Page 1: Major Hazard Facilities Introduction to Safety Report

Major Hazard Facilities

Introduction to Safety Report

Page 2: Major Hazard Facilities Introduction to Safety Report

2

Some Abbreviations and Terms

• AFAP - As far as practicable• BPCS – Basic process control system • Employer - Employer who has management control of the

facility• FTA – Fault tree analysis• HAZOP – Hazard and operability study• HSR - Health and safety representative • LOPA – Layer of protection analysis• MHF - Major hazard facility – as defined in the regulations• MA - Major accident• OHS -Occupational health & safety• QRA – Quantitative Risk Assessment• SMS - Safety management system

Page 3: Major Hazard Facilities Introduction to Safety Report

3

Topics Covered in This Presentation

• Introduction• Key principles and objectives of the MHF regulations• Why is a Safety Report needed?• What is the Safety Report?• What must the Safety Report do?• Main components of the Safety Report• Hazard identification• Safety assessment• Risk controls• Emergency response plans

Page 4: Major Hazard Facilities Introduction to Safety Report

4

• Demonstration (of adequacy)• What else is in the safety report?• MHF regulations versus process• Sources of additional information• Review and revise• Conclusion• Examples of major accidents

Topics Covered in This Presentation

Page 5: Major Hazard Facilities Introduction to Safety Report

5

Introduction

• This seminar is a basic introduction to the Safety Report that is required under the MHF Regulations.

• It has been developed for the following purposes:– To provide a simple overview– To be suitable for new MHF Employers– Outline the reason for a safety report– Overview of all parts of a safety report– Show examples of major accidents

Page 6: Major Hazard Facilities Introduction to Safety Report

6

Key Principles of MHF Regulations

• Focus on major hazards (catastrophic events i.e. typically high consequence and low frequency)

• Requires a proactive risk based approach• Places the responsibility on the Employer• Employer has to actively demonstrate safe operation

Page 7: Major Hazard Facilities Introduction to Safety Report

7

Key Principles of MHF Regulations

• Consultation with different parties required at all critical stages

• Facilitate culture change at major hazard facilities • Regulator ‘peer review’, tied to a licence• Addresses both on-site and off-site safety

Page 8: Major Hazard Facilities Introduction to Safety Report

8

Increasing risk

Consequence Severity

Rela

tive F

req

uen

cy o

f Occu

rren

ce

Minorrisks

Very high risksshould alreadybe eliminated

after risk assessment

OHS risks already

regulated

Focus of MHF Regulations

Focus of MHF Regulations is

high consequence (catastrophic)

but low frequency incidents

Page 9: Major Hazard Facilities Introduction to Safety Report

9

Objective of the MHF Regulations

• The objective of the MHF Regulations is to provide for the safe operation of major hazard facilities to:

– Reduce the likelihood of an MA occurring– Reduce the consequences to health and safety and damage to

property in the event of an MA occurring

Page 10: Major Hazard Facilities Introduction to Safety Report

10

MHF Regulations

Specific parts of the MHF Regulations relevant for this seminar are:

• Hazard identification (9.43)• Risk assessment (9.44)• Risk control measures (9.45)• Safety management system (9.46)• Emergency planning (9.53) • Provision of information to the community (9.50)

Page 11: Major Hazard Facilities Introduction to Safety Report

11

Why is a Safety Report Needed?

There is a need for specific control of major hazards due to:

• Changing scale and complexity of specific facilities• Advances/changes in technology - unforeseen hazards• Changing community perceptions• Range of major accidents that have occurred• Prescriptive approach has proven inappropriate

Page 12: Major Hazard Facilities Introduction to Safety Report

12

Why is a Safety Report Needed?

Some major accidents that have occurred

• Coode Island, Australia – storage terminal fire, August 1991, 0 dead, 0 injured

• Longford, Australia – explosion and fire, September 1998, 2 dead, led to the development of Victorian MHF legislation

• Entschede, Holland – fireworks factory explosion, May 2000, 21 dead, 1,000 injured

• Texas City, USA – fire and explosion, March 2005, 15 dead, over 170 injured

Page 13: Major Hazard Facilities Introduction to Safety Report

13

Why is a Safety Report Needed?

Port Kembla Ethanol Tank Fire, NSW, Australia, 28th January 2004

Quote from the Coroner…“not a lack of adequate safety procedures but rather the failure to adhere to them”.(Welding was carried out in an unsuitable area without a ‘hot work’ permit)

Page 14: Major Hazard Facilities Introduction to Safety Report

14

This has led to Regulations where:

• The Employer knows what technical and human activities occur

• The Employer decides on the appropriate means of major hazard control for the facility, and prepares a Safety Report explaining this

• The Regulator assesses and audits performance adequacy against the safety report

Why is a Safety Report Needed?

Page 15: Major Hazard Facilities Introduction to Safety Report

15

Why is a Safety Report Needed?

• The introduction of regulations were ‘fast tracked’ in Victoria primarily as a result of the Royal Commission into the incident at Longford in 1998.

• The Victorian MHF regime is now mature and is working well.

Page 16: Major Hazard Facilities Introduction to Safety Report

16

What is the Safety Report?

• The safety report must address all hazardous events that could result in MAs that pose serious danger or harm to:

– Persons– The community– Property– The environment

Page 17: Major Hazard Facilities Introduction to Safety Report

17

What is the Safety Report?

• A safety report is a detailed document that outlines: – The identification and control mechanisms in place to prevent

and mitigate all MAs for the facility– The types of safety studies undertaken – The results obtained for such studies– The management arrangements in place

to ensure the continued safety of the facility and its people and the surrounding community.

• The safety report must be prepared in consultation with employees and be a true reflection of the state of the safety arrangements for the facility.

Page 18: Major Hazard Facilities Introduction to Safety Report

18

What is the Safety Report?

The Role of the Safety Report

• Regulatory role: The primary document used by an approved assessor to verify that the facility is operated safely to support the Employer’s licence application.

• Information Repository: Contains all information about the safe operation of the facility which contributes to continuous improvement of safety at the facility.

Page 19: Major Hazard Facilities Introduction to Safety Report

19

What Must the Safety Report Do?

• Document the state of safety arrangements for the facility

• Demonstrate to the satisfaction of the Commission, through content and supporting material, that:

– The employer knows what technical and human activities occur – How activities are managed– How safety will be managed in the event of an emergency

Page 20: Major Hazard Facilities Introduction to Safety Report

20

Review

Improve

Monitor

Safer Facility

Identify methods to be used for monitoring and reviewing all activities for continual improvement of the safety arrangements of the facility over its lifetime.

What Must the Safety Report Do?

Page 21: Major Hazard Facilities Introduction to Safety Report

21

The Safety Report Should…

• Reflect the facility safety culture• Contain information about the facility and interaction with its

surroundings• Describe the systems used to achieve safety• Identify, assess and show controls for potential major

accidents• Demonstrate ongoing consultation between the employer and

workforce• Be integrated into the Employers management systems rather

than a collection of separate individual safety studies

Page 22: Major Hazard Facilities Introduction to Safety Report

22

Safety Report Timeline

Refer Guidance Booklet 4 for this timeline

Time Scale Time taken for Activity

Activity

0 0 Regulations in force

3 months 3 months Employer notifies the Commission of MHF or potential MHF

9 months 6 months The Commission notifies employer of classification

15 months 6 months Employer submits a safety report outline

24 months 9 months Employer completes safety report, contracts an approved assessor

30 months 6 months Approved assessor completes the safety report assessment and employer applies to the Commission for an MHF licence

36 months 6 months The Commission issues the employer with a licence and conditions for licence up to 5 years

Page 23: Major Hazard Facilities Introduction to Safety Report

23

Main Components of a Safety Report

The main components of the safety report are:

• Facility description• Risk assessment

- Hazard and MA identification- Risk control measures

• Safety management system description• Emergency response plan• Demonstration of adequacy

– Control measures– Safety Management System

Page 24: Major Hazard Facilities Introduction to Safety Report

24

Facility Description

• History • Daily operations • Schedule 9 materials and their characteristics• Demographic description• Facility topography & meteorological data• Simplified process flow diagrams• Site layout drawings• Location plans, surrounding facilities and sensitive neighbours• Proposed changes

Page 25: Major Hazard Facilities Introduction to Safety Report

25

Risk Assessment Requirements

• Hazard identification – for determining MAs• Risk assessment studies – for determining controls• Risk evaluation - for determining risk acceptability• Recommendations and review – for continuous improvement

Page 26: Major Hazard Facilities Introduction to Safety Report

26

Hazard and MA Identification

Hazards that can lead to major accidents are identified. From these, MA scenarios can be developed for further analysis.

Past Risk Assessments

Process Hazard Studies

(HAZOP/What If)

Unit Technical

Review Input(Specialist

Review)

Major Accident

EventGrouping

Incident History

(internal / external)

Dangerous Goods

Present and Material

Properties

Page 27: Major Hazard Facilities Introduction to Safety Report

27

Risk Assessment

The information for assessment can be presented as a bow-tie diagram

Hazards Controls

Preventative Controls

Controls

Mitigative Controls

MA

Cau

ses

Out

com

es

Consequences

Page 28: Major Hazard Facilities Introduction to Safety Report

28

Example: Layer of Protection Analysis

Analysing the safety measures and controls that are between an uncontrolled event and the worst potential consequence - risk reduction study

PROCESSDESIGN

BPCS

CRITICAL ALARMS ANDOPERATING PROCEDURES

AUTOMATIC SIS

PHYSICAL PROTECTION &MITIGATION SYSTEMS

PLANT EMERGENCY RESPONSE

COMMUNITY EMERGENCY RESPONSE

Risk Assessment

Page 29: Major Hazard Facilities Introduction to Safety Report

29

Risk Assessment

Example Risk Matrix

Page 30: Major Hazard Facilities Introduction to Safety Report

30

Description of the Safety Management System

• A comprehensive and integrated management system for all aspects of control measures adopted

• Documented and describes how compliance is to be achieved• Site safety philosophy and how it is reflected in the SMS• Safety policy and safety objectives• Organisation and personnel responsible for the

implementation and compliance with the SMS• Major features/elements of the SMS• SMS performance monitoring processes• Consultative processes used to develop and implement the

SMS

Page 31: Major Hazard Facilities Introduction to Safety Report

31

OH&S Management System Model – AS 4801

Overall vision, goals

and commitment to improve

• Legal compliance• Objectives and targets• Implementation plans

• Resources• Leadership responsibility• Training and competency• Consultation and communication• Documentation• Hazard identification, risk assessment

and controls• Emergency response

• Monitoring and measurement

• Incident investigation• Records management• Audits

Suitable, adequate, effective

Changes needed? Opportunities to

improve?

gg

Safety PolicySafety Policy

PlanningPlanning

Implementation& Operation

ImplementationChecking&CorrectivActio

Measurement& Evaluation

ContinualImprovement

ContinualImprovement

ManagementRevie

ManagementReview

Page 32: Major Hazard Facilities Introduction to Safety Report

32

Emergency Response Plans

• Promote preparation• Ensure necessary equipment is available• Ensure personnel are trained and prepared to respond• Identify communication methods• Identify community resources• Consultation with emergency services, local council &

community

Page 33: Major Hazard Facilities Introduction to Safety Report

33

Emergency Incident Scenario Plans

• Analysis of the consequences of specific MA’s to determine fire fighting access and to identify affected areas

• Determination of firewater and foam requirements for extinguishing the fire and/or protecting affected equipment

• Available as a resource for training

Page 34: Major Hazard Facilities Introduction to Safety Report

34

Demonstration of Adequacy

• The safety report must demonstrate that the Employer is achieving safe operation of the facility by :

– Use of adequate control measures– Satisfactory management systems

Page 35: Major Hazard Facilities Introduction to Safety Report

35

Demonstration of Adequacy of Control Measures

• Controls linked to hazards and proportionate to risk• Depth and breadth of control measures• Performance indicators defined and performance monitored• Risk has been reduced AFAP• Standards, industry practices• Decisions are documented and justifiable• Improvement programs – past and future

More information is available in the Comcare guidance Booklet 3 (control measures).

Page 36: Major Hazard Facilities Introduction to Safety Report

36

Demonstration of Adequacy of SMS

Comprehensive and Integrated

• Performance standards for the control measures are defined• Control measures are monitored and failures are addressed• Adequate education and training is provided for employees• Processes are provided for review and revision of control

measures• Sufficient resources are provided, responsibilities,

accountabilities defined• Planning, implementation and monitoring processes are provided

for control measures and the system as a whole

More information is available in Booklet 3 (SMS)

Page 37: Major Hazard Facilities Introduction to Safety Report

37

Detailed Risk Assessment Records

• Risk analysis of the hazards on site. E.g. LOPA FTA Risk matrix QRA

• Provides a more detailed analysis of causes/frequency/consequences/controls for each identified MA

• Assessment of off-site risk• Comparison of risk reduction options

What Else is in a Safety Report?

Page 38: Major Hazard Facilities Introduction to Safety Report

38

Occupied Buildings Risk Assessment

• Analysis of the impact of MAs on occupied buildings• Mainly risks (due to flame impingement, explosions, toxic

gas) from other buildings/operations

What Else is in a Safety Report?

Page 39: Major Hazard Facilities Introduction to Safety Report

39

Risk Assessment Procedures

• Details of all the hazard and risk assessment work documented in procedures and referenced

• Procedures provide step by step guidance on how the assessments were undertaken – enables corporate memory retention

• Consistency of approach for all assessments• Justification for selection of risk assessment processes• Resources/guidance for the conduct of future assessments

What Else is in a Safety Report?

Page 40: Major Hazard Facilities Introduction to Safety Report

40

Community Consultation

• Community consultation philosophy• Summary of Safety Report information for community• Community bulletins

What Else is in a Safety Report?

Page 41: Major Hazard Facilities Introduction to Safety Report

41

Recommendations and Improvements

• Identification of opportunities to reduce risk via risk assessments

• Recommendations are assessed and prioritised

What Else is in a Safety Report?

Page 42: Major Hazard Facilities Introduction to Safety Report

42

MHF Regulation vs. Suggested Process

Reg No. Regulation Process

9.43 Identify, in consultation with employees, all:

a) Hazards that could cause or contribute to causing a potential Major Accident

b) Potential Major Accidents

Hazard identification workshop using What If / HAZOP, checklists or other suitable methods

9.44 The Employer, in consultation with employees, must ensure that any risks associated with the hazards or potential major accidents are assessed

Risk assessment workshop using structured risk assessment process (for example fault tree analysis or LOPA)

Page 43: Major Hazard Facilities Introduction to Safety Report

43

MHF Regulation vs. Suggested Process

Reg No. Regulation Process

9.45 The Employer, in consultation with employees, must adopt control measures that eliminate or reduce as far as practicable the risk to health and safety. This relates to both the likelihood of the potential Major Accident and the severity of the consequences.

Risk assessment workshop using suitable risk assessment process and risk register.

Page 44: Major Hazard Facilities Introduction to Safety Report

44

Review & Revision

• Employers must review (and revise) the safety report for an MHF to ensure risks remain reduced AFAP:

– Prior to modification– When new information becomes available regarding possible MA

hazards previously unknown– Upon licence renewal conditions or at least every 5 years– At the direction of the Commission– After a major accident

Page 45: Major Hazard Facilities Introduction to Safety Report

45

Conclusion

• The safety report must demonstrate adequacy of all Safety Duties required by the MHF regulations

• Safety Duties are ongoing requirements• An Employer at a MHF who fails to comply with the MHF

regulations may be subject to civil proceedings or criminal prosecution under the OHS Act.

Page 46: Major Hazard Facilities Introduction to Safety Report

46

Sources of Additional Information

• Part 9 of the Occupational Health and Safety (Safety Standards) Regulations 1994

• Major Hazard Facility Guidance Material – Comcare website www.comcare.gov.au

• WorkSafe Victoria www.workcover.vic.gov.au• NSW Major Industry Hazard Advisory Papers 1 to 9• Centre for Chemical Process Safety• UK Health and Safety Executive, www.hse.gov/comah

Page 47: Major Hazard Facilities Introduction to Safety Report

47

Questions?

Page 48: Major Hazard Facilities Introduction to Safety Report

48

Publicly Available Data/Incidents

Several examples of incidents are available. These include:1. Tosco Avon refinery fire incident, Martinez California, 23rd

February 1999 (source: U.S. Chemical Safety and Hazard Investigation Board, Report No. 99-014-1-CA, issue date March 200)

2. Buncefield fire, December 2005 (source: UK HSE)3. Dubai Dry Dock Incident (source: Web site, US Naval Sea

Systems Command)

Page 49: Major Hazard Facilities Introduction to Safety Report

49

Buncefield Incident (UK) – December 2005.

• In the early hours of Sunday 11 December 2005, a number of explosions occurred at Buncefield Oil Storage Depot, Hemel Hempstead, Hertfordshire

• At least one of the initial explosions was of massive proportions and there was a large fire, which engulfed a high proportion of the site

• Over 40 people were injured; fortunately there were no fatalities

Page 50: Major Hazard Facilities Introduction to Safety Report

50

Buncefield Incident

Off-Site Consequences

• “Significant damage” to commercial and residential neighbours

2000 people evacuated• Sections of M1 Motorway closed• Very large smoke plume over Southern England → Air

pollution• Large quantities of foam and water → contaminated water

courses and ground water

Page 51: Major Hazard Facilities Introduction to Safety Report

51

Buncefield Incident

• HSE/EA investigation determined the direct cause (initiating event) as follows:

– “Tank 912 ……. overflowed at around 05.30 hours …….. while being filled at a high rate”

– Large vapour cloud formed and flowed off-site– First explosion at 06.01 hours

• There were multiple root causes (failures) identified• Many related to management system failures• Still some unanswered questions

– Why was there so much explosive force?

Page 52: Major Hazard Facilities Introduction to Safety Report

52

Buncefield Fuel Storage – before incident

Page 53: Major Hazard Facilities Introduction to Safety Report

53

Buncefield – during the incident

Page 54: Major Hazard Facilities Introduction to Safety Report

54

Buncefield – after the incident

Page 55: Major Hazard Facilities Introduction to Safety Report

55

Dubai Dry Dock Incident

• On 27 March, 2002 in Dubai there was a breach and failure in one of the dock gates that caused uncontrolled flooding in the dry dock.

• Several vessels were set on blocks inside the dry dock at the time of the failure. The vessels included the large vessel "Key Burmuda," a cargo barge and the accommodation barge "SEP 350“.

Page 56: Major Hazard Facilities Introduction to Safety Report

56

Dubai Dry Dock Incident

• The dry dock gates failed at 09.30 during a working day.

• The dock is 500 metres long by 100 metres wide and 11 metres deep.

Page 57: Major Hazard Facilities Introduction to Safety Report

57

Dubai Dry Dock Incident

Everything looks normal!!

Page 58: Major Hazard Facilities Introduction to Safety Report

58

Dubai Dry Dock Incident

Moments after the first breach at 09:30 on 27.3.02

Page 59: Major Hazard Facilities Introduction to Safety Report

59

Dubai Dry Dock Incident

Larger vessels coming off the blocks

Page 60: Major Hazard Facilities Introduction to Safety Report

60

Dubai Dry Dock Incident

Cargo barge getting ready to roll. Many trapped inside, a few on deck getting ready to jump

Page 61: Major Hazard Facilities Introduction to Safety Report

61

Dubai Dry Dock Incident

“KEY BERMUDA” coming off blocks. “INDRA-1” swinging towards rig

Page 62: Major Hazard Facilities Introduction to Safety Report

62

Dubai Dry Dock Incident

Accommodation barge “SEP 350” sinking

Page 63: Major Hazard Facilities Introduction to Safety Report

63

Dubai Dry Dock Incident

“SEP 350” touching bottom

Page 64: Major Hazard Facilities Introduction to Safety Report

64

Dubai Dry Dock Incident

The aftermath. Official reports account for 26 persons killed.