Making the Business Case for Concrete
Quadruple the Quantity of Concrete on Building Projects Using the Concrete Design Center
Patrick Matsche Building Promotions, NRMCA
![Page 2: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/2.jpg)
2
Empirical – Quantifiable Data
![Page 3: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/3.jpg)
8,000 yd3
2,000 yd3
• We lose 6,000 yd3 per project • We lost 7.3 million yd3 in 2016* • $1 Billion in revenue
4-7 stories | 200,000 ft2
* Dodge Data & Analytics, 4-7 story buildings, excluding parking garages
![Page 4: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/4.jpg)
4
$33M
![Page 5: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/5.jpg)
National Ready Mixed Concrete Association
Concrete’s Role in Sustainable Development
by James Bogdan
![Page 6: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/6.jpg)
6
Market Opportunity: Green Building
Source: USGBC Green Building Economic Impact Study. Booz Allen Hamilton. Sept 2015.
2018 Bldg construction = $850B 2018 Green construction = $225B (26%) 2018 LEED construction = $80B (10%)
![Page 7: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/7.jpg)
7
Attributes of Ready Mixed Concrete • Local material
– Abundant raw materials and production is local • Minimal processing
– Efficient operations • Uses wastes (by-products) from other industries
– Fly ash, slag • Thermal mass
– Reduces energy consumption during building operations • Resilient / long service life
– Low maintenance • Recyclable
![Page 8: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/8.jpg)
8
Life Cycle Perspective
Product Use
Material Acquisition Production
Construction End of Life Recycling
Life Cycle Stages
Cradle to Grave TO
Cradle to Cradle
![Page 9: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/9.jpg)
9
Life Cycle Perspective
Source: EPA (2003)
![Page 10: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/10.jpg)
10
Extraction: Logging • Wood products • Disruption per
unit of building material is high
• Renewal takes generations
• Stream damage common
Source: Natural Resources Canada
![Page 11: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/11.jpg)
11
Impact Index
Resource Impact Index
Concrete Aggregate Quarrying Limestone Quarrying
1.00 1.50
Steel Iron Ore Mining 2.25
Wood Boreal Timber Harvesting Coastal Timber Harvesting
2.50 3.25
Source: Natural Resources Canada
![Page 12: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/12.jpg)
12
Summary: Concrete Life-Cycle Benefits
Concrete Feature Sustainable Design Benefit Most materials harvested and manufactured locally Minimizes transportation energy
Most ingredients require little processing Minimizes energy of production
Incorporates recycled industrial byproducts
Reduces the energy required for manufacturing & landfilling of industrial wastes
Absorbs CO2 throughout its lifetime through carbonation Reduces carbon footprint
Building systems combine insulation and thermal mass Homes and buildings more energy efficient
Long service life Minimizes reconstruction, repair and maintenance
Recyclable Existing infrastructure exist to place spent product as a raw material into another product
![Page 13: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/13.jpg)
Concrete Design Center Architectural Design |Structural Design |Cost Analysis
Energy Analysis | LEED Optimization
Infrared images courtesy of Logix
![Page 14: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/14.jpg)
14
Why Should NRMCA Promote ICFs?
![Page 15: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/15.jpg)
15
ICFs – Very Competitive on First Cost 4 story Multi-family reference building, $10-$15 million cost of construction
Towson, MD 0% Pittsburgh 2% Austin, TX 1% Kansas City -1% Albany 3% Athens, GA 3% Phoenix, AZ -1% Melville, NY 1% Sacramento, CA 1%
![Page 16: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/16.jpg)
16
ICFs Increase Revenues for Owner
Individual metered wood to master metered concrete:
INCREASE in Net Operating Income of $188,600 every year
![Page 17: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/17.jpg)
17
ICFs: Strong – Efficient – Easy to Use
![Page 18: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/18.jpg)
18
ICFs are Ideal for Low to Mid-Rise Building
Apartments Dormitories
Senior Residences Hotels / Motels
![Page 19: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/19.jpg)
19
ICFs Make Buildings Safer… • Walls (Fire Ratings)
– 2 hrs for 4” wall – 3 hrs for 6” wall – 4 hrs for 8” wall
• Floors (Fire Ratings) – 2 to 3 hrs – Depends on system
![Page 20: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/20.jpg)
20
Reduce Insurance Costs $6
2,65
0
$63,
875
$77,
000
$24,
675
$33,
600
$21,
000
$34,
125
$24,
500
$19,
075
$20,
475
$0
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
Edgewater,NJ
Towson, MD Orlando, FL Dallas, TX Los Angeles,CA
Total Builder's Risk Insurance Premium for Reference Building 15 month construction period
$14 million construction replacement cost
Wood Concrete
$52,
080
$55,
440
$29,
540
$30,
660
$32,
620
$22,
120
$35,
840
$23,
800
$22,
540
$21,
140
$0
$20,000
$40,000
$60,000
$80,000
$100,000
Edgewater, NJ Towson, MD Orlando, FL Dallas, TX Los Angeles,CA
Annual Property Insurance Premium for Reference Building
$14 million construction replacement cost
Wood Concrete
![Page 21: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/21.jpg)
Feb 2017 Maplewood, NJ
Jan 2017 Lynnwood, WA
Jan 2017 Laurens, NY
Dec 2016 Cambridge, MA
Jan 2017 Kane, PA
Oct 2016 Oakland, CA
Oct 2016 Gilbert, AZ
Aug 2016 Northampton, MA
Feb 2016 Norfolk, VA
Mar 2014 Odenton, MD
Apr 2014 Rockville, MD
Apr 2015 Baltimore, MD
Jan 2015 Edgewater, NJ
Jan 2015 Evans, GA
Mar 2014 Houston, TX
Mar 2017 Raleigh, NC
![Page 22: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/22.jpg)
22
Green Building Programs
![Page 23: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/23.jpg)
23
Concrete Thermal Mass • Thermal Mass • Increase thermal lag
– Off peak demand – Lower energy costs
• Lower peak energy – Smaller, more
efficient HVAC equipment
• Reduce temperature swings – Less heating and
cooling energy required
![Page 24: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/24.jpg)
24
Concrete Thermal Mass
Tilt-up Concrete Walls
Insulating Concrete Forms
Removable Form Systems
![Page 25: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/25.jpg)
Value – Energy Efficiency “The best performing building in a multifamily new
construction four stories or greater that SWA has ever worked on in that category.” – Steven Winter Associates, Inc. (SWA)
![Page 26: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/26.jpg)
26
Concrete and Sound Intent: To provide workspaces and classrooms that promote occupants’ well-being, productivity, and communications through effective acoustic design.
![Page 27: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/27.jpg)
27
Quiet = Happy Tenants Save You Money • Walls
– STC: 55-70 • Floor
– STC: 50+ – IIC: 50+
![Page 28: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/28.jpg)
28
Wood Prices Keep Going Up…
• Framing lumber composite price is up this week $41 from week ending February 3rd and up $91
year to date.
![Page 29: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/29.jpg)
29
Wood Prices Keep Going Up…
90100110120130140150160170
Producer Price Index Base: 2009 = 100
Softwood Lumber Concrete Products
![Page 30: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/30.jpg)
30
…and the labor market gets tighter
![Page 31: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/31.jpg)
31
…Even When the Unthinkable Happens
• Natural Gas Explosion Next Door • 2 Buildings Collapse • 8 People Killed • 70 People Injured
• 100 Families Displaced 2013 2015
March 12, 2014
![Page 32: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/32.jpg)
32
…there’s still more trouble with wood “I strongly recommend that we slow down and figure out how to build structures that will last, and spend less time on how to build them more cheaply and more quickly. Until then, I (along with other experts and construction litigation attorneys) will enjoy the abundance of work provided by investigating damages associated with typical wood construction practices.” “In summary, mid-rise wood framed buildings may be allowed by the code; however, if we don’t start changing our construction practices to deal with the challenges, we are asking for trouble.”
![Page 33: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/33.jpg)
33
ICFs have a track record of Success
![Page 34: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/34.jpg)
34
ICFs have a track record of Success Lane Miles
Standish Portland, OR
• $8 Million • 25,000 SF Apartments • 5,000 SF Retail/Offices
![Page 35: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/35.jpg)
35
ICFs have a track record of Success
Ricchi Condominium San Antonio, TX
![Page 36: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/36.jpg)
36
ICFs have a track record of Success Bellarmine University
Dormitories Louisville, KY 104,000 SF project Awarded this project based on speed of construction Started: Jan 2007 Completed: July 2007
![Page 37: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/37.jpg)
37
ICFs have a track record of Success Drury Inn
All Locations Hotel Owner and Operator Less Expensive to Operate and More Durable 15 ICF Hotels currently under construction Operates 55 ICF Hotels
![Page 38: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/38.jpg)
38
We can save you money and time
![Page 39: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/39.jpg)
39
Direct Project Promotion – Convert projects to concrete through the
Concrete Design Center
2030 Target
750 Converted
![Page 40: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/40.jpg)
40
![Page 41: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/41.jpg)
www.buildwithstrength.com
![Page 42: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/42.jpg)
42
![Page 43: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/43.jpg)
43
MRc2: Company EPD
![Page 44: Making the Business Case for Concrete - Business Case for... · 8,000 yd3 . 2,000 yd. 3 • We lose 6,000 yd. 3 . per project • We lost 7.3 million yd. 3. in 2016* • $1 Billion](https://reader036.vdocuments.net/reader036/viewer/2022081402/605437dadd91ea3cc464c555/html5/thumbnails/44.jpg)
Who Do You Know?