1 Chairman 2 Member 3 Member 4 Member 5 Shri Y. B. Sontakke, Joint Director (WPC), Member 6 Sp. Invitee 7 Sp. Invitee Maharashtra Pollution Control Board, Mumbai Chairman of the committee welcomed the members of the committee and allowed proceeding of the meeting to start. The minutes of the 2nd (Booklet No. 4) Consent Committee meeting of 2017-18 held on 23.04.2017 circulated under Board’s letter No. MPCB/AS (T)/TB/B-8745 dated 27.04.2017 were confirmed. Shri V. M. Motghare, Joint Director (Air Pollution Control) Maharashtra Pollution Control Board, Mumbai The meeting thereafter deliberated on the agenda items placed before the committee and following decisions were taken. MAHARASHTRA POLLUTION CONTROL BOARD Minutes of 4th Consent Committee Meeting of 2017-2018 held on 01.08.2017 at 11:00 a.m. at 4th Floor Conference Hall, MPC Board, Kalpataru Point, Sion (E), Mumbai 22. (Booklet No. 7, 8 & 9) ………. The following members of the Consent Committee were present: Shri. R. G. Pethe Dr. P. Anbalagan, IAS, Member Secretary Maharashtra Pollution Control Board, Mumbai Retired WPAE, MPC Board Shri Shri P. K. Mirashe, Assistant Secretary (Technical) Maharashtra Pollution Control Board, Mumbai Shri A. R. Supate, Principal Scientific Officer, Shri N. N. Gurav, Reginal Officer (HQ), Maharashtra Pollution Control Board, Mumbai Maharashtra Pollution Control Board, Mumbai Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 1

Upload: others

Post on 31-Oct-2019

20 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

1 Chairman

2 Member

3 Member

4 Member

5 Shri Y. B. Sontakke, Joint Director (WPC), Member

6 Sp. Invitee

7 Sp. Invitee

Maharashtra Pollution Control Board, Mumbai

Chairman of the committee welcomed the members of the committee and allowed proceeding of the meeting to start. The minutes of the 2nd (Booklet No. 4)

Consent Committee meeting of 2017-18 held on 23.04.2017 circulated under Board’s letter No. MPCB/AS (T)/TB/B-8745 dated 27.04.2017 were confirmed.

Shri V. M. Motghare, Joint Director (Air Pollution Control)

Maharashtra Pollution Control Board, Mumbai

The meeting thereafter deliberated on the agenda items placed before the committee and following decisions were taken.

MAHARASHTRA POLLUTION CONTROL BOARD

Minutes of 4th Consent Committee Meeting of 2017-2018 held on 01.08.2017 at 11:00 a.m. at 4th Floor Conference Hall, MPC Board, Kalpataru Point,

Sion (E), Mumbai 22. (Booklet No. 7, 8 & 9)

……….

The following members of the Consent Committee were present:

Shri. R. G. Pethe

Dr. P. Anbalagan, IAS, Member Secretary

Maharashtra Pollution Control Board, Mumbai

Retired WPAE, MPC Board

Shri Shri P. K. Mirashe, Assistant Secretary (Technical)

Maharashtra Pollution Control Board, Mumbai

Shri A. R. Supate, Principal Scientific Officer,

Shri N. N. Gurav, Reginal Officer (HQ),

Maharashtra Pollution Control Board, Mumbai

Maharashtra Pollution Control Board, Mumbai

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 1

Page 2: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

Sr.

No.

Name of Industry Decision on grant

of consent

Consent granted

upto

Section Remarks/ Discussion (1)

Establish

1

Kingston Exotica (Sr. No. 85/1/85/2 &

92/1 Behind Kingston Serene, Near Tata

Inora Park,

Autade Handewadi, Pune)

Approved

Consent to

Establish

Commissioning of

the unit or 5 yrs

whichever is earlier

RO(HQ)

It was decided to grant consent to establish for

construction of residential project on total plot area

of 20,950 sq. mtrs. & total construction BUA of

36,117.67 sq. mtrs., by imposing following

conditions:

(i) PP shall not take any effective steps prior to

obtaining Environment Clearance and submit Bank

Guarantee of Rs. 10 lakhs towards compliance of

same and consent conditions.

(ii) PP shall submit an affidavit in Board’s

prescribed format within 15 days regarding the

compliance of conditions of EC and C to E.

(iii) PP shall install online monitoring system for

BOD, TSS and flow at the outlet of STP.

2

Maple Moshi Annex (Maple Group, 7th

Floor, City Square Building, Behind The

Pride Hotel,

Shivaji Nagar, Pune)

Approved

Consent to

Establish

Commissioning of

the unit or 5 yrs

whichever is earlier

RO(HQ)

It was decided to grant consent to establish for

construction of residential cum commercial project

on total plot area of 24,000 sq. mtrs. & total

construction BUA of 49,985.35 sq. mtrs., as per EC

dtd. 27.06.2016, by imposing following conditions:

(i) PP shall not take any effective steps prior to

obtaining Environment Clearance and submit Bank

Guarantee of Rs. 10 lakhs towards compliance of

same and consent conditions.

(ii) PP shall submit an affidavit in Board’s

prescribed format within 15 days regarding the

compliance of conditions of EC and C to E.

(iii) PP shall install online monitoring system for

BOD, TSS and flow at the outlet of STP.

3

VGS Realty Construction Pvt.Ltd.

(Omkar House), Off Eastern Express

Highway, Opp. SIon

Chunnabhatti Signal, Sion (E).)

Not Approved

Consent to

Establish

(Revalidation)

_____ RO(HQ)

It was decided to issue SCN for refusal of consent

to establish for revalidation, on following non-

compliances:

(i) PP has not replied to email dtd. 22.05.2017

regarding non submission of EC copy, area detail,

STP and MSW proposal and present status of

construction work.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 2

Page 3: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

4

Ram India Shelters (Ram House, 712/13

Market yard Pune) S.NO.165 (P)

Phursungi Haveli Not Approved

Consent to

Establish

_____ RO(HQ)

It was decided to issue SCN for refusal of consent

to establish, on following non-compliances:

(i) PP has carried out construction work before

obtaining Environment Clearance from competent

authority and C to E from Board.

5

Bajajsons Limited (Plot No. 31,MIDC

Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

SATPUR Nashik

Not Approved

Consent to

Establish

_____ APC

It was decided to issue final refusal of consent to

establish for expansion in existing project and

closure directions on following non compliances:

(i) Industry is not recycling the effluent in existing

plant as per consent conditions.

(ii) Land is not developed for disposal of treated

effluent.

(iii) As TDS content in treated effluent is high and

effluent is used for gardening within premises which

is polluting ground water table.

6

Golden Dreams TechnoPark Pvt.Ltd.,

(Plot No.:- F-4/1, F-4/1 (PT) MIDC Area,

Chikalthana,

Aurangabad)Not Approved

Consent to

Establish

(Revalidation)

_____ RO(HQ)

It was decided to issue SCN for refusal of consent

to establish for revalidation, on following non-

compliances:

(i) PP has not submitted not submitted Area details

along with building layout, local body

permission/NOC, STP & OWC proposal, CA

certificate in proper format, status of Environment

Clearance.

7

Mumbai Waste Management Limited,

(Plot No. P - 32, MIDC , Taloja , Tal :

Panvel, Dist.

Raigad) Approved

Consent to

Establish

Commissioning of

the unit or 5 yrs

whichever is earlier

RO(HQ)

It was decided to grant consent to establish for

plastic recycling unit, by imposing following

conditions:

(i) Industry shall not take any effective steps prior to

obtaining amended environment clearance and

submit Bank Guarantee of Rs. 10 lakh towards

compliance of same and consent conditions.

(ii) Industry shall obtain registration under plastic

waste management rules 2016.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 3

Page 4: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

8

Crystal Garden (S. No 134/3 &4 (C),

Pashan,) 134/3 & 4 (C) Pashan Haveli,

Pune

Approved

Consent to

Establish

(Revalidation)

Commissioning of

the unit or 5 yrs

whichever is earlier

RO(HQ)

It was decided to grant consent to establish for

revalidation of construction of residential cum

commercial project on total plot area of 27500.66

sq. mtrs. & total construction BUA of 13592.699 sq.

mtrs., subject to submission of EC copy, by

imposing following conditions:

(i) PP shall submit Bank Guarantee of Rs. 10 lakhs

towards compliance consent conditions.

(ii) PP shall submit an affidavit in Board’s

prescribed format within 15 days regarding the

compliance of conditions of EC and C to E.

(iii) PP shall install online monitoring system for

BOD, TSS and flow at the outlet of STP.

9

SHALIMAR NUTRIENTS PRIVATE

LIMITED (Survey No.246/1,246/2, 247/A,

247/B/1,247/B/2,249,250) SONKHAMB

TALUKA:KATOL

KATOL

Not Approved

Consent to

Establish

_____ WPC

It was decided to issue refusal of consent to

establish and closure directions on following non

compliances:

(i) Exceeding the JVS reports continually for

existing industry.

(ii) Non submission of reply to SCN.

10

Terrapolis Asset Pvt. Ltd.,Proposed

SRA Project “Terrapolis Atrius” on plot

bearing C.T.S No.

509, 510, 510/1to 8 Village Nahur

(1501,LODHA

SUPREMUS,S.B.MARG,LOWER

PAREL,MUMBAI)Approved

Consent to

Establish

Commissioning of

the unit or 5 yrs

whichever is earlier

RO(HQ)

It was decided to grant consent to establish for

construction of residential SRA project on total plot

area of 4,221 sq. mtrs. & total construction BUA of

36,260.35 sq. mtrs., as per EC dtd. 28.01.2016, by

imposing following conditions:

(i) PP shall not take any effective steps prior to

obtaining Environment Clearance and submit Bank

Guarantee of Rs. 5 lakhs towards compliance of

same and consent conditions.

(ii) PP shall submit an affidavit in Board’s

prescribed format within 15 days regarding the

compliance of conditions of EC and C to E.

(iii) PP shall install online monitoring system for

BOD, TSS and flow at the outlet of STP.

11

JVS Comatsco Industries Private

Limited Gat No- 106/2,107/2,107/3 Village-

Moh SinnarApproved

Consent to

Establish

Expansion

Commissioning of

the unit or 5 yrs

whichever is earlier

APC

It was decided to grant consent to establish for

expansion, by imposing following non compliances:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards O & m of pollution control system and

consent conditions.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 4

Page 5: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

12

Ramsons Industries Ltd. (A-301, Neeti

Gaurav, Central Bazar Road,

Ramdaspeth, Nagpur.) Kh.No.

151/1,152/1, Mouza Bazargaon, Amravati

Road Kalmeshwar

Approved

Consent to

Establish

Commissioning of

the unit or 5 yrs

whichever is earlier

APC

It was decided to grant consent to establish, by

imposing following conditions:

(i) Industry shall not take any effective steps prior to

obtaining Environment Clearance and submit Bank

Guarantee of Rs. 5 lakh towards compliance of

same and consent conditions.

13

MENON ALKOP ( DIVISION OF MENON

BEARINGS LTD.) C-1, Five star MIDC

Kagal-

Hatkanangale

Approved

Consent to

Establish

Expansion

Commissioning of

the unit or 5 yrs

whichever is earlier

APC

It was decided to grant consent to establish for

expansion, by imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards compliance consent conditions.

(ii) Industry shall upgrade there ETP before

applying for consent to operate.

14

PHOENIX MECANO INDIA PVT. LTD.,

GAT NO. 388,389 PIRANGUT

INDUSTRIAL ESTATE, BHARE MULSHI

Approved

Consent to

Establish

Expansion

Commissioning of

the unit or 5 yrs

whichever is earlier

APC

It was decided to grant consent to establish for

expansion, by imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards compliance consent conditions.

15

Suncity Corporation, CTS Nos.

574/C,574/17 to 54,Village-

Kanjur,Bhandup, Mumbai

Not Approved

Consent to

Establish

_____ RO(HQ)

It was decided to issue final refusal of consent to

Establish and stop work, on following non

compliances:

(i) As PP has applied for the consent to establish

after High Court order dtd. 26th & 29th Feb 2016.

16

Salasar Alloy & Steel Industries Private

Limited, Plot No. E-9, MIDC Butibori,

Hingna Approved

Consent to

Establish

Commissioning of

the unit or 5 yrs

whichever is earlier

APC

It was decided to grant consent to establish for

expansion of existing unit for additional products

Galvanized Wire (by electroplating activity 3450

MT/M), by imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards compliance consent conditions.

17

SIYARAM SILK MILLS LIMITED,

Plot No. T-9, Addl. Amravati Nadgoan

Peth Industrial Area

(Textile Park)

Approved

Consent to

Establish

Commissioning of

the unit or 5 yrs

whichever is earlier

WPC

It was decided to grant consent to establish for

manufacturing of Denim Yarn, by imposing following

conditions:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards compliance consent conditions.

18

Ebco Pvt.Ltd.,

SURVEY NO.53, HISSA NO.7/3 & 7/4,

GAURAI PADA, VASAI (E), DIST -

PALGHARApproved

Consent to

Establish

Commissioning of

the unit or 5 yrs

whichever is earlier

APC

It was decided to grant consent to establish for

expansion for increase in production quantity, water

consumption and effluent, subject to verification of

JVS of existing unit, by imposing following

conditions:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards compliance consent conditions.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 5

Page 6: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

19

ALKOPLUS PRODUCERS PVT.

LIMITED., Plot No - 3, Additional MIDC,

Latur.

Approved

Consent to

Establish

Commissioning of

the unit or 5 yrs

whichever is earlier

WPC

It was decided to grant consent to establish for

installation of Thermic fluid heater, by imposing

following conditions:

(i) Industry shall not take any steps prior to

obtaining Environment Clearance and submit Bank

Guarantee of Rs. 5 lakh towards compliance of

same and consent conditions.

(ii) Industry shall take prior permission from

Regional Officer, Aurangabad before restarting of

production.

20

Garg Inox Ltd.,

G-4, RANJANGAON INDUSTRIAL AREA

MIDC TALUKA SHIRUR

Approved

Consent to

Establish

Expansion

Commissioning of

the unit or 5 yrs

whichever is earlier

APC

It was decided to grant consent to establish for

expansion for replacing existing process of wire

annealing with sand bath by lead bath, by imposing

following conditions:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards compliance consent conditions.

21

AVIANS INNOVATIONS TECHNOLOGY

PVT LTD.,

C-22/6 CHAKAN INDL. AREA, MIDC, PH-

II, VILLAGE:- BHAMBOLI, KHEDApproved

Consent to

Establish

Commissioning of

the unit or 5 yrs

whichever is earlier

APC

It was decided to grant consent to establish for the

proposed manufacturing activity of (1)

Rolling shutter Qty-150 Nos/m. (2) Gates Qty-15

No/M (3) Dock levelers Qty-75 No/M. with

painting & powder coating activity, by imposing

following conditions:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards compliance consent conditions.

22

Paradise Superstructures, Sai World

Empire, S. No. 93/1, 93/2+4, 93/3, 94/1,

64/2, 94/3A, 94/3B,94/4, 102/1A, 102/1B,

102/3, 102/4, 102/5A/2, 102/5B, 102/5K,

103/1A, 103/1B, 103/2A, 103/2B, 103/3

Villlage Rohinjan, Tal. Panvel, Dist.

Raigad

Not Approved

Consent to

Establish

_____ RO(HQ)

It was decided to issue final refusal of consent to

Establish and stop work, on following non

compliances:

(i) PP has started construction work without

obtaining Environment Clearance from competent

authority and consent to establish from Board.

23

HBS View Pvt. Ltd., HBS VIEW 360, C.S.

No.12/738, Plot no. 14 of Malabar Hill

Division, Tardeo

Main Road, 'D' ward, MumbaiNot Approved

Consent to

Establish

_____ RO(HQ)

It was decided to issue final refusal of consent to

Establish and stop work, on following non

compliances:

(i) As PP has applied for the consent to establish

after High Court order dtd. 26th & 29th Feb 2016

stating that all the projects application / proposals

submitted after 1st March 2016 shall be restricted.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 6

Page 7: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

24

Raychem RPG PVT LIMITED (1/62,

M.G.Road, Opp Bharat petrol pump,

Sativali Village)

Approved

Consent to

Establish

Commissioning of

the unit or 5 yrs

whichever is earlier

APC

It was to grant consent to establish for expansion

i.e. Medium Voltage Covered conductor – 50 sq mm

– 3000 Mtrs/Medium Voltage Conductor 70 sq mm -

96000 Mtrs/M, Medium Voltage Covered Conductor-

99 sq mm-11000 Mtrs/M, Medium Voltage Covered

Conductor- 120 sq mm- 11000 Mtrs/M., by imposing

following conditions:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards compliance consent conditions.

25

IRAA Clothing Pvt.Ltd., B-7/3,

M.I.D.C.,Tarapur Boisar

Not Approved

Consent to

Establish

Expansion

_____ WPC

It was decided to issue SCN for refusal of consent

to establish expansion on following non-

compliances:

(i) Industry has not submitted supporting

document regarding name change. Latest JVS

results, environment statement details, proposed

water budget and fuel consumption.

(ii) Industry has failed to submit compliance report

for conditional restart direction.

26

KIRLOSKAR PNEUMATIC CO LTD.,

(SASAWAD INDUSTRIAL ESTATE) 606

SASWAD PURANDAR

Approved

Consent to

Establish

Commissioning of

the unit or 5 yrs

whichever is earlier

APC

It was decided to grant consent to establish for Shot

Blasting activity, by imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards compliance consent conditions.

27

ANSHUL SPECIALITY MOLECULES

PRIVATE LIMITED (108-110, MIDC)

PLOT NO. 108,109,110 DHATAV MIDC ,

VILLAGE ROTH (B) ROHAApproved

Consent to

Establish

Commissioning of

the unit or 5 yrs

whichever is earlier

AS(T)

It was decided to grant consent to establish for

expansion for repacking of chemicals, by imposing

following conditions:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards compliance consent conditions.

(ii) Industry shall install online monitoring system.

28

Anant Dudh Pvt. Ltd. (At Post - Kikvi, Tal -

Bhor, Dist - Pune.) Gat No. 263 Kikvi Bhor

Not Approved

Consent to

Establish

_____ WPC

It was decided to issue SCN for refusal of consent

to establish for industry type R-47 Milk

processing and dairy products (Integrated project),

on following non-compliances:

(i) As per MoEF direction u/s 5 of EPA 1986 dtd.

13/11/2013 Village Kikvi Tal. Bhor, Dist. Pune

falls under ESA of Western Ghats identified by

HLWG. The Red category of Industries in

CPCB/SPCB list are prohibited to Establish,

Expansion of projects/activities.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 7

Page 8: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

29

INDIAN OIL CORPORATION LIMITED

(LPG BOTTLING PLANT) (AT-POST:

BHOSE,, Chakan

Shikrapur Road, SH-55)

Approved

Consent to

Establish

(Expansion)

Commissioning of

the unit or 5 yrs

whichever is earlier

AS(T)

It was decided to grant consent to establish

expansion for Statutory Testing & Painting activity,

by imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards compliance consent conditions.

30

Shree Sai Construction, S. No. 73, H.

No. A & B, village Achole, near dubey

medical collage,

Nalasopara €

Approved

Consent to

Establish

Commissioning of

the unit or 5 yrs

whichever is earlier

RO(HQ)

It was decided to grant consent to establish for

construction of residential project on total plot area

of 17,930 sq. mtrs. & total construction BUA of

31,257.85 sq. mtrs., as per EC dtd. 09.05.2017,

subject to submission of EC copy, by imposing

following conditions:

(i) PP shall submit Bank Guarantee of Rs. 5 lakhs

towards compliance of consent conditions.

(ii) PP shall submit an affidavit in Board’s

prescribed format within 15 days regarding the

compliance of conditions of EC and C to E.

(iii) PP shall install online monitoring system for

BOD, TSS and flow at the outlet of STP.

31

NAMCO INDUSTRIES PVT. LTD.,

HORALE, PO WAOSHIApproved

Consent to

Establish

(Expansion)

Commissioning of

the unit or 5 yrs

whichever is earlier

APC

It was decided to grant consent to establish for

expansion for manufacturing of Stainless Steel

Slabs, by imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards compliance consent conditions.

Operate

1

NITCO LTD., SHRIGAON-POYAND,

ALIBAUG, RAIGAD, MAHARASHTRA) Approved

Consent to

Operate

31.07.2018 APC

It was decided to grant consent to operate for

Captive Power Plant having capacity 4.5 MW, by

imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards compliance consent conditions.

2

STAR CIRCLIPS AND ENGINEERING

LIMITED, K-44 -44/1 FIVE STAR MIDC

AREA BUTIBORI)

Approved

Consent to

Operate

31.01.2021 APC

It was decided to grant consent to operate for

installation of electric Heater, by imposing following

conditions:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards compliance consent conditions.

3

MANGALORE MINERALS PVT. LTD.,

(GAT NO 48 (PART), A/p JADAWVADI,

BEHIND TALEGAON

MIDC, TAL- MAVAL)

Approved

Consent to

1st Operate

31.07.2018 APC

It was decided to grant 1st consent to operate in

principally for Reclaim silica sand Qty-8000 MT/M &

Resin Coated sand Qty-2000 MT/M., by imposing

following conditions:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards compliance consent conditions.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 8

Page 9: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

4

Kalika Steel Alloys Pvt Ltd., Plot No. C-

7, 8 & C-9, Add. MIDC, Jalna Approved

Renewal of

Consent to

Operate

31.05.2019 APC

It was decided to grant renewal of consent to

operate for manufacturing MS Ingots & Billets 800

MT/Day and TMT Retrolled Bars 800 MT/Day.,by

imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards compliance consent conditions and O

& M of pollution control systems.

5

SUDITI INDUSTRIES LTD., C-253/254

MIDC, TTC INDUSTRIAL AREA, PAWNE

VILLAGE, TURBHE,

NAVI MUMBAI

Not Approved

Consent to

Operate for

Amendment

_____ WPC

It was decided to issue SCN for refusal of consent

to operate for Amendment, on following non

compliances:

(i) Industry has not to installed SCADA system, as

unit generate effluent quantity more than 100 CMD,

the instructions of same had given as per decision

of CEPI review meeting.

(ii) Industry have not switch fuel for boiler from coal

to PNG,

(iii) Industry has not submitted Bank guarantees as

per previous consent

(iv) Industry has not submitted CA certificate

showing investment for multiple unit in the board

prescribed format.

(v) Not submitted document reg. change in name

“Suditi enterprises to Suditi Industry Ltd”

6

ITC Ltd (Food Division), Plot No. D-1,

MIDC Ranjangaon, Tal:- Shirur, Dist:-

Pune 412220

Approved

1st Consent to

Operate and

amalgamation

with existing

Renewal of

Consent to

Operate

28.02.2019 WPC

It was decided to grant 1st Consent to Operate and

amalgamation with existing Renewal of Consent to

Operate, by imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards compliance of consent conditions and

O & M of pollution control systems.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 9

Page 10: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

7

Hotel Atmantan Lodging and Boarding

122/1, NORTH MAIN ROAD, KOREGAON

PARK, PUNE

Approved

Renewal of

Consent to

Operate for

Expansion

31.05.2022 WPC

It was decided to grant renewal of consent to

operate with expansion for hotel activity for

additional 36 Nos. of Room, by imposing following

conditions:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards compliance of consent conditions and

O & M of pollution control systems.

(ii) PP shall install online monitoring system within 4

months.

Consent shall be issued after obtaining requisite

consent fee.

8

Anuraj Sugars Ltd., Yawat At-Post Yawat

, Tal. Daund , Dist. Pune

Approved

Renewal of

Consent to

Operate

31.07.2018 WPC

It was decided to grant renewal of consent to

operate for sugar manufacturing unit, by imposing

following conditions:

(i) Industry shall submit Bank Guarantee of Rs. 5

lakh towards compliance of consent conditions and

O & M of pollution control systems.

(ii) PP shall install online monitoring system within 4

months.

(iii) Industry shall not to use 32 TPH Boiler until

provision of Wet Scrubber as APC.

Consent shall be issued after obtaining requisite

consent fee.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 10

Page 11: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

9

The Janta Co-Op. Dairy Society. Ltd.,

CTSNo1838,1840,1883,1885,1886,1968–

1971,2039–2044,2100–2103,2157,2158,2

221,2222,2294,2295,SNo133(2a)

CTS No. 1838, 1840, 1883, 1885, 1886,

1968 – 1971, 2039 – 2044, 2100 – 2103,

2157, 2158, 2221, 2222,

Bhayander Approved

Consent to

1st Operate

(Part)

31.05.2018 RO(HQ)

It was decided to grant consent to 1st operate

(Part), for residential project on total plot area of for

residential project on total plot area of 21,496 sq.

mtrs. & total BUA construction of 78,913.10 sq.

mtrs. out of 90,507.85 sq. mtrs., subject to

verification report from SRO about online monitoring

system, by imposing following conditions:

(i) PP shall submit Bank Guarantee of Rs. 10 lakh

towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be granted after: (1) Submission of

Certificate from Architect regarding BUA completed

for which they have applied for 1st Consent to

Operate. (2) After installation of online monitoring

system for the parameters Flow, BOD, and TSS at

STP outlet and verification of the same from

SRO/RO.

10

Om Sai Construction, Sai Mannat Plot

No. 1, 1A, 1-B/1, 1-B/2, 1-B/3, 1-B/6,

Sector 34A, Kharghar, Navi Mumbai

Approved

Consent to

1st Operate

(Part)

31.05.2018 RO(HQ)

It was decided to grant consent to 1st operate

(Part), for residential project on total plot area of for

residential project on total plot area of 3,759.55 sq.

mtrs. & total BUA construction of 48,539.45 sq.

mtrs. out of 51,112.044 sq. mtrs. (As per EC dtd.

14.03.2014), subject to verification report from SRO

about installation of STP, OWC and online

monitoring system, by imposing following

conditions:

(i) PP shall submit Bank Guarantee of Rs. 20 lakh

towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be granted after: (1) Submission of

Certificate from Architect regarding BUA completed

for which they have applied for 1st Consent to

Operate. (2) After installation of online monitoring

system for the parameters Flow, BOD, and TSS at

STP outlet and verification of the same from

SRO/RO.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 11

Page 12: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

11

NAMCO INDUSTRIES PVT. LTD.,

(HORALE, PO WAOSHI) 140,144 AT

HORALE, WAWOSHI VILLAGE

KHALAPUR

Approved

Consent to 1st

operate

(Expansion) with

Amalgamation

with existing

Renewal of

consent to

operate

30.09.2022 APC

It was decided to grant consent to 1st operate for

expansion with amalgamation with existing Renewal

of consent to operate, by imposing following

conditions:

(i) Industry shall submit Bank Guarantee of Rs, 5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after obtaining requisite

consent fee.

12

Sylvanus Properties Ltd., Plot no 44/1,

45/5, 45/7, 45/8 to 42 at Village Savroli

and 25/10 at

Dahivali Taluka Khalapur District Raigad

Not Approved

Consent to 1st

Operate

(Part)

_____ RO(HQ)

It was decided to issue SCN for refusal of consent

to 1st operate (part), on following non-compliance:

(i) PP has not amended consent to establish for

total BUA-1,35,315 sq.m as per EC.

(ii) PP has not provided OWC and also not

submitted architect certificate.

13

Shagun Relaty, Plot No. 204, Sector-23

,Ulwe Panvel

Approved

Consent to

1st Operate

31.05.2018 RO(HQ)

It was decided to grant consent to 1st operate, for

residential project on total plot area of for residential

project on total plot area of 6,898.90 sq. mtrs. &

total BUA construction of 29,499.211 sq. mtrs. (As

per EC dtd. 05.09.2014), subject to verification

report from SRO about installation of OWC and

online monitoring system, by imposing following

conditions:

(i) PP shall submit Bank Guarantee of Rs. 20 lakh

towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be granted after: (1) Submission of

Certificate from Architect regarding BUA completed

for which they have applied for 1st Consent to

Operate. (2) After installation of online monitoring

system for the parameters Flow, BOD, and TSS at

STP outlet and verification of the same from

SRO/RO.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 12

Page 13: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

14

Shree Saptashree Builders &

Developers Pvt. Ltd, Near ACC Colony,

Opp. Dnyansadhana Vidya

Mandir, Mental Hospital, Road, Thane (W)

Approved

Consent to

1st Operate

31.05.2018 RO(HQ)

It was decided to grant consent to 1st operate, for

residential project on total plot area of for residential

project on total plot area of 13,890.64 sq. mtrs. &

total BUA construction of 36,360.56 sq. mtrs. (As

per EC dtd. 05.09.2014), subject to verification

report from SRO about installation of online

monitoring system, by imposing following

conditions:

(i) PP shall submit Bank Guarantee of Rs. 10 lakh

towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be granted after: (1) Submission of

Certificate from Architect regarding BUA completed

for which they have applied for 1st Consent to

Operate. (2) After installation of online monitoring

system for the parameters Flow, BOD, and TSS at

STP outlet and verification of the same from

SRO/RO.

15

Geomatrix Developers LLP, Plot No.

29,Sector 25 ,Kamothe, Panvel, Dist

Raigad Kamothe Panvel

Approved

Consent to

1st Operate31.05.2018 RO(HQ)

It was decided to grant consent to 1st operate, for

residential project on total plot area of for residential

project on total plot area of 14,599.650 sq. mtrs. &

total BUA construction of 49,828.24sq. mtrs. (As

per C to E), subject to verification report from SRO

about installation of STP, OWC and online

monitoring system, by imposing following

conditions:

(i) PP shall submit Bank Guarantee of Rs. 20 lakh

towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be granted after: (1) Submission of

Certificate from Architect regarding BUA completed

for which they have applied for 1st Consent to

Operate. (2) After installation of online monitoring

system for the parameters Flow, BOD, and TSS at

STP outlet and verification of the same from

SRO/RO.

PP shall submit the application for C to E& C to O

for remaining BUA as per amended EC.

Renewal

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 13

Page 14: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

1

Super Auto India Ltd., Gat No - 308,

Nanekarwadi, Chakan, Taluka - Khed,

Pune - 410501, Maharashtra

Not Approved

Renewal of

Consent to

Operate

_____ APC

It was decided to issue final refusal of renewal of

consent to operate on following non-compliances:

(i) Industry has increased the C.I. by Rs.11.82 Crs

without obtaining consent to establish from the

Board.

(ii) Industry is not operating ETP regularly and

discharging untreated effluent outside factory.

(iii) Industry has not provided scrubber to the

chrome plating section.

(iv) Industry has stored H.W. in open space and not

sending it to CHWTSDF.

(v) Industry has not reply to SCN issued on

27.3.2017.

2

Balkrishna Synthetics Limited, Plot No.

H-3/1, MIDC A ROAD, Tarapur Palghar

Approved

Renewal of

Consent to

Operate

31.01.2022 WPC

It was decided to grant renewal of consent to

operate with Nil effluent and subject to verification

of online monitoring system, by imposing following

conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after obtaining requisite

consent fee.

3

Transrail Lighting Limited, B 1/1 MIDC,

Deoli, Dist - Wardha

Approved

Renewal of

Consent to

Operate

31.05.2018 APC

It was decided to grant renewal of consent to

operate, by imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

(ii) Industry shall install ARP within 6 months period

and submit Bank Guarantee of Rs. 5 lakh towards

compliance of same.

Consent shall be issued after obtaining requisite

consent fee.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 14

Page 15: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

4

Kirloskar oil Engines Ltd., A11/1, MIDC,

Ambad, Nashik

Approved

Renewal of

Consent to

Operate

28.02.2021 APC

It was decided to grant renewal of consent to

operate, by imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after obtaining requisite

consent fee.

5

WEBER HYDRAULIC INDIA PVT. LTD.,

PLOT NO. 3, GAT NO. 822 TO 833, 834

(P), 836 (P), 848,

849 (P), VILLAGE - SHIRWAL, TALUKA -

KHANDALA, DIST - SATARA 412801

Not Approved

Renewal of

Consent to

Operate

_____ APC

It was decided to issue final refusal of renewal of

consent to operate on following non-compliances:

(i) Industry has not submitted BG as per previous

consent condition.

(ii) Industry is not in operation since Aug-2016.

(iii) Industry has not reply to SCN issued on

25.05.2017.

6

WESTERN COALFIELDS LIMITED,

A SUBSIDARY OF COAL INDIA (A

GOVT. OF INDIA

UNDERTAKING) (O/o of the Sub Area

Manager,Silewara UG mine,Silewara Sub

Area,WCLNagpur

Area)

Approved

Plain Renewal of

Consent to

Operate

31.03.2019 APC

It was decided to grant plain renewal of consent to

operate for Under Ground Mine, by imposing

following conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after obtaining requisite

consent fee.

7

Gimatex Industries Pvt. Ltd.,

7 km. milestone, NH-7, Vill. Wani,

Hingaghat, Dist. Wardha

Approved

Plain Renewal of

Consent to

Operate

31.07.2018 WPC

It was decided to grant plain renewal of consent to

operate forYarn-1325 MT/M,Grey cloth-320 MT/M &

Soft waste-164 MT/M, by imposing following

conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after obtaining requisite

consent fee.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 15

Page 16: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

8

Polyplastic Industries (India) Pvt.Ltd., B-

30/2,MIDC, Industrial

Area,Ranjangaon,Tal-Shirur,

Dist.- PuneApproved

Renewal of

Consent to

Operate

(with increase in

CI)

31.07.2018 APC

It was decided to grant renewal of consent to

operate with increase in CI from 42.15 to 60.05

Crores and without increase in production quantity,

by imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after obtaining requisite

consent fee.

9

Shree Bhimeshwari Ispat Pvt Ltd.,

J 17 Additional MIDC Satara

Approved

Renewal of

Consent to

Operate

30.06.2018 APC

It was decided to grant renewal of consent to

operate without increase in production quantity, by

imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after obtaining requisite

consent fee.

10

SUPER CRAFT FOUNDRY,

UNIT 02 plot no D76 Miraj MIDC Miraj.

Dist Sangli Not Approved

Renewal of

Consent to

Operate

_____ APC

It was decided to issue SCN for refusal of renewal

of consent to operate on following non-

compliances:

(i) Industry has CI of Rs. 13.27 Crs. and now unit

has applied forrenewal mentioning CI as Rs. 25.77

Crs. i.e. unit has increased CI by Rs. 12.50 Crs.

11

The Automotive Research Association

of India (ARAI) Survey No. 102, Vetal Hill,

Off Paud Road,

Kothrud, Pune

Not Approved

Renewal of

Consent to

Operate

_____ APC

It was noted that already SCN was issued to the

said industry on 25.05.2017 and they have replied

to it on 12.06.2017 & 15.06.2017.

As CI of the industry is Rs. 423.8462 Crs. It was

decided to refer case to CAC Desk.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 16

Page 17: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

12

KSPG Automotive India Pvt. Ltd., Plot

No.A-1, Additional Supa Parner Industrial

Park, Village-Waghunde Budruk,

Taluka:Parner, Dist:Ahmednagar. Not Approved

Renewal of

Consent to

Operate

_____ APC

It was decided to revoke the consent for the unit

located at Plot No. A-3, as industry has shifted their

activities from Plot No. A-3 to A-1.

Industry shall take soil sample for the plot no. A-3

and submit results to Board.

Bank Guarantee of Rs. 5 lakh to be returned after

compliance of conditions regarding hazardous

waste disposed of at MEPL, Pune and results of

soil sample.

13

Cummins Generator Technologies India

Private Limited, C-33, MIDC,

AhmednagarApproved

Renewal of

Consent to

Operate

30.06.2018 APC

It was decided to grant renewal of consent to

operate without increase in production quantity, by

imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after obtaining requisite

consent fee.

14

Siyaram Silk Mills Limited, Plot No. G-

1/1, MIDC, Tarapur-Boisar, Tal. & Dist.

PalgharApproved

Renewal of

Consent to

Operate

(Amendment for

change in

quantity of

polyester yarn

dyeing and cotton

yarn dyeing)

31.05.2021 WPC

It was decided to grant renewal of consent to

operate amendment for change in quantity of

polyester yarn dyeing and cotton yarn dyeing

without increase in production quantity and without

change in effluent quantity, by imposing following

conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after obtaining requisite

consent fee.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 17

Page 18: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

15

SUPREME AUTOSHELL INDIA PVT.

LTD., Plot No.21 & 30,MIDC, Satpur,

Nashik

Approved

Renewal of

Consent to

Operate

30.09.2018 APC

It was decided to grant renewal of consent to

operate for additional activity of electroplating and

production with increase in CI in principally, subject

to installation of APCS to electroplating section, by

imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after obtaining requisite

consent fee.

16

HINDUSTAN PETROLEUM

CORPORATION LTD., CHANDRAPUR

LPG PLANT, PLOT NO. B-32

& 33, GHUGHUS MIDC ROAD,

CHANDRAPUR

Approved

Renewal of

Consent to

Operate

31.12.2018 AS(T)

It was decided to grant renewal of consent to

operate with increase in CI., by imposing following

conditions:

(i) Forfeit Bank Guarantee of Rs. 1 lakh towards

installation of paint booth without C to E from

Board.

(ii) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

(iii) PP shall submit Board Resolution from plant

head, towards installation of paint booth without

obtaining consent to establish from the MPC Board

thus violated the provisions of Environmental Laws

and in future, they will not do such violations and

BG of Rs. 2 lakh towards submission of Board

resolution by 31.08.2017.

Consent shall be issued after obtaining requisite

consent fee.

17

Deepak Nitrite Ltd., PLOT NO. K-9 & K-

10,MIDC TALOJA,DISTRICT-RAIGAD

Approved

Renewal of

Consent to

Operate

28.02.2018 AS(T)

It was decided to grant renewal of consent to

operate without increase in production quantity, by

imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after obtaining requisite

consent fee.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 18

Page 19: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

18

TG Terminals Private Limited, Village

Veshvi, Post Dighode, Tal. Uran, Dist.

RaigadApproved

Renewal of

Consent to

Operate

(with change of

name)

31.03.2022 RO(HQ)

It was decided to grant renewal of consent to

operate for CFS activity with change of name from

M/s. Forbes & Company Ltd to M/s TG Terminals

Pvt. Ltd., by imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after obtaining requisite

consent fee.

19

Anand Teknow Aids Engineering India

Ltd., Plot no A-18, 5 star MIDC Loni

Deokar Village

Pune- Solapur Road Tal- Indapur Dist-

Pune-413312Not Approved

Renewal of

Consent to

Operate

_____ APC

It was decided to issue SCN for refusal of renewal

of consent to operate, on following non-

compliances:

(i) Industry has increased in capital investment from

Rs. 8.10 Crs. To 39.61 Crs. (total increase in C.I.

31.51 Crs) without obtaining permission from Board.

(ii) Industry has failed to reply to the SRO vide letter

dated 29.03.2017 asked industry to submit

clarification on this increase in C.I.

20

Bajaj Electricals Ltd., Plot No. B-7, MIDC

Ranjangaon, Village Dhoksangvi, Tal:-

Shirur, Dist:-Pune 412209Approved

Renewal of

Consent to

Operate

31.03.2022 APC

It was decided to grant renewal of consent to

operate without increase in production quantity, by

imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after obtaining requisite

consent fee.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 19

Page 20: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

21

Kider India Pvt. Ltd., Gat No. 584/2,

Koregaon Bhima, Tal:- Shirur, Dist:- Pune

412216 Shirur

Approved

Renewal of

Consent to

Operate

(with increase in

CI)

28.02.2020 APC

It was decided to grant renewal of consent to

operate with increase in C.I., by imposing following

conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

(ii) PP shall submit Board Resolution from plant

head, towards starting constructed of new shed

without obtaining consent to establish from the

MPC Board thus violated the provisions of

Environmental Laws and in future, they will not do

such violations and BG of Rs. 2 lakh towards

submission of Board resolution by 31.08.2017.

Consent shall be issued after obtaining requisite

consent fee.

22

SASTI UG MINE, WCL BALLARPUR

AREA Sasti UG Mine, Ballarpur Area,

WCL, PO: Sasti

Approved

Renewal of

Consent to

Operate

31.03.2020 APC

It was decided to grant plain renewal of consent to

operate for Under Ground Mine, by imposing

following conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

(ii) SRO to do monthly sampling.

Consent shall be issued after obtaining requisite

consent fee.

23

Ghonsa Opencast Mine Office of the Sub

Area Manager, Ghonsa-Kumbharkhani,

Po.- Rasa, Tal.-

Wani, Distt. - Yavatmal, Maharashtra

Not Approved

Renewal of

Consent to

Operate

______ APC

It was decided to defer the case and put up in next

CC after obtaining EC copy and SCN status.

24

BHARAT PETROLEUM CORPORATION

LIMITED, BORKHEDI DEPOT Village

Borkhedi (C.Rly),

off NH-07Approved

Renewal of

Consent to

Operate

31.05.2022 AS(T)

It was decided to grant renewal of consent to

operate, by imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after obtaining requisite

consent fee.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 20

Page 21: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

25

SRI AMBIKA SOLVEX LIMITED,

VILLAGE - VANI RAMBHAPUR,

AMARAVATI ROAD, AKOLA

Approved

Renewal of

Consent to

Operate

31.05.2018 WPC

It was decided to grant renewal of consent to

operate in principally, subject to submission of

CGWA NOC and Bank Guarantee, by imposing

following conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

(ii) Industry shall take prior permission from

Regional Officer, Amaravati before restarting of

production.

Consent shall be issued after obtaining requisite

consent fee.

26

DTL Ancillaries Ltd, Gat No.373,

Kharabwadi, Near WMDC Industrial Area,

Kharabwadi, Chakan, Tq. Khed, Approved

Renewal of

Consent to

Operate

31.03.2022 APC

It was decided to grant renewal of consent to

operate, by imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after obtaining requisite

consent fee.

27

WESTERN COALFIELDS LIMITED

Durgapur Rayatwari Colliery Ballarshah

Road, Chandrapur Area

Not Approved

Renewal of

Consent to

Operate

_____ APC

It was decided to issue final refusal of renewal of

consent to operate and closure direction, on

following non-compliances:

(i) PP has not replied to SCN issued on 07.06.2017

as non-compliance reported by SRO, Chandrapur.

28

The Indian Card Clothing Co Ltd., Next

to Hindustan Antibiotics Ltd., Mumbai

Pune Highway,Pimpri

Approved

Renewal of

Consent to

Operate

30.04.2019 APC

It was decided to grant renewal of consent to

operate, by imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

(ii) Industry shall upgrade ETP and STP within 6

months period and submit Bank Guarantee of Rs.

10 lakh towards compliance of same.

Consent shall be issued after obtaining requisite

consent fee.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 21

Page 22: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

29

Beekalene Fabrics Pvt Ltd., Plot No.C-

1/1, MIDC, TTC Indl Area, Village -

Pawane, Thane Belapur Road

Not Approved

Renewal of

Consent to

Operate

_____ WPC

It was decided to issue SCN for refusal of renewal

of consent and stop work, on following non-

compliances:

(i) Industry has not submitted Board

resolution as they have increased CI by 22.21 Cr

without prior permission from MPC Board.

(ii) JVS analysis report dated 16.12.2015 parameter

BOD & COD are not achieving consented

standards.

(iii) industry has not submitted Bank Guarantee as

per previous consent conditions.

30

Ultra Engineers (Unit IV) Sector No 10,

Plot No 58 ,PCNTDA, Bhosari, Pune.Not Approved

Renewal of

Consent to

Operate

_____ APC

It was decided to issue SCN for refusal of renewal

of consent and stop work, on following non-

compliances:

(i) Industry has increase in capital investment. from

Rs. 39.95 Crs to Rs. 42.37 Crs. And also increase

production quantity without permission from the

Board.

31

METALYST FORGINGS LTD., Gat No.

251, Chakan - Talegaon Road,

Kharabwadi, Chakan

Not Approved

Renewal of

Consent to

Operate

_____ APC

It was decided to issue SCN for refusal of renewal

of consent and stop work, on following non-

compliances:

(i) industry has not provided adequate APC system.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 22

Page 23: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

32

INDIAN OIL CORPORATION LIMITED

(LPG BOTTLING PLANT) AT-POST:

BHOSE,, Chakan

Shikrapur Road, SH-55

Approved

1st Consent to

Operate and

amalgamation

with existing

Renewal of

Consent to

Operate

30.09.2020 AS(T)

It was decided to grant 1st consent to operate &

amalgamation with existing consent, by imposing

following conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after obtaining requisite

consent fee.

33

PHOENIX MECANO INDIA PVT. LTD.,

GAT NO. 388,389 PIRANGUT

INDUSTRIAL ESTATE, BHARE MULSHINot Approved

Renewal of

Consent to

Operate

_____ APC

It was decided to issue SCN for refusal of renewal

of consent to operate, on following non-

compliances:

(i) Industry increased from Rs. 29.92 Crs to Rs.

51.97 Crs without obtaining permission from the

Board.

34

Govind Milk & Milk Products Pvt.Ltd.

(Ganeshsheri,Pandharpur Road,Kolki)

93/1,93/2,94/1,95 Ganeshsheri, Kolki

PhaltanApproved

Renewal of

Consent to

Operate

30.04.2019 WPC

It was decided to grant renewal of consent to

operate, by imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after obtaining requisite

consent fee.

35

Allana Cold Storage Ltd., D-38,MIDC

Industrial Area,TTC,Thane Belapur

Road,Turbhe,Navi

MumbaiApproved

Renewal of

Consent to

Operate

31.05.2021 WPC

It was decided to grant renewal of consent to

operate, by imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after obtaining requisite

consent fee.

36

REAL DAIRY INDUSTRIES PVT LTD., F

22 KATPHAL ROAD MIDC BARAMATI

BARAMATI Approved

Renewal of

Consent to

Operate

30.05.2020 WPC

It was decided to grant renewal of consent to

operate, by imposing following conditions:

(i) Industry shall submit Bank Guarantee of Rs.5

lakh towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after obtaining requisite

consent fee.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 23

Page 24: MAHARASHTRA POLLUTION CONTROL BOARD164.100.154.113/consentappraisal/pdf/Web_Minutes_of_4th_CC_meeting...Bajajsons Limited (Plot No. 31,MIDC Area ,Satpur ,Nashik.) Plot No.-31 MIDC,

37

Asmeeta Infratech Limited, Plot no. 1

Addl. Kalyan Bhiwandi Indistrial Area

Bhiwandi

Approved

Consent to

Establish

(Revalidation)

Commissioning of

the unit or 5 yrs

whichever is earlier

RO(HQ)

It was decided to grant consent to establish

revalidation for construction for Textile Park project

on total plot area of 2,42,814 sq. mtrs. & total

construction BUA of 2,18,532.60 sq. mtrs., by

imposing following conditions:

(i) PP shall not carry out further remaining work

after expiry of EC i.e. 27/09/2018 and submit Bank

Guarantee of Rs. 20 lakhs towards compliance of

same and consent conditions.

(ii) PP shall submit an affidavit in Board’s

prescribed format within 15 days regarding the

compliance of conditions of EC and C to E.

(iii) PP shall install online monitoring system for

BOD, TSS and flow at the outlet of STP.

The meeting concluded with a vote of thanks to the Chair.

Note: As decision taken in CAC meeting held on 03.11.2015, regarding granting consent for maximum validity i.e. 5 years for Red category, Orange - 6

years Hence all above industry consent to renewal shall be granted for 5 years after obtaining requisite consent fee, excluding Sugar industries.

As per the circular issued by the Board vide no.MPCB/AS(T)/TB/B-5087 dated 03.12.2015.

1] All consent shall be issued by prescribing condition of new hazardous waste rule dated 04.04.2016 for compliance of Hazardous Waste and other wastes

(Management & Transboundary Movement), Rules 2016.

2] As per new BMW rule PSO to submit the compliance report for all the HCE for STP / ETP.

3] It was decided to issue directions to textile, chemical and other pollution potential industry having effluent quantity of 25 CMD to install online monitoring for

parameter - flow, pH, BOD, COD & SS with camera to asses station and maintain probe in non-performing CEPT area i.e. PRIA, Roha, Taloja Tarapur &

Lote.

Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 24