAURANT

Page 11: MAGUDHDHUVAA ISLAND RESORT PROJECT PROGRESS REPORT ... 2009 Progress Report for M… · magudhdhuvaa island resort project progress report ... ‐ 2 tractors with trolleys (tafe)

PHOTO35 SEMIWATER SUITES PHOTO36 SEMIWATER SUITES

PHOTO37 SEMIWATER SUITES PHOTO38 SEMIWATER SUITES

PHOTO39 SEMIWATER SUITES PHOTO40 SEMIWATER SUITES

Page 12: MAGUDHDHUVAA ISLAND RESORT PROJECT PROGRESS REPORT ... 2009 Progress Report for M… · magudhdhuvaa island resort project progress report ... ‐ 2 tractors with trolleys (tafe)

PHOTO41 SPA & TREATMENT ROOMS PHOTO42 SPA & TREATMENT ROOMS

PHOTO43 SPA & TREATMENT ROOMS PHOTO44 SPA & TREATMENT ROOMS

PHOTO45 RECEPTION & ADMINISTRATION PHOTO46 RECEPTION & ADMINISTRATION

Page 13: MAGUDHDHUVAA ISLAND RESORT PROJECT PROGRESS REPORT ... 2009 Progress Report for M… · magudhdhuvaa island resort project progress report ... ‐ 2 tractors with trolleys (tafe)

PHOTO47 RECEPTION & ADMINISTRATION PHOTO48 RECEPTION & ADMINISTRATION

PHOTO49 RECEPTION & ADMINISTRATION PHOTO50 RECEPTION & ADMINISTRATION

PHOTO49 RECEPTION & ADMINISTRATION PHOTO50 ADDITION TO VEHICLE PARK