Maine-New Hampshire Connections Study
Public Informational MeetingSeptember 24, 2009
![Page 2: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/2.jpg)
2
Meeting Overview• Welcome • Update on Stimulus Application/BICA – 10 minutes• Study Schedule Update - 5 minutes• Traffic Forecasts – 10 Minutes• Fatal Flaw Analysis: Discussion - 1 hour• Brainstorm New Alternatives - 20 minutes• Next Steps - 10 minutes
![Page 3: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/3.jpg)
Stimulus Application
• Submitted September 15, 2009• $70 Million for Memorial Rehab, $10 Million
for State Pier• Full application can be found at:
www.mainenhconnections.org/updates
3
![Page 4: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/4.jpg)
4
Study Update/Schedule Review
• September: Traffic analysis and travel demand model forecasts complete for no-build conditions
• September: Fatal Flaw Analysis and process • September: Brainstorm alternatives (solutions)•Oct/Nov: Ongoing Fatal Flaw Review•December: Fatal Flaw Analysis yields list of
feasible alternatives• January: Analysis of feasible alternatives
begins•January/Feb: TIGER Grant results/Possible Study
adjustment
![Page 5: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/5.jpg)
Future Traffic Volumes
How will traffic flow in the future??
5
![Page 6: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/6.jpg)
Future (2035) No-Build Conditions
• Memorial Bridge is closed• Sarah Long remains, but has reduced
weight limits• Albacore Connector is open to all
movements• What we see – Study Area traffic growth at
approximately 24% (about 1% per year)• Most traffic (not all) shifts to Sarah Long
and I-95 High Level bridge66
![Page 7: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/7.jpg)
![Page 8: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/8.jpg)
Fatal Flaw Analysis
8
![Page 9: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/9.jpg)
9
Fatal Flaw Analysis: How it works
• Used to evaluate and screen full range of alternatives (solutions) identified
• Remaining feasible alternatives receive “Higher”level of analysis
• Fatal flaw screening:– Does alternative satisfy purpose, need and goals?– Does alternative have significant impacts?– Is alternative permittable?– Is alternative financially/physically feasible?– Is alternative clearly inferior to other alternatives?
![Page 10: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/10.jpg)
Fatal Flaw Analysis
10
All Alternatives identified by Steering and Stakeholder Committees, Public, Agencies
Fatal Flaw Analysis
Evaluate Feasible Alternatives
![Page 11: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/11.jpg)
Fatal Flaw Draft Matrix• Tool to “funnel” all alternatives (solutions)• Criteria based on Purpose and Need Statement
and regulatory requirements• This analysis less detailed than for feasible
alternatives• At this point do not have detailed information on
such categories as aesthetics and economic impact. These will be applied later to feasible alternatives
• Today’s run-through: Your choice!!
![Page 12: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/12.jpg)
Fatal Flaw Draft Evaluation Matrix
See Handout
![Page 13: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/13.jpg)
13
![Page 14: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/14.jpg)
Brainstorm Session: Full Range of Alternatives
![Page 15: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/15.jpg)
Note – rail is assumed to be maintained under all Sarah Mildred Long bridge rehab or replacement alternatives. If eliminated, alternate rail options will be evaluated.
Draft Alternatives in Scope
![Page 16: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/16.jpg)
Memorial Bridge Alternatives• Ped/Bike/Cars only• Rehab: “as is” but historic• Rehab with bike lane• Replacement with lift bridge – not historic• Replacement with increased clearance• Replacement with new alignment• Replacement with draw bridge• Replacement with fixed span• Replacement with mid-level moveable 16
![Page 17: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/17.jpg)
Sarah Long Bridge Alternatives• Rehab: “as is” but historic• Rehab with bike lane• Replacement with lift bridge – not historic• Replacement with increased clearance• Replacement with new alignment• Replacement with draw bridge• Replacement with fixed span• Replacement with mid-level moveable• Replacement with vessel improvements• Replace or rehab with rail only
17
![Page 18: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/18.jpg)
Other Alternatives
• Vehicle tunnel• Rail tunnel• No bridges at all• Ferry (s)• Mono rail• Single high level bridge• Add trolley to Memorial Bridge• Light passenger rail
18
![Page 19: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/19.jpg)
Summary of Stakeholder Input
Memorial Bridge Alternatives1. Rehab on existing alignment/same clearances2. Replace on existing alignment/same clearances3. Replace on existing alignment/mid-level bridge4. Replace on existing alignment/high-level bridge5. Close the bridge to all traffic
19
![Page 20: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/20.jpg)
20
![Page 21: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/21.jpg)
Summary of Stakeholder Input
Sarah Long Bridge Alternatives1. Rehab on existing alignment/same clearances2. Replace on existing alignment/same clearances3. Replace on existing alignment/mid-level bridge4. Replace on existing alignment/high-level bridge5. Close the bridge to all traffic
21
![Page 22: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/22.jpg)
22
![Page 23: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/23.jpg)
Summary of Stakeholder Input
New Alternatives1. Close both PM and SML bridges and replace with single,
high level bridge on a new alignment with rail2. Close both PM and SML bridges and replace with tunnel
on a new alignment with rail3. Close both PM and SML bridges and provide ferry service.
Maintain rail bridge
4. Combination of PM and SML Alternatives 1 through 55. Combination of PM and SML Alternatives 1 through 56. Etc.
23
![Page 24: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/24.jpg)
24
![Page 25: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/25.jpg)
Additional Alternatives
• YOUR INPUT!!
![Page 26: Maine-New Hampshire Connections Study](https://reader031.vdocuments.net/reader031/viewer/2022022306/6215787ccfb92a2d9c0feef4/html5/thumbnails/26.jpg)
26
Upcoming Meetings
– October/November: Steering/Stakeholder Committee Meeting(s) to check in on Fatal Flaw Analysis