8/11/2019 Maintenance and Operation of HIPPS
1/20
Monitoring the Reliability PerformanceHigh Integrity Pressure Protection Sys
Baris Arslan
Senior Safety ConsultantOilconx Risk Solutions (ORS)
!!!"#$%&'#"(#) ,-"+-".-+.
-
8/11/2019 Maintenance and Operation of HIPPS
2/20
This presentation is about
How to maintain HIPPS?
How to demonstrate the reliability of HIPPS in operation?
Human Reliability & HIPPS Maintenance
!!!"#$%&'#"(#)
-
8/11/2019 Maintenance and Operation of HIPPS
3/20
The beginning of wisdom is to call things with their
right names
HIPPS protects downstream equipment against
overpressure coming from upstream.
Instrument based systems for secondary
protectionor HIPPS?
Why is HIPPS so special?
!!!"#$%&'#"(#)
HIPPS or not
-
8/11/2019 Maintenance and Operation of HIPPS
4/20
-
8/11/2019 Maintenance and Operation of HIPPS
5/20
!!!"#$%&'#"(#)
84%9&:4%1; 1(>0$1&:4%1; />4';4$;&:4
/=4$1; (#)?#'1'>%
@';1?1';1'> (#)?#'1'>%@';1?1';1'> A (#):3'1;
%B%>1)
8#?%3;1% CDE
FG?#$> ?3?1H3'1%
/0:%14I1;0(1 ;1)4'; $4>1 #' $1H31J
FH3)3'4>1 4 ?4$>3(0H4$ %(1'4$3# J$#)
;1%35' :4%3%
K>=1$%"""
-
8/11/2019 Maintenance and Operation of HIPPS
6/20
Procedures for analyzing maintenance
performancefor: Systematic faults & recurring faults
Assessing demand rates (if higher than design
basis or not)
Diagnosis / repair / revalidation
Ensuring that functional safety is maintained
during operation and maintenance Availability of skills and resources for
maintenance
!!!"#$%&'#"(#)
Chronological documentation
maintenance Results of tests
Documentation of the time
Documentation of modificat
High safety integrity systems
severe consequencesnot s
maintenance procedures
IEC:61508 2010ensuring functiona
during operational phase
-
8/11/2019 Maintenance and Operation of HIPPS
7/20
OLF 070 gives detailed guidance about
SIS (indirectly HIPPS) maintenancefocusing on: SIS Maintenance Scope
Use of vendor documents
Functional testing requirements
Integral / partial tests
Maintenance reporting Compensating measures upon overrides
and failures
Reporting of demands / anomalies
P-001contains Requirements about testing frequency
Valve leakage testing frequency
System regularity aspect
Reference is made to IEC standards
API 521, Annex E.5 gives som
about HIPPS testing. Highligh Considering site resources w
testing frequency
Potential for introducing faul
shutdowns due to human er
API 17OSubsea HIPPS The proof test intervals are t
in the maintenance procedu
Experience data to include f
based on the number of perf
SIF together with how many
in a failure
!!!"#$%&'#"(#)
OLF/NORSOK views on HIPPS maint
-
8/11/2019 Maintenance and Operation of HIPPS
8/20
PM Procedure for each HIPPS
Linked to design basis documents (such as SRS)
Maintained database for information such as demands, failures etc.
Well-designed infrastructure to accomodate information flow (maintenance reports
damage codes, automatic notifications etc.)
Well established procedures to analyse failure data
Verification and validation activities (see assurance on next slide)
Competent (and available) personnel to make decisions in due time
!!!"#$%&'#"(#)
Key requirements for HIPPS mainte
appear to be
-
8/11/2019 Maintenance and Operation of HIPPS
9/20
S4>4 T4H3;4>3#'LU #$ M#$$1(>3V1
U43'>1'4'(1
System responsible is notified
Origin of data is controlled (document traceable)
Equipment type (manufacturer, year etc. checked)
Operating conditions are verified
Failure code and long text is checked (i.e. in compliance
with corporate guideline/EN 14224)
Offshore personnel is consulted for data validation
K'%=#$1 T1$3J3(4>3#'
Test period
Acceptance criteri
Pass/fail statemen
Revisions on desig
Competence requi
Verification of fun
component basis
LU L$#(1;0$1
FIL /B%>1)S4>4:4%1
/>451 + />451 .
Two Stage Offshore Failure Data Val
for HIPPS
-
8/11/2019 Maintenance and Operation of HIPPS
10/20
!" $%&'( )*+ ,*%(
S1%35' W4%3%
S1V1H#? $1H34:3H3>B )#;1H67-0%'3&0.8%9 :;.(0.34 *3 8&-.,&0.*3?
S1J3'1 4((1?>4'(1 ($3>1$34 6@&0&(2%%0(ABC7AD*'>*'&0%AE%'F*'#$1 #?1$4>3#'
6@%4'&,%, ($(0%
-
8/11/2019 Maintenance and Operation of HIPPS
11/20
90% confidence interval hasbeen applied for OREDA
based studies
70% confidence interval forIEC-based appraoch
Only useful lifetime has beenincluded due to
Offshore site-acceptance test Onshore factory acceptance
test
Assumption: Sub-componentsare replaced before the wear-out period (e.g. lifetimereplacements)
Useful lifetime and confidence inte
-
8/11/2019 Maintenance and Operation of HIPPS
12/20
Field data is vital for the credibility of
Periodic Reliability Monitoring
Standardized data format is necessary toadress failure cause and failureconsequence
Data needs to be collected for all HIPPScomponents, e.g. input devices, controlunits and final elements
Why is it difficult to collect data? It requires:
Resources (positive & negativereporting)
Competence and motivation
Sophisticated ERP systems
!!!"#$%&'#"(#)
IFF(2*'% 0%123.1.&3J%3,*'(
C%-.&
G='8%$*'(A7=02*'.0.%(
Data collection is the key
-
8/11/2019 Maintenance and Operation of HIPPS
13/20
!!!"#$%&'#"(#)
Q0'(>3#'4H M=1(9 L$#(1;0$1 3% J#HH#!1;
@' (4%1 #J J43H0$1X '#>3J3(4>3#' 3% ($14>1;
3' >=1 (#)?4'B FIL :B >1(='3(34'%
Y'3Z01 J43H0$1 (#;1% 4$1 0%1;
3#'4H ;4)451 >1G> 3% 3'(H0;1;
K?1$4>3#'4H )#;1 3% 4;[0%>1; 4% ?1$
/I/ 4'; LU ?$#(1;0$1
;#!'
S15$4;1; K?1$4>3#'
3#'
K'%=#$1 3'V1%>354>3#'% %>4$>
:1
81(='3(34'% )0%
$1(#5'3]1 4HH J43H0 @'>1$J4(3'5 %B%>1
J43H0$1% )0%> :1
\@LL/ 8$43'3'5 ?
>1(='3(34'% )0%>
L$4(>3(4H
Y%1 #J L$
U43'>1'4
!3>= /I/
Y%1 #J J4%B%>1)%
L#>1'>34H
In case of HIPPS failures (offshore
training package
-
8/11/2019 Maintenance and Operation of HIPPS
14/20
Different strategies based on HIPPS
classification (see Slide 4) For 1st generation HIPPS, focus on dangerous
undetected failures and
For 3rd generation HIPPS, classification of both
safe and dangeorus failures
Failure database is updated based on failure
classifications
!!!"#$%&'#"(#)
Code Input F!"# %
&'( %
)*( % %
)*+ % %
)#' %
,-. %
,-, %
/"' %
/+) % %
"0* %
*'' %
(*+ % %
1)# % %
1(' % %
1-& %
Q43H0$1 (#;1% J#$ \@LL/
Classification of failure codes for dif
generations HIPPS
-
8/11/2019 Maintenance and Operation of HIPPS
15/20
PERIODIC CHECKS
Keep it simple
Use existing reliability model (if any) for aparticular HIPPS
(clear benefits if the model is not softwaredependent, e.g. excel based or similar)
Apply simple but recognized methods toevaluate the effect of failure inter-arrival times,distributions, sampling etc.
Determine a final failure rate to update themodel
Is the HIPPS performance acceptable?
Where is the acceptance criteria?
ACCEPTANCE CRITERIA
Again, different acceptance criteriaclassifications (Slide 4)
Some examples:
Fully risk-based approach
Risk-based approach with minim
requirements API-based judgments (equal to concept)
Remember: Two-stage assuto verify acceptance criteria
!!!"#$%&'#"(#)
Periodic Verifications
http://www.haikumind.com/wp-content/uploads/2011/02/keep-it-simple-stupid-kiss.png -
8/11/2019 Maintenance and Operation of HIPPS
16/20
Classical human error producing conditions apply widely to full-automatic HIPPS operation
and maintenance
Based on our experience, typically observed human errors on HIPPS relate to red markeditems in the North Sea:
Poor feedback (reporting)
Physical capabilities exceeded
No independent check after testing
Unclear allocation of function and responsibility
An incentive to use more dangerous methods
A poor or hostile working environment Task pacing caused by intervention of others
Operator inexperienced
Little or no independent checking or testing of output
High level emonotional stress
Disruption of normal work sleep cycles
Unfamilarity with the situation which occurs (infrequent or new situation)
A need to unlearn a technique and apply one which requires application of another philosophy
HIPPSHuman Error Producing Con
-
8/11/2019 Maintenance and Operation of HIPPS
17/20
Human reliability is a huge concern for
HIPPS operation and maintenance
Numerous incidents have been observedat different companies where HIPPSvalves and/or transmitters have beendisabled
Generally speaking, limited focus on
quantification of human reliability formaintenance of HIPPS in the oil and gasbusiness
Limited failure reporting regarding humanfailures during maintenance
Human reliability must be c
an integral part of overall HIPPS
!!!"#$%&'#"(#)
\0)4'
I1H34:3H3>B
\4$;!4$1
I1H34:3H3>B
KV1$4HH \@LL/ $1
Human reliability & HIPPS mainten
-
8/11/2019 Maintenance and Operation of HIPPS
18/20
-
8/11/2019 Maintenance and Operation of HIPPS
19/20
Failure of HIPPS may lead to major accidents with catastrophic consequences
Maintenance & Operationlongest lifecyclewe need reliable HIPPS all the way thru
A customized approach is needed for different types of HIPPS, Operating Company and
HIPPS maintenanceif done as advised by IECis a complex job requiring strict collabinteraction at all levels. It requires highly competent, motivated people and enhanced datools
Collection and analysis of data are very important. Credibility of simply everything is dont collect correct field data from offshore oil platforms
Human failures remain as a big concern. Human reliability must be adressed as a part oreliaibility
No quick-fix for HIPPS maintenance
!!!"#$%&'#"(#)
Conclusion
-
8/11/2019 Maintenance and Operation of HIPPS
20/20
Baris Arslan
Senior Safety Consultant
+46 735391827
!!!"#$%&'#"(#)
For more information, please contact
mailto:[email protected]:[email protected]:[email protected]:[email protected]