make-to-stock production – discrete industrysapidp/012002523100005746092015e/... · make-to-stock...

22
Make-to-Stock Production – Discrete Industry SAP Best Practices

Upload: hoangquynh

Post on 06-May-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

Make-to-Stock Production – Discrete Industry

SAP Best Practices

Page 2: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 2

Purpose, Benefits, and Key Process Steps

Purpose This scenario describes a business process, which is typical for companies with lot-size oriented

production.

The production scenario produces a finished good and all dependent components in make-to-stock production (MTS).

Furthermore, the scenario is supported by the main cost object controlling functions required, such as preliminary costing and period-end closing.

Benefits Production triggered by a production plan

Serial number and batch management included

Optional with: quality management, consigned inventory, external processing

Key Process Steps Creating Planned Independent Requirements

Material Requirements Planning at Plant Level

In-House Production (subassembly)

In-House final assembly (Finished Good)

Capacity Leveling

Confirming Assembly Activities

Page 3: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 3

Required SAP Applications and Company Roles

Required SAP Applications

Enhancement package 5 for SAP ERP 6.0

Company Roles

Production Planner

Production Supervisor

Shop Floor Specialist

Warehouse Clerk

Strategic Planner

Engineering Specialist

Page 4: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 4

Detailed Process Description

Make-to-Stock Production – Discrete Industry

This scenario describes a business process, which is typical for companies with lot size oriented production. The production scenarios consist of both goods movements (goods issues and receipts) and confirmation of completion of the production order. Furthermore, the scenario is supported by the main cost object controlling functions required, such as preliminary costing

and period-end closing.

The typical planning process starts with sales quantity planning. The previous period’s actual sales figures can be used as a basis for future planning.

In Sales and Operations Planning, you ensure that production stays in line with sales so that you may create the production plan synchronously to sales. The planning data is transferred from Sales and Operations Planning to Demand Management. Demand Management generates independent requirements, which are used in the subsequent Material Requirements Planning (MRP) run.

In material requirements planning, the bill of materials (BOM) for the top-level material demand gets exploded and production is planned right down to procured component level. MRP results in planned orders being generated for the material to be produced.

If insufficient warehouse stock is available, purchase requisitions are created for the raw materials required. When the order is created, target costs are calculated for the order lot size (preliminary costing).

During the production process, costs incurred are updated on the order, which enables you to keep track of and compare target costs and actual costs at any time.

Period-end-closing activities are applied to the order. This includes Work In Progress calculation and variance calculation.

After this, Work in Progress is settled to financial accounting and production variances are settled to management and financial accounting.

Page 5: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 5

Process Flow Diagram Make-to-Stock Production – Discrete Industry

Man

ufa

ctu

rin

g

Eve

nt

Pla

nt

Co

ntr

oller

Period End Closing

“General” Plant (181)

Material Requirements

Planning at Plant Level & Evaluation of Stock / Requirement

List

Beginning of Planning

Cycle

Purchase Requisiti

on

MRP List

Inventory @ Standard. Cost

Pro

du

cti

on

Pla

nn

er

Periodic Plan Revision

Release Production

Order

Capacity Leveling

Material Staging for

Planned Orders

Confirming Assembly Activities

/ Final Confirmation

Semi-Finished Goods Receipt

Goods Issue/ Back flush

Update Capacity

Goods Receipt Slip

Pick List

Order Print Planned Orders

Capacity

Leveling O.k.?

Material Availabl

e?

Bu

yer

Ware

-h

ou

se

Cle

rk

Goods Receipt Slip

Procurement of Stock

Material with QM (127)

Procurement &

Consumption of Cosigned

Inventory (139)

Str

ate

gic

P

lan

ner

Creating Planned

Independent Requirements

Convert Planned Order to Production

Order

Inventory Consumption @ Standard.

Cost

Procurement w/o QM

(130)

Finished Goods Receipt

MM Subcontracti

ng (138)

PP-Subcontracting (External Processing)

(150)

No

Yes

No

Yes

Logistics Planning

(144)

1

Page 6: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 6

Process Flow Diagram Make-to-Stock Production – Discrete Industry

Pro

du

cti

on

S

up

erv

iso

r

1 Review

Operation List

Ev

en

t

Page 7: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 7

Legend

Symbol Description Usage Comments

To next / From last Diagram: Leads to the next / previous page of the Diagram

Flow chart continues on the next / previous page

Hardcopy / Document: Identifies a printed document, report, or form

Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines

Financial Actuals: Indicates a financial posting document

Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines

Budget Planning: Indicates a budget planning document

Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines

Manual Process: Covers a task that is manually done

Does not generally correspond to a task step in a document; instead, it is used to reflect a task that is manually performed, such as unloading a truck in the warehouse, which affects the process flow.

Existing Version / Data: This block covers data that feeds in from an external process

Does not generally correspond to a task step in a document; instead, this shape reflects data coming from an external source; this step does not have any incoming flow lines

System Pass / Fail Decision: This block covers an automatic decision made by the software

Does not generally correspond to a task step in the document; instead it is used to reflect an automatic decision by the system that is made after a step has been executed.

Exte

rnal

to S

AP

Business Activity / Event

Unit Process

Process Reference

Sub-Process

Reference

Process Decision

Diagram Connection

Hardcopy / Document

Financial Actuals

Budget Planning

Manual Process

Existing Version /

Data

System Pass/Fail Decision

Symbol Description Usage Comments

Band: Identifies a user role, such as Accounts

Payable Clerk or Sales Representative. This band

can also identify an organization unit or group,

rather than a specific role.

The other process flow symbols in this table go

into these rows. You have as many rows as

required to cover all of the roles in the scenario.

Role band contains

tasks common to that

role.

External Events: Contains events that start or end

the scenario, or influence the course of events in

the scenario.

Flow line (solid): Line indicates the normal

sequence of steps and direction of flow in the

scenario.

Flow line (dashed): Line indicates flow to

infrequently-used or conditional tasks in a

scenario. Line can also lead to documents involved

in the process flow.

Connects two tasks in a scenario process or a non-step event

Business Activity / Event: Identifies an action that either leads into or out of the scenario, or an outside Process that happens during the scenario

Does not correspond to a task step in the document

Unit Process: Identifies a task that is covered in a step-by-step manner in the scenario

Corresponds to a task step in the document

Process Reference: If the scenario references another scenario in total, put the scenario number and name here.

Corresponds to a task step in the document

Sub-Process Reference: If the scenario references another scenario in part, put the scenario number, name, and the step numbers from that scenario here

Corresponds to a task step in the document

Process Decision: Identifies a decision / branching point, signifying a choice to be made by the end user. Lines represent different choices emerging from different parts of the diamond.

Does not usually correspond to a task step in the document; Reflects a choice to be made after step execution

<F

unction>

Page 8: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 8

Convert

Planned Order

Dependent

Reqmts

Reservations

Warehouse

Material Reqmts

Planning

Materials Requirement Planning - MRP

Planned Ind.

Requirements

Production

Order

Page 9: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 9

Alternative Planning Strategies for Finished Product

Strategy Net Requirements Planning (10) Planning with Final Assembly (40)

Customer requirements passed on to

production No Yes

This means . . . ... sales orders do not influence production ... sales orders that exceed planned

independent requirements can influence

production

... the main objective is to ensure smooth

production

... the most important factor here is the

ability to react flexibly to customer demand

Planned independent requirements

allocated and reduced during sales

order processing No Yes

Planned independent requirements

reduced at goods issue for delivery Yes No

Page 10: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 10

Work Center

Work Center: Assembly

Routings Costing Scheduling

& Capacity

1010,-

2150,-

3160,-

Default values

Routings

Costing Data Sched. Data

Capacity Data

Page 11: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 11

Routing Work Center / Operation

Routing Header

Operation 10:

Final Assembly

Material Components

Work center

Control key

Standard values

Activity types

Description

....

Page 12: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 12

Individual Conversion Individual Conversion

Planned

orders

Production

orders

Collective Conversion Collective Conversion

Planned Order Conversion

Production

order Planned

orders

Page 13: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 13

Specify order type Specify order type

Define order item Define order item

Copy routing Copy routing

Lead time scheduling Lead time scheduling

Copy bill of material Copy bill of material

Optional changes Optional changes

Save production order Save production order

Friday January 28 2011

Tuesday July 12 2011

Requirements planning Requirements planning Manually Manually

Availability check Availability check

Automatically Automatically

Optional (Customizing)

Production Order Creation

Page 14: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 14

Order proposal

(planned order)

Order creation

Availability

check

Order release and

batch determination

for components

Order settlement Order header

Operations Operations

Components Components

Costs Costs 20

50 100

Material withdrawal

Goods receipt

Production Order Processing

Production Order

Confirmations

Page 15: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 15

Material

Goods movement

Material

document

Accounting document

Warehouse Warehouse

Operation

Mat. comp.

Prod. order

Costs

Update of stock quantities Update of stock values materials can be batch controlled

Goods Movement

Page 16: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 16

Goods issue posting

Material document

Acctg. document

Goods Issue

Updating stock quantities Updating stock values Reducing reservations Calculating actual costs and up-

dating the order

Page 17: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 17

Order confirmation Order confirmation . . .

Manual entry

Production Order Confirmations

Production order

Operation 0010

Operation 0020

Operation 0030

Operation . . . .

Page 18: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 18

l Costing variant

Display planned/actual costs

l Cost elements l Cost itemization l Cost component split

Planned costs Planned costs

Material costs

Costs for external

procurement

Production costs

Material overhead

costs

Production overhead

costs

Costs for external

processing

Cost elements Cost elements : : Phases Phases

l Gen. operation values

l Standard values

l Control key “costing

indicator”

Resources Resources

l Formula key for

costing

l Cost center

l Activity type

l Formula constants

Cost calculation log

l Ind . " Rel . to costing "

l Price

Material Material components components

Order Order type type / Plant / Plant

Production Order - Preliminary Costing

Page 19: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 19

Production order cost Production order cost

Overhead calculations Overhead calculations

- Work center

- Standard value

- Quantities

- Cost center

- Activity types

- Formulas

- Activity types

Operation

Internal activities costs Material costs

Cost of Production Order

- Quantities

- Prices

Work center Cost center Material

components

- Periods

Activity cost

Page 20: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 20

Order Status

Pre-Released or Released Partially Delivered Finally Delivered or Technically Completed

Variances

Delivery

Value

Actual Costs

WIP at

Actual Costs

=

WIP at

Actual Costs

=

- Delivery

Value

=

-

WIP and Variance Calculation in Lot-Based Cost Object

Controlling

Actual Costs Actual Costs

Page 21: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 21

Material

600

Product cost planning

Lotsize 1 PC CO- PC

Production Order Mat. F126

800 1.200

400 2.400

-2.000

400

Material Production Surcharge GR Variances

Actual Cost

CO-

PC

Material Master

Standard Price = 2000

Target Version 0

Price 150 Qty 150 Structure 100 Scrap 0 Lotsize 0

Production

1100

Surcharge

300

Warehouse Price difference

Financial Accounting

2000 400

Settlement FI

CO-

PA

Settlement of Order (Example)

Page 22: Make-to-Stock Production – Discrete Industrysapidp/012002523100005746092015E/... · Make-to-Stock Production – Discrete Industry SAP Best Practices ... Make-to-Stock Production

© 2011 SAP AG. All rights reserved. 22

No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice.

Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.

Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.

IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, System z10, System z9, z10, z9, iSeries, pSeries, xSeries, zSeries, eServer, z/VM, z/OS, i5/OS, S/390, OS/390, OS/400, AS/400, S/390 Parallel Enterprise Server, PowerVM, Power Architecture, POWER6+, POWER6, POWER5+, POWER5, POWER, OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS, HACMP, RETAIN, DB2 Connect, RACF, Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX, Intelligent Miner, WebSphere, Netfinity, Tivoli and Informix are trademarks or registered trademarks of IBM Corporation.

Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries.

Oracle is a registered trademark of Oracle Corporation.

UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.

Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc.

HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology.

Java is a registered trademark of Sun Microsystems, Inc.

JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.

SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP BusinessObjects Explorer, StreamWork, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries.

© 2011 SAP AG. All rights reserved

Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of Business Objects Software Ltd. Business Objects is an SAP company.

Sybase and Adaptive Server, iAnywhere, Sybase 365, SQL Anywhere, and other Sybase products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of Sybase, Inc. Sybase is an SAP company.

All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.

The information in this document is proprietary to SAP. No part of this document may be reproduced, copied, or transmitted in any form or for any purpose without the express prior written permission of SAP AG.

This document is a preliminary version and not subject to your license agreement or any other agreement with SAP. This document contains only intended strategies, developments, and functionalities of the SAP® product and is not intended to be binding upon SAP to any particular course of business, product strategy, and/or development. Please note that this document is subject to change and may be changed by SAP at any time without notice.

SAP assumes no responsibility for errors or omissions in this document. SAP does not warrant the accuracy or completeness of the information, text, graphics, links, or other items contained within this material. This document is provided without a warranty of any kind, either express or implied, including but not limited to the implied warranties of merchantability, fitness for a particular purpose, or non-infringement.

SAP shall have no liability for damages of any kind including without limitation direct, special, indirect, or consequential damages that may result from the use of these materials. This limitation shall not apply in cases of intent or gross negligence.

The statutory liability for personal injury and defective products is not affected. SAP has no control over the information that you may access through the use of hot links contained in these materials and does not endorse your use of third-party Web pages nor provide any warranty whatsoever relating to third-party Web pages.