Page 1: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Great state. Great opportunity.

MAJOR PROJECTS FORUMCairns and surrounding regionInfrastructure Projects October 2013

Page 2: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

The Department State Development, Infrastructure and Planning is responsible for driving the economic development of Queensland.

© State of Queensland, Department State Development, Infrastructure and Planning, 2013, 100 George Street, Brisbane Qld 4000. (Australia)

Licence: This work is licensed under the Creative Commons CC BY 3.0 Australia licence. To view a copy of this licence, visit www.creativecommons.org/licenses/by/3.0/au/deed.en. Enquiries about this licence or any copyright issues can be directed to the Senior Advisor, Governance on telephone (07) 3224 2085 or in writing to PO Box 15009, City East, Queensland 4002

Attribution: The State of Queensland, Department of State Development, Infrastructure and Planning.

The Queensland Government supports and encourages the dissemination and exchange of information. However, copyright protects this publication. The State of Queensland has no objection to this material being reproduced, made available online or electronically but only if it is recognised as the owner of the copyright and this material remains unaltered.

The Queensland Government is committed to providing accessible services to Queenslanders of all cultural and linguistic backgrounds. If you have difficulty understanding this publication and need a translator, please call the Translating and Interpreting Service (TIS National) on telephone 131 450 and ask them to telephone the Queensland Department of State Development, Infrastructure and Planning on telephone (07) 3227 8548.

Disclaimer: While every care has been taken in preparing this publication, the State of Queensland accepts no responsibility for decisions or actions taken as a result of any data, information, statement or advice, expressed or implied, contained within. To the best of our knowledge, the content was correct at the time of publishing.

An electronic copy of this report is available on the Department of State Development, Infrastructure and Planning’s website at www.dsdip.qld.gov.au To obtain a printed copy of this report, please contact us via the contact details provided at the end of this report. NTH_0404.001

Page 3: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 1 of 20

State Government projects

State Government projects Project description Total est. cost $M

Commenced (Y/N)

Department of Aboriginal and Torres Strait Islander and Multicultural Affairs (Program Office)

Lot development project in Remote Indigenous Communities (including Aurukun, Doomadgee, Hope Vale, Kowanyama, Lockhart River, Napranum, Mapoon, Mornington Island, Northern Peninsula Area, Palm Island, Pormpuraaw, TSRIC, Woorabinda, Wujal Wujal)

39.60 Y

Department of Communities, Child Safety and Disability Services

Safe Haven Women's Shelter in Mornington Island 1.36 Y

Department of Communities, Child Safety and Disability Services

Safe Haven Non Government Organisation (NGO) staff accommodation in Coen

0.55 Y

Department of Communities, Child Safety and Disability Services

Safe Haven Non Government Organisation (NGO) staff accommodation in Mornington Island

2.40 Y

Department of Communities, Child Safety and Disability Services

Safe Haven Services Club Village Opportunity Hub in Coen 0.90 N

Department of Communities, Child Safety and Disability Services

Cooktown Office accommodation 0.90 Y

Department of Communities, Child Safety and Disability Services

Torres Strait Child Safety House 1.75 Y

Department of Communities, Child Safety and Disability Services

Child Safety Non Government Organisation (NGO) staff accommodation in Mornington Island

0.60 N

Department of Communities, Child Safety and Disability Services

Child Safety House in Lockhart River 0.90 Y

Department of Communities, Child Safety and Disability Services

Northern Peninsula Area (NPA) Safety Houses in Bamaga 0.77 Y

Department of Community Safety (Qld Corrective Services)

Lotus Glen Correctional Centre Post Occupancy Works 7.00 N

Department of Community Safety (Qld Fire and Rescue Service)

Replacement of Auxiliary Fire and Rescue Station at Mareeba 2.91 Y

Page 4: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 2 of 20

State Government projects Project description Total est. cost $M

Commenced (Y/N)

Department of Community Safety (Emergency Services)

Replacement of Auxiliary Fire and Rescue Station at Millaa Millaa 1.05 Y

Department of Community Safety (Emergency Services)

New State Emergency Service Headquarters, Administration and Training Facility, located on McNamara Street, Cairns

Unavailable N

Department of Education, Training and Employment

Aurukun Campus of Cape York Aboriginal Australian Academy - Pre-Prep Facility

2.45 N

Department of Education, Training and Employment

Tagai State College - Thursday Island Primary Campus - Duplex 0.81 Y

Department of Education, Training and Employment

Gordonvale State School - New Accommodation and various projects

4.70 Y

Department of Education, Training and Employment

Thursday Island State High School - Air conditioning and electrical upgrade, refurbishment/renovation and repairs

0.78 Y

Department of Education, Training and Employment

Atherton State High School - Additional accommodation 0.54 Y

Department of Education, Training and Employment

Mareeba State High School - Upgrade student services 0.47 Y

Department of Education, Training and Employment

Redlynch State College - New accommodation 1.85 Y

Department of Education, Training and Employment

Cairns State High School - Accommodation 4.16 Y

Department of Education, Training and Employment

Tagai State College Campuses - Air conditioning replacement program

1.48 Y

Department of Education, Training and Employment

Trinity Bay State High School - New accommodation 5.09 Y

Department of Housing and Public Works Cairns construction and upgrades 15.55 N

Department of Justice and Attorney-General Public Trust Office building improvements 0.50 N

Page 5: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 3 of 20

State Government projects Project description Total est. cost $M

Commenced (Y/N)

Department of Local Government Community Recovery and Resilience/Torres Strait Regional Authority (joint funding)

Major Infrastructure Program (MIP) Stage 5 - Sewerage renewal for Mer Island

2.00 N

Department of Local Government Community Recovery and Resilience/Torres Strait Regional Authority (joint funding)

Major Infrastructure Program (MIP) Stage 5 - Pump station refurbishment and sewerage treatment plant upgrade for Saibai Island

1.50 N

Department of Local Government Community Recovery and Resilience/Torres Strait Regional Authority (joint funding)

Major Infrastructure Program (MIP) Stage 5 - Water upgrade lagoon improvements for Erub Island

1.00 N

Department of Local Government Community Recovery and Resilience/Torres Strait Regional Authority (joint funding)

Major Infrastructure Program (MIP) Stage 5 - Road surface reseal program

0.48 N

Department of Local Government Community Recovery and Resilience/Torres Strait Regional Authority (joint funding)

Major Infrastructure Program (MIP) Stage 5 - Water main replacement for Hammond Island

0.50 N

Department of Local Government Community Recovery and Resilience/Torres Strait Regional Authority (joint funding)

Major Infrastructure Program (MIP) Stage 5 - Wasaga road and drainage Stage 2 for Horn Island

7.50 N

Department of Local Government Community Recovery and Resilience/Torres Strait Regional Authority (joint funding)

Major Infrastructure Program (MIP) Stage 5 - Sewerage augmentation Stage 1 - pumps station; rising main and sewer upgrades, sewerage augmentation design

3.00 N

Department of Local Government Community Recovery and Resilience/Torres Strait Regional Authority (joint funding)

Major Infrastructure Program (MIP) Stage 5 - Water main replacement for Iama Island

0.50 N

Department of Local Government Community Recovery and Resilience/Torres Strait Regional Authority (joint funding)

Major Infrastructure Program (MIP) Stage 5 - Extension of water reticulation to service areas 4, 5A and 5B - Mer Island

0.47 N

Department of Local Government Community Recovery and Resilience/Torres Strait Regional Authority (joint funding)

Major Infrastructure Program (MIP) Stage 5 - SCADA telemetry upgrade including remote access

2.00 N

Page 6: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 4 of 20

State Government projects Project description Total est. cost $M

Commenced (Y/N)

Department of Local Government Community Recovery and Resilience/Torres Strait Regional Authority (joint funding)

Major Infrastructure Program (MIP) Stage 5 - Northern Peninsula Area Regional Council (NPARC) - Design for new refuse facility

0.50 N

Department of Local Government Community Recovery and Resilience/Torres Strait Regional Authority (joint funding)

Major Infrastructure Program (MIP) Stage 5 - Torres Strait Island Regional Council (TSIRC) - Water main replacement for Badu Island

0.50 N

Department of Local Government Community Recovery and Resilience/Torres Strait Regional Authority (joint funding)

Major Infrastructure Program (MIP) Stage 5 - Northern Peninsula Area (NPA) roads and drainage

2.50 N

Department of Science, Information Technology, Innovation and the Arts

Australian Institute of Tropical Health and Medicine (Cairns, Townsville and Torres Strait) - individual projects listed under Private Projects - JCU

34.32 N

Department of State Development, Infrastructure and Planning (Partial Commonwealth Funding)

The Mission Beach Safe Boating Infrastructure Project - provision of maritime infrastructure within Boat Bay to improve boating safety at Mission Beach. The design development stage commenced on 5/09/13

16.27 Y

Department of Transport and Main Roads

Kennedy Developmental Road – The Hann Highway (funded by the Queensland Government’s Regional Safety Development Program) is a 5-year upgrade program to form, pave and seal some of the remaining gravel sections of the Kennedy Developmental Road between The Lynd and Hughenden now in its final stage

10.20 Y

Department of Transport and Main Roads Port Douglas roundabout construction funding under the Queensland Transport and Roads Investment Program

2.00 Y

Ergon Energy

Two projects for delivery of underground power supply. Project One - extension of underground cabling to Cairns health facilities and Cairns Airport. Project Two - express feeder to Cairns Base Hospital relating to the re-development of the hospital

3.60 Y

Queensland Health & Hospital and Health Services

Upgrade to health facilities at Mareeba Hospital 2.00 Y

Queensland Health &Hospital and Health Services

Upgrade to health facilities at Atherton Hospital 9.90 Y

Page 7: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 5 of 20

State Government projects Project description Total est. cost $M

Commenced (Y/N)

Queensland Health & Hospital and Health Services

Upgrade to health facilities at Thursday Island Hospital 1.45 Y

Queensland Health & Hospital and Health Services

Cairns Base Hospital re-development - Staged development due for completion 2015

446.30 Y

Queensland Health & Hospital and Health Services

Saibai Island Primary Health Care Centre staff accommodation 9.64 Y

Queensland Health & Hospital and Health Services

Cape York improved Primary Health Care Centre 1.84 Y

Queensland Health & Hospital and Health Services

Torres Strait staff accommodation 5.79 Y

Queensland Health & Hospital and Health Services

Cape York staff accommodation - Kowanyama 1.37 Y

Queensland Health & Hospital and Health Services

Transitional Facility - 20 residential units Hoare and Wallace Streets, Manunda (Federal Government Funding)

10.00 N

Queensland Health & Hospital and Health Services

Minor Capital Projects and Acquisitions - Cairns & Hinterland; Cape York; Torres Strait and Northern Peninsula Area

4.53 Y/N

Queensland Police Service Capital Works Housing Program Doomadgee new residence 1.44 Y

Ports North - Port of Cairns DSDIP Co-ordinated Project http://www.dsdip.qld.gov.au/assessments-and-approvals/coordinated-projects.html

Cairns shipping channel - EIS Stage of the State Government approved $40M expansion of the Port of Cairns shipping channel in Trinity Inlet to accommodate larger cruise ships and the upgrade of associated land-based infrastructure and services

4.50 Y

The 2013-2014 Queensland Government Building Projects: Industry Guide details the budgeted government capital works building programs and projects for the financial year and is available at the following link: http://www.hpw.qld.gov.au/SiteCollectionDocuments/IndustryGuide20132014.pdf

Building industry consultants and contractors will need to be appropriately registered on the whole-of-Government Prequalification (PQC) System to be eligible for invitation or selection on government building projects.

Page 8: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 6 of 20

Australian Government projects

Australian Government projects Project description Total est. cost $M

Commenced (Y/N)

Department of Transport and Main Roads Cairns Bruce Highway Upgrade (Stage 1) - 3.4 kms between Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive

150.00 Y

Department of Transport and Main Roads

Gulf Developmental Road (Georgetown to Normanton) - reconstruction works delivered under the Natural Disaster Relief and Recovery Arrangements (NDRRA), a joint federal and state initiative (works being undertaken by Croydon Shire Council)

11.76 Y

Department of Transport and Main Roads

Gulf Developmental Road - reconstruction works between Georgetown and Mt Surprise19 km of flood-damaged road at 14 sites between Georgetown and the Three Ways: reconstruction work is being delivered under the Natural Disaster Relief and Recovery Arrangements (NDRRA)

23.50 Y

Department of Transport and Main Roads Kennedy Highway (Mt Garnet to The Lynd) - reconstruction works delivered under the Natural Disaster Relief and Recovery Arrangements (NDRRA)

8.70 Y

Department of Transport and Main Roads Innisfail-Japoon Road, Innisfail - reconstruction works delivered under the Natural Disaster Relief and Recovery Arrangements (NDRRA)

Unavailable Y

Department of Transport and Main Roads

Kennedy Highway, Ravenshoe - reconstruction works on 4 sites totalling 12.18 km of the Kennedy Highway near Ravenshoe - reconstruction works is being delivered under the Natural Disaster Relief and Recovery Arrangements (NDRRA)

17.09 Y

Department of Transport and Main Roads

Millaa Millaa-Malanda Road and Palmerston Highway - slope stabilisation works various sections of Millaa Millaa-Malanda Road and Palmerston Highway - reconstruction works is being delivered under the Natural Disaster Relief and Recovery Arrangements (NDRRA)

7.60 Y

Page 9: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 7 of 20

Australian Government projects Project description Total est. cost $M

Commenced (Y/N)

Department of Transport and Main Roads

Millaa-Millaa Malanda Road: widening and reconstruction works 3 sections of Millaa-Millaa Malanda Road at north of East Evelyn Road intersection, Elias Road to Dirran Creek Bridge and Turner Road to Sheehan Road, Tarzali. The $1.9 million widening works funded by the BlackSpot program. The $7.42 million reconstruction works delivered under the Natural Disaster Relief and Recovery Arrangements (NDRRA)

9.32 Y

Department of Transport and Main Roads

Mossman-Mt Molloy Road project will reconstruct 5 sections - 2 are between Bushy Creek and Julatten and 3 sites are at the top of the range. Reconstruction works delivered under the Natural Disaster Relief and Recovery Arrangements (NDRRA)

Unavailable Y

Department of Transport and Main Roads Peninsula Developmental Road reconstruction between Laura and Weipa. Reconstruction works delivered under the Natural Disaster Relief and Recovery Arrangements (NDRRA)

8.00 Y

Department of Transport and Main Roads Cairns Transit Network - James Cook University premium bus stop Panguna Street, off McGregor Road roundabout

Unavailable N

Regional Development Australia Far North Queensland and Torres Strait (RDA FNQ&TS) - Regional Development Australia Fund (RDAF) - Round Three

Two projects - Tablelands Regional Council for its Atherton Forest Mountain Bike Park and Cairns Regional Council's Skate in the Tropics project.

0.63 Y

National Broadband Network Company (NBN Co)

Roll out of high speed broadband network throughout Regional Australia

Unavailable Y

Page 10: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 8 of 20

Local Government projects

Local Government projects Project description Total est. cost $M

Commenced (Y/N)

Cairns Regional Council Cairns CBD Make-Over Stage 1 - includes CBD Masterplan Projects City Place and City Centre Alive

20.00 Y

Cairns Regional Council Northern extension of Lake Street linking with Airport Avenue 3.00 N

Cairns Regional Council Cairns Performing Arts Centre - concept plans; design stage 1.00 N

Cairns Regional Council School of Arts - Stage 1 1.15 N

Cairns Regional Council Civic Theatre refurbishment 1.38 N

Cairns Regional Council Manunda Sporting Precinct Masterplan implementation 2.57 Y

Cairns Regional Council

Re-development of Tobruk Pool - three staged project. Allocated $1.2m in the 2013/14 capital expenditure budget to commence detailed design and preliminary civil works including road access and car parking

16.70 N

Cairns Regional Council Cairns Southern Cycleway 3.00 N

Cairns Regional Council Flood Mitigation - Moody Creek catchment. 120 megalitre detention basin

4.30 N

Cairns Regional Council Machan's Beach Sea Wall project over three years 1.00 N

Cairns Regional Council Transport - bridges infrastructure 1.75 N

Page 11: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 9 of 20

Local Government projects Project description Total est. cost $M

Commenced (Y/N)

Cairns Regional Council Technical Support Services - Building and disaster management 2.33 N

Cairns Regional Council Northern Beaches trunk water main and Paradise Point reservoir

4.80 N

Cairns Regional Council Behana waste treatment plant and inlet /outlet pipelines (Site 7 Meerawa)

2.00 N

Cairns Regional Council Stanton Road water supply upgrade (formerly Reservoir Access Road)

0.60 N

Cairns Regional Council Red Hill reservoir 2.30 N

Cairns Regional Council Recycled water distribution mains to Smithfield Village and James Cook University

1.00 Y

Cairns Regional Council Construction of Draper Road Reservoir DN 450 dedicated inlet main

1.50 Y

Cairns Regional Council Copperlode Falls Dam construction of penstock, valves and outlet refurbishment

1.00 N

Cairns Regional Council Endeavour Park - extension of playing surface 2.57 N

Cairns Regional Council Walker Road Sport and Recreation Precinct Masterplan - design and finalise masterplan

2.00 N

Cassowary Coast Regional Council Fleet & Plant Program - purchase and trade of fleet and plant 1.80 Y

Cassowary Coast Regional Council Etty Bay Road upgrade, Links 1 and 2 - Construct to rural collector road standard, Etty Bay - Widen shoulders, full pavement reconstruction

1.48 Y

Cassowary Coast Regional Council McGowan Drive Upgrade Stage 1 - Road, carpark and shared pathway upgrade, Innisfail

0.91 N

Page 12: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 10 of 20

Local Government projects Project description Total est. cost $M

Commenced (Y/N)

Cassowary Coast Regional Council Road Reseal Program - Reseal bitumen roads based on condition

2.24 Y

Cassowary Coast Regional Council NDRRA Complementary Works Program 2.00 Y

Cassowary Coast Regional Council Flying Fish Point Road upgrade - Road & pathway upgrade (Bridge to Aluart Road), Innisfail Estate - Retaining wall and footpath

0.55 Y

Cassowary Coast Regional Council Kirrama Range Road - Road, bridge and drainage rehabilitation, Kirrama Range

4.61 N

Cassowary Coast Regional Council Santolin Road Culverts - Bridge construction, Santolin Rd, Lower Tully-Replace existing armco culverts

0.50 N

Cassowary Coast Regional Council Daveson Road, Trunk Water Main Stage 1 - Replace DN525 trunk water main, Daveson - Replacement of 525NB main to Mission Beach

0.75 N

Cassowary Coast Regional Council Lower Tully Water Zone - Dedicated trunk water main from Hyatt St Reservoir, Tully

0.54 N

Cassowary Coast Regional Council Sewer Rehabilitation Program, Innisfail. Program to inspect and rehabilitate high risk sewer reticulation infrastructure to actively reduce infiltration

0.78 Y

Cassowary Coast Regional Council Natural Disaster Relief and Recovery Arrangements (NDRRA) 2011 Event - restoration works

88.00 Y

Cassowary Coast Regional Council Natural Disaster Relief and Recovery Arrangements (NDRRA) 2013 Event - restoration works

11.00 N

Cassowary Coast Regional Council

Construction of a regional multi-purpose facility to accommodate the Cassowary coast Regional Library, a Regional Enterprise and Business Incubation Centre, tourism, education, health and well being information providers and community meeting space for the region

5.00 N

Page 13: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 11 of 20

Local Government projects Project description Total est. cost $M

Commenced (Y/N)

Cook Shire Council Battlecamp Road upgrade 1.40 Y

Cook Shire Council Musgrave Strathgordon Road - soil stabilisation 3.40 N

Cook Shire Council Restoration of Cook Shire roads 30.00 N

Tablelands Regional Council Kuranda new Visitor Information Centre 0.65 Y

Tablelands Regional Council Kuranda Coondoo Street - pedestrian walkway pods 0.71 Y

Tablelands Regional Council Almaden Ootann Road - Road widening, reconstruction and drainage

0.70 Y

Tablelands Regional Council Forty Mile Ootann Road - Road widening, reconstruction and drainage

0.80 Y

Tablelands Regional Council Kuranda Thoree Street Social Housing Duplex Round 2 0.57 Y

Tablelands Regional Council Malanda new Visitor Information Centre 1.40 Y

Tablelands Regional Council 2012/2013 Reseals Asphalt 1.35 Y

Tablelands Regional Council 2012/2013 Reseals Bitumen 1.35 Y

Tablelands Regional Council 2013/2014 Reseals Program 1.30 N

Tablelands Regional Council 2013/2014 Reseals Program 1.70 N

Page 14: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 12 of 20

Local Government projects Project description Total est. cost $M

Commenced (Y/N)

Tablelands Regional Council Ravenshoe Tully Falls Road - Vine Creek Bridge upgrade 0.85 N

Tablelands Regional Council Mareeba Byrnes Street - footpath upgrade 0.55 Y

Tablelands Regional Council Natural Disaster Relief and Recovery Arrangements (NDRRA) 2013 Event - flood damage restoration works

10.50 N

Page 15: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 13 of 20

Private Sector projects

Private Enterprise projects Project description Total est. cost $M

Commenced (Y/N)

Alluna Land Trust & Eco Civil & Construction Solutions

Community accommodation facility in Cairns incorporating commercial sheds and multi purpose recreational centre. Staged development over 5 years - Stage 1 to commence April 2014

40.00 N

APC Property Group Atherton Green Retirement Resort - 138 Units; 118 residential blocks and community care

35.00 N

APC Property Group Trinity Blue Retirement Resort (Trinity Beach) - 117 Units; 23 residential blocks and community care

100.00 Y

Aquis Resort at the Great Barrier Reef Pty Ltd DSDIP Co-ordinated Project http://www.dsdip.qld.gov.au/assessments-and-approvals/coordinated-projects.html

Re-development of 343 ha of rural land into a large scale integrated tourism resort

4.2B N

Arton Group Kewarra Retirement Village - Staged development commencing 2014

60.00 N

Arton Group Kewarra Aged Care Facility commencing 2014 20.00 N

Aust-Pac Capital Pty Ltd DSDIP Co-ordinated Project http://www.dsdip.qld.gov.au/assessments-and-approvals/coordinated-projects.html

Wongai Project - Underground coking coal mine and export facility 150 kms north-west of Cooktown

500.00 N

Bell Bird Park Developments Pty Ltd Tourism development at Ellis Beach incorporating 221 rooms and units; retail space and conference facilities

100.00 N

Brookfield Residential Properties Bluewater is a master planned community at Trinity Beach. A staged development - next stage 30 lots

Unavailable Y

Page 16: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 14 of 20

Private Enterprise projects Project description Total est. cost $M

Commenced (Y/N)

Cairns Aquarium & Reef Research Centre

Cairns Aquarium located on 4,003sqm development site on corner of Abbott, Lake & Florence Streets, Cairns. Development proposes 12,000sqm of aquatic scenes, a 100 seat restaurant, a 120 seat function and conference centre, retail outlets, corporate offices and executive suites

35.00 N

Cape Alumina Ltd DSDIP Co-ordinated Project http://www.dsdip.qld.gov.au/assessments-and-approvals/coordinated-projects.html

Pisolite Hills Project - Integrated Bauxite Mine and Port Facilities - 50 kms north-east of Weipa and 40 kms south-east of Mapoon

400.00 N

Carbine Tungsten Limited Establishment of a substantial hard rock production operation - 3 step production plan over a number of years. Workers camp and facilities as well as earthworks

70.00 N

Catholic Education - Diocese of Cairns St Monica's High School Stage 2 - Additional teaching facility 2.10 N

Catholic Education - Diocese of Cairns St Augustine's College Cairns - Expansion of J Block 6.00 Y

Catholic Education - Diocese of Cairns Flexible Learning Centres for Cairns and Cooktown Unavailable N

Catholic Education - Diocese of Cairns Pre-Prep/Primary School at Weipa Unavailable N

Catholic Education - Diocese of Cairns Mt Peter College - External infrastructure works 5.00 N

Central Park Group Construct new shopping centre. 17,000sqm Central Park Market, Spence Street, Cairns - 2 year construction timeframe

85.00 N

Coles-Wesfarmers (Bunnings) Development of Adbri Masonry site on corner of Kenny and Draper Streets - new Bunnings complex 16,000sqm

Unavailable N

Page 17: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 15 of 20

Private Enterprise projects Project description Total est. cost $M

Commenced (Y/N)

Consolidated Tin Mines Mt Garnet mine - conversion of zinc mill to process tin ore. Potential production of 5,000 tonnes per annum.

124.00 N

Coral Gardens Development - Craiglie 214 allotments over 4 stages - Stage 1 comprises 42 Lots 15.00 N

Caring for People Affected by Cancer (COUCH)

COUCH Wellness Centre, Reservoir Road - A 3 stage project including facilities for respite and a range of complementary therapies providing a holistic approach to cancer treatment. Stage 1 commenced in July 2013

9.00 Y

Delfam Pty Ltd Craiglie subdivision of 104 residential lots and associated parkland on a 19.6 ha cane site

10.00 N

Dexus Pty Ltd Expansion of Smithfield Shopping Centre, including a new cinema complex

Unavailable Y

Double Island Resort Expansion and refurbishment of Double Island Resort 10.00 N

Drawbridge Developments Pty Ltd House on the Hill development at Mooroobool - Stages 2 and 3 comprising 64 townhouses

Unavailable N

Fabcot Pty Ltd (Woolworths development arm) Woolworths Shopping Precinct - Gordonvale Unavailable N

Fortress Developments Springbrook Residential Estate, Redlynch - Staged development - Parkside (2nd precinct in Springbrook) Stage 6 under construction

Unavailable Y

Felhope Pty Ltd Adventure Waters - Water Park

Privately owned venture 12 kms north of Cairns on a 16 acre site next to the proposed Aquis development

45.00 N

Fullshare Group International Sheraton Mirage refurbishment 200.00 N

Page 18: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 16 of 20

Private Enterprise projects Project description Total est. cost $M

Commenced (Y/N)

Gulf Alumina Limited Skardon River bauxite mining operation, 2 million tonnes per year production scheduled to commence during 2014

Unavailable N

Hawker Pacific Hangar Expansion Extend the current facility to the current exiting car park fence. This will increase the capacity by around 50%

3.00 N

Everett Family Trust

Hinchinbrook Habitats Tourism & Residential Property Development - a residential and ecotourism property development on 630 acres. Concept designs and engineering plans completed. Key infrastructure installed including access roads and dams

6.50 Y

Holy Spirit Care Services Stages 4 & 5 - Extension to existing retirement village of 104 additional two and three bedroom independent living apartments complementing the existing facility at Holy Spirit Westcourt

40-50 N

Infigen 70 mw Wind Farm at Forsayth 150.00 N

Integrated Food & Energy Developments Pty Ltd (IFED)

The Etheridge Tropical Bio-processing project 1.00B N

James Cook University - Cairns Space Consolidation Projects - Modifications and refurbishment of various spaces on Cairns Campus

1.00 Y

James Cook University - Cairns Australian Institute of Tropical Health and Medicine - offices, laboratories including new building (s) and refurbishment of existing facilities

24.50 N

James Cook University - Cairns Australian Institute of Tropical Health and Medicine facilities - Thursday Island

6.33 N

James Cook University - Townsville Australian Institute of Tropical Health and Medicine facilities 31.00 N

James Cook University - Townsville The Science Place - design and construction 80.00 N

Page 19: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 17 of 20

Private Enterprise projects Project description Total est. cost $M

Commenced (Y/N)

JKO Mining Pty Ltd Gold mine & processing plant near Georgetown (old Deutsche Rohstoff processing plant)

Unavailable Y

Ken Frost Pty Ltd North Point Estate Smithfield Stages 3-8. Staged residential development includes 241 residential lots

90.00 Y

Ken Frost Pty Ltd Half Moon Bay Trinity Beach - 102 lot staged residential development. 48 lots to be completed

50.00 Y

K & V Enterprises Pty Ltd Canopy Edge Estate Smithfield - Staged residential development

Unavailable Y

Lancini Property & Development Cairns Homemaker Centre staged development. Stage 1 complete, Stage 2 to commence October 2013

75.00 Y

Lend Lease Cairns Central Shopping Centre expansion - approx 10,000 m2 100.00 N

Marino Family Redlynch Shopping Centre expansion - 12,175sqm - Keir Queensland appointed as Construction Managers

20.00 Y

Metallica Minerals (SCONI Project) SCONI is a mining and processing project at Greenvale, North Queensland extracting Nickel, Cobalt and Scandium. Anticipating initial construction to commence late 2013

600.00 N

Metallica Minerals (Oresome Australia) Zircon-rutile heavy mineral sand project near Weipa - construction phase to commence mid 2014

10.00 N

Middin Pty Ltd Red Peak Forest Estate - a masterplanned residential subdivision of 500 Allotments. Approximately 210 lots completed to date

Unavailable Y

Page 20: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 18 of 20

Private Enterprise projects Project description Total est. cost $M

Commenced (Y/N)

MSF Sugar Ltd

25.5 hectare site subdivided into 32 lots for a mixture of residential, industrial and tourism/commercial uses at ex Babinda Sugar Mill site, Babinda. Staged development - residential (village industry) sites to be developed first

Unavailable N

North Queensland Airports Group Re-development of Cairns Airport. Stage development over a 20 year period

1.00B N

Norship Marine (The Fry Family) Expansion of marine facilities to increase capacity to paint and repair boats in a controlled environment

8.00 N

North Queensland Bio-Energy Corporation Limited

North Queensland Bio Energy Plant - Ethtec Cellulosic Bio refining project, ethanol and power generation facility in Ingham

425.00 N

Orpheus Island Trust Refurbishment of Daintree Eco Lodge & Spa and expansion works

5.00 N

Paino Family C/- Edge Architecture 3 level Building - retail, residential and restaurant development on corner of Vasey Esplanade and Trinity Beach Road

7.00 N

Port Bajool Asia Pacific Energy Innovation Centre - a tourist attraction in conjunction with the Mt Emerald Wind Farm

10.00 N

Pregno Family Investments Pty Ltd Implementation of Edmonton Business & Industry Park (EBIP) - 6 staged project with first stage to commence mid 2014

400.00 Y

Ratch-Australia and Port Bajool Mount Emerald Wind Farm located 15 minutes drive south west of Mareeba

540.00 N

Ratch-Australia High Road Wind Farm at Tumoulin Road and the Kennedy Highway

100.00 N

Page 21: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 19 of 20

Private Enterprise projects Project description Total est. cost $M

Commenced (Y/N)

Robert Prettejohn Development of 19 residential lots on a 18.8 ha site at Taylor Point (between Kewarra and Trinity Beaches)

Unavailable N

RTA Weipa Pty Ltd (Rio Tinto Alcan Group) DSDIP Co-ordinated Project http://www.dsdip.qld.gov.au/assessments-and-approvals/coordinated-projects.html

South of Embley project - extending bauxite mining south of Embley River, including construction of new infrastructure (a beneficiation plant, power station, warehouses, workshop, barge and ferry facilities, port and ship loading facilities

1.45B N

S & F Marino Pty Ltd 180 residential lots, public space and potential lots for future multi-unit development between Ramsey Drive and Reservoir Road, Kanimbla

Unavailable N

Satterley Property Group Smithfield Village - Trinity Park; a staged residential development (1400 house lots) - Stage 17 released in 3 parts (33 lots)

Unavailable Y

Satori Resorts - Ella Bay Pty Ltd DSDIP Co-ordinated Project http://www.dsdip.qld.gov.au/assessments-and-approvals/coordinated-projects.html

Ella Bay - re-development of a 450 ha cattle station into an integrated tourism and residential community. Proposed to develop over a 15 year period and includes an upgrade of Ella Bay Road and the construction of a new bypass road to connect to Ella Bay Road. Resort hotels and holiday villas for approx. 2,000 tourist plus plans for 540 permanent residences

1.4B N

Savannah Lifestyle Resorts - Mareeba A 3 staged resort community development, designed with the active over-50's in mind

100.00 Y

Shangri-La Hotel Chain

Staged Project: - Renovation of the Horizon Club Lounge and the 120 rooms facing the Marlin Marina. Extension of Ba8, air-conditioned section of the North food and wine restaurant and expansion of the kitchen Phase 2 - Renovation of the remaining 130 rooms including carpets, furnishing and bathroom fittings

12.00 N

Page 22: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Page 20 of 20

Private Enterprise projects Project description Total est. cost $M

Commenced (Y/N)

Stateland Pty Ltd Cairns North commercial development - 302-310 Sheridan Street, Cairns North - 3,246 sqm site two single level, stand-alone buildings with a total lettable area of 1,159 sqm

4.50 N

Sunset DriveInn Pty Ltd

Stage 1, residential and commercial development former Woree drive in theatre. 6.27ha site - 520 units, apartments and townhouses to house more than 1,000 people - 4 stage development

175.00 N

Sweet Creek Pty Ltd 12 unit development next to the corner development on Vasey Esplanade and Trinity Beach Road, Trinity Beach

Unavailable N

Urban Properties Pty Ltd Bluewater Park Estate - Development of 51 Lot residential subdivision at Debbie Street and Summertime Close, Trinity Park

Unavailable N

Vital Metals Tungsten Mine 160 kms northwest of Cairns near Mt Carbine - Watershed project

100.00 N

Cover photograph courtesy of GDA Constructions Pty Ltd

Page 23: MAJOR PROJECTS FORUM · Sheehy Road, White Rock and Chinaman Creek, Ray Jones Drive 150.00 Y Department of Transport and Main Roads Gulf Developmental Road (Georgetown to Normanton)

Major Projects ForumDepartment of State Development, Infrastructure and Planning tel 07 +61 7 4048 [email protected]