Major construction projects –
current and upcoming
March 19, 2018
![Page 2: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/2.jpg)
Project Management unit
![Page 3: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/3.jpg)
McTavish Gate
Project 15-058
![Page 4: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/4.jpg)
Existing conditions
▪ Gate deterioration
▪ Water drainage issues
▪ Redpath Hall stairs
deterioration
▪ Underground water
mains need to be
upgraded.
![Page 5: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/5.jpg)
Project description
▪Restoration of the gate itself.
▪Resurfacing of the roadway/sidewalk.
▪Addition of bike racks, hydraulic bollards.
▪ Improve lighting.
▪ Improve connection with University Centre ‘terrace’.
▪Waterproof Redpath Hall foundation (north side only).
▪Redpath Hall stairs reconstruction.
▪Replacement of 2 water mains and addition of a meter
chamber.
![Page 6: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/6.jpg)
Proposed design
By EKM
![Page 7: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/7.jpg)
Leacock Amphitheatre
Project 15-056
![Page 8: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/8.jpg)
Existing conditions
➢Leacock Building (1965) façades and foundation
show varying degrees of damages and
deterioration.
➢Concrete structure west and south of Leacock has
deteriorated over time due to water infiltration and
insufficient drainage capacity.
![Page 9: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/9.jpg)
Project description
Phase I – Leacock Building:
▪Repairs to façades and exterior glass walls (“curtain walls”)
▪ Improvements to vestibules to make them universally accessible
▪Waterproofing of the foundation
Phase II - Areas south and west of Leacock Building:
▪Will be demolished, rebuilt and redesigned
▪Will be transformed into a multi-purpose exterior amphitheatre.
![Page 10: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/10.jpg)
Proposed design
![Page 11: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/11.jpg)
Proposed design
![Page 12: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/12.jpg)
Schedule
PROJECT PHASE START DATE END DATE
Phase I (Leacock Building) March 2018 Oct. 2018
Phase II (Amphitheatre) April 2019 Sept. 2019
![Page 13: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/13.jpg)
McIntyre/LSC garageRepair damaged structure
Project 11-099
![Page 14: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/14.jpg)
Project description
▪ Repair or rebuild deteriorated sections
of concrete slabs
▪ Replace existing HVAC systems
▪ Replace existing drainage systems
▪ Code upgrades
![Page 15: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/15.jpg)
Project description (cont’d)
▪ Exterior: envelope repairs to south portion of parking
![Page 16: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/16.jpg)
Schedule
PROJECT PHASE START DATE END DATE
Construction June 2018 Aug. 2020
Substantial Completion /
CommissioningAug. 2020 Oct. 2020
Occupancy / Delivery Oct. 2020
![Page 17: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/17.jpg)
University CentreReplacement of HVAC system & electrical distribution
Project 12-231
![Page 18: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/18.jpg)
Existing conditions
➢ Ventilation system and
perimeter heating systems
are obsolete (1965);
replacement parts are no
longer available.
➢ Electrical distribution
system also needs to be
replaced.
![Page 19: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/19.jpg)
Project description
▪ Replace entire existing HVAC system.
▪ Build new mechanical room for kitchen HVAC system in basement of the
building.
▪ Replace the building’s electrical distribution systems.
▪ Addition of a new washroom given high building occupancy.
▪ Bring building up to the most recent building codes with respect to the
electromechanical systems.
![Page 20: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/20.jpg)
Schedule
PROJECT PHASE START DATE END DATE
Construction April 2018 Winter 2019
Occupants relocation March/April 2018 Progressive return
Full occupancy Jan. 2019
![Page 21: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/21.jpg)
Bensadoun School of Retail Management
Project 17-141
![Page 22: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/22.jpg)
Project description
▪ Phase 1: Renovation of the east façade and part of the south façade of
the Bronfman Building for the Bensadoun School of Retail Management
(part of the Desautels Faculty of Management).
▪ Phase 2: Renovation of a section of the main and second floors of the
Bronfman Building for the Bensadoun School of Retail Management.
![Page 23: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/23.jpg)
Project description
Main floor 2nd floor
Sherbrooke façade McTavish façade
![Page 24: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/24.jpg)
Proposed design
![Page 25: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/25.jpg)
Schedule
PROJECT PHASE DATE
Phase I Summer 2018
Phase II Fall 2018
![Page 26: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/26.jpg)
Stewart-Biology BuildingWest wing redevelopment
Project 14-125
![Page 27: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/27.jpg)
Project update
▪ Work completed:
• Lot 0: users moved out in September 2017
• Lot 1: selective demolition and partial asbestos decontamination
in January 2018
▪ Work to come:
• Lot 2: complete demolition and asbestos decontamination
by July 2018
• Lot 3: tender process by May and June 2018 for fit-out
▪ Tentative end date:
• by Winter 2020 (Lot 3/fit-out - substantial completion)
![Page 28: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/28.jpg)
Proposed design (south-east façade)
![Page 29: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/29.jpg)
Proposed design (lab, W2 level)
![Page 30: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/30.jpg)
Macdonald-Harrington BuildingEnvelope renovation
Project 11-041
![Page 31: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/31.jpg)
Project update
▪ Work completed
• Excavation, installation of drainage system, soil decontamination and
backfilling
• Foundation: Repairs and waterproofing
• Masonry: South façade and south chimney
• Windows: All wooden windows removed, restoration in progress.
• Roof: Annex roof completed
▪ Work to come (& tentative end dates):
• Masonry: North, east, and west façades masonry repair (by Oct. 2018)
• Windows: Wooden windows restoration and installation, aluminum windows replacement (by Jan. 2019)
• Roof: Main roof (by Oct. 2018)
▪ Tentative project completion date: March 2019
![Page 32: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/32.jpg)
Macdonald EngineeringMasonry restoration
Project 13-064
![Page 33: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/33.jpg)
Project update
▪ Work completed:
• North and south sections of Macdonald wing: reconstruction of masonry
walls to be completed by end of April 2018
▪ Work to come:
• Central section of the Macdonald wing: masonry restoration and rain
water management interventions
• Electrical wing: masonry restoration and roof replacement.
▪ Tentative end date:
• Full project completion by spring of 2019.
![Page 34: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/34.jpg)
Roddick GatesRestoration and redesign
Project 15-057
![Page 35: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/35.jpg)
Project update
▪ Work completed:
• Rehabilitation of monument – incl. foundation, two center columns and
stonework
• Improvement of drainage system
• Renovation of half-moon by the city
• Installation of paving stones and landscaping on east side
▪ Work to come:
• Complete the replacement of underground electrical cables and conduit
infrastructure.
• Installation of granite benches, hydraulic and fixed bollards, new lighting and
interactive wayfinding tactile screen.
• Landscaping and furniture installation on the west side
▪ Tentative completion date: May 2018
![Page 36: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/36.jpg)
Other projects
▪ Replacement of HVAC systems
(to be completed between March and December 2018)
• Lyman Duff
• Rutherford
• Burnside
• Ferrier
• Education
• Macdonald-Stewart Library
![Page 37: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/37.jpg)
Other projects (cont’d)
▪ Other current projects (funded by SIF program):
• Wong: upgrades to the high-temperature metals laboratory
(“foundry”) – August 2018
• Rutherford: upgrades to the Nanotools Microfabrication
Laboratory – August 2018
• Construction of new emergency power facility (to house two
generators) – November 2018
![Page 38: Major construction projects current and upcoming€¦ · Other projects (cont’d) Other current projects (funded by SIF program): •Wong: upgrades to the high-temperature metals](https://reader034.vdocuments.net/reader034/viewer/2022042314/5f02e1e77e708231d4067adf/html5/thumbnails/38.jpg)
Other projects (cont’d)
https://www.mcgill.ca/construction/