Page 1: MAINTENANCE - · PDF fileA Challenging Landscape- Brazil at glance - Wind industry service and operational risks Vestas Maintenance 9/6/2017 2 • Turbine availability during optimum

Vestas Service Value Proposition

MAINTENANCE

Your Power – Our Commitment

9/6/2017 Brazil Wind Power 2017

Page 2: MAINTENANCE - · PDF fileA Challenging Landscape- Brazil at glance - Wind industry service and operational risks Vestas Maintenance 9/6/2017 2 • Turbine availability during optimum

A Challenging Landscape- Brazil at glance- Wind industry service and operational risks

Vestas Maintenance

9/6/2017

2

• Turbine availability during optimum conditions

• Budgeting for unplanned maintenance events

• Spare parts access & availability and supply chain reliability

• Shortages in skilled workforce

• Safety and environmentally friendly footprint

• Asset management expertise

• Managing unpredictability

Vestas Service

signifies

peace of mind for maximum ROI & Safety

Challenges

Page 3: MAINTENANCE - · PDF fileA Challenging Landscape- Brazil at glance - Wind industry service and operational risks Vestas Maintenance 9/6/2017 2 • Turbine availability during optimum

Vestas Services™ - Fleetwide Lifetime Service Partner for Brazil

9/6/2017

Vestas Maintenance3

- Value Proposition

Delivering a high level of safety performance.

We strive to be transparent and to have a close collaboration with

you in order to optimise your business .

Your assets could be any technology or brand additional to

Vestas.

Delivering high-quality service solutions in order to lower the

Levelised Cost of Energy for your preferred O&M strategy.

Offering you optimised performance by growing our knowledge

and insight from servicing the world largest operating wind base.

Continuously improving our offerings thanks to the largest R&D

organisation in the industry.

Comprehensive service offerings

for the full lifetime of our customers assets

Page 4: MAINTENANCE - · PDF fileA Challenging Landscape- Brazil at glance - Wind industry service and operational risks Vestas Maintenance 9/6/2017 2 • Turbine availability during optimum

7,81611,394

14,57920,312

25,80432,901

41,609

51,100

57,000

73,970

0

10.000

20.000

30.000

40.000

50.000

60.000

70.000

80.000

VestasGE WindEnerconMingyang GamesaUnited

Power

Suzlon SiemensGoldwind

Accumulated installed MW, year-end 2015

Vestas is the world’s largest service provider - In fact, Vestas does not only have the largest installed base but also the largest service

fleet

Source: MAKE Report, Onshore only, * 18.04.2016

+30,000

Wind Turbines

monitored

~ 7,000 Dedicated

Service Staff

+85 GW installed in

75 Countries

Vestas Maintenance

9/6/2017

4

As of Today*:

Vestas Fleet

under

service

Page 5: MAINTENANCE - · PDF fileA Challenging Landscape- Brazil at glance - Wind industry service and operational risks Vestas Maintenance 9/6/2017 2 • Turbine availability during optimum

Pure.Performance- A partnership with Vestas provides predictability in a flexible business model

Vestas Maintenance

9/6/2017

5

The Right O&M

Planning

• Predictive maintenance planning based

on weather forecasts and performance

analysis

• Focused on preventive and predictive

maintenance to secure highest possible

availability for customers

The Right People

• Industry leader in safety & certified

training

• Experts in O&M and engineering

• LEAN problem solving techniques

• High HSE standards and performance

The Right

Intelligence

• +30 years of global data collection

• Local diagnostics data centres

• Global performance monitoring network

• Data stream from +30,000 turbines

The Right

Infrastructure

• Global delivery, logistics & sourcing

network

• 24/7 surveillance centre & hotline

• The right parts, in the right time, at the

right place

Page 6: MAINTENANCE - · PDF fileA Challenging Landscape- Brazil at glance - Wind industry service and operational risks Vestas Maintenance 9/6/2017 2 • Turbine availability during optimum

Safety Values At Vestas- Background & Development

Background

• Safety is deeply anchored in Vestas’ DNA, it is an

integrated part of the business, something that is lived

since we believe that all hazards can be managed

• In 2005 Vestas commenced multiple wide-ranging safety

initiatives and detailed injury tracking systems to assure

proactive safety

Safety journey

• Lost time injuries (LTI) have been reduced at an average

rate of 28% every year from 2005 to 2016

• Today Vestas reports 1,5 lost time injuries per one million

working hours (2015)

• The new measure of Total Recordable Injuries (TRI) has

been introduced in 2011, covering a broader range of

injuries

34

26

21

15

85

3,2 2,8 2,1 1,6 1,5

11 10 911

9

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Injuries per 1.000.000 working hours

Lost time injuries

Total Recordable injuries

Vestas Maintenance

*Vestas own staff only, no contractor fatalities included

9/6/2017

6

Page 7: MAINTENANCE - · PDF fileA Challenging Landscape- Brazil at glance - Wind industry service and operational risks Vestas Maintenance 9/6/2017 2 • Turbine availability during optimum

Technical & Safety Training Set Up

DenmarkVestas Instructors: 12

Scope:

Installation

Service

Troubleshooting

Vestas Safety

GermanyVestas Instructors: 10

Scope:

Installation

Service

Troubleshooting

Vestas Safety

ChinaVestas Instructors: 3

Scope:

Installation

Service

Troubleshooting

Vestas Safety

SpainVestas Instructors: 8

Scope:

Installation

Service

Troubleshooting

Vestas Safety

IndiaVestas Instructors: 3

Scope:

Installation

Service

Troubleshooting

Vestas Safety

BrazilFacility & Vestas

Instructors : 3

Scope:

Installation

Service

Troubleshooting

Vestas Safety

USAVestas Instructors: 16

Scope:

Installation

Service

Troubleshooting

Vestas Safety

AustraliaVestas Instructors: 1

Scope:

Installation

Service

Troubleshooting

Vestas Safety

South AfricaVestas Instructors: 1

Scope:

Installation

Service

Vestas Safety

MexicoFacility/Equip only

Scope:

Installation

Service

Vestas Safety

FranceVestas Instructors: 1

Scope:

Service

Vestas Safety

MED Training Centres

NCSA Training Centres

APC Training Centres

New in 2017/2018

Vestas Maintenance

9/6/2017

7

Page 8: MAINTENANCE - · PDF fileA Challenging Landscape- Brazil at glance - Wind industry service and operational risks Vestas Maintenance 9/6/2017 2 • Turbine availability during optimum

Pure.Performance- A partnership with Vestas provides predictability in a flexible business model

Vestas Maintenance

9/6/2017

8

The Right O&M

Planning

• Predictive maintenance planning based

on weather forecasts and performance

analysis

• Focused on preventive and predictive

maintenance to secure highest possible

availability for customers

The Right People

• Industry leader in safety & certified

training

• Experts in O&M and engineering

• LEAN problem solving techniques

• High HSE standards and performance

The Right

Intelligence

• +30 years of global data collection

• Local diagnostics data centres

• Global performance monitoring network

• Data stream from +30,000 turbines

The Right

Infrastructure

• Global delivery, logistics & sourcing

network

• 24/7 surveillance centre & hotline

• The right parts, in the right time, at the

right place

Page 9: MAINTENANCE - · PDF fileA Challenging Landscape- Brazil at glance - Wind industry service and operational risks Vestas Maintenance 9/6/2017 2 • Turbine availability during optimum

Vestas Turbine Watch provides +15

years expertise in of 24/7/365

SURVEILLANCE ensuring timely

response

Identify performance deviation in the

fleet based on statistical analysis and

predictive models to

INITIATE OPERATIONS

ACTIVITIES at the

right time

Planning of maintenance based

on Vestas Forecasting™ to help

MAXIMISING PRODUCTION

Findings are used to improve

maintenance strategy to provide

RELIABLE PERFORMANCE AND

OUTPUT MANAGEMENT

MONITORIDENTIFY

&

INITIATE

PLAN &

REPAIR

LEARN &

IMPROVE

The Right OPERATIONS AND MAINTENANCE plan- Prevention through prediction

VGA

Vestas Maintenance

9/6/2017

9

VTM

Page 10: MAINTENANCE - · PDF fileA Challenging Landscape- Brazil at glance - Wind industry service and operational risks Vestas Maintenance 9/6/2017 2 • Turbine availability during optimum

Pure.Performance- A partnership with Vestas provides predictability in a flexible business model

Vestas Maintenance

9/6/2017

10

The Right O&M

Planning

• Predictive maintenance planning based

on weather forecasts and performance

analysis

• Focused on preventive and predictive

maintenance to secure highest possible

availability for customers

The Right People

• Industry leader in safety & certified

training

• Experts in O&M and engineering

• LEAN problem solving techniques

• High HSE standards and performance

The Right

Intelligence

• +30 years of global data collection

• Local diagnostics data centres

• Global performance monitoring network

• Data stream from +30,000 turbines

The Right

Infrastructure

• Global delivery, logistics & sourcing

network

• 24/7 surveillance centre & hotline

• The right parts, in the right time, at the

right place

Page 11: MAINTENANCE - · PDF fileA Challenging Landscape- Brazil at glance - Wind industry service and operational risks Vestas Maintenance 9/6/2017 2 • Turbine availability during optimum

9/6/2017

Vestas Maintenance11

Vestas Warehouse footprint (2015)25 warehouses placed geographically to secure quality & on time delivery

Area warehouses

Central warehouses

Global warehouse

Legacy warehouse

Page 12: MAINTENANCE - · PDF fileA Challenging Landscape- Brazil at glance - Wind industry service and operational risks Vestas Maintenance 9/6/2017 2 • Turbine availability during optimum

Repair Solutions

9/6/2017

Vestas Maintenance12

-Cost efficient repair solutions and complete replacements

BladeCare ™

Repair solutions:

• Cracks, erosion and surface

repairs

• Lightning damage repair

• Blade cleaning services

• Blade tip refurbishment

exchange

• Gel coating/painting

Uptower and onsite repairs:

• High-speed shaft bearing

change (rotor and generator

side)

• High-speed shaft change

• Intermediate shaft bearing

change (rotor and generator

side)

• Intermediate shaft change

Uptower and onsite repairs:

• Bearing exchanges

• Rebalancing

• Rotor cable replacement

GeneratorCare™ includes

the uptower repair solution

for Leroy Somer generators

for 3 MW turbines.

GearboxCare™GeneratorCare ™

Vestas offers you 568 different repair solutions and has 7 internal repair workshops and repair partners

located strategically across the world.

Supporting your O&M strategy we have introduced our main component Care Concepts:

Page 13: MAINTENANCE - · PDF fileA Challenging Landscape- Brazil at glance - Wind industry service and operational risks Vestas Maintenance 9/6/2017 2 • Turbine availability during optimum

Pure.Performance- A partnership with Vestas provides predictability in a flexible business model

Vestas Maintenance

9/6/2017

13

The Right O&M

Planning

• Predictive maintenance planning based

on weather forecasts and performance

analysis

• Focused on preventive and predictive

maintenance to secure highest possible

availability for customers

The Right People

• Industry leader in safety & certified

training

• Experts in O&M and engineering

• LEAN problem solving techniques

• High HSE standards and performance

The Right

Intelligence

• +30 years of global data collection

• Local diagnostics data centres

• Global performance monitoring network

• Data stream from +30,000 turbines

• After Sales product development

The Right

Infrastructure

• Global delivery, logistics & sourcing

network

• 24/7 surveillance centre & hotline

• The right parts, in the right time, at the

right place

Page 14: MAINTENANCE - · PDF fileA Challenging Landscape- Brazil at glance - Wind industry service and operational risks Vestas Maintenance 9/6/2017 2 • Turbine availability during optimum

the RIGHT PEOPLEthe RIGHT PEOPLE

The Right Intelligence- Vestas’ market leading intelligence systems constitute the core of WTG optimization

GLOBAL DATA –

LOCAL ANALYSISDATA KEY INSIGHTSSIMPLICITY & CENTRICITY

Deployment of a global,

agile and cross-

functional analytical

platform

Unified overview and

seamless user

experience

90 % of customer needs

secured by 10 data

points

24/7 service availability

Data available in many

forms and shapes

Data insights based on

+15 years experience

and learning

Benchmarking against

the world (VTM)

Enables global analytical

governance and

improvement of

diagnostics capabilities

Vestas Maintenance

9/6/2017

14

7 Vestas Performance

and Diagnostics Centres

with global reach

Locally responsive

diagnostics data centres

throughout the world

Vestas operates the

largest worldwide wind

turbine data system

• Data from +33,000

turbines

• 65 TB of information

PRODUCT DEVELOPMENT

All this knowledge and

information enable

Vestas to develop new

products for the After

Sales market

Products meant to

increase production,

availability or lifetime of

customers assets

+5% AEP

Page 15: MAINTENANCE - · PDF fileA Challenging Landscape- Brazil at glance - Wind industry service and operational risks Vestas Maintenance 9/6/2017 2 • Turbine availability during optimum

• Vestas has developed different strategies to calculate how

much can the components of the turbine be operating

through load models and on-site inspections

• Despite unclear regulation in place, Vestas is willing to be

your long-term Service Provider.

• Life Plus services

• Loads Analysis based on historic data

• Physical inspection of the turbine

• Remaining lifetime calculation

• Monitoring and Inspection programs

• Operation and Maintenance

Turbine Plus and Life Plus- Availability and Lifetime increase

Turbine Plus Life Plus

Vestas Maintenance

9/6/2017

15

0

10.000

20.000

30.000

40.000

50.000

60.000

2016 2017 2018 2019 2020Nu

mb

er

of

turb

ines (

>500kW

)

Turbines aged 15+ years1

Vestas GE Enercon

Siemens Gamesa Other

1 Source: MAKE Consulting (April,2016); only showing turbines with a nominal output of 500kW or higher

• Vestas has more than 40 products that are meant to

increase the availability of the turbines:

• Automatic Lubrication Systems

• Bat Mitigation System

• Climate Package - High Voltage Transformer room

• Controller Upgrade to VMP Global

• Leading Edge Protection of wind turbine blade

• Lightning Protection: Copper Cap and Copper

Strips

• Obstacle Collition Avoidance System (OCAS)

• Optional Fire Trace: Fire Suppression System

• Vestas Shadow Detection System

• …

Page 16: MAINTENANCE - · PDF fileA Challenging Landscape- Brazil at glance - Wind industry service and operational risks Vestas Maintenance 9/6/2017 2 • Turbine availability during optimum

Power Plus- Improvement of Vestas’ customers AEP

• Constantly improve our turbines is key to ensure to our customer that we tailor made the optimization of their assets.

• We deliver 2-3 new products per year to increase our After Sales portfolio

• In Brazil we have analyzed 13 wind farms and they are able to increase 1,5%-3,5% AEP with different PowerPlus products

Vestas Maintenance

9/6/2017

16

20142012 2013 2017

Power Uprate

for

V82-1.65MW

Power Uprate

for

V90-1.8MW

Vortex Generators

and Gurney Flaps

for V90-1.8/2.0MW

and

V100-1.8/2.0MW

Extended Cut

Out for

V90-3.0MW

Vortex

Generators

for

V82-1.65MWPower Uprate

for

3MW platform

Extended Cut

Out for

V80-1.8/2.0MWPowerPlus™

launch

Power Uprate

and Extended

Cut Out for

V100-1.8/2.0MW

Power

Performance

Optimisation

launch

2015 2016

Vortex

Generators

for

multibrand

turbines

Power

Performance

Optimisation

2.0 launch

Controller

Upgrade for

V90-3.0MW

Page 17: MAINTENANCE - · PDF fileA Challenging Landscape- Brazil at glance - Wind industry service and operational risks Vestas Maintenance 9/6/2017 2 • Turbine availability during optimum

Power Plus- Track record

Vestas Maintenance

9/6/2017

17

AME

3500 WTGs in

total

APC

640 WTGs in

total

NEU

1080 WTGs in

totalCEU

530 WTGs in

total

MED

1100 WTGs in

total

Page 18: MAINTENANCE - · PDF fileA Challenging Landscape- Brazil at glance - Wind industry service and operational risks Vestas Maintenance 9/6/2017 2 • Turbine availability during optimum

Active Output ManagementPerformance concepts tailored for you

Sales presentation – Active Output Management ®Vestas Maintenance

9/6/2017

18

Your assets need long term partnership

with solid, reliable and transparent partners

that can have close collaboration with you

in order to optimise your business.

Page 19: MAINTENANCE - · PDF fileA Challenging Landscape- Brazil at glance - Wind industry service and operational risks Vestas Maintenance 9/6/2017 2 • Turbine availability during optimum

Copyright Notice

The documents are created by Vestas Wind Systems A/S and contain copyrighted material, trademarks, and other proprietary information. All rights reserved. No part of the documents may be reproduced or copied in any form or by any

means - such as graphic, electronic, or mechanical, including photocopying, taping, or information storage and retrieval systems without the prior written permission of Vestas Wind Systems A/S. The use of these documents by you, or

anyone else authorized by you, is prohibited unless specifically permitted by Vestas Wind Systems A/S. You may not alter or remove any trademark, copyright or other notice from the documents. The documents are provided “as is” and

Vestas Wind Systems A/S shall not have any responsibility or liability whatsoever for the results of use of the documents by you.

Thank you for your attention.

9/6/2017

Vestas Maintenance19